Loading...
HomeMy WebLinkAboutSW8051127_CURRENT PERMIT_20051215STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�L�� DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �o�ZIS� YYYYMMDD i �OF W ATF9Q Michael F Easley, Governor p G William G Ross, Jr, Secretary r North Carolina Department of Environment and Natural Resources Alan W Klimek, P E Director Division of Water Quality December 15, 2005 Mr John O Stevenson, President Stevenson Cars, Inc 821 South College Road Wilmington, NC 28403 Subject Stormwater Permit No SW8 051127 Stevenson Honda & Acura Addition High Density Project New Hanover County Dear Mr Stevenson The Wilmington Regional Office received a complete Stormwater Management Permit Application for Stevenson Honda & Acura Addition on December 9, 2005 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 051127 dated December 15, 2005, for the construction of the subject project This permit shall be effective from the date of issuance until December 15, 2015, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the Stormwater management system will result in future compliance problems If any parts, requirements, or limitations'contained in this permit are unacceptable, you have the right to request an adludicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Robert Gordon, or me at (910) 796-7215 Sinc rety, Edward Beck Regional Supervisor Surface Water Protection Section ENBlydg S IWQSISTORMWATIPERMIT1051127 dec05 cc David Hollis, PE, Hanover Design Services Tony Roberts, New Hanover County Building Inspections City of Wilmington Stormwater Services Beth E Wetherill, New Hanover County Engineering Robert Gordon Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer 5erv�cel 877 623 6748 One Wilmington Regional Office Wilmington NC 28405 3845 FAX (910) 350 2044 Internet h2o enrstate nc us N_ orthCarol na An Equal Opportunity/Affirmative Action Employer - 50% Recycled110% Post Consumer Paper � j�laturall State Stormwater Management Systems Permit No SW8 051127 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr John O Stevenson & Stevenson Cars, Inc Stevenson Honda & Acura Addition 821 South College Rd - New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until December 15, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 203,500 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans The built -upon area for the future development is limited to 30,000 square feet 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 051127 6 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, acres 59 Onsite, ft 259,530 Offsite, ft2 0 b Total Impervious Surfaces, ft2 203,500 c Design Storm, inches 1 d Pond Depth, feet 75 e TSS removal efficiency 90% f Permanent Pool Elevation, FMSL 362 g Permanent Pool Surface Area, ft2 7,800 h Permitted Storage Volume, ft3 20,010 i Temporary Storage Elevation, FMSL 380 1 Controlling Orifice 1 5"0 pipe k Permitted Forebay Volume, ft3 3,730 1 Receiving Stream/River Basin Burnt Mill Cr 1 Cape Fear m Stream Index Number 18-74-63-2 n Classification of Water Body "C,Sw" 11 SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowinq and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times Page 3 of 7 State Stormwater Management Systems Permit No SW8 051127 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is 118 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 State Stormwater Management Systems Permit No SW8 051127 13 The Director may notify the permfttee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permfttee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permfttee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permfttee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permfttee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permfttee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permfttee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 151h day of December, 2005 NORTH,CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION � y for Alan Klimek, P E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No SW8 051127 Stevenson Honda & Acura Addition Stormwater Permit No SW8 051127 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No SW8 051127 Certification Requirements .1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7 o� wArFR Michael F Easley Governor J1.1� P �O G William G Ross, Jr Secretary r North Carolina Department of Environment and Natural Resources fl r Alan W Klimek P E Director Division of Water Quality December 15, 2005 Mr .John O Stevenson, President Stevenson Cars, Inc 821 South College Road Wilmington, NC 28403 Subject Stormwater Permit No SW8 051127 Stevenson Honda & Acura Addition High Density Project New Hanover County Dear Mr Stevenson The Wilmington Regional Office received a complete Stormwater Management Permit Application for Stevenson Honda & Acura Addition on December 9, 2005 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 051127 dated December 15, 2005, for the construction of the subject project This permit shall be effective from the date of issuance until December 15, 2015, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the Stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding If you have any questions, or need additional information concerning this matter, please contact Robert Gordon, or me at (910) 796-7215 Sincerety, Edward Beck Regional Supervisor Surface Water Protection Section ENB/rdg S 1WQSISTORMWATIPERMIT1051127 dec05 cc David Hollis, PE, Hanover Design Services Tony Roberts, New Hanover County Building Inspections City of Wilmington Stormwater Services Beth E Wethenll, New Hanover County Engineering Robert Gordon Wilmington Regional Office Central Files North Carolina Divisien of Water Quality 127 Cardinal Drive Extension Phone (910) 796 7215 Customer 5ervicel 877 623 6748 Wilmington Regional office Wilmington NC 28405 3845 FAX (910) 350 2004 Internet h2o enr state nc us One NorthCai ohna An Equal opportunity)Affirmalive Action Employer — 50% Recycled110% Post Consumer Paper Nafumlly State Stormwater Management Systems , Permit No SW$ 051127 j STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr John O Stevenson & Stevenson Cars, Inc Stevenson Honda & Acura Addition 821 South College Rd - New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until December 15, 2015, and shall be subject to the following specified conditions and limitations I DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 203,500 square feet of impervious area 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans The built -upon area for the future development is limited to 30,000 square feet 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 7 State Stormwater Management Systems Permit No SW8 051127 6 The following design criteria have been provided in the wet detention pond and must be maintained at design condition a Drainage Area, Acres 59 Onsite, ft 259,530 Offsite, ft2 0 b Total Impervious Surfaces, ft2 203,500 c Design Storm, inches 1 d Pond Depth, feet 7 5 e TSS removal efficiency 90% f Permanent Pool Elevation, FMSL 362 g Permanent Pool Surface Area, ft2 7,800 h Permitted Storage Volume, W 20,010 1 Temporary Storage Elevation, FMSL 380 i Controlling Orifice 1 5"0 pipe k Permitted Forebay Volume, W 31730 1 Receiving Stream/River Basin Burnt Mill Cr / Cape Fear m Stream Index Number 18-74-63-2 n Classification of Water Body "C,Sw" II SCHEDULE OF COMPLIANCE 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping g Access to the outlet structure must be available at all times Page 3 of 7 State Stormwater Management Systems Permit No SW8 051127 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria a The fountain must draw its water from less than 2' below the permanent pool surface b Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond c The falling water from the fountain must be centered in the pond, away from the shoreline d The maximum horsepower for a fountain in this pond is 1/8 horsepower 6 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility 9 Access to the stormwater facilities shall be maintained via appropriate easements at all times 10 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Protect name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The protect area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 11 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 12 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction Page 4 of 7 V, State Stormwater Management Systems Permit No SW 8 051127 13 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made Ili GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its meats and may or may not be approved The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued this the 151h day of December, 2005 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION M1 � for Alan W Klimek, P E , Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems , Permit No SW8 051127 • Stevenson Honda & Acura Addition Stormwater Permit No SW8 051127 New Hanover County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number Date SEAL Page 6 of 7 L . , State Stormwater Management Systems Permit No SW8 051127 Certification Requirements ,1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the project is graded such that the runoff drains to the system 4 All roof drains are located such that the runoff is directed into the system 5 The outlet/bypass structure elevations are per the approved plan 6 The outlet structure is located per the approved plans 7 Trash rack is provided on the outlet/bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 Required drawdown devices are correctly sized per the approved plans 13 All required design depths are provided 14 All required parts of the system are provided, such as a vegetated shelf, and a forebay 15 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7 OFFICE USE ONLY � Date R cery d Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I GENERAL INFORMATION 1 Applicants name (specify the name of the corporation, individual etc who owns the project) sGvL 42b.JJ5 . I VLC— . 2 Print Owner/Signing Officials name and title (person legally responsible for facility and compliance) 3 Mailing Address for person listed in item 2 above City State Zip Zg4_01B Telephone Number ( g C n ) 3(JS — i 4 Project Name (subdivision, facility or establishment name - should be consistent with project name on plans, specifications letters operation and maintenance agreements etc) 5 Location of Project (street address) city Allf ?�V3 County _&nw__ A29LO 6 Directions to project (from nearest major intersection) V'A t lt=_� of LOA (2+e-- I `r)cs. Cry[ ::)- ( t-3 2�) At-> C-)ttsf., tv,#—> , Cek- t V' €, Vs eC)6-0'-' 7 Latitude .39,0/3, Longitude Z76,53 ) of project 8 Contact person who can answer questions about the project Name BC—+- LV=' 6.r--, 11 _ Telephone Number (9(Q ) 39S — i j (2p II PERMIT INFORMATION 1 Specify whether project is (check one) New Renewal i.� Modification Form SWU-101 Version 3 99 Page I of 2 If this application is being submitted as the result of a renewal or modification to an existing permit list the existing permit number t,&�1, Ll A=.& i VL and its issue date (if known) cL<At -�-r vu 41-r� 0 t :5 -Cci I t �., b L&:!c- 3 Specify the type of project (check one) Low Density IHigh Density Redevelop General Permit Other Additional Project Requirements (check applicable blanks) _CAMA Major ',Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION 1 In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project 2 Stormwater runoff from this project drains to the�'� River basin 3 Total Project Area _ JS!!Z� acres 4 Project Built Upon Area —7E) % 5 How many drainage areas does the project have? D YLe�_ 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below Basin Information `I ` ' ' , i , A, � i v z" 1, 5+" 1 h 4' <k3 ' Drainage'Area 1 -` ` ° i « , r" i" _ , '_ Drainage Area 2 C +a as i Receiving Stream Name >���� Mt ( I Ga Receiving Stream Class C Drainage Area Q_CS Existing Impervious* Area 'a, 8 0LC_Lrf_=> S Proposed Impervious*Area Cp;7 CxL)e % Impervious* Area (total) -79C720 �' *` "' "i r � Impervious ,Surface Area, , r ` , ' Drainage`Area 1 ��,` `° . i' ;,'art ,' ' '' r t Drainage Area 2 On -site Buildings =© On -site Streets On -site Parking i M GOO 13 On -site Sidewalks Other on -site Off -site Total +�� 3 '^� SP Total * Impervious area is defined as the built upon area including but not limited to buildings, roads, parking areas sidewalks gravel areas, etc 6;7 azLLes Form SWU-101 Version 3 99 Page 2 of 4 7 How was the off -site impervious area listed above derived?, IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment 1 The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State Z No more than 'ZO square feet of any lot shall he covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools 3 Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings 4 Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above that the covenants will be binding on all parties and persons claiming under them, that they will run with the land that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items listed below The complete application package should be submitted to the appropriate DWQ Regional Office 1 Please indicate that you have provided the following required information by initialing in the space provided next to each item Initials • Original and one copy of the Stormwater Management Permit Application Form DS kA • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of Stormwater treatment/management • Two copies of plans and specifications including - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours proposed contours spot elevations, finished floor elevations Details of roads drainage features, collection systems, and stormwater control measures - Wetlands delineated or a note on plans that none exist - Existing drainage (including off -site), drainage easements pipe sizes, runoff calculations - Drainage areas delineated Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section U Ccn_u ui <Zpw � iCIS s P�—, T>LS Designated agent (individual or firm) Pl� Mailing Address City r LJLD % `ryt V"Jz+3 V k State �iC _ Zip �cS40 Phone - 7 fc _) 34?�-- !Z, Fax (g C) ) 54-3 - 2)g4-1 VIII APPLICANT'S CERTIFICATION I (print or type name of person listed in General Information item 2) -.J 0 (-LL L- d, �_1✓+-SQL certify that the information included on this ermit application form is, to the best of my knowledge correct and that the project will be constructed i/co Orman with the approved plans that the required deed restrictions and protective covenants will ec nd t he proposed project complies with the requirements of 1SA NCAC 2H 1000 Signature tom-MSLdQ-L,- - �-�i.�c�--sue Date_ 1b `U -05 Form SWU-101 Version 3 99 Page 4 of 4 Permit No 5 t'`' i-Os 1 12 -7� (to he provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET bETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes an apphcation form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details I PROJECT INFORMATION Project Name AC.LA_VCZt Contact Person _I�czf _� &JCL en,, Phone Number For projects with multiple basins, specify which basin this worksheet applies to iQA elevations Basin Bottom Elevation e E!g —77 ft Permanent Pool Elevation 5co, Z ft Temporary Pool Elevation 36 . 0 ft areas Permanent Pool Surface Area —7 CJV 0 sq ft Drainage Area ac Impervious Area ,G-7 ac (floor of the basin) (elevation of the orifice) (elevation of the discharge structure overflow) (water surface area at the orifice elevation) (on -site and off -site drainage to the basin) (on -site and off -site drainage to the basin) volumes Permanent Pool Volume t g Gb_C] cu ft (combined volume of main basin and forebay) Temporary Pool Volume ?�r d Q cu ft (volume detained above the permanent pool) Forebay Volume 3 7 © cu ft (approximately 20% of total volume) Other parameters SA/DAI (surface area to drainage area ratio from DWQ table) Diameter of Orifice (--- %, _ in (2 to 5 day temporary pool draw -down required) Design Rainfall in Design TSS Removal 2 _ _.9'n % (minimum 85% required) Form SWU-102 Rev 3 99 Page 1 of 4 Footnotes When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth Linear interpolation should be employed to determine the correct value for non- standard table entries In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal II REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below If a requirement has not been met, attach justification. Applicants Initials a The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet) � W _ — b The forebay volume is approximately equal to 20% of the basin volume l-]S i-( c The temporary pool controls runoff from the design storm event d The temporary pool draws down in 2 to 5 days 6.i(a_ _ e If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) (-{ f The basin length to width ratio is greater than 3 1 g The basin side slopes above the permanent pool are no steeper than 3 1 C--( h A submerged and vegetated perimeter shelf with a slope of 6 1 or less (show detail) i Vegetative cover above the permanent pool elevation is specified j A trash rack or similar device is provided for both the overflow and orifice k A recorded drainage easement is provided for each basin including access to nearest right- of-way _� 6k _ 1 If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin D5 14 in A mechanism is specified which will drain the basin for maintenance or an emergency III WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided This system (check one) 0 does YYd s not This system (check one) 0 does oes not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay Form SWU-102 Rev 3 99 Page 2 of 4 Maintenance activities shall be performed as follows After every significant runoff producing rainfall event and at least monthly a Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition b Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed 2 Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed 3 Inspect and repair the collection system (i a catch basins, piping, swales, riprap, etc ) quarterly to maintain proper functioning 4 Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below) Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i e stockpiling near a wet detention basin or stream, etc ) The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the permanent pool depth reads J��6� feet in the main pond, the sediment shall be removed r When the permanent pool depth reads 5 feet in the forebay, the sediment shall be removed BASIN DIAGRAM (11l1 to the blanks) Permanent Pool Elevation 2(4i 2, Sediment Re oval El �2 75 ° ----------------- - Sediment Removal Elevation � � 75% Bottom Ele ahon_G - %------------------------------------------- ---- Bottom Elevation, 25% FOREBAY MAIN POND 5 Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface These plants shall be encouraged to grow along the vegetated shelf and forebay berm 6 If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency dram shall be minimized to the maximum extent practical Form SWU-102 Rev 3 99 Page 3 of 4 7 All components of the wet detention basin system shall be maintained in good working order I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above I agree to notify DWQ of any problems with the system or pnor to any changes to the system or responsible party Print name -Jckt-1 Q. Title yt.0 Addre: Phone S ignati Date Note The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president I, - -�, C.: C� ;. , a Notary Public for the State of NO(iV% Card r'r" County of 2 n tea { _,do hereby certify that personally appeared before me this aU day of _ jo c3 5- _ , 1pa s , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements Witness my hand and official seal, ,�--w-�- SEAL My commission expires �a ` —I-G- ra (a _ ^ FormSWU-lot Rev 3 99 Page 4 of