Loading...
HomeMy WebLinkAboutSW8050852_HISTORICAL FILE_20050928 (2)STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD State Stormwater Management Systems Permit No. SW8 050852 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Mr. James D. Rowe & JRW Partners, LLC Dollar General - Atkinson The intersection of Hwy. 53 & Whitehouse Ave., Atkinson - Pender County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file.with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until September 28, 2015, and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 41164 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. There is no additional impervious surface available for future development in this permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans: 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 f State Stormwater Management Systems Permit No. SW8 050852 6. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 1.64 Onsite, ft : 71438 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 41164 C. Design Storm, inches: . 1 d. Pond Depth, feet: 3.5 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 60.5 g. Permanent Pool Surface Area, ft2: 8184 h. Permitted Storage Volume, ft3: 5590 i. Temporary Storage Elevation, FMSL: 61.15 j. Controlling Orifice: 1 "0 pipe k. Permitted Forebay Volume, ft3: 3537 I. Receiving Stream/River Basin: Mill Branch 1 Cape Fear M. Stream Index Number: 18-68-18-10 n. Classification of Water Body: "C;Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater, management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be.followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 050852 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 1/8 horsepower. 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 12. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 050852 13, The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North. Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The . filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 28th day of September, 2005. NORTH ROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 050852 Dollar General - Atkinson Stormwater Permit No. SW8 050852 Pender County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAT_ Page 6 of 7 State Stormwater Management Systems Permit No. SW8 050852 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. .10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. .13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc:. NCDENR-DWQ Regional Office Warren Holt, Pender County Building Inspections Page 7 of 7 Page 1 of t ,v36509SZ North Carolina Flame F. Marshall DEPAR 1 MENT OF THE Secretary SECRETARY OF STATE Corporations °Corporations Home •Important Notice •Corporate Forms/Fees *Corporations FAQ *Tobacco Manufacturers *Dissolution Reports ONon-Profit Reports *Verity Certification aOnline Annual Reports Links *Secretary Of State Home aRegister for E-Procurement *Dept. of Revenue Legislation 41999 Senate Bills �2001 Bill Summaries •Annual Reports 1997 $Corporations 1997 *Other Legislation Search "By Corporate Name *For New Corporation "By Registered Agent Online Orders loStart An Order "New Payment Procedures Contact Us •Corporations Division OSecretary of State's web site Print QPrintable Page PO Box 29622 Raleigh, NC 27626-0622 (919j807-2000 Date: 9/13/2005 Click here to: View Document Filings 1 t=)Print apre-populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC JRW Partners, LLC Legal Limited Liability Company Information SOSID: 0779859 FiD: Status: Current -Active Date Formed: 4/29/2005 Citizenship: Domestic State of Inc.: NC Duration: 12-31-2055 Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address: Principal Mailing Address: Rowe, James Donald 781 South Us Highway Bypass Burgaw NC 28425 PO Box 1456 Burgaw NC 28425 781 South Us Highway Bypass Burgaw NC 28425 PO Box 1456 Burgaw NC 28425 For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster, http://www.secretary.state.tic.us/Corporations/Corp.aspx?Pitemld=7734202 9/13/2005 To: Robert Gordon Environmental Engineer II From: Justin Bishop, E.I. Malpass Engineering, P.C. Re: DWQ Stormwater project Number SW8 050852 Project Name: Dollar General — Atkinson I have clarified what the "other on -site" impervious area is in the application, provided seeding requirements on the plan, and provided areas below the permanent pool on calculation page. Clifton L. Moore, Jr. (Retired) Robert C. Kenna. Jr. TO DATE FAX NO MOORE & KENAN ATTORNEYS AT LAW 211 EAST FREMONT STREET BURGAW, NORTH CAROLINA 28425 EMAIL Itenanlaw bellsouth.net TELEPHONE (910) 259-9800 FACSIMILE (910) 259-7006 FACSMLE TRANSMITTAL SHEET Robert Gordon w/Division of Water Quality Monday, September 12, 2005 350-2004 REF: JRW Partners, LLC ' FROM: Robert C. Kenan, Jr. NUMBER OF PAGES TO FOLLOW THIS COVER SHEET: 1 F,f MAILING ADDRESS: P.O. Sox 957 Burgaw, N.C. 29425 r � = If you do not receive all of the pages, or if any other problems should occur, ' please telephone at 910- 259-9800; REMARKS: "NOTICE/CAUTION: CONFIDENTIAL AND PRIVILEGED rNFORMATIONO* The information contained in this facsimile message is attorney privileged and confidential information intended only for the use of the individual or entity named above. If the reader of this message is not the intended recipient, you are hereby notified that any dissemination, distribution or copy of this communication in error, please immediately notify us by telephone and return the original message to us at the above address via the U.S. Postal Service. Thank you, Z00/100'd OZS# 21:Li 50OZ/Zi/60 900L 65Z 016 NdNI} OMd IdOXWOAJ Clifton L. Muorc, Jr. (Retired) Robert C. Kennn, Jr. MOORE & KENAN ATTORNEYS AT LAW 211 EAST FREMONT STREET BURGAW, NORTH CAROLINA 28425 EMAIL kenanlawAbellsouth net TELEPHONE (910) 259-9800 FACSIMILE (910) 259-7006 September 12, 2005 VIA FACSIMILE ONLY 910 350-2004 MAILING ADDRESS; P.O. Box 957 Burgaw, N.C. 28425 Robert Gordon Division of Water Quality North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington. North Carolina 28405 d ' Re: JRW Partners, LLC Dear Mr. Gordon: I represent JRW partners, LLC, a North Carolina limited liability.company with Articles of Organization approved by the North! Carolina Secretary of State `on April 29, 2005 Currently, there are three (3) members of the limited liability company who are as follows: Samuel Eugene Jordan, James Donald Rowe and Jody Dean Woodcock. - ' It is my understanding from Mr. Rowe that you need to know the names of the member of the limited liability company in order to evaluate its application for a storm water permit. Should you have any questions regarding the information provided herein or need any additional information regarding the limited liability company,-please:Aomot hesitate to contact me. Respectfully yours, Robert C. Kenan, Jr. . ,, Z00/Z00'd 035# 9Z:Lt GOOZ/Zi/60 900L 69Z 016 NVNI} ONV IdOOH:wOJd P. 1 -FILE -MODE ----� 741 MEMORY TX * * * COMMUNICATION RESULT REPORT ( SEP.13.2005 OPTION REASON FOR ERROR E-3) NONANSWERR LINE FAIL ADDRESS (GROUP) ---------------- 93925203 8:09AM ) TTI RESULT ---------OK - NCDENR WIRO PAGE --------- - P. i- E-2) BUSY E-4) NO FACSIMILE CONNECTION FAX COVER SHEET Date: September 13, 2005 No. of Pages: 1 To: Justin Bishop I From: Robert Gordon Jeff Malpass Express permitting section Company: Malpass Engineering FAX # 910-350-2004 FAX #: 910-392-5203 Phone # 910-796.7303 DWQ Stormwater Project Number: SWa 050852 Project Name; Dollar General - Atkinson MESSAGE: Request for additional information for Dollar General. Because there are only a few items, this will be the only correspondence you receive. The following items are necessary to complete our review. Most of the items below can be handled via fax, but I would prefer to have the seeding info on the drawing. Give me a call if there are any questions. Thanksl • Please clarify what the "other on -site" impervious area is (listed on section III (6) of the application), • Please provide stage storage information for the pond and forebay for elevations below permanent pool (above permanent pool is alreadv FAX COVER SHEET Date: September 13, 2005 No. of Pages: 1 To: Justin Bishop 1 From: Robert Gordon Jeff Malpass Express permitting section Company: Malpass Engineering FAX # 910-350-2004 FAX #: 910-392-5203 Phone # 910-796-7303 DWQ Stormwater Project Number: SW8 050852 Project Name: Dollar General - Atkinson MESSAGE: Request for additional information for Dollar General. Because there are only a few items, this will be the only correspondence you receive. The following items are necessary to complete our review. Most of the items below can be handled via fax, but I would prefer to have the seeding info on the drawing. Give me a call if there are any questions. Thanks! • Please clarify what the "other on -site" impervious area is (listed on section III (6) of the application). • Please provide stage storage information for the pond and forebay for elevations below permanent pool (above permanent pool is already provided) • Please provide basic seeding specifications (I just need to know what type of vegetation will be planted) 06/23/2005 06:30 1910343e214 MALPASS ENGINEERING PAGE 02 'i J 0 �k' P RMENR G North Carolina Department of Environment and Natural Resources Z 127 Cardinal Drive, Wilmington NC 28405 (910) 395-3900 FAX (910) 350-2004 Request for Express permit Review (60 -- FILL-IN all information below and CHECK required Permit(s). FAX or email to Cameron. WeayerAncmail.net along with a narrative and vicinity map of the project location. Projects must be submitted by 9:00 A.M. of the review date, unless prior arrangements are made. APPLICANT Naive Company Address_ FT, 9GK t`456 CitylStateJurl4w NC Zip.-2$J25 County fender Phone q ID - 2a 1, 4 G 57 Fax Email PROJECT Name Dallyr G e.p1 - A1601 _ PROJECT SYSTEM(S) TRIBUTARY TO ; II Br4n c (STREAM NAME) - Coe Fear RIVER BASIN ENGINEERICONSULTANT A4 ss Company a ass I P, C- Address I134 S' k City/State G---Zip 29q 12 County ry r Phone 4 b -3U-M3 Fax UO -M-- 5203 mail State or National Environmental Policy Act (SEPA, NEPA) - EA or EIS Required ❑ Yes J❑ No ❑ STREAM ORIGIN Determination; # of stream calls; Stream Name ❑ STORMWATER ❑ Low Density 0 High Density -Detention Pond ❑ High Density -Other Wetlands MUST be addressed below ❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ off Site ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures information MANAGEMENT ❑ Upland Develupment ❑ Manila Development ❑ Urban Waterfront ----------------------- ... ---...... —------ ------------- ------ ------...._._._.----------------------------------------------_____-- [Z LAND QUALITY (2 Erosion and Sedimentation Control Fan with 6. 37 acres to be disturbed. WETLANDS (401) Wetlands on Property ❑ Yes M No isolated Wetlands on Property ❑ Yes Z No Check all that apply Wetlands Will Be Impacted ❑ Yes ❑ No Weiland Impacts: Acre(s) Wetlands Delineation has been completed ❑ Yes ❑ No ❑ Buffers Impacted: Acrc(s) USA COE Approval of Delineation completed ❑ Yes ❑ No 404 Appliratinn in pmr.Psc wlt1SA(,nE ❑YPS ❑Nn I Permit rer.Pivp.d from USArF ❑Yes ❑No 401 Application required ❑Yes ❑ No If Yes, ❑ Regular ❑ Express Additional fees, not to exceed 50% of the original Express Review permit application fee, may be charged for subsequent reviews due to the insufficiency of the permit applications. For DENP. use only SUDMITTAL DATCG: Fee Split for multiple permits: SW $ CAMA LOS S 401 $ Total Fee Amount $ Fri TI Vill, 71 _J\j ,on 08/23/2005 06:30 19103430214 MALPASS ENGINEERING PAGE 04 To: Cameron Weaver From: Justin Bishop, EI Malpass Engineering, P.C. RE: Dollar General - Atkinson The site is located on the corner of NC HWY 53 & N. Whitehouse Ave, west of N. Whitehouse Ave. The site is 9.0 acres and we are proposing to disturb 6.37 acres. Approximately 0.95 acres will be impervious. The project is commercial. The site is for a Dollar General store. The storm A-ater will be treated in a wet pond. VOI L.7I GUC1.1 CEO. .]IJ 1 71 VJH 71,141 Y IT'"LI-f-+77 7-I'll:'I IYCC ~0°v'EP PAGE _ _ ve r-R 3 N , F�� F' A Y : 3Q — 2c74'f. i TEL: 3 pAGE S] TC FOLLOW U -d I V C d era 1 M �OF NA%Q Michael F. Easley, Governor O G William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality September 7, 2005 Mr. James Donald Rowe, Partner JRW Partners, LLC PO Box 1456 Burgaw, NC 28425 Subject: Request for Stormwater Management Permit Application Dollar General -Atkinson Stormwater Project No. SW8 050852 Pender County Dear Mr. Rowe: On August 30, 2005, the Wilmington Regional Office received a copy of a Letter of Receipt for an Erosion Control Plan Express Review for the subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, 1 completed application form, fee, and supporting documentation, or a written response regarding the status of this project and the expected submittal date must be received in this Office no later than October 7, 2005. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Pro'ect Number above on all correspondence. If you have any questions, please call me at (910-796-7404. Sincerely, Linda Lewis Environmental Engineer ENB/arl: S:IWQSISTORMWATISTORMSUB1050852.sep05 cc: Ren Holt, Pender County Building Inspections Jeff Malpass P.E. Wilmington Regional Office Central Files North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Wilmington Regional Office Wilmington, NC 28405.3845 FAX (910) 350-2004 Internet: www.enr,state.nc.us One NorthCaro/l/ina An Eqval Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper JVaturally AN iU� NCDENR North Carolina Department of Environment and Natural Division of Land Resources James D. Simons, PG, PE Director and State Geologist Land Quality Section RECEIVED A G 3: 0 2005 sW� _ , BY. OAS �%..- Resources Michael F. Easley, Governor William G. Ross Jr., Secretary 8/29/2005 LETTER OF RECEIPT FOR AN EROSION CONTROL PLAN EXPRESS REVIEW JRW Partners, LLC Mr. James Donald Rowe, Partner P.O. Box 1456 Burgaw, NC 28425 RE: Project Name: Dollar General, Express Review Project ID: Pende-2006-065 County: Pender, Atkinson, NC Hwy 53 River Basin: Cape Fear Submitted By: Malpass Engineering Date Received by LQS: August 29, 2005 Plan Type: NEW Dear Mr. Rowe: SS, This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The review period for an express review is three days of receipt of a complete plan. If additional information is requested, it must be submitted within five working days of receipt. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. If you have questions please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, �r.L;A.Z�'Z Carol N. Miller t Assistant Regional Engineer cc: Mr. Jeffery B. Malpass, PE, Malpass Engineering LQS-WiRO; SWS-WiRO Wilmington Regional Office 127 Cardinal Drive'Ext., Wilmington, North Carolina 28405-3845 • Phone: 910-395-39001 FAX: 910-350-2004 /�-k- �N}9y y.Y�>--