Loading...
HomeMy WebLinkAboutSW8050801_COMPLIANCE_20050803STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD� VORTECHS SYSTEM Filename: NET ANNUAL TSS REMOVAL EFFICIENCY Project # SW8 050801 Date Project Name Wilm.Intl.Airport Gen. Aviation Apron Expai Reviewer Recvng Stream Smith Creek Classification Drainage Basin Cape Fear Index # Site Area 3.2 acres Drainage Area Impervious Area Calculation Buildings Parking/Asphalt 151589 Concrete Total, sq ft Volume/Storage Calculation S:\WPDATA\WQS\VORTECHS\050801 03-Aug-05 P.Bartlett C; SW 18-74-63 151589 SF 3.48 ac Rational Cc (list C after each BUA) % Impervious- 100.0% If Rational Method is used, place a 1 in this box 0 Cc: 1.00 RV 0.95 VORTECHS Model No. Selected 7000 Grit Chamber Area, sq ft 50.30 Design Ratio' M Flow Rate Capacity, CIFS 11,0 10 Year 10 Min High Intensity Event 7.26 in/hr RV 0.95 Volume Flow Rate Required Bypass Capacity, 0 13.0 CFS Elevation at B. ass Weir Weir Elie v., ft: 24.8011-ength, 77il L, ft: CD1- 3.301 Rim Elev., ft: Q=CDLH 3/2 H= 0.76 WEIR, WSEL: Weir El, + H=F777T72s,.%Ift Must be < 29.25 Rim Elev. 1", 30-Min Event Volume Flow Rate 2.00 in/hr Operating Rate `. 902Jgpm/sf Rainfall Operating Rate2, 0/.Total Rainfall %Removal %Relative. Intensity, in1hr gpmisf Volume 3 Efflciencv4 Efficiency 0.02 0.59 4.40 98.0 4.3 0.04 1.18 4.80 98.0 4.7 0.06 1.77 5.20 98.0 5.1 0.08 2.36 4.60 97.0 4.5 0.10 2.95 4.00 97.0 3.9 0.12 3.54 3.50 95.8 3.4 0.14 4.13 3.70 94.1 3.5 0.16 4.72 3.50 94.1 3.3 0.18 5.31 3.20 92.6 3.0 0.20 5.90 3.20 92.6 3.0 0.25 7.38 6.20 90.0 5.6 0A5 13,28 18.40 80.3 14.8 0.65 19.18 10-70 70.9 7.6 0.85 25.08 6.80 63.0 4.3 1.00 29.51 6.10 58,2 3.6 1.25 36-89 3.30 503 1.7 1.50 44.27 3.80 41.1 1.6 1.75 51,64 1.70 32.1 0.5 2.00 59.02 1.00 22.1 0.2 2.25 66.40 0.70 17.0 0.1 2.50 73,78 0.80 12,9 0.1 78.5 % Rain Falling at >2.5in/hr or Bypassing Treatment 0A Assumed Removal Efficiency for Bypassed Flows, % 0.0 Removal Efficiency Adjustment , % 6.8 Net Annual TSS Removal Efficiency, Required Net Annual TSS Removal Efficiency, % fC4,, 6 &_�4 Notes: V (,h 7 o ry 'Design Ratio= (Tot. Drain. Area) x (Runoff Coefficient) x (cfs to gpm conversion)/Grit Chamber Area `Operating Rate, gpm/sf = Intensity, in/hr x Design Ratio v 1.: 0 0 -,7P) 'Based on 10 years of rainfall data from NCDC Station 9457, Wilmington WSO Airport, New Hanover County. NC "Based on Vorlechnics laboratory verified removal of 50 micron particle gradation (Ref,: Technical Bulletin #11) 'Reduction due to use of 60-minute data for a site that has a time of concentration less than 30-minutes.