Loading...
HomeMy WebLinkAboutSW8050101_CURRENT PERMIT_20050126STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW w� l�l DOC TYPECURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE o�Cd/75Or:%b YYYYMMDD �oF WATtR Michael F. Easley, Governor `p G William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality January 26, 2005 Mr. Michael Newton, President Somersett Development, Inc. 5600 Maxwell Place Wilmington, NC 28409 Subject: Stormwater Permit No. SW8 050101 Somersett Place High Density Subdivision Project New Hanover County Dear Mr. Newton: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Somersett Place on January 18, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 050101, dated January 26, 2005, for the construction of the project, Somersett Place. This permit shall be effective from the date of issuance until January 26, 2015, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 395-3900. Sincerel , Ed Beck Acting Regional Supervisor Surface Water Protection Section ENB/arl: S:1WQSISTORMWATIPERMIT1050101.jan05 cc: Phil Tripp, P.E., Tripp Engineering Tony Roberts, New Hanover County Inspections Division of Coastal Management Kent Harrell, P.E., City of Wilmington Development Services Beth E. Wetherill, New Hanover County Engineering Linda Lewis tWilmington-Regional-Offi ee Central Files North Carolina Divisicn of Water Quality 127 Cardinal Drive Extension Phone (910) 395-3900 Customer Services-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet: h2o.enr.state.nc.us An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper One NorthCarolina Natura!!Y State Stormwater Management Systems Permit No. SW8 050101 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES -DIVISION-OF WATER QUALITY__ -- STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Michael Newton & Somersett Development, Inc. Somersett Place Pine Grove Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "storm water rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 26, 2015 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The subdivision is permitted for 31 lots, each allowed 3,250 square feet of built -upon area. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 2 of 8 State Stormwater Management Systems Permit No. SW8 050101 5. The following design elements have been permitted for this infiltration basin stormwater facility, and must be provided in the system at all times. Basin #1 Basin #2 __ a. `-Drainage Area, acres: - �— - — 1.46 5.69 Onsite, ft2: 59,097 247,856 Offsite, ft2: 4,500 0 b. Total Impervious Surfaces, ft2: 31,590 112,674 Lots at 3,250 ft2: 16,250 84,500 Roads/Parking, ft2: 7,793 20,520 Other, ft2: 3,047 7,654 Offsite, ft2: 4,500 (Pine Grove) 0 c. Basin Depth, feet: 2.25 4.5 d. Design Storm: 3.5" 2.5" e. Bottom Elevation, FMSL: 20.5 19.0 f Permitted Surface Area @Bottom, ft2: 3,415 3,760 g. Permitted Storage Volume, fta: 9,516 26,944 h. Storage/Bypass Elevation, FMSL: 22.75 23.5 i. Type of Soil: Fine - medium sand j. Expected Infiltration Rate, in/hr: 7.0 33.0 k. Time to Draw Down, hours: 5 3 I. Receiving Stream 1 River Basin: Hewletts Creek / Cape Fear m. Stream Index Number: CFP24 18-87-26 n. Classification of Water Body: "SA" II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot, including driveways and sidewalks, does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 3 of 8 State Stormwater Management Systems Permit No. SW8 C50101 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 7. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater . system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 9. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur.at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 10. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 4 of 8 State Stormwater Management Systems Permit No. SW8 050101 11. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. -_12.- --Prior-to-transfer-of the -permit ;'the"stormwatEr'facilities Will be inspected by DWQ -_T personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 13. Prior to the safe of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 050101, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division . of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot is 3,250 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. h. Alf runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. 14. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 15. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Page 5 of 8 State Stormwater Management Systems Permit No. SW8 050101 Ill. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and ____-----approval_by the_.Director._ln_the event there_ is_either_a_desire for the.facilities_to—.__.__—__ change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 9. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Permit issued this the 26th day of January 2005. NORTJa CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan . Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 8 State Stormwater Management Systems Permit No. SW8 050101 Somersett Place Stormwater Permit No. SW8 050101 New Hanover County,. -----.---._._.-.-------- Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 7 of 8 State Stormwater Management Systems Permit No, SW8 050101 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such;as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 8 of 8 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Somersett Development Inc. 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Michael Newton President 3. Mailing Address for person listed in item 2 above: 5600 Maxwell Place City: Wilmin ton State: NC Zip: 28409 Telephone Number: 4. Project Name (subdivision, facility, or establishment name— should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Somersett Place 5. Location of Project (street address): Somersett Lane City: Wilmington County: New Hanover 6. Directions to project (from nearest major intersection): From the intersection of NC 132 and NC 76, travel east on 76 to Pine Grove Drive. Turn right on Pine Grove for approx. 4,000 If. Somersett Lane is on the Left. 7. Latitude : N 34" 00' 00" Longitude: W 770 00' 00" of project 8. Contact person who can answer questions about the project: Name: Charles Cazier Telephone Number: 910-763-5100 I1. PERMIT INFORMATION: 1. Specify whether project is (check one): X New Renewal Modification Form SWU-101 Version 3.99 Page] of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list The existing permit number NA and its issue date (if known) 3. Specify the type of project (check one): Low Density X High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major _X Sedimentation/Erosion Control 404H401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. site is treated with two open infiltration basins 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Project Area: 6.98 acres 5. How many drainage basins does the project have? 2 4. Project Built Upon Area: 45.97 %. 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. BasinInformatton I ., �. Overall ..... .. ..: , ... Draina e Basin I ? g . 'Dratnag; Basui.2 � Receiving Stream Name Hewlett's Creek Hewlett's Creek Hewlett's Creek Receiving Stream Class SA SA SA Drainage Basin Area 7.15 ac 1.46 ac 5.69 ac Existing Impervious * Area - - - Proposed Impervious * Area 3.31 ac 0.73 ac 2.59 ac % Impervious* Area (total) 46.32% 49.67% 45.46% Impervious *Surface Area ,��... ...r., Overall �.._. Drainage Basin 1 "Drainage Basin 2 On -site Buildings 31 lots a 3,250 sf 100,750 sf 16,250 sf 84,500 sf On -site Streets 28,313 sf 7,793 sf 20,520 sf On -site Parking - - - On -site Sidewalks 10,701 sf 3,047 sf 7,654 sf Other on -site - - - Off -site 4,500 sf 4,500 sf - Total: Z=144,264 sf E=31,590 sf E=112,674 sf * Impervious area is defined cis the built upon area including, but not limited to, buildings, roads, parking areas sidewalks, gravel areas, etc. Form SWU-101 Version 399 Page 2 of 4 How was the off -site impervious area listed above derived? From eXiStinV surveyed road area in Pinc Grove Drive IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state slornnvaler management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than 3,250 square feel of rnry lot shall be covered by su uctures of impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include mood decking or the water surface ofsivinuning pools 3. Sivales shall not be f lled in, piped or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stornm ater management pernut modification prior to construction. 5. All permitted runofffrom outparcels orfuture development shall be directed into the pei•mitted.stormwcrter control system. These connections to the stornnvater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS 'I'hc applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (910) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. l . Please indicate that you have provided the following required information by initialing in the space provided next to each item. Applicant's Initials • Original and one copy of the Stormwater Management Permit Application Form [lDL • One copy of the applicable Supplement Form(s) for each BMP Celf • Permit application processing fee of $420 (payable to NCDENR) C-M • Detailed narrative description of stormwater treatment/management az • Two copies of plans and specifications, including: Development/Project name - Engineer and firm Legend North arrow Scale - Revision number and date Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and Stormwater control measures - Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) Vli. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): _Tripp Engineering, P.C. Mailing Address: 419 Chestnut Street City: Wilmington _ State: NC Zip: 28401 y Phone: 910 763-5100 VI.II. APPLICANT'S CERTIFICATION Fax: (910)_ 763-5631 1, (print or type name of person listed in General Information, item 2) Michael Newton , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1.1000. / /7 /1 a Signature: Date: Form SWU-101 Version 3.99 Page 4 of