Loading...
HomeMy WebLinkAboutSW8050101_COMPLIANCE_20050126STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE �v�%�o YYYYMMDD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v DOC TYPE ❑ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD Permit No. 5%U JO So o (to be provided by UWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: Place Contact Person: Charles D. Cazier. Phone Number: (910) 763-5100_ This worksheet applies to : Basin No. I in Drainage Area i (as identified on plans) (from Form SiYU-101) 11. DESIGN INFORMATION — Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate S14WT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation Form SWU-103 Rev 3.99 Fine to Med. Sand 7.0 _CD r ef/hr/sf (circle appropriate units) 18.5 fmsl (Seasonal High Water Table elevation) inch (1.5 inch event for SA waters, 1 inch event for others) 3 951 c.f. 3.86 days hours 53.4 ft. x 64 9 516 c.f. 20.5 fmsl 22.75 fmsl 23.25 fmsl Page] of 3 ft, = 3,415 sq. ft. (bottom dimensions) Ill. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials 9::W a. System is located 50 feet from class SA waters and 30 feet from other.surface waters. CDC _ b. System is located at least 100 feet from water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. d. Bottom of system is 3 feet above any bedrock or impervious soil horizon. e. System is not sited on or in fill material or DWQ approval has been obtained f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. G� g. Drainage area for the device is less than 5 acres. h.. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. I. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters). Design volume and infiltration calculations attached. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. GAG k. All side slopes stabilized with vegetated cover are no steeper than 3:1(H:V).2:1 & sodded I. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within basin is provided. r� p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. q. Runoff in excess of design volume bypasses off-line systems (bypass detail provided). r . System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. Cr, s. Plans ensure that the installed system sill meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly, inspect the infiltration system for erosion, trash accumulation, grass cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner That will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads .75 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .l 000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Michael Newton President Address: 5600 Maxwell Place Wilmington, NC 28409 Phone: 910-520-7230 ., Date: 9 r 2 fr cam¢ Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Della C. Baird -,a Notary Public for the State of North Carolina , County of Pender , do hereby certify that Michael Newton personally appeared before me thisZL day of _September_, _2004_, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL = No Aqy �2: AUBLIG r',,' Form SWU-103 Rev 3.99 i%'l,r11r0U'�l"o\�� My commission expires October 15 2006 Page 3 of 3 Permit No. SWFOSMI (to be provided by DIVA) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWO Storm_water Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. 1. PROJECT INFORMATION Project Name: 191 Contact Person: Charles D. Cazier Phone Number: (910) 763-5100 This worksheet applies to : Basin No. 2 in Drainage Area 2 (as identified on plans) (from Form SPVU-101) I1. DESIGN INFORMATION — Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Fine to Med. Sand Infiltration Rate 33 in/hr r ef/hr/sf (circle appropriate units) SHWT Elevation 16.5 fmsl (Seasonal High Water Table elevation) Basin Design Parameters Design Storm _ 1.5 inch (1.5 inch event for SA waters, I inch event for others) Design Volume I4 225 c.f. Drawdown Time 1.64 -d}s hours Basin Dimensions Basin Size 39 ft. x �129.66_ ft. = 3 760 sq. ft. (bottom dimensions) Basin Volume Provided 26,944 c.f Basin Elevations Bottom Elevation 19.0 fmsl Storage Elevation 23.5 fmsl Top Elevation 24.0 fmsl Form SWU-103 Rev 3.99 Page i of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials GX__ a. System is located 50 feet from class SA waters and 30 feet from other surface waters. CJZ- , . b. System is located at least 100 feet from water supply wells. CZ. c. Bottom of system is at least 2 feet above the seasonal high water table. d. Bottom of system is 3 feet above any bedrock or impervious soil horizon. e. System is not sited on or in fill material or DWQ approval has been obtained C f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. g. Drainage area for the device is less than 5 acres. [IVW h.. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. 1:1,M i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters). Design volume and infiltration calculations attached. GAL' j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. k. All side slopes stabilized with vegetated cover are no steeper than 3:1(H:V).2:1 & sodded �T 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. in. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within basin is provided. p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. (. q. Runoff in excess of design volume bypasses off-line systems (bypass detail provided). r . System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. r�7(� s. Plans ensure that the installed system sill meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of IV. INIF'ILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly, inspect the infiltration system for erosion, trash accumulation, grass cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. I After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner That will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads .75 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Michael Newton President Address: Phone: Signature: Date: V - Zl — 47 Note: The legally responsible party should not be a homeowners association unless more than SO% of the lots have been sold and a resident of the subdivision has been named the president. 1, Della C. Baird , a Notary Public for the State of North Carolina-. County of Pender , do hereby certify that Michaei Newton personally appeared before me this�day of_September , 2004 ,and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, M,,Zd SEAL = 4). C1OTAR .a PUBL\G Form SWU-103 Rev 3.99 '�.,F9 C�1jN��\\ ��f+!!! rl n n t������ My commission expires October 15, 2006 Page 3 of 3 TRIPP . ENGINEERING} P.C. 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 January 11, 2005 NCDENR Division Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Linda Lewis Re: Somersett Place Project No. SW8 050101 TE 04086 Dear Linda: RECEIVED JAN 12 2M DWQ PROJ # In response to your comments dated January 6, 2005, we offer the following: 1. A note that "no wetlands exist on site" has been provided. 2. A copy of the soils report and a site visit investigation report with Vincent Lewis has been documented. 3. A highlighted drainage area map is enclosed. 4. The off site area is highlighted within the highlighted drainage area map. 5. An updated vicinity map is provided. 6. A typical lot grading plan has been provided on the Cl sheet. 7. A new set of deed restrictions are enclosed specifying_1,250 sf. 8. Calculations, applications and supplements for basin No. 1 and basin No. 2 are provided. 9. Calculations, applications and supplements for basin No. 1 and basin No. 2 are provided. 10. Please find enclosed a copy of the Board of Directors sheet with the corporate seal. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. 0" - I Charles D. Cazier, E.I. CDC:dcb Eric. INFILTRATION BASIN ANALYSIS PROJECT NUMBER: 050101-2 PROJECT NAME: Somersett Place DRAINAGE BASIN: Cape Fear River RECEIVING STREAM: Hewletts Creek Index No.: SITE AREA 6.98 acres IMPERVIOUS AREA CALCULATION Lots Street Sidewalk Offsite TOTAL % IMPERVIOUS, I= ELEVATION OF SEASONAL HIGH WATER TABLE REPORTED INFILTRATION RATE SURFACE AREAS AND ELEVATIONS FILENAME: S:IWQSIINBASIN1050101-2.WK1 DATE: 12-Jan-05 REVIEWER: L. Lewis CLASS: SA If ORW, is site within the 575' AEC? DRAINAGE AREA: :<.«247856i SF Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 19 3760 0 TOP 23.5 8215 26943.75 VOLUME I DEPTH 1 DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME :::<><:<2370& CUBIC FEET TOTAL VOLUME AVAILABLE ;.;:.:2643:75 CUBIC FEET DEPTH OF RUNOFF :.f? FEET TIME TO DRAWDOWN ::«:.5' HOURS MUST BE <120 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CiA= 1.02 CFS Qp through the bottom of the basin= 2.87 CFS Must be > Or 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min. event = 11634.75 CF < 26943.75 CF COMMENTS Volume and drawdown are (not) within Design Requirements. INFILTRATION BASIN ANALYSIS PROJECT NUMBER: 050101-1 PROJECT NAME: Somersett Place DRAINAGE BASIN: Cape Fear River RECEIVING STREAM: Hewletts Creek Index No.: SITE AREA 6.98 acres IMPERVIOUS AREA CALCULATION Lots Street Sidewalk Offsite TOTAL FILENAME: S:1WQS11NBASIN1050101-1.WK1 DATE: 12-Jan-05 REVIEWER: L. Lewis CLASS: SA If ORW, is site within the 575' AEC? DRAINAGE AREA: :63597 SF Rational C 16250 0.95 7793 0.95 3047 0.95 4500 0.5 Pine Grove Drive Place a 1" here if Rational :> % IMPERVIOUS, 1= 49 7°!a RV= .05+.009 (I) ELEVATION OF SEASONAL HIGH WATER TABLE 185` FEET MSL REPORTED INFILTRATION RATE >7: INCHES/HOUR or 0.000162 FPS SURFACE AREAS AND ELEVATIONS Elev. (ft) Area, sq ft Inc. Volume Acc. Volume BOTTOM 20.5 3415 TOP 22.75 5044 VOLUME I DEPTH / DRAWDOWN CALCULATION DESIGN STORM, INCHES DESIGN VOLUME TOTAL VOLUME AVAILABLE DEPTH OF RUNOFF TIME TO DRAWDOWN 25 YEAR 24 HOUR STORM NIA Intensity, i = .33 inches 1 hour Qr=CiA= Qp through the bottom of the basin= 10 YEAR 10 MIN HIGH INTENSITY EVENT Intensity, i = 6.3 inches 1 hour Volume for 10 yr. 10 min. event = 0 9516.375 CUBIC FEET CUBIC FEET FEET HOURS MUST BE <120 0.26 CFS 0.55 CFS Must be > Qr 2983.99 CIF < 9516.375 CF COMMENTS Volume and drawdown are (not) within Design Requirements. 1 /11 /2005 CDC WATERSHED DATA Total Drainage Area s . ft. Iacre$ 63,597 1 1,46 Somersett Place Infiltration Basin Not 10-year Storm Impervious Area Land Use s . ft. I acres buildings 16,250 0.37 arkin las halt 7,793 0.18 concrete 3,047 0.07 offsite 4,500 0.10 Total 31,590 0.73 INFILTRATION SYSTEM: Rv= 0.50 inlin Design Rainfall= 1.5 in Volume of first inch and one half of runoff = (Design rainfall) (Rv)(Drainage Area) V= 3,951 cu-ft % impervious = 0.497 = 49.7% say 49.7% CPRE = 0.25 CPOST = (% imp.)(.95)+(1-% imp.)(.25) 0.6 12 = 5.06 inihr 110 = 6.30 inlhr 125 = 7.13 inlhr Total Volume provided: ((Bottom Area + Flood Area)/2) x (Flood Elevation + Bottom Elevation) Area (so Elevation(ft) Vt = 9,516 cu-tt Bottom: 3,415 20.5 Flood: 6,044 22,75 DRAWDOWN RATE: RATE OF INFILTRATION 7 INIHR DEPTH OF BASIN; 27,00 ft DRAW DOWN RATE: 3.85714286 H R S o�X\%h1CARp���,, aQ SEA �'• w -a 17374 f�,AtirF • �Q� r'R G 69A, N`� 1111111I I lillO 04086 RECEIVED JAN 12 2005 DWQ PRoJ # S6V 90 501v1 i 1 /11/2005 CDC WATERSHED DATA Total Draina a Area s . ft. acres 247,B56 5.69 Somersett Place Infiltration Basin No2 10-year Storm Impervious Area Land Use s ,ft. acres buildings 84,500 1.04 arkin las halt 20,520 0.47 concrete 7,654 0.18 Total 112,674 2.59 INFILTRATION SYSTEM: Rv= 0.46 in/in Design Rainfall= 1.5 in Volume of first inch and one half of runoff = (Design rainfall) (R v) (Drainage Area) V= 14,225 cu-ft % impervious = 0.455 = 45.5 % say 45.5% CPRE = 0.25 CPOST = (% imp.)(.95)+(1-% imp.)(.25) 0.57 12 = 5.06 inlhr 110 = 6.30 inlhr 125 = 7.13 inlhr -otal Volume provided: ((Bottom Area + Flood Area)12) x (Flood Elevation + Bottom Elevation) Area (SO Elevation(ft) Vt = 26,944 cu-ft Bottom: 3,760 19.0 Flood., 8,215 23.50 DRAWDOWN RATE: RATE OF INFILTRATION 33 INlHR DEPTH OF BASIN: 54.00 ft DRAW DOWN RATE: 1.63636364 HRS 04086 1/17/2005 CDC WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 1.46 ACRES HYDRAULIC LENGTH 430 FT CHANGE IN HEIGHT 5 FT RUNOFF COEF.'C' 0,25 TIME OF CONCENTR 5.00 MIN INTENSITY 10 YR 7.23 INIHR Somersett Place Stormwater Basin No 1 Routing 10-year Storm Qa = 2.64 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 4.8 INCHES t0yr, 6hr PRECIPITATION CN = 75 S = (10001CN)-10 S = 3.33 Depth (D) = (P-0.2S)A21(P+0.8S) D = 2.29 IN - 10yr, 6hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43.5)(D)(Area)J / Qp Tp = 22.94 MINUTES Storage Volume Req'd = (Qp-Qa)'Tp'1.39`60 = 7,070 cu. ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 20.50 feel AFTER DEVELOPMENT WATERSHED AREA 1,46 ACRES HYDRAULIC LENGTH 430 FT CHANGE IN HEIGHT 5 FT RUNOFF COEF.'C' 0.6 TIME OF CONCENTR 5.00 MIN INTENSITY (10 YR) 7.23 INIHR Qp = 6.33 CFS Qp = POST -DEVELOPED PEAK DISCHARGE \`�,�E11111 111 !l11I1� .;oF�SS%p••. 9 aQ SEAL yam'• y -o t 17374 :a: i//Z OREGORy ��7h!!1 i 11111L11��` S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (cu ft) (ft) (ft) 20,5 3,415 0 0 0 0 0 0 21.5 4,139 3,777 3,777 1,0 8.2367 0 1.02 22.5 4,863 4,501 8,278 2.0 9.0214 0.6931 1.96 23,5 5,587 5,225 13,503 3.0 9.5107 1.0986 2.95 24.5 6,311 5.949 19,452 4.0 9.8757 1.3863 4.00 25.5 7,035 6,673 26,125 5.0 10.1706 1.6094 5,11 26.5 3,518 29,643 6.0 10.2970 1.7918 5,68 27.5 - 29,643 7.0 10.2970 1.9459 5.68 28.5 29,643 8.0 10,2970 2.0794 5.68 Regression Output 04086 Ks = 3698 b = 1.20 RECEIVED Constant 8.22 JAN 18 -2005 DWQ PROD # 0 1/17/2005 Somersett Place 04086 CDC Stormwater Basin No 1 Routing 10-year Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 2.64 cis Qp = 6.33 cis Tp = 22.9 min Calculations account for infiltration dT = 4 min At 7.8 in/hr BASIN DATA Ks = 3698 b = 1.20 Zo = 20.5 ft Normal water elev = 20.5 ft Peak Outflow = 0.00 cfs Box Weir Length = 0 ft Peak Stage = 22.59 ft Cw = 3.0 Maximum Storage = 8,957 cu ft Zcr = 23.25 ft Control Holes: State Orifice: Dia = 0.00 in Dd = 0 in Inv = 20.5 ft Cd = 0.59 Weir: L = 48 in Zi = 20.5 ft Inv = 22.75 ft Time Inflow Storage Stage Outflow W Riser Barrel Orifice City Weir IFStore Infiltrate (min) (cfs) . (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cu ft) (cfm) 0 0,0 0 20.50 0 0 0 0 0.00 0.0 0 4 0.5 0 20.50 0 0.00 0 0 0.00 0.0 148 8 1.7 ill 20.50 0.00 0.00 0.0 0.00 0,00 0.0 296 12 3,4 523 20.54 0.00 0.00 0.0 0.00 0.00 79.3 444 16 5.0 1338 20.76 0.00 0.00 0.0 0.00 0.00 746.2 592 20 6.1 2540 21.05 0.00 0.00 0.0 0.00 0.00 1799,8 740 24 6.3 3999 21.37 0.00 0.00 0.0 0.00 0.00 3110.9 888 28 5.6 5511 21.67 0,00 0.00 0.0 0.00 0.00 4475.0 1036 32 4.5 6856 21.93 0,00 0.00 0.0 0.00 0.00 5672.1 1184 36 3.6 7932 22.12 0.00 0.00 0.0 0.00 0.00 6600.4 1332 40 2.9 8790 22.27 0.00 0.00 0,0 0.00 0.00 7310.4 1480 44 2.3 9474 22.37 0,00 0.00 0.0 0.00 0.00 7846.5 1628 48 1.8 10020 22.45 0.00 0.00 0.0 0.00 0.00 8243.8 1776 52 1.4 10455 22.51 0.00 0.00 0.0 0.00 0.00 8530.5 1924 56 1.2 10801 22.55 0.00 0.00 0.0 0,00 0.00 8729.1 2072 60 0,9 11077 22,57 0.00 0.00 0.0 0.00 0.00 8857.4 2220 64 0.7 11298 22.59 0.00 0.00 0.0 0.00 0.00 8929.6 2368 68 0.6 11473 22.59 0.00 0.00 0.0 0.00 0,00 8967.2 2516 72 0.5 11613 22.59 0.00 0.00 0.0 0.00 0.00 8949.2 2664 76 0.4 11725 22.58 0.00 0.00 0,0 0.00 0.00 8912,8 2812 80 0.3 11814 22.57 0.00 0.00 0.0 0.00 0.00 8853.8 2960 84 0.2 11885 22.56 0.00 0.00 0.0 0.00 0.00 6776.7 3108 88 0.2 11941 22.54 0.00 0.00 0.0 0.00 0.00 8685.3 3256 92 0.1 11986 22.52 0.00 0.00 0.0 0.00 0.00 8582.3 3404 96 0.1 12022 22.50 0.00 0.00 0.0 0.00 0.00 8470.3 3552 100 0.4 12051 22.47 0,00 0.00 0.0 0.00 0.00 8350.9 3700 104 0.1 12074 22.45 0.00 0 00 0.0 0.00 0.00 8225.8 3848 108 0.1 12092 22.42 0.00 0,00 0.0 0.00 0.00 8096.0 3996 112 0.0 12106 22.40 0.00 0.00 0.0 0.00 0.00 7962,5 4144 116 0.0 12118 22.37 0.00 0.00 0.0 0.00 00.00 7826.0 4292 120 0.0 12127 22.34 0.00 0.00 0,0 0.00 0.00 7687.3 4440 124 0.0 12135 22.31 0.00 0.00 0.0 0.00 0.00 7546.6 4588 128 0.0 12140 22.28 0.00 0.00 0.0 0.00 0.00 7404,5 4736 132 0.0 12145 22.26 0.00 0.00 0,0 0.00 0.00 7261.2 4884 136 0.0 12149 22.23 0.00 0.00 0,0 0.00 0.00 7116.9 5032 140 0.0 12152 22.20 0.00 0.00 0.0 0.00 0.00 6971.9 5180 144 0.0 12154 22.17 0,00 0.00 0.0 0.00 0.00 68262 5328 1/17/2005 Somersett Place 04086 CDC Stormwater Basin No 1 Routing 10-year Storm 148 0.0 12156 22.14 0.00 0.00 0.0 0.00 0.00 6680.1 5476 152 0.0 12158 22.11 0.00 0.00 0.0 0.00 0.00 6533.6 5624 156 0.0 12159 22.08 0.00 0.00 0,0 0.00 0.00 6386.8 5772 160 0.0 12160 22.05 0.00 0.00 0.0 0.00 0.00 6239.8 5920 164 0.0 12161 22.02 0.00 0.00 0.0 0.00 0.00 6092.5 6068 168 0.0 12161 21.99 0.00 0,00 0.0 0.00 0.00 5945.2 6216 172 0.0 12162 21.96 0.00 0.00 0.0 0.00 0.00 5797.6 6364 176 0.0 12162 21.92 0.00 0.00 0.0 0.00 0.00 5650.0 6512 180 0.0 12162 21.89 0.00 0.00 0.0 0,00 0.00 5502.3 6660 184 0.0 12163 21.86 0.00 0.00 0.0 0.00 0,00 5354.6 6808 188 0.0 12163 21,83 0,00 0.00 0.0 0.00 0.00 5206.8 6956 192 0.0 12163 21.80 0.00 0.00 0.0 0.00 0.00 5058.9 7104 196 0.0 12163 21.77 0.00 0.00 0.0 0.00 0.00 4911.1 7252 200 0.0 12163 21.74 0.00 0.00 0.0 0.00 0.00 4763.2 7400 204 0.0 12163 21,70 0.00 0.00 0,0 0.00 0.00 4615.2 7548 208 0.0 12163 21.67 0.00 0.00 0.0 0.00 0.00 4467.3 7696 212 0.0 12163 21.64 0.00 0.00 0.0 0.00 0,00 4319.3 7844 216 0.0 12163 21.61 0,0C 0.00 0.0 0.00 0.00 4171.4 7992 220 0.0 12163 21.57 0.00 0.00 0.0 0.00 0.00 4023.4 8140 224 0.0 12163 21,54 0.00 0.00 0 0 0.00 0.00 3875.4 8288 228 0.0 12163 21.51 0.00 0.00 0.0 0.00 0,00 3727.5 8436 232 0.0 12163 21.47 0.00 0.00 0.0 0.00 0.00 3579.5 8584 236 0.0 12163 21.44 0.00 0.00 0,0 0.00 0.00 3431.5 8732 240 0.0 12163 21.41 0.00 0.00 0.0 0,00 0.00 3283.5 8880 244 0.0 12164 21.37 0.00 0.00 0.0 0.00 0.00 3135.5 9028 248 0.0 12164 21.34 0,00 0.00 0.0 0.00 0.00 2987.5 9176 252 0.0 12164 21.30 0.00 0.00 0,0 0.00 0.00 2839.5 9324 255 0.0 12164 21.27 0.00 0.00 0.0 0,00 0.00 2691.5 9472 260 0.0 12164 21.23 0.00 0.00 0.0 0,00 0.00 2543.5 9620 264 0.0 12164 21.20 0.00 0.00 0.0 0.00 0.00 2395.5 9768 268 0.0 12164' 21.16 0.00 0.00 0,0 0.00 0.00 2247.5 9916 272 0.0 , 12164 21 A 2 0.00 0.00 0.0 0.00 0.00 2099.5 10064 276 0.0 12164 21,09 0.00 0.00 0.0 0.00 0.00 1951.5 10212 280 0.0 12164 21.05 0.00 0.00 0.0 O.Oo 0.00 1803.5 10360 284 0.0 12164 21.01 0.00 0.00 0.0 0.00 0.00 1655.5 10508 288 0.0 12164 20.97 0.00 0.00 0,0 0.00 0.00 1507.5 10656 292 0.0 12164 20,93 0.00 0.00 0.0 0,00 0.00 1359.5 10804 296 0.0 12164 20.89 0.00 0,00 00 0.00 0.00 1211.5 10952 300 0.0 12164 20.85 0.00 0.00 0.0 0.00 0.00 1063.5 11100 304 0,0 12164 20.81 0,00 0.00 0.0 0.00 OM 915.5 11248 308 0,0 12164 20.77 0.00 0.00 0.0 0.00 0.00 767.5 11396 312 0.0 12164 20.73 0.00 0,00 0.0 0,00 0.00 619.5 11544 316 0.0 12164 20.68 0.00 0.00 0.0 0.00 0.00 471.5 11692 320 0,0 12164 20,63 0.00 0.00 0.0 OM 0.00 323.5 11840 324 0.0 12164 20.58 0.00 0,00 0.0 0.00 0.00 175.5 11988 328 0.0 12164 20.52 0,00 0.00 0.0 0.00 0.00 27.5 12136 332 0.0 12164 20.50 0,00 0.00 0.0 0.00 0.00 0.0 12284 336 0,0 12164 20,50 0.00 0.00 0.0 0.00 0.00 0.0 12432 340 0.0 12164 20.50 O.CO 0.CO 0.0 0.00 0.00 M 12580 344 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 12728 348 0.0 12164 20.50 0,00 0.00 0.0 0.00 0,00 0,0 12876 352 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 13024 356 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 13172 350 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 13320 364 0.0 12164 20.50 0,00 0.00 0.0 0.00 0,00 0.0 13468 368 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 13616 372 0.0 12164 20.50 0,00 0.00 0.0 0.00 0.00 0.0 13764 376 0.0 12164 20,50 0.00 0.00 0.0 0,00 0.00 0.0 13912 380 0.0 12164 20.50 0.00 OM 0.0 0.00 0.00 0.0 14060 384 0.0 12164 20.50 0,00 MO 0,0 0.00 0.00 0.0 14208 388 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 14356 392 0.0 12164 20.50 0,00 0.00 0.0 0.00 0.00 0.0 14504 396 0,0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0.0 14652 400 0.0 12164 20.50 0.00 0.00 0.0 0.00 0.00 0,0 14800 404 0.0 12164 20.50 0,00 0.00 0,0 0.00 0.00 0.0 14948 408 0.0 12154 20.50 0,00 0.00 0.0 0,00 0.00 0.0 15096