Loading...
HomeMy WebLinkAboutSW8041210_CURRENT PERMIT_20070202STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SWkolD DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v U& DOC TYPE ❑ HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ YYYYMMDD Aw)tW APEMichdel F Easley, Governor iWilliam G Ross Jr, Secretary North Carolina Department of Emironmentand Natural Resources Q-� Alan W Klimek, P E Director Division of Water Quality February 2, 2007 John Norment, President Shoreline at Seagate HOA, Inc C/o Atlantic Rental Management 818 Lorraine Avenue Wilmington, NC 28412 Subject Transfer of Stormwater Permit No SW8 041210 Shoreline at Seagate High Density Project New Hanover County Dear Mr Norment The Wilmington Regional Office received a complete request to transfer the Stormwater Management Permit for Shoreline at Seagate (formerly 313 Greenville Avenue) on January 24, 2007 Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H 1000 We are forwarding Permit No SW8 041210 dated June 29, 2005, for the construction, operation and maintenance of the subject project This permit shall be effective from the date of issuance until June 29, 2015, and shall be subject to the conditions and limitations as specified therein Please pay special attention to the Operation and Maintenance requirements in this permit Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P O Drawer 27447, Raleigh, NC 27611-7447 Unless such demands are made this permit shall be final and binding Please obtain a copy of the approved plan from Mr Penton If you have any questions, or need additional information concerning this matter, please contact Linda Lewis, or me at (910) 796-7215 Sincer �e�L Edward Beck Regional Supervisor Surface Water Protection Section ENBlarl S IWQSISTORMWATERIPERMIT1041210 feb07 cc Howard Penton, 313 Greenville, LLC Howard Resnik, P E , Coastal Site Design Tony Roberts, New Hanover County Building Inspections City of Wilmington Development Services Beth E Wetherill, New Hanover County Engineering Linda Lewis Wilmington Regional Office Central Files NnthCarolma aturally North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796 7215 Customer Service Wilmington Regional Office Internet www newaterqualMv org fax (910) 350 2004 1-877 623 6748 An Equal Opportunity/Affirmative Action Employer — 50% Recycledll0% Posl Consumer Paper State Stormwater Management Systems Permit No SW8 041210 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Shoreline at Seagate Homeowner's Association, Inc Shoreline at Seagate 313 Greenville Avenue, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an infiltration basin in compliance with the provisions of 15A NCAC 2H 1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit This permit shall be effective from the date of issuance until June 29, 2015, and shall be subject to the following specified conditions and limitations I. DESIGN STANDARDS 1 This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data 2 This stormwater system has been approved for the management of stormwater runoff as described in Section 16 on page 3 of this permit The stormwater control has been designed to handle the runoff from 20,025 square feet of impervious area This basin must be operated with a 30' vegetated filter 3 The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans The built -upon area for the future development is limited to 1,000 square feet 4 All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans 5 The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system Page 2 of 5 State Stormwater Management Systems Permit No SW8 041210 6 The following design criteria have been provided in the infiltration basin and must be maintained at design condition a Drainage Area, 9cres Onsite, ft Offsite, ftz b Total Impervious Surfaces, ft� c Design Storm, inches d Basin Depth, feet e Bottom Elevation, FMSI f Bottom Surface Area, ft g Bypass Weir Elevation, FMS� h Permitted Storage Volume, ft i Type of Soil l Expected Infiltration Rate, inlhr k Seasonal High Water Table, FMSL I Time to Draw Down, hours m Receiving Stream/River Basin n Stream Index Number o Classification of Water Body II SCHEDULE OF COMPLIANCE 1 21 52,853 0 20,025 08 170 1,601 178 1,789 Baymeade Fine Sand 12 140 <2 Bradley Creek 1 Cape Fear CPF24 18-87-24-4-(1) "SC HQW #" 1 The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface 2 During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately 3 The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to a Semiannual scheduled inspections (every 6 months) b Sediment removal c Mowing and revegetation of slopes and the vegetated filter d Immediate repair of eroded areas e Maintenance of all slopes in accordance with approved plans and specifications f Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter g A clear access path to the bypass structure must be available at all times 4 Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ The records will indicate the date, activity, name of person performing the work and what actions were taken 5 The facilities shall be constructed as shown on the approved plans This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data 6 If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility Page 3 of 5 State Stormwater Management Systems Permit No SW8 041210 7 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation Any deviations from the approved plans and specifications must be noted on the Certification A modification may be required for those deviations 8 Access to the stormwater facilities shall be maintained via appropriate easements at all times 9 The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below a Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc b Project name change c Transfer of ownership d Redesign or addition to the approved amount of built -upon area or to the drainage area e Further subdivision, acquisition, lease or sale of all or part of the project area The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought f Filling in, altering, or piping of any vegetative conveyance shown on the approved plan 10 The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction 11 A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction 12 The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made III GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate The approval of this request will be considered on its merits and may or may not be approved The permittee is responsible for compliance with all permit conditions until such'time as the Division approves the transfer request 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215 6A to 143-215 6C 3 The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction Page 4 of 5 State Stormwater Management Systems Permit No SW8 041210 4 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems 5 The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility 6 The permit may be modified, revoked and reissued or terminated for cause The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition 7 Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual 8 Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit 9 The permittee shall notify the Division any name, ownership or mailing address changes within 30 days Permit issued thishe 2"d day of February 2007 NO ROLI 1RONMENTAL MANAGEMENT COMMISSION Alan W Klimek,,PDirector Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 5 r Permit No SW8 (X/Z-' O Ito be provided bN DW& State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Mana ement Plan Review A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications Showing all stoririwater conveyances and system details I PROJECT INFORMATION Project Name :31 U i L�r} ✓ fir TMI``lc" �+f c� Contact Person Ze 5,, t , P:� Phone Number -2x ) -7---,)1 -4- !� r This worksheet applies to Basin No I (as identified on plans) in Drainage Area ! (from Form SWU 101) il. DESIGN INFORMATION - Attach supporting calculations/documentation The soils report must be based upon an actual field investigation and soil borings County soil maps are not an acceptable source of sods information All elevations shall be in feet mean sea level (fmsl) Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation ,forage Elevation Top Elevation ! i ✓ _ r cf/hr/sf (circle appropriate units) , fmSI (Seasonal High Water Table elevation) l inch U S inch event for SA waters, 1 inch event for others) c f G, o. days -- ft x — ft = i, - f sq ft (bottom dimensions) c f n V !/ fmsl ► 7 fmsl fmsl I=or n SWU 103 Rev 3 99 Page ] of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N C Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section 15 A NCAC 2H 1008 Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below Attach justification if a requirement has not been met. Applicants Initials a System is located 50 feet from class SA waters and 30 feet from other surface waters b System is Iocated at least 100 feet from water supply wells c Bottom of system is at least 2 feet above the seasonal high water table d Bottom of the system is 3 feet above any bedrock or impervious soil horizon e System is not sited on or in fill material or DWQ approval has been obtained f System is located in a recorded drainage easement for the purposes of operation and (7oLr �6ll�i maintenance and has recorded access easements to the nearest public nght-of-way g Drainage area for the device is less than 5 acres -Ale h Soils have a rrummum hydraulic conductivity of 0 52 inches per hour and soils report is attached .� i System captures and infiltrates the runoff from the first 1 0 inch of rainfall (1 5 inch event for areas draining to SA waters ) Design volume and infiltration calculations attached + J System is sized to take into account the runoff at the ultimate built -out potential from all surfaces drairung to the system, including any off -site drainage Calculations attached k All side slopes stabilized with vegetated cover are no steeper than 3 1 (H V) 1 A pretreatment device such as a catch basin, grease trap, filter step, grassed swale or sediment trap is provided m Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided n Vegetated filter is provided for overflow and detail is shown on plans (Required nummum length is 50 feet for SA waters, 30 feet for other waters) Z-4A. o Flow distribution mechanism within the basin is provided p A benchmark is provided to determine the sediment accumulation in the pretreatment device q Runoff in excess of the design volume bypasses off-line systems (bypass detail provided) r r System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days A soils report and all pertinent draw -down calculations are attached �/` • s Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized Form SWU-103 Rev 3 99 Page 2 of 3 IV INFILTRATION BASIN OPERA'I ION AND MAINTENANCE AGREEMENT 1 After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation vegetative cover, and general condition 2 Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mo", vegetated cover to maintain a maximum height of six inches, and remove trash as needed 3 After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflo.t structures for blockage and deterioration Remove any blockage and repair the structure to approved design specifications 4 Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the onginal design depth The system shall be restored to the original design depth without over -excavating Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (t a stockpiling near a stormwater treatment device or stream, etc ) A benchmark shall be established in the pretreatment unit The benchmark will document the onginal design depth so that accurate sediment accumulation readings can be taken The measuring device used to deterrrune the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments When the design depth reads feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin 5 if the Division determines that the system is failing, the system will immediately be repaired to onginal design specifications If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H 1000 must be designed, approved and constructed I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party Print Name and Title Udress Phone C Signature NO V Date r 7 cr Note The legally resonsible�rarry should nor be a homeowners association urilese more than 50% of the lots have been sold and resident of the subdivision has been named the president ,cam a No�ublic for the State of / +r • (_ County of do Hereby certify that ��n� h ir► personally appeared before me this _ day of _ �^ �s_ G % and acknowledge the due execution of the foraoina infiltration basin maintenance requiremenr�, Witness my hand and official fieal SEAL My commission expires O -2 ! ,lJ,_,..�„Y,� For-m S WU-1 U3 Rev 3 99 Pa-e 3 of 3 OFk10E USE ONLY Date Received Fee Paid Permit Number 11-!/� v ,c- U D �5 L� 0 I L2/ G State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original GENERAL INFORMATION I Applicants name (specify the name of the corporation individual etc who owns the project) Ap,,) 313 �L_(,C. 2 Print Owner//Si/g�ning; OOfficial s name and title (person legally responsible for facility and compliance) (1E I�i1 tcJ[ tt r( /`T1—I s1 ! 4 1" L," Lc..1 a IJ — 3 Mailing Address for person listed in item 2 above City �,'l.�+ln , tom., State N6, Zip 27-0-�0-3 Telephone Number d 4 Project Name (subdivision facility or establishment name should be consistent with project name on plans specifications letters operation and maintenance agreements etc /) 313 6-rce,y `le- Ar"�tile- 5 Location of Project (street address) �nc�'E� n ✓r City County 6 Directions to project (from nearest major intersection) r,., f'1"TYL'Ci`/,��CL1 r7T a�, PrcJez4-!.s a,., 'le-4- apprK� ..� fecr tic( 4s G✓`5ShGvillc /I,.e- , 7 Latitude 3�" 1 L o Longitude 77`',,SZ 30 ' of project 8 Contact person who can answer questions about the pt oject Name 64/ctr-c J , %'- 'I elephone Number (J10 II PERMIT INFORMATION 1 Specify whether project is (check one) \' New Renewal Modification Fonn SWU-101 Version 3 99 Page 1 of If this application is being submitted as the result of a renewal or modification to an existing pernut, list the existing permit number NZA and its issue date (if known) 3 Specify the type of project (check one) Low Density �C, High Density Redevelop General Perrrut 4 Additional Project Requirements (check applicable blanks) Other _CAMA Major XSedimentation/Erosion Contrgl _404/401 Permit _NPDES Stormwater Information on required state perruts can be obtained by contacting the Customer Service Center at 1-877-623-6748 III PROJECT INFORMATION In the space provided below, summarize how stormwater will be treated Also attach a detailed narrative (one to two pages) describing stormwater management for the project 2 Stormwater runoff from this project drains to the _ LC? nc. F"cz f` River basin 3 Total Project Area w I' Z I acres 4 Project Built Upon Area 37.3 % 5 How many drainage areas does the project have? I 6 Complete the following information for each drainage area If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below InforinatsDnf sr$ �' k � 4� kDr"auiage"Arearal;« ° x s M= z iDr`auiage Area 2 < Receiving Stream Name a F cc Receiving Stream Class Drainage Area s 3 st C1,Z1 Existing Impervious* Area j s� O, D Proposed. Im ervious*Area 7 p o L 5- a 46 ac % Ir ervious" Area (total) 3 7, 9 ervrous Stufare Area Drama a Area 1 <Tz 4 �,� g ' Dr"asiiage Aiea 2 ° f On -site Buildings E 39 ,¢ O, 16 On -site Streets .-..� On -site Parking s D, Z On -site Sidewalks 1 3 Other on -site (4, ` rcc are. n O0 0 Off -site Total Zc, oZ: s O 46- a Total Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc Form SWU-101 Version 3 99 Page 2 of 4 7 How was the off -site impervious area listed above derived IV DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot If lot sixes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment I The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality These covenants may not be changed or deleted without the consent of the State 2 No more than ZQ, OZ `- square feet of 5 let -shall be covered by structures or impervious materials Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools 3 Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings 4 Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction 5 All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claimmg under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot V SUPPLEMENT, FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project Contact the Stormwater and General Pernuts Urut at (919) 733-5083 for the status and availability of these forms Form SWU-102 Wet Detention Basm Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3 99 Page 3 of 4 VI SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ) A complete package includes all of the items lasted below The complete application package should be submitted to the appropriate DWQ Regional Office Please indicate that you have provided the following required information by initialing in the space provided next to each item • Original and one copy of the Stormwater Management Perrrut Apphcatjon Form • One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Ongmal contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section r ! Designated agent (individual or firm) _RoW ai-ct �5�n,1.0 �,G Coo, lci i � s 1 to ut__ Mailing Address P, '_ 30X_ 4-c -4-— - City _......._....... Of/Ait? 4 d,I State NG Zip Z�6?4(06 Phone ( 010 ) 791 444- 1 Fax ( 910 ) 79l — 4441 VIII APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) ayi. a rc( /7 , . a� certify that the info on lu d on this permit application form is, to the best of my knowledge, correct and that the project wail a 4ge in conformance with the approved plans, that the required deed restrictions and protective cov n corded, and that the proposed project complies with the requirements of 15A NCAC 2H MOO Signature Date 0 40 • Form SWU-101 Version 3 99 Page 4 of 4 roc watt tiL6Ladi Caticv irwuvar 0 rtm G Ran >z S«n 6 NWM Gmlm• ftxr * at F.1M[ennaAC trtE N�rur� o:rocs Q AW W 1Ciutte , PZ Dwaw Daman rf vXA1 Qv o,tv C OAML T WATER QUALIA SECTION F CURRENT PEWIT INFORMATION: Stomweler Management Permit Number_ as `� .Qq I Zl0 Perm. Halder"s name _ SI S &ZE",16U�C 1. L. L - Signing official's name, -.� Tape , hAa.ltJ.A. Mailing address ordbM wr odtrwp Cee_o �� Stats tf k-ZipCode Phone FAX ? (AMa Coda rind 14 ;Area Coca end MvmW III. NEW OWNER I PROJECT I 140MESS INFORMATION Th7ra UeSt is for. (please check all that apply) Chan a in ownershipof theproperty/companyPlease coin lete Items #2, *3, and #4 below) { P Name change of project (Pfease complete Item #5 below) MaillN address change (Please complete Item 04 below) —d Otl'w (please explain) 2 New owner`s name to be put on permit & 3 New owner's signing offrceal's name and title, o 4 New Mailing Address 1$ Lo UAw E Gty � - State bat_, Z1pCode T�b�2 — Phonk.V_Lo)AX ,hl,4, (AMM Cade ar+d NWW Vv" Coda &W NUMW l New Project Name to be plaoed on permd,'S1 b t.�.-S Arf` SlF 'lf� Page 1 of 2� Z��6 Xux born Gsolutia �r1=iorr of irk h 127 Ca&I' Dim E,tttttsim Wdnv0M NC zW Cwwmu So* -C w Im,n�nonRt�oa�14a1dC laltrntl Far (910)3SN211+ I ,. s�� d ,SS6 2Sb 016 01 woad CO bT 9002-2T-nnr THIS APPLICATION PACKAGE WILL NOT BE ACCEPTED BY THE DIVISION OF WATER QUALITY UNLEU ALL OF THE APPLICABLE ITEM8 LsTED BELOW An INCLUDED WITH THE SUBMITTAL. REQUIRED ITEMS, 1 This completed form. 2 Legal documentation of the transfer of ownership 3 A copy of the recoiled d*d restrttlans, if required by the permit a The designer's oertfication, if requmad l y the permit 5 A signed Operation and Maintenance plan, It a system that requires maintenance will change aMrw"ip 6 Maintenance records CERTIFICATION MW BE COMPLETED AND SIGNED BY THE CURRENT PERMIT HOLDER AND APPLICANT IN THE CASE OF A �E OF OWNERSHIP FOR NAME CHANGES, COMPLETE AND SIGN ONLY THE CURRENT PERMITTEE'S CERTIFICATION, Current Permfte'"adfication. 1, 41.. ittte8t that this appliceitlon for a namelownership change has been n4Wv n s saturate and cornplete to the best of my knowledge I understand that If ma r �d of this applkaa�n are not compMW and that if all required supporting inform i and chments are not included, this application package will be retumed as in t Signature OWL 7 D*e 10 ,.� New Applicant'A t'tlfiCatian; R Aua tw oar+ip m far s� transrose ar own�+a+tp) 1, o amfr� ,—, attest that this application for an ownership change as been revre ra�nd�is accurate snd complete m the best of~my knowledge I understand that required oarts of this application are not completed and that tf all required supporting i and chments are not rnduded, this appllcatien package will be rptumed as n Sgneture Dater 2 THE COMPU11D APPLICATION PACKAGE, INCLUDING ALL SUPPORTING INFORMATION A14D MATERIALS, SHOULD SE SENT TO THE FOLLOWING ADDRESS, North Carolina Departmerl of Envinxtmerd and Natural Resources Division of Wei Quality 127 Cardinal Drive EAenslon WilmingWn, NC 28406 ATTN, Linda Lew $ Page 2 of 2 S,£ d 2SS6 2Sb Si6 01 W082 20 bZ 9002-2T-Nnr Permit No SW8 041210 New Hanover County Designer's Certification Air i, , as a duly registered E - in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the protect, (Project) for -1i1 -S GFre-ztte, 1.-LC—. (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications The checklist of items on page 2 of this form is included in the Certification Noted deviations from approved plans and specification Signature Registration Number rye. 2P-44 11 Date ez - Certification Requirements R"JEJ C FEIVE D DEC 14 2006 DWQ Page 6 of 7 SEAL '56c-13t740 Jtate z)tormwater WWI Idyel I IUI It Oybwf i I, Permit No SW8 041210 1 The drainage area to the system contains approximately the permitted acreage 2 The drainage area to the system contains no more than the permitted amount of built -upon area 3 All the built -upon area associated with the protect is graded such that the runoff drams to the system 4 All roof drains are located such that the runoff is directed into the system 5 The bypass structure wear elevation is per the approved plan 6 The bypass structure is located per the approved plans 7 A Trash Rack is provided on the bypass structure 8 All slopes are grassed with permanent vegetation 9 Vegetated slopes are no steeper than 3 1 10 The inlets are located per the approved plans and do not cause short- circuiting of the system 11 The permitted amounts of surface area and/or volume have been provided 12 All required design depths are provided 13 All required parts of the system are provided 14 The required system dimensions are provided per the approved plans cc NCDENR-DWQ Regional Office Tony Roberts, New Hanover County Building Inspections Page 7 of 7