Loading...
HomeMy WebLinkAboutSW8041122_HISTORICAL FILE_20190306STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director \'larch 6.2019 NORTH CAROLINA Environmental Quality APAC-Atiantic- Inc. — Coastal Carolina Division Ann: Mr. Chester F. Harrison. ;rice President 2626 Glenwood Avenue, Suite 550 Raleigh; NC 2760S Subject: Notice of Permit Txtension and Renewal Request State Storm water Flanageinent Permit No. SW8 041.122 APAC-Atlantic Inc. Coastal Div. Deppe. Aspholt Plant Onslow County Dear. Mr. Harrison: Effective August 1, 2013 the State Stornwater program has been transferred from the Division of Water Quality (DWQ) to the Division of L-'nergy; \9ineral and Land Resources (DEi\,ILR). All previous references to DWQ will remain in older storm -water permits issued prior to August 1, 2013 until they are modified; transferred. or renewed. Please note that this letter references D1 NI1,R as the Division responsible for issuance of the permit. On August 5, 2009, the Governor signed Session Law 2009-406. This ]a", impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 1,13 of the General Statutes; N'',hich was current and valid at any point between January 1, 2005, and December 31, 2010. `fhe law extended the effective period of any storrnwater permit that was set to expire during this Unie frame to three (3) years from its current expiration date. On August 2, 2010; the Governor signed Session Lary 2010-177. which granted an extra year for a total of four (4) years extension. Accordingly, this permit, x+which was set to expire on December S, 2014, sliall now be effective from the date of issuance until December S, 2018, which includes all available extensions. State Stormwater Nlanagerttent Permit 4SWS 041 122 for the subject project was last issued on December S, 2004 to APAC-Atlantic, Inc. — Coastal Carolina Division and expired on December S, 201 S as noted above. Per 15A NCAC 2H.1045(3) (the siorlinvarer rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a pennit and must be accompanied by a processing fee, which is currently set at S505.00. If this is still an active project, please complete and submit a renewal application prior to April 9, 2019. The renewal application cart be found at the following website under the Applications Forms section: https ://deq.nc. go y/about/divi sioris/energy-m ine.ral-land-resources/energy-mineral-land-rules/storniwater- prograrn/I7ost-construction. Please note that if then have not already been submitted to the Division, the permit renewal request must be accompanied by the required Designers Certification and the recorded documents (if applicable). If this project has not been constructed and a permit is no longer needed; please submit a request to have the permit rescinded. Additionally, a review of the North Carolina Secretary of State corporation's database revealed that this corporation has a new address and new point of contact. Please submit a completed Permit Information Update Form to correct your contact information which is available on our website at: littps://deq.nc.goy/about/divisions/energy-minet-a]-land-resources/energy-rtiineral-]and-rifles/sLoriii ;vater- prograrn/post-construction. Please be advised that you are required to comply with the terms, conditions and limitations of the Stormwater klanagernent Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7 until you submit the required Permit Transfer application form to the Division and receive approval from the Division to transfer the permit or, if the site has not been built, submit a request to rescind the permit anti receive approval. This includes providing the necessary operation and maintenance of the permitted storrniyater systern. Please note that State Storrtnvater perttrits do t701 autotturtically transfer with the sale of a property. The Permit Transfer Application Form is available on our website at- hLLps://cleq.iic.gov/about/divisioiis/energy-rriineral-larici-resources/eiiei-gy-mineral-land-rules/storm% ater- program/post-construction. r North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources s _ R,=_Aq Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 parH cwaouw v. 910.796.7215 c� State Stonnwmer Permit XOo S\VS 04,1122 Page 2 of The operation of the stormwater ureaunent system Nvithout a valid and active permit, and/or failure to provide the Designer's Certification and/or failure to operate and maintain the siormwater treatment system, are violations of CGS 143 Article 21 and may result in appropriate enforcement action. If You have any questions regarding this matter; please contact Garrett Zorda at (910) 796-721 -. or garretl.zorda@tcdenr.gov. JiF7cere[Y_ �� Dantiv Smitlt. Interim Director Division Of Cnertrv, NIineral and Land Resources GDS/gd7: %Stormwate.rTermits & .l'1-ojectS1200410d 1122 1-11)12019 03 rec-rep 0411122 cc: WiLmington Regional Office File r, ROY COOPER Governor MICHAEL S. REGAN Secretory S. DANIEL SMITH In terim Director ,March 6. 2019 NORTH CAROLINA Environmental Quality APAC-Atlantic. Inc. — Coastal Carolina Division Attn: ,%Mr. Chester F. Harrison, Nice President 2626 Glenwood Avenue, Suite 550 Raleigh, NC 27608 Subject: Notice of Permit Extension and Rencival Request State Stormwater NJanagement Permit No. SNN'8 041 122 APAC-Atlantic Inc. Coastal Div. Deppe Asphalt Plant Onslow County Dcar `•Ir. Harrison: Effective august 1. 2013 the State Stormwater program has been transferred from the Division of Water Quality (DNVQ) to the Division of Energy, N,lineral and Land Resources (DE,NMLR). All previous references to DWQ will remain in older siorinwater permits issued prior to August 1, 2013 until they are modified, transferred, or renewed. Please note that this letter references DES-1LR as the Division responsible for issuance of the permit. On August 5, 20097 the Governor signed Session Law 2009-406. This law impacted any development approval issued by the former Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which was current and valid at any point between January 1, 2008, and December 3 I, 2010. The law extended the effective period of any storinwaier permit that was set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010; the Governor signed Session Law 2010-1 77. which granted an extra year for a total of four (4) years extension. Accordingly, this permit, which was set to expire on December 8, 2014, shall now be effective from the date of issuance until December 8, 2018,_ which includes all available extensions. State Stormwater klanagement Permit `lS\V8 041 122 for the subject project was last issued on December 8, 2004 to APAC-Atlantic, Inc. — Coastal Carolina Division and expired on December 8, 2018 as noted above. Per 15A \CAC 21-I.1045(3) (the stormwater rules), applications for permit renewals shall be submitted 180 days prior to the expiration of a permit and must be accompanied by a processing fee, which is currently set at S505.00. if this is still an active project, please complete and submit a renewal application prior to April 9, 2019. The renewal application can be found at the following website under the Applications Forms section: hops://deq. nc.gov/abouL/divis ions/energy-mineral-land-resources/energy-mi neral-land-rules/stormwater- program/post-construction. Please note that if they have not already been submitted to the Division, the permit renewal request must be accompanied by the required Designer's Certification and the recorded documents (if applicable). If this project has not been constructed and a permit is no longer needed, please submit a request to have the permit rescinded. Additionally, a review of the North Carolina Secretary of State corporation's database revealed that this corporation has a new address and new point of contact. Please submit a completed Permit Information Update Form to correct your contact information which is available on our website at: https://deq.nc.gov/about/d ivisions/energy-mineral -land-resourceslenergy-mineral-land-rules/siormwaier- pro gram/post-construction . Please be advised that you are required to comply with the terms, conditions and limitations of the Stormwater iManagement Permit under Title 15A :Forth Carolina Administrative Code 21-1 .1003 and forth Carolina General Statute 143-214.7 until you submit the required Permit `transfer Application Form to the Division and receive approval from the Division to transfer the permit or, if the site has not been built, submit a request to rescind the permit and receive approval. This includes providing the necessary operation and maintenance of the permitted storinwater system. Please note that State Stormmwater permits do not autolllatically transfer with the sale of a property. The Permit Transfer Application Form is available on our website at: hitpsa/deq.nc.gov/about/divisions/energy-mineral-land-resourceslenergy-mineral-land-rules/stormwater- program/post-construction . ®E North Carolina Department of Environmental Quality 1 Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 NORTH CAPCUNA �� Dq- "' .4E".ru� Wr1T� 910.796.7215 State St0['nikva[er Permit No. SW8 041 122 Page 2 of 2 The operation of the stormwater treatment system without a valid and active permit, and/or failure to provide the Designers Certification and/or failure to operate and maintain the stormwatcr treatment system, are violations of `'CGS 143 Articie 21 and may result in appropriate enforcement action. Ifvou have any questions regarding this matter; please contact Garrett Zorda at (910) 796-72l.5 or garret I.zorda a.ncdenr.gov. Sincerely, A, -Danny Smith. Interim Director Division of Energy, \-lincrai and Land Resources GDS/gdz: %StormwaterTermits &, 11'rojects120041041122 1-11D12019 03 req_ren 041122 cc: Wilmington Regional Office File ti CA&Z Li17 ENGINEERS and SCIENTISTS December 6, 2004 Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Request For Additional Information NCDENR Stormwater Project No. SWS O41122 APAC — Atlantic, Inc. Deppe Asphalt Plant Onslow County, North Carolina CATLIN Project No. 204-064 Dear Ms. Lewis: Post Office Box 10279 Wilmington, NC 28404-0279 Telephone: (910) 452-5861 Fax: (910) 452-7563 RE, DEC U 6 2004 BY: On behalf of our client APAC — Atlantic, Inc. (APAC), CATLIN Engineers and Scientists (CATLIN) has enclosed for your review a Revised Stormwater Management Permit Application Package with request for express turnaround for the proposed project at the Deppe Asphalt Plant located on Highway 17 North in OnSlbw County, North Carolina. This revised package has been prepared based on a letter from your office dated November 29, 2004 that requested additional information pertaining to this project. We have reviewed your request for additional information and offer the following responses to the requested information: Comments 1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. Acknowledged. Wetlands have been identified on the attached Construction Drawings as determined by others. Please refer to Sheets 2 and 3 of the Construction Drawings for location. www.catlinusa.com December 6. 2004 Page 2 of 2. Please provide more temporary pool volume in both ponds. Per the calculations, neither of the ponds provides sufficient volume to store the first inch. Acknowledged. The Wet Detention Basin Supplement Forms SWU-102 provided in the original submittal package listed the minimum temporary pool design volumes. These forms have been revised with the actual temporary pool volume. The volume of runoff produced by the first inch of rainfall has been calculated using the "Simple Method" (Ref: Storrnwater Best Management Practices, NCDENR, 1999, page 6-7). These calculations have been provided on page 3 of 5 of the calculations for each respective drainage area. Please refer to "Additional Revision Page 2" of the attached calculations for each respective drainage area for the actual temporary pool volume calculations. The actual temporary pool volumes were calculated using the dimensions illustrated on the Construction Drawings. 3. Please provide calculations which demonstrate how it was determined that the required minimum forebay volume had been provided in the pond. Acknowledged. The Wet Detention Basin Supplement Forms SWU-102 provided in the original submittal package listed the minimum required forebay volumes. The actual forebay volume calculations have been provided on "Additional Revision Page I" of the attached calculations for each respective drainage area. The actual volumes were calculated using the dimensions illustrated on the Construction Drawings. The forebay volumes for each wet detention basin have been updated on the Wet Detention Basin Supplement Forms S WU-102 in order to illustrate the actual volumes. 4. Please add the nearest intersection of two major roads to the vicinity map. A major road is any 1, 2, or 3 digit NC, US or interstate highway. Acknowledged. Please refer to Sheet 1 of the Construction Drawings for the requested information. 5. Please either provide a trash rack over the three orifices, or indicate on the riser detail that they will be reverse sloped in order to keep floating debris from clogging them up. Acknowledged. Please refer to Sheet 4 of the Construction Drawings. The detail has been updated to show the trash rack covering the orifices. 6. I've never permitted a pond where the exact minimums required were provided, down to the last cubic foot and square foot. You certainly don't have to provide some wiggle room, but it's probably best in case things come up during construction. It's rare that a pond gets build exactly to the dimensions provided, so it's best to slightly over -design than not to have enough. Acknowledged. As previously stated, the Wet Detention Basin Supplement Forms SWU- 102 provided in the original submittal package listed the minimum required volumes. However, the basins illustrated on the Construction Drawings were slightly larger than the December 6, 2004 Page 3 of'3 minimum calculated volumes. The calculations for each respective drainage area have been revised/updated to reflect the actual design volumes as opposed to the minimum volumes. Subsequently.. CATLIN has revised the Wet Detention Basin Supplement Fornis SWU-102 for each respective drainage area. Please note that the basins illustrated in this revised submittal package have been slightly altered to provide additional capacity, if needed during constructiori. 7. APAC-Atlantic, Inc. is a registered corporation with the Secretary of State, however, APAC-Atlantic, Inc. Coastal Carolina Division is not. If it is your intent that the latter be the permittee, please have it registered with the Secretary of State. If not, please revise the application to reflect the correct corporate name. Acknowledged. The application has been revised to state that the permittee is APAC- Atlantic, Inc. The attached revised permit application package has been revised throughout to reflect the changes discussed in the above responses to comments. If you require additional information, or have any questions, please do not hesitate to call us at (910) 452-5861. Sincerely, Jeffery K. Becken, P.E. Project Manager Andrew M. Howell, .I. Staff Engineer Enclosures. Revised Storrnwater Management Permit Application Package cc: Mr. Gary Hall - APAC — Atlantic; Inc. Mr. William Earp - APAC Atlantic, Inc. 204064 Revisrd SW Permit App Ltr f Michael F. Easley, Governor William G. Ross, Jr., secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality November 29, 2004 Mr. Chester Harrison, APAC -Atlantic, Inc. PO Box 399 Kinston, NC 28502 Vice President Subject: Request for Additional Information Stormwater Project No. SW8 041122 Dieppe Asphalt Plant Onslow County Dear Mr. Harrison: The Wilmington Regional Office received an Express Stormwater Management Permit Application for Deppe Asphalt Plant on November 29, 2004, with a scheduled review date of November 29, 2004. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please either delineate all wetlands on site, disturbed or undisturbed, or note on the plans that none exist. 2. Please provide more temporary pool volume in both ponds. Per the calculations, neither of the ponds provides sufficient volume to store the first inch. 3. Please provide calculations which demonstrate how it was determined that the required minimum forebay volume had been provided in the pond. 4. Please add the nearest intersection of two major roads to the vicinity map. A major road is any 1, 2 or 3 digit NC, US or interstate highway. 5. Please either provide a trash rack over the three orifices, or indicate on the riser detail that they will be reverse slope in order to keep floating debris from clogging them up. 6. I've never permitted a pond where the exact minimums required were provided, down to the last cubic foot and square foot. You certainly don't have to provide some wiggle room, but it's probably best in case things come up during construction. It's rare that a pond gets built exactly to the dimensions provided, so it's best to slightly over -design than not to have enough. 7. APAC-Atlantic, Inc. is a registered corporation with the Secretary of State, however, APAC-Atlantic, Inc. Coastal Carolina Division is not. If it is your intent that the latter be the permittee, please have it registered with the Secretary of State. If not, please revise the application to reflect the correct corporate name. North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington Regional Office Wilmington, NC 28405-3845 An Equal Opportunity/Affiana&ve Action Employer — 50°% Recycled/10% Post Consumer Paper Phone (910) 395.3900 Customer Service 1-877-623-6748 FAX (910) 350-2004 Internet: h2o.enr.state.nc.us Nor thCarohna Mr. Harrison November 29, 2004 Stormwater Application No. SW8 041122 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to December 6, 2004, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 395-3900. _ Sincerely, Linda Lewis Environmental Engineer RSSlarl: S:IWQSISTORMWATIADDINF0120041041122.nov04 cc: Jeff Becken, P.E., Catlin Engineers & Scientists Linda Lewis Page 2 of 2 Entity Names Page 1 of 1 North Carolina Elaine F. Marshall DEPARTMENTOF TI-IE Secretary SECRETARY OF STATE Corporations *Corporations Home *Important Notice *Corporate Forms/Fees *Corporations FAQ *Tobacco Manufacturers *Verify Certification *Online Annual Reports Links °Secretary Of State Home *Business License *Register for E-Procuremen *Dept. of Revenue Legislation *1999 Senate Bills *2001 Bill Summaries *Annual Reports 1997 "Corporations 1997 *Other Legislation Search *By Corporate Name •For New Corporation *By Registered Agent Online Orders *Start An Order *New Payment Procedures PO Box 29622 Raleigh, NC 27626-0622 (919)807-2225 Date: 11 /29/2004 Click here to: View Document Filings I Print a pre -populated Annual Report Form I File an Annual Report I Corporation Names Name Name Type NC APAC-Atlantic, Inc. Legal NC APAC-Carolina, Inc. Prev Legal NC North Carolina rev Legal Bitulithic, Inc. Business Corporation Information S OS I D: 0000025 Status: Current -Active Date Formed: 6/17/1980 Citizenship: Foreign State of Inc.: DE Duration: Perpetual Registered Agent Agent Name: Registered Office Address Registered Mailing Address: Principal Office Address Principal Mailing Address C T Corporation System 225 Hillsborough Street Raleigh NC 27603 225 Hillsborough Street Raleigh NC 27603 U S Hwy 19/23 S Chanler INC 28715 Bell Fork Rd PO Box 905 Jacksonville NC 28540-0000 For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to Webmaster. For questions or comments concerning the Corporations Division, please send e-mail to Corporations Administrator Click here for help downloading forms. http://www.secretary.state.nc.us/Corporations/soskb/Corp.asp?4909930 11/29/2004 23 092 9046 State of North Carolina Department of the Secretary of State SOSID: 0000025 Date Filed: 4/2/2003 2.53:00 PM Elaine F. Marshall North Carolina Secretary of State 230929046 APPLICATION FOR AMENDED CERTIFICATE OF AUTHORITY Pursuant to §55-15-04 of the General Statutes of North Carolina, the undersigned corporation hereby applies for an Amended Certificate of Authority to transact business in the State of North Carolina and for that purpose submits the following statement. . l . The name of the corporation is: APAC-Carolina Inc. 2. The name the corporation is currently using in the State of North Carolina is: APAC-Carolina Inc. 3. The state or country of incorporation is: Delaware 4. The date the corporation was authorized to transact business in the State of North Carolina is: June 17, 1980 5. This application is filed for the fallowing reason (complete all applicable hems): a. The corporation has changed its corporate name to:' APAC-Atlantic. Inc. b. The name the corporation will hereafter use in the State of North Carolina is changed to: T^ APAC-Atlantic Inc. c. The corporation has changed its period of duration to: no change d. The corporation has changed the state or country of its incorporation to: no change 6. Attached is a certificate attesting to the change, duly authenticated by the secretary of state or other official having custody of corporate records in the state of country of incorporation. 7. If the corporation is required to use a fictitious name in order to transact business in this State, a copy of the resolution of its board of directors, certified by its secretary, adopting the fictitious name is attached. 8. This application will be effective upon filing, unless a date and(or time is specified: This the 31st day of March 20 03 APAC-Carolina, Inc. Name of Corporation Signature Robert J. Allen, Assistant Secretary Type or Print Name and Tide �~ NOTES: 1. Filing fee is S75. One executed original and One exact or conformed copy of this application must be filed with the Secretary of State. 2. • If the name of the corMatian as changed is unavailable for use in North Carolina, indicate this fact and state the name the corporation wishes to use in North Carolina on 5b. (See NCOS §55.15-06) (Revised Jnnuary 2000) (Form B40) CORPORATIONS DIVISION P. O. BOX 29622 RALEIGH, NC 27626-0622 14CO23 - t 1AW2 C 7 Syn 031im Velc6vare PAGE 1 the First State I, HARRIET SMITH WINDSOR, SECRETARY OF STATE OF THE STATE OF DELAWARE, DO HEREBY CERTIFY THAT THE SAID "APAC—CAROLINA, INC.", FILED A CERTIFICATE OF AMENDMENT, CHANGING ITS NAME TO "APAC—ATLANTIC, INC.", THE TWENTY—EIGHTH DAY OF MARCH, A.D_ 2003, AT 3:15 O'CLOCK P.M. 0893677 8320 Harriet Smith Windsor, Secretary of State AUTHENTICATION: 2339870 030211494 DATE: 03-31-03 SOS1D: 0000025 Date Filed: 8/2/2004 11:43:00 AM Elaine F. ;Marshall North Carolina Secretary of State CD-479 (43) Business Corporation Use this form onl 2004 215 01333 7-01 Contact the N.C. North Carolina Annual Report Annual Report far Liability Partnerships, and Limited Liability Companies. Name of Corporation: APAC ATLANTIC INC State of Incorporation: DELAWARE Secretary of State Corp. ID Number: 0000025 Fiscal Year Ending: 9i/ 3 0� 03 Mena / ay I YN, Federal Employer ID Number: 581401474 j If this is the initial annual report filing, you must complete the entire form. If your business corporation's information has not changed since the previous report, check the box and complete Line B only. t . Registered agent & registered office mailing address Agent: C.T. CORPORATION Mailing Address:225 HILLSBOROUGH ST, RALEIGH, 2. Street address & county of registered office street Address: 225 HILLSBOROUGH ST, RALEIGH, County: WAKE 3.If registered agent changed, signature of new agent: I wpnnwe epn0t1hA" Cef�M ro dW appO.b1 M 1 4.Enter principal office address here: U.S. HIGHWAY 19-23 SOUTH CHANLER, NC 287153 5. Enter principal office telephone number here: 859 357-7485 6. Enter name, title, and business address of principal officers here: Complete Form CD-479A to list additional principal officers Name: SEE ATTACHED SCHEDULE Title: Address: City: Slate: Zip: Name: Title: Address: City: State: Zip: Name: Title: Address: City; State: Zip: 7. Briefly describe the nature of business: 8.Certification of annual report must be completed by all corporations Sq"Wm IFGM1 n 9 E. $Wwd by on 0 xe e7 a qV suen1 TV" a hw,1 N> 07 14 04 001. ASSISTANT SECRETARY Fro* 6by3t)77488 Ashland Tax Dept 07 52 04 08-04-2004 11 114 APAC-ATLANTIC, INC. OFFICERS & DIRECTORS LIST OFFICE ADDRESSES APRIL. 21, 2004 DIRECTO-RS: T. Edward Briley, Jr. 604 East New Bern Road Kinston NC 28504 Michael C. Cuilik 9599 Hawkins Drive Manassas VA 20109 Otis A. Vaughn U. S. Highway 19-23 S Chandler NC 28715 QFFICERS: Otis A. Vaughn President U. S. Highway 19-23 S Chandler NC 28715 Wallace R. Alphin Vice President/ 9599 Hawkins Drive Assistant Secretary Manassas VA 20109 Kenneth A. Atkinson, Jr. Vice President/ 154 Winyah Road Assistant Secretary Conway SC 28526 Kenneth W. Blackwelder Vice President/ U. S. Highway 19-23 S Assistant Secretary Candler NC 28715 Edward O. Blount, Jr. Vice President/ 9599 Hawkins Drive Assistant Secretary Manassas VA 20109 Clarence O. Brickey Vice President/ U. S. Highway 19.23 S Assistant Secretary Chandler NO 28715 T. Edward Briley, Jr. Vice President! 604 East New Bern Road Assistant Secretary Kinston NC 28504 Lonnie R. Carroll, Jr. Vice President/ U. S. Highway 19-23 S Assistant Secretary Chandler NO 2871 � Ivan G. Clayton Vice President/ 300 South Senbow Road Assistant Secretary Greensboro NC 27401 L. Mark Collins Vice President/ U. S. Highway 19-23 S Assistant Secretary Chandler NC 28715 j idown •Y$ A.19-1n f&l^ 8593577466 Ashland Tax Dept 07'52.20 08-04-2004 12 N 4 OEFICERS.. \VV/ Thomas F. Crater Vice President/ 300 South Benbow Road Assistant Secretary Greensboro NC 27401 Michael C. Cuilik Vice President/ 9599 Hawkins Drive Assistant Secretary Manassas VA 20109 J. Clarke DeHart Vice President/ 900 Ashwood Pkwy Suite 700 Assistant Secretary Atlanta GA 30338 Thomas W. Dorsey Vice President/ U. S. Highway 19-23 S Assistant Secretary Chandler NC Z15 Thomas E. Elmore, 111 Vice President/ 620 Mineral Springs Road Assistant Secretary Darlington SC 29540 Richard K, Fischer Vice President/ 3111 Port Cobb,Drive Assistant Secretary Smyna GA 30080 Chester F. Harrison Vice President/ 604 East New Bern Road Assistant Secretary Kinston NC 28504 Wade C. House Vice President/ 8738 Vulcan Drive Assistant Secretary Manassas VA 20109 Terry W. Jordan Vice President/ 156 Highway Constructors Road Assistant Secretary Marston NC 28363 Daniel W. Miles Vice President/ 9599 Hawkins Drive Assistant Secretary Manassas VA 20109 Graham T. Moore, Jr. Vice President/ 1100 Robeson Street Assistant Secretary Fayetteville NC 28305 Carry M. Swann, III Vice President/ 604 East New Bern Road Assistant Secretary Kinston NC 28504 Robert W. Thompson, Jr. Vice President/ 121 Northampton DR Assistant Secretary Canton GA 30115 William H. Tomlinson Vice President/ 9599 Hawkins Drive Assistant Secretary Manassas VA 20109 J. James Wiley III Vice President/ 900 Ashwood Pkwy Suite 700 Assistant Secretary Atlanta GA 30338 Robert D. Rose Secretary/ 900 Ashwood Pkwy Suite 700 Treasurer Atlanta GA 30338 2 APAC•ATLANTIC INC 593577466 Ashland Tax Dept 07.52-41 08-04-2004 13114 QFFjQ&RS, James A. Burrow Assistant Secretary/ Assistant Treasurer Timothy A. Counts Assistant Secretary/ Assistant Treasurer David A. Donofrio Assistant Secretary/ Assistant Treasurer Mary J, Prettyman Assistant Secretary/ Assistant Treasurer Lewis A. Rife Assistant Secretary/ Assistant Treasurer David L. Riley Assistant Secretary/ Assistant Treasurer W. Marshall Roberts Assistant Secretary/ Assistant Treasurer MUTING D xING OFiFICCRS: Jerome M. Colvin Vice President/ Assistant Secretary William B. Miller Vice President/ Assistant Secretary M. Ray Pace Vice President/ Assistant Secretary Jami K, Suver Vice President/ Assistant Secretary Richard P. Thomas Vice President/ Assistant Secretary Paul S. Meyer Vice President/Gen't Counsel/Asst. Secretary Robert J. Allen Deputy Treasurer/Asst. Treasurer/Asst. Secretary Joseph R. Brace Deputy Treasurer/Asst. Treasurer/Asst, Secretary 2786 Martinsburg Pike Stephenson VA 22656 9599 Hawkins Drive Manassas VA 20109 1451 Myrtle Street Sarasota FL 34234 300 South 8enbow Road Greensboro NC 27401 620 Mineral Springs Road Darlington SC 29540 U. S. Highway 19-23 S Candler NC 28715 604 Bast New Bern Road Kinston NC 28504 3499 Blazer Parkway Lexington KY 40509 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 3499 Blazer Parkway Lexington KY 40509 500 Diederich Blvd. Russell KY 41169 50 E. RiverCenter Blvd. Covington KY 41012 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 500 Diederich Blvd. Russell KY 41169 500 Diederich Blvd. Russell KY 41169 3 f APAC-ATLANTIC INC aD4l93f t486 Ashland Tax Dept. 07 53:01 08-04-2004 14 174 EXECUTING AND ATTESTING QFFICERS� John V. Connolly Deputy Treasurer/Asst. TreasurerlAsst. Secretary Brian D. Menshouse Deputy Treasurer/Asst. Treasurer/Asst. Secretary Stephanie B. Stitt Deputy Treasurer/Asst. Treasurer/Asst. Secretary Michael F. Deaton Assistant Secretary David C. Lewis Assistant Secretary Deborah L. Murphey Assistant Secretary Rene Suarez Assistant Secretary David M, Tooian Assistant Secretary 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 500 Diederich Blvd. Russell KY 41169 500 Diederich Blvd. Russell KY 41 169 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 4636 Scarborough Drive Lutz FL 33649 900 Ashwood Pkwy Suite 700 Atlanta GA 30338 APAC-ATLANTIC (NC 04t1Z-2- CA1 : Li17 ENGINEERS and SCIENTISTS November 3, 2004 Mr. Cameron Weaver North Carolina Department of Environment and Natural Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Post Office Box 10279 Wilmington, NC 28404-0279 Telephone: (910) 452-5861 Fax: (910) 452-7563 Re: Stormwater Management Permit Application w/ Express "Turnaround APAC — Atlantic, Inc. Deppe Asphalt Plant Onslow County, North Carolina CATLIN Project No. 204-064 Dear Mr. Weaver: On behalf of our client APAC Atlantic, Inc., (APAC) CATLIN Engineers and Scientists (CATLIN) has been requested to prepare a Stormwater Management Permit Application with express turnaround for the proposed project at the Deppe Asphalt Plant located on Highway 17 North in Onslow County, North Carolina. A general site location map (USGS Topographic Quadrangle) has been included. This letter is to inform you of our intent to submit this application with a request for express turnaround review. As part of the express turnaround request, APAC and CATLIN would like to request a pre -application submittal meeting on November 15, 1004. The following is a brief narrative of the proposed methods of stormwater treatment and control. The APAC property in Deppe. North Carolina includes roughly 14.4 acres of land for the operation of an Asphalt Concrete (AC) plant and associated activities. The site is currently undergoing redevelopment activities. For the development of a stormwater management strategy, proposed final contours will divide the property into two distinct drainage areas, 'A' and B'. The intent of the design will be to prevent untreated stormwater from leaving the site, to control the velocity of runoff, and to ensure non -erosive flow. These design requirements will be met by the following means: On -site stormwater will be treated by means of grassed swales and two wet detention ponds with a design 85% pollutant removal efficiency for each drainage area. Grassed swales will be designed w/ roughly a l% slope, and a length to exceed 100 feet per acre of drainage area. Sfio�� www ca t1 inusa. coin Wet detention ponds will have been designed to control. at a minimum, the first inch of rainfall and draw down over a period of 2 to 5 days. An earthen berm will be utilized to ensure that ston-nwater will be conveyed to the designed treatment structures. (i.e. swales, wet detention basins, etc.) If you have any questions, please do not hesitate to call us at (910) 452-5861. Sincerely, ;�J, fery K. Becken, P.E. Project Manager Andrew M. I-Iowell, �.I. Staff Engineer Enclosures: General Location USGS Topographic Quadrangle cc: Mr. Gary Hall - APAC — Atlantic, Inc. Mr. William Earp - APAC — Atlantic, Inc. 204064 Express SW Permit Ltr 11 b ` F !r s • - .4 em� 5 �!i r �94� hr II Fountain of Life S Cb1439 1146 45 1439: ill •� III , p • 46 Irdj r_ r- j' 1437 Pit ATE LOCAT�N 1438 i Bm Deppe 44' 14036 ::Gem cr �b . ri 4 II I <5 ,+ 47 \ � �,- � 1 \`� ` V1 ` • \ it R �za SCALE 1:24 000 MK f y 2 0 1 MILE cN 1000 0 1000 2000 3000 4000 5000 6000 7600 FEET 1 .5 0 1 KILOMETER 107 MILS 1.19' 23 MILS CONTOUR INTERVAL 5 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 Q LEI 6 C, 0 PR°W APAC-ATLANTEC, M COASTAL CARouNA DIVISION DEPPE ASPHALT PLANT HIGHWAY i7 NORTH MPM N.C. mu GENERAL LOCATION USGS TOPOGRAPHIC QUADRAN(E RGURE ENGINEER andSCIENTlsi8 WI-M1NGTON, NORTH CAROUNA a KR 204064 ! SEP 2004 M�'AS SHOWN °M "' WHW ate®" DAT t:y + Remittance Register Prepared By ANAC, Inc. �,7._,, f+,�3•y 46061 L f M�b�tl • �!lf7tl Vendor: 00446707 'x ' • � IINR%AIR QUALITY SECTION ±� �.•l• I•-,4 r NCOE o w 3}f:r i`Ai I tl�t�, 11�01%t00a - � ��*• 127 CARDINAL DRIVE EXT r WILMINGTON NC 28403 ax rose •tac Discount mount. P,t[ l-.I}r.. `�� K" „'•.• Description Quantity n os n --- -- -- - i.'.•t+.t0»lhlilcl�7....Oaca Plant vehicle Job D rip[i Qva ['Ly ------------- -------- - -- Unit C t T cel COr•Ci ' T G .......................... --- ------ - ------------ "--- •n 4.000.00 4,000.00 S•i � s flNl10l29/7004 r 4,nno-.nn }L:14i. Y��,1M4t M14 . yyyf} •r .. {a ��,,, fir � •'iA',:h��A . �:.y �., •11;' ' fit:' � y.. � � il,21 .;, NOV - 3 t-004 q pia' c#,,cu-. - f.1. .J E SP/l e 0 DAQ WIRO ' .__._ __-ram..,.•+ _.. .-�i" ,PAC, INN- j DATE i AMOUNT 1 50S T OPNEE BOX :..0'.i "I". ,..: i , A. 44670 l . i ,10194 � $ ' � ' 4.000 00 � vom I' N07 CASH:.i1 v'1 RD U) PAY :OUR TT CDU5Ar� A W D 0O i00 ...... ............... . ... ............................. . TO THE ORDER OF: GENERAL ACCOUNT NCDEHNIR1AIR QUALITY SECTION i?7 CARDINAL t7RIVE EX-1 VVIL Ir51NC� T Or r NC BY K r 't �IGNATllRF ACH STATEMENT 3?=JnE DE?OSi i IIJG APAC, INC. CHECK NUMBER POW FRCE BOX 3390 HECK DATE 17701 ?F-2 �30`1 �Y INVOKE= NO. DATE DESCRIPTION GROSS DEDUCTIONS 4PlOUh'T PAID i i I 0 ,. rJ ,.r.'�" Nov-03-04 09:00am From-CATLIN ENGINEERS AND SCIENTISTS s a I FAX Transmission from..... ENGINEERS and SCIENTISTS +0104527563 T-844 P-01/04 F-813 CATLIN Engineers and Scientists P.O. Box 10279 • Wilmington, NC 28404-0279 220 Old Dairy Road •Wilmington, NC 28405 Phone (910) 452-5861 Fax (910) 452-7563 TO: 4". Ver-vto,. COMPANY: &,f4 DrNR - FROM: --TC-f-T 13eckei+ 4�d �fa,.,e — ��7LTitr}. ��if�7Prrs of ��•'���'s S DATE: 3 04- CATLIN Project No.: SUBJECT: oi.•-�,,�aPi 1%a�.� f �..�.' r�� c� ❑ Per Your Request For Your Review ❑ Please Comment ❑ Reply ASAP ❑ Urgent TOTAL NUMBER OF PAGES, INCLUDING COVER: COMMENTS: /�I., l �.,/��.V P! Ps CL/. o f ?1 ec. 5 e o �" P 5P ' c4e -4 ! '! �G t ^!J YaL, tnVp Co-1C ,+141 n C)y l! o 1— DESTINATION FAX NO. -9/0_-� 50 - ?60 �L "Virtually Anvwhere" www.caflinusa.com Nov-03-04 09:01am From-CATLIN ENGINEERS AND SCIENTISTS +9104527563 T-844 P.02/04 F-813 CA&CL i ENGINEERS and SCIENTISTS November 5, 2004 Mr. Cameron Weaver North Carolina Department of Environment and Natural Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Post Office Box 10279 Wilmington, NC 28404-0279 Telephone: (910) 452-5861 Fax; (910) 452-7563 Re: Storm -water Management Permit Application w/ Express Turnaround APAC — Atlantic, Inc. Deppe Asphalt Plant Onslow County, North Carolina CATLIN Project No. 204-064 Dear Mr_ Weaver: On behalf of our client APAC — Atlantic, Inc., (.APAC) CATLIN Engineers and Scientists (CA FLIT) has been requested to prepare a Stormwater Management Permit Application with express turnaround for the proposed project at the Deppe Asphalt Plant located on highway 17 North in Onslow County, North Carolina. A general site location map (USGS Topographic Quadrangle) has been included. This letter is to inform you of our intent to submit this application with a request for express turnaround review. As part of the express turnaround request. APAC and CATLIN would like to request a pre -application submittal meeting on November 15, 1004. The following is a brief narrative of the proposed methods of stormwater treatment and control.. The APAC property in Deppe, North Carolina includes roughly 14.4 acres of land for the operation of an Asphalt Concrete (AC) plant and associated activities_ The site is currently undergoing redevelopment activities. For the development of a stormwater management strategy, proposed final contours will divide the property into two distinct drainage areas; 'A• and 'B'. The intent of the design will be to prevent untreated stormwater from leaving the ;ite, to control the velocity of runoff, and to ensure non -erosive flow. These design requirements AU be met by the following means: On -site stormwater will be treated by means of grassed swales and two wet detention ponds with a design 85% pollutant removal efficiency for each drainage area. Y Cnassed swales will be designed wl roughly a 1% slope, and a length to exceed 100 feet per acre; of drainage area. www.carlinsisa.com %v-03-04 09:01am From-CATLIN ENGINEERS AND SCIENTISTS +9104527563 T-844 P.03/04 F-813 r 1 Wet detention ponds will have been designed to control, at a minimum. the first inch of rainfall and draw down over a period of 2 to 5 days. An earthen berm will be utilized to ensure that stormwater will be conveyed to the designed treatment structure:. (i.e. swales, wet detention basins, etc.) If you have any questions, please dci not hesitate to call us at (910) 452-5861, Sina:rely, J fery K. Becicen, P.E. Project Manager Andrew M. Howell, .I. Staff Engineer Enclosures: General Location USGS Topographic Quadrangle M. Mr. Gary Hall - APAC — Atlantic, Inc. Mr. William Earp - APAC - Atlantic, Inc. ]WC�j i prga \W Permit Ur ,I Nov-03-04 09:01am From-CATLIN ENGINEERS AND SCIENTISTS +9104527563 T-944 P.04/04 F-613 u h ri V� F✓ ✓r y9K• ti s Li y e[� h -1 Udf it n � , a n ni 13i0 it. nl �u• 36' -PIT LOCATION _ I I S�� 1 � au Deppe 44' n 4, I r aa8 y h H� a` 4 4 a`' n of a71R JZ� 11 aQa^ R SCALE 1:24 000 pM 7 6 1 MILE �� 1000 0 1000 2000 3000 40DO 5000 600D 7000 FEET 10-. M s I•,g, T 1 ^ _ .5 0 - _ _1 KILOMETER 23 MILS CONTOUR INTERVAL 5 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 Q - EMAlNEEH and;�tCAROU;RA 7 APAC—AXANTI:, Wt WASTAL GROUNA DIVAS r, UU13E AW"&T PLMT HI(WAY 17 KMTM ME GENERAL LOCAMON USGS TOPOGRAPHIC QUADRANGLE FIGURE hMWINGTON NOR1N AD IQ 204064 Ef SEP 2004 SAS SHOWN M`o f WIiW o®= DAT �l Nov-0,3-04 09:00am From-CATLIN ENGINEERS AND SCIENTISTS +9104527563 7-944 P.01/04 F-913 FAX 'Transmission from..... CA&%. LiF1 ENGINEERS and SCIENTISTS �a CATLIN Engineers and Scientists P.O. Box 10279 * Wilmington, IBC 28404-0279 220 Old Dairy Road • Wilmington, PVC 28405 Phone (910) 452-5861 Fax (910) 452-7563 TO: 4"_ Ve`ryeo,: COMPANY: /V,,�4 G•�,o�, �g Z)ZN,? - FROM:ZZ — e,A76rAj 1'.rq,'7Pr�S J<.'t�7S S DATE: — 3 - 04� CATLIN Project No.: SUBJECT: ,5'oi.-r...afP� %la�t�1P� 1�r'�--f; 4?al"rc,'o�! - — ❑ Per Your Request KFor Your Review ❑ Please Comment ❑ Reply ASAP ❑ Urgent TOTAL NUMBER OF PAGES, INCLUDING COVER: COMMl=NTS: /1, Po, Ps L/ oR. 04 -7 1 y - S ! C of �1G /O'� �4 r� ♦ i —T Q ;L ?/,fc. 5,fC_ 5 C o P' S�����" e - - -�o - ! -1 C .17t, f"0-4 ,OJ co•-1 ...,ems P s yam. UP Cc17 CP DESTINATION FAX NO, -WO _-� 50 - 26O 1- "Virtually Anywhere" www.catlinusa.com Nov-03-04 09:01am Froth-CATLIN ENGINEERS AND SCIENTISTS +9104527563 T-844 ?.OZ/04 F-813 CA&CUF1 ENGINEERS and SCIENTISTS November 5, 2004 Mr, Cameron Weaver North Carolina Department of Enviroru-nent and Natural Resources Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Post Office Box 10279 Wilmington, NC 28404-0279 Telephone: (910) 452-5861 Fax: (910) 452-7563 Re: Stormwater Management Permit Application w/ Express Turnaround APAC — Atlantic, Inc. Deppe Asphalt Plant Onslow County, North Carolina CATLIN Project No. 204-064 Deal Mr_ Weaver: On behalf of our client APAC — Atlantic, Inc., (-APAC) CATLIN Engineers and Scientists (CA FLIN) has been requested to prepare a Stormwater Management Permit Application with express turnaround for the proposed project at the Deppe Asphalt Plant located on Highway 17 North in Onslow County, North Carolina. A general site location snap (USGS Topographic Quadrangle) has been included. This letter is to inform you of our intent to submit this application with a request for express turnaround review. As part of the express turnaround request. APAC and'CATLIN would like to request a pre -application submittal meeting on November 15, 1004. The following is a brief narrative of the proposed methods of stormwater treatment and control_ The APAC property in Deppe, North Carolina includes roughly 14.4 acres of land for the operation of an Asphalt Concrete (AC) plant and associated activities. The site is currently und{-rgoing redevelopment activities. For the development of a stormwater management strategy, proposed final contours vvill divide the property into two distinct drainage areas; `A' and V. The intent of the design will be to prevent untreated stormwater from leaving the iite, to control the velocity of runoff, and to ensure non -erosive flow. These design regt;irements will be inet by the following means: On, -site stormwater will be treated by means of grassed swales and two wet detention ponds with a design 85% pollutant removal efficiency for each drainage area. Grassed swales will be designed w/ roughly a 1% slope, and a length to exceed 100 feet per acre of drainage area. www Carl i n usa. com. Nov-0S-04 09:01am From-CATLIN ENGINEERS AND SCIENTISTS +910452T563 T-644 P.03/04 F-613 1 Wet detention ponds will have been designed to control, at a minimum, the first inch of rainfall and draw down over a period of 2 to 5 days. An earthen berm A411 be utiiized to ensure that stormwater will be conveyed to the designed treatment structures_ (i.e. ~wales, wet detention basins, etc.) If you have any questions, please do not hesitate to call us at (910) 452-5861, Sinecrely, J ery K. Bechen, P.B. Proji!et Manager Andrew M_ Howell, .I_ Staff Engineer Enclosures: General Location USGS Topographic Quadrangle QC-1 Mr, Gary Hall - APAC — Atlantic, Inc. Mr. William Earp - APAC Atlantic, Inc. '-WC7J f.-pmi SW Permit Llr Nov-03-04 09 :01 am From—CATLIN ENGINEERS AND SCIENTISTS +910452TES3 T-844 P-04/04 F-813 rr II rl jl Fla &FE LOCAMN s?A Deppe 44 44,.Jll 41 1p 4r, _71 (11439) M 7 SCALE 1:24 000 c 1 MILE c 1000 -1 �, 3000 4CCC 5Q00 61100 70DG FEET 70 1:_ 1 .5 0 1 Kl,_OmETER MILS 1.1T CONTOUR INTERVAL 5 FEET NATIONAL GEODETIC VERTICAL DATUM OF 1929 ENGINEERtand lENTffFB APAC—AXANTIC, INC. COASTAL CMMMA DIVIM DEPK ASPHALT PLMT HIGHWAY 17 MOR714 RM w,r— ME GENERAL LOCATION USGS TOPOGRAPHIC QUADRANGLE FIGURE MLwNGTON NORTM CMAROUMNA lle Ma 04064 t! SEP 2004 SAS SHOM JM* ft WHW dam =DAT CA1 `Li17 ENGINEERS and SCIENTISTS November 24, 2004 Ms. Linda Lewis Environmental Engineer North Carolina Department of Environment and Natural Resources Division of Water Quality Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, North Carolina 28405-3845 Re: Stormwater Management Pennit Application APAC — Atlantic. Inc. Deppe Asphalt Plant Onslow County, North Carolina CATLIN Project No. 204-064 Dear Ms. Lewis: Post Office Box 10279 Wilmington, NC 28404-0279 Telephone: (910) 452-5861 Fax: (910) 452-7563 v^� Q� V" On behalf of our client APAC — Atlantic. Inc. (APAC), CATLIN Engineers and Scientists (CATLIN) has enclosed for your review the Stormwater Management Permit Application Package with request for express turnaround for the proposed project at the Deppe Asphalt Plant located on Highway 17 North in Onslow County, North Carolina. The application fee is attached. This package was prepared based on recommendations made by your office during a meeting with representatives of CATLIN and APAC on November 15, 2004. f you have any questions, please do not hesitate to call us at (910) 452-5861. Sincerely, efeyBec�ken, P.E. Andrew . Howell, E.I. Project Manager Staff Engineer Enclosures: Stornlwater Management Permit Application Package cc: Mr. Gary Hall - APAC — Atlantic, Inc. Mr. William Earp - APAC — Atlantic, Inc. 204064 SW Permit App Ltr RECEIVED NOV : � may www.catlinitsa.coni Request for Stormwater Management Permit Project No SW8 0408... Subject: Request for Stormwater Management Permit Project No SW8 040840 Onslow County From: wacarp@ashland.com ashiand.com Date: Fri, 29 Oct 2004 12:56:11 -0400 To: Linda.lewis@ncmail.net Ms. Linda, I've been trying to contact you on the above referenced Site and letter that we've received from your office from Oct 15, 2004. I had called your office in Aug and was told that the NPDES Stormwater permit that we have for the Asphalt plant NCG 160097 would be sufficient for this project as we were redoing the ground from an already existing site. I assume we have to have another permit to request from your letter and anticipate the permit application to be done prior to the Nov 15th and turned in to you for your review. I do how ever have a questions about the site. we have been on hold for the last two months waiting on the Erosion and Sedimentation Control Plan Approval, and at the time we were under the impression that we didn't need anything else for this site as we were told above we had everything else. While waiting We asked Carol Miller if we could start paving prior to the approval and she felt it was ok to pave because it was ground cover. although three days ago she called and told Catlin Eng. that we should ask you if we could pave as there may be a stormwater reason not to pave yet. Can we pave the areas of truck traffic in the 1st stage area A prior to receiving this permit? This would stop a lot of Erosion and sedimentation from possibly leaving the site although we have it contained per our permits. It would also help us control the dust from the trucks entering and leaving the plant site. Please let us know what we can do if anything. Thanks Sill Earp 14kr t2116?4 1 of 1 10/29/2004 2:55 PM Re: Depee Asphalt Plant Subject: Re: Depee Asphalt Plant ' From: Carol Miller <Carol.Miller@ncmail.net> Date: Wed, 20 Oct 2004 08:24:44 -0400 To: Linda Lewis <Linda.Lewis@ncmail.net> Linda: just a heads up since you have not approved anything to date. we did approve the E&SCP, but with the usual condition that all other necessary permits be obtained. I have advised the consultant with Catlin & Assoc. that they may be in violation if they start adding any impervious prior to the storm water permit issuance (I'm pretty sure it is high density), but apparently Catlin is not doing their storm water. They (APAC) have given me every indication that they will start paving immediately, but MAYBE they will heed my warning. Raid onl11 Carol Linda Lewis wrote: Carol: No, we have just recently requested they submit an application. If I need anything, I'll raid your files like I always do. Linda Carol Miller wrote: Hi Linda and Rhonda, have either of Onslow County, diapproved it might. Let me Thanks, Carol you received a stormwater plan for the Depee Asphalt We required a plan after they exceeded an acre and have twice. I don't think they have a storm water permit, but know if you need any additional info. Plant in they Iof1 10/21/2004 12:11 PM I . L-PaICy, %JJvrl I lul �O G William G. Ross, Jr., Secretary C r North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality October 15, 2004 Mr. Chester F. Harrison, Vice President APAC-Atlantic, Inc,. Coastal Carolina Division PO Box 399 Kinston, NC 28502 Subject: Request for Stormwater Management Permit Application APAC Deppe Asphalt Plant Stormwater Project No. SW8 040840 Onsiow-County Dear Mr. Harrison: On August 17, 2004, the Wilmington Regional Office received' a copy of the Notice of Receipt of an Erosion and Sedimentation Control Plan for the subject project. The North Carolina Administrative Code requires any project that must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site., prior to receipt of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action by this Office. Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and supporting documentation, or a written response regarding the -status of this project and the expected submittaf date must be received in this Office no later than November 15, 2004. Failure to respond to this request may result in the initiation of enforcement action, and construction may experience a subsequent delay.. The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT be.considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-395-3900. Sincerely, Linda Lewis Environmental Engineer RSS/arl: S:1WQSISTORMWATISTORMSUB1040840.oct04 cc: Onslow County Building Inspections ,Jeffery Becken, Catlin Engineers & Scientists LWirnington Regional Office File- T t--Ceritral-Files — North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 395.3900 Customer Servicet-877-623-5748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (919) 733-2496 Internet: h2o.encstate.nc.us - One NorthCar llina An Equa3 Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper Naturally -7-9tate- of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Division of Land Resources Land Quality Section Michael F. Easley, Governor William G. Ross Jr., Secretary `LT-1-9?FA 1� NCDENR V NC TH CfaCU— DC-ARTMEH Cr EEhRommExT A a NATURAL F=ouacEs August 17, 2004 NOTICE OF RECEIPT OF EROSION & SEDIMENTATION CONTROL PLAN APAC-Atlantic, Inc., Coastal Carolina Division Mr. Chester F. Harrison, Vice President PO Box 399 Kinston, NC 28502 Dear Mr. Harrison: This office has received a soil erosion and sedimentation control plan for the project listed below which was submitted as required by the North Carolina Sedimentation Pollution Control Act (NCGS 113A,-57(4)}, Please be advised that this Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of said land -disturbing activity (NCGS 11 3A- 54(d)(4)1. The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authcrity must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30 day period will be deemed approval of the plan if the submitted plan is complete. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion & sediment control plan is a violation of the Act. A copy of any erosion and sediment control plan which could involve the utilization of ditches for the.purpose of de,.vaterina or lowering the water table is forwarded by this office to the Division of Water Quality (DWQ). It is suggested that you contact the Division of Water Quality at (910) 395-3900 if the ditches shown on your plan will lower the water table. We have performed a preliminary review of your submitted plan and have determined that additional information ,.-rill be necessary before a final review can be completed. Enclosed is a checklist of items that must be submitted before we can comolete the review process. Failure to provide the additional information may result in disapproval of your plan. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and Mate water quality laws, regulations and rules. If you have questions or need additional information, please do not hesitate to contact this office. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Sincerely, Janet M. Russell Environmental Technician cc: Jeffery K. Eecken; Catlin Engineers & Scientists WiRO-LQS; WiRO-WQS-SW PROJECT NAME: APAC Deppe Asphalt Plant PROJECT NO.: Onslo-2005-051 LOCATION: Highway 17 - Onslow County RIVER BASIN: White Oak SUBMITTED BY: Catlin Engineers & Scientists DATE~ RECEIVED BY L.Q.S.: August 13, 2004 127 North Cardinal Drive, Wilmington, N.C. 28405-3845 a Telephone 910-395-3900 a Fax 910-350-2004 An Equal Opporunity Affirmative Action Employer