Loading...
HomeMy WebLinkAboutSW8041122_COMPLIANCE_20041208STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD WET DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1041122-A.nov04.WK1 PROJECT #: SW8 041122-A.nov04 REVIEWER: L. Lewis Pond A PROJECT NAME: Deppe Asphalt Plant DATE: 08-Dec-04 Receiving Stream: Starkey's Creek Class: C Drainage Basin: White Oak Index No. WOK01 20-10 Site Area 11.01 acres Drainage Area 244790.40: ; square feet Area in Acres 5.62 IMPERVIOUS AREAS Rational C Building 650.00 square feet Asphalt Paving 184994.00 square feet SW square feet Future square feet square feet square feet TOTAL :';:;1:;8564;:f square feet Rational Cc= 0.05 SURFACE AREA CALCULATION % IMPERVIOUS 75.84% SA/DA Ratio 5.41 % Des. Depth 5 Req. SA 13240 sf TSS: 90 Prov. SA > #5 54> sf VOLUME CALCULATION Rational ?* Des. Storm :::<:1C11= ....................................... inches Rv= 0.733 Bottom 33 msl Perm. Pool 38 Of. msl Design Pool 39 msl Storage met @elev 38.90 msl Req. Volume cf cf Vol. Prov. at DP ...:.......::153 cf ORIFICE CALCULATION " place a "1" in the box if Rational is used FOREBAY Perm. Pool Volume= 34373 Req. Forebay Volume= 6874.6 Provided Volume= 8462.00 *Percent= ;.4 fi°70....... * Forebay depth = pond depth Elevation Area Inc. Vol. Acc. Vol. 38.00 15750.00 39.00 17556.00 16653.00 16653.00 Avg. Head = 0.48 ft Q2 Area = 3.74 sq. inches Flow Q2, cfs 0.086 cfs Q5 Area = 1.49 sq. inches Flow Q5, cfs 0.035 cfs Orifice Area 2.36 sq. inches No. of Orifices >>>; Q= 0.055 cfs Diameter, inches I .a6 weir H x W in x m Drawdown = 3 2 days Surface Area a�DP = 17556 sq. ft. Falling Head Drawdown = 4.9 days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines WET DETENTION POND ANALYSIS FILE NAME: S:IWQSIPOND1041122-B.nov04.WK1 PROJECT #: SW8 041122-B.nov04 REVIEWER: L. Lewis Pond B PROJECT NAME: Deppe Asphalt Plant DATE: 08-Dec-04 Receiving Stream: Starkey's Creek Class: C Drainage Basin: White Oak Index No. WOK01 20-10 Site Area 11.01 acres Drainage Area 2349 L ft0 square feet Area in Acres 5.39 IMPERVIOUS AREAS Rational C Building 0.00 square feet Asphalt Paving 186343.00 square feet SW square feet Future square feet square feet square feet TOTAL ' 18fi33 00;, square feet Rational Cc= 0.04 SURFACE AREA CALCULATION % IMPERVIOUS 79.32% SAIDA Ratio 5.65% Des. Depth 5 Req. SA 13279 sf TSS: 90 Prov. SA :..:.:1:535: sf VOLUME CALCULATION Rational ?* Des. Storm 1>:{7tl> inches Rv= 0.764 Bottom 31 msl Perm. Pool 35 Oft:: msl Design Pool 37 msl Storage met @elev 36.92 msl Req. Volume 1�955 cf Vol. Prov. at DP :.........:::.:.:>1.233> cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.48 ft 0.087 cfs 0.035 cfs weir HxW days * place a "1" in the box if Rational is used FOREBAY Perm. Pool Volume= Req. Forebay Volume= Provided Volume= *Percent= 34674 6934.8 9258.00 2°la *forebay depth = pond depth Elevation Area Inc. Vol. Acc. Vol. 36.00 15375,00 37.00 17091,00 16233.00 16233.00 Q2 Area = 3.74 sq. inches Q5 Area = 1.50 sq. inches Orifice Area 2.36 sq. inches Q= 0.055 cfs :... m x .....::........ in Surface Area @DP = 17091 sq. ft. Falling Head Drawdown = 4.8 days COMMENTS Surface Area , Volume and Orifice are within Design Guidelines