Loading...
HomeMy WebLinkAboutSW8041122_APPROVED PLANS_20041208STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�(XO8 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE �?604/AOS� YYYYMMDD STORMWATER MANAGEMENT PLAN 1 REVISIONS MADE BASED ON COMMENTS FROM NCDENR IN A LETTER DATED NOVEMBER 29, 2004. REFER TO CATLIN'S DECEMBER 6,2004 RESPONSE LETTER. NO. DESCRIPTION R E V I S 1 0 N S FOR APAC ATLANTIC, INC. DEPPE ASPHALT PLANT DESIGNED BY- JF 13 DRAWN BY: WHW CHECKED BY MEM APPROVED BY: MEM DATE: DECEMBER 2004 JKB 12/06/04 BY DATE DEPPE, N.C. 14 b UAYSYN.LE yf1- BELGWE DEPPE a 0 a SITE 5LAL 027952 2K. - SITE LOCATION MAP NOT TO SCALE P..£ DJ3 m 1917 WILMINGTON, NORTH CAROLINA PROJECT STORMWATER MANAGEMENT PLAN FOR APAC—ATLANTIC, INC. DEPPE ASPHALT PLANT DEPPE, N.C. TITLE U� APPROVED N0 ?7H CAROLINA E HRONNUINTAL MANAGEMENT COMMISSION DIVISION OF WATER QUALITY ) I?- oc- C- Zcx%�- COVER SHEET SCALE: NO SCALE I `OB NO. two 2Z 204064-01-01 1 , T-1 y' f - n k rvrt FTr r F. T' -- { r '�; ii -k'E :�'; 'r , !T 'A�t-1'i 1 i r �'; -pit r S'. a.I./.1 { r .n J: fl�ki,..r 1� HRj�.kIL►l,ii'jj6S{i 'iw�.-rrP.1i%ir.nl1f'rt1110 khIfi!f}r,I�hkfICCC'ff.�rliklli�Ti OCT 04 SWP-204064-01-01 GENERAL NOTES R/W - ENTRANCE TO BE REMOVED DURING ROAD CONSTRUCTION CA OF ASPHALT uC N7-- - - - - EXISTING ENTRANCE-I,, n DRAINAGE AREA A • s f w. r Q s 1 S I � 1 1 A 4 SEDIMENT BASIN A BOTTOM ELEV. 33.0' PERMANENT 'S I� POOL ELEV- 38.0' ►� L (SEE DETAIL SHEET PROPOSED INLET ELEVATION = 1 REVISIONS MADE BASED ON COMMENTS FROM NCDENR IN A LETTER DATED NOVEMBER 29, 2004. REFER TO CATLIN'S DECEMBER 6,2004 RESPONSE LETTER. NO. DESCRIPTION R E V I S I O N S - - - _ CA OF ASPHALT - - - - 6.5' bdLi N LINK FEN FELD •�■■r�wl� �wa■ff�w•�la�.aia,. w.r,Y.�ww}{■l�Tia� • a!�■■ P SEDIMENT BASIN B ■ .o BOTTOM ELEV. 31.0' '� PERMANANT POOL ELEV. 36.0' a �........., (SEE DETAIL SHEET 4 i .�� mm : .q,DR.ems .A raw• •'+ � Q � � / . �.. ;.,- ~.. '• n AREA B . 41 • � a x 'z PROP S INLET ELEVATION = 4DNIL F Qp Vk OF PAVEMENT "PROPOSED PRINCIPAL SPILLWAY OUTFALL ELEVATION = 37.0' PROPOSED PRINCIPAL SPILLWAY ELEVATION = 39.0' EMERGENCY SPILLWAY ELEVATION = 41.5' DESIGNED BY: JKB DRAWN BY: WHW CHECKED BY: MEM APPROVED BY: MEM DATE: DECEMBER 2004 JKB 12/06/04 BY DATE 027��� . •PA K. L • BRIDGE W <01 BOTTOM OF RAIL ROAD BED 0 } a yti30TTOM bp L ftAD 1 " W `Y 4 I ,I,, PROVSED P INCIPA SPILLWAY `OUTFALL 1 PROPOSED PRINCIPAL SPILLWAY ELEVATION = 37.0' _N ELEVATION 39.75! As �F-W� L 1� 3T 10 C tiF°�o 0 x a 0 v r z m 1. BOUNDARY SURVEY AND FLOOD ZONE LOCATION PROVIDED BY WILLIE MILLER LAND SURVEYING. 2. TOPOGRAPHIC SURVEY PROVIDED BY CHARLES F. RIGGS & ASSOCIATES, INC. 3. ELEVATIONS ARE FROM MEAN SEA LEVEL. 4. A 25 FEET WIDE MINIMUM VEGETATIVE BUFFER IS PROPOSED TO REMAIN IN -PLACE AROUND THE NORTHWEST AND SOUTHWEST PROPERTY LINES. THE VEGETATION WILL BE MAINTAINED AS NEEDED. 5. ALL AREAS WITHIN THE VEGETATIVE BUFFER IS AND WILL BE AN IMPERVIOUS MATERIAL. 6. TOTAL PROPERTY ACREAGE IS 14.4 ACRES. 7. TOTAL ACREAGE FOR DRAINAGE AREA 'A' IS APPROXIMATELY 5-62 ACRES. 8. TOTAL ACREAGE FOR DRAINAGE AREA 'B' IS APPROXIMATELY 5.39 ACRES. 9. EXISTING OUTFALL LOCATION HAS NOT BEEN SURVEYED. 10- EXISTING SITE DRAINAGE IS TO THE EXISTING DITCHES WHICH DRAIN TO THE EXISTING OUTLET LOCATION. IT IS OUR UNDERSTANDING THIS IS AN APPROVED NPDES PERMITTED OUTFALL. 11. IT IS ASSUMED THAT THE PROPOSED CONSTRUCTION WILL NOT INCREASE OUTFALL VOLUME SINCE IMPERVIOUS AREA IS NOT INCREASING. 12. OWNERS ARE APAC-ATLANTIC, INC. CONSTRUCTION NOTES 1. ACTIVITIES ARE PROPOSED TO BE COMPLETED IN TWO PHASES, THE FIRST PHASE IS THE CONSTRUCTION OF THE NEW PLANT AND DRAINAGE AREA 'A' FEATURES. THE SECOND PHASE IS THE DEMOLITION OF THE EXISTING PLANT AND CONSTRUCTION OF DRAINAGE AREA 'S' FEATURES. 2. THE EXISTING SITE ENTRANCE WILL BE UTILIZED AS CONSTRUCTION ENTRANCE. 3. TEMPORARY SEDIMENT BASIN TO BE CLEANED OUT AT END OF CONSTRUCTION AND CONVERTED TO PERMANENT SEDIMENT BASIN. 4. EXISTING UNDERGROUND UTILITIES HAVE NOT BEEN LOCATED. UNDERGROUND UTILITIES ARE TO BE LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION ACTIVITIES. 5. EMBANKMENT - TAKE FILL MATERIAL FROM THE AREAS APPROVED BY OWNER. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT IS TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8-INCH CONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND THEN COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF THE HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 6. SAFETY - SEDIMENT BASINS MAY ATTRACT CHILDREN AND CAN BE DANGEROUS- AVOID STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNING SIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND LOCAL REQUIREMENTS. 7, FOREBAY DEPTH IS 5.0 FEET IN BOTH SEDIMENT BASINS. 8. DITCH ALONG EASTERN EDGE OF PROPERTY MAY NEED TO BE REGRADED TO ALLOW POSITIVE SLOPE IN PRINCIPLE SPILLWAY BARREL FROM SEDIMENT BASIN B. LEGEND SYMBOL DESCRIPIM :............. . STRUCTURE (EXISTING) STRUCTURE (UNDER CONSTRUCTION) PROPOSED ADDITIONAL SILT FENCE EXISTING SILT FENCE DRAINAGE AREA DIVISION LINE PROPOSED 25 FOOT WIDE MINIMUM VEGETATIVE BUFFER DELINEATED WETLANDS 41 d• J- W ro FLOW ARROWS CONTRACTOR TO DRAMs TO SEDIMENT BASIN AT 19 SLOPE - m X EDGE OF PAVEMENT (PROPOSED) FENCE PROPERTY LINE ------- DITCH LINE (VEGETATED) PPo-_ P POWER LINE WITH POWER POLE EIR EXISTING IRON ROD UP EXSTNG IRON PIPE EXISTING CONTOUR 60 30 0 60 SCALE IN FEET L® PRMCT STORMWATER MANAGEMENT PLAN FOR TITLE CONSTRUCTION SITE PLAN ��'"dscmimis APAC-ATLANTIC, INC. DEPPE ASPHALT PLANT 2 WILMINGTON, NORTH CAROLINA DEPPE, N.C. SCALE: SCALE: 1 "=fi0' RM- N0. 204064-01-02 OCT 04 204064-SWP-01-02 t' -._. i i' �- l f r ^'r. '. ' f 7,• - s - �}•rf - - 1 5N T7 - - - �- - 1 - rr---,-e- �,;T •� �' 11• I r . i { fir. ' ' f ' N '� f ' �'' 'if' ,�.I I'� e • ,f �{ .r - --, - . -. . '!; .._!'... --- ..lt:. f?r-..._.. _.-'--:it..- ._.C.7.'___.'±�H+r �QEt,n��:(tll_'�'31SfF'�r,:1.1."L_l3i^Z': NO. DETENTION POND INLET VEGETATED PERIMETER SHELF in N _ ZEMERGENCY SPILLWAY ELEVATION_ _ _ _ --- ----- - -- Z PRINCIPAL SPILLWAY TEMPORARY POOL - - WATER QUALITY ORIFICE ELEVATION o - (PERMANENT POOL ELEVATION) o ni VEGETATED o VEGETATED 04 SHELF vi T FOREBAY SHELF , SEDIMENT REMOVAL ELEVATION �G\; FOREBAY SPILLWAY (VEGETATED) EVATION - - EMERGENCY SPILLWAY N 18" CMP RISER (RIP --RAP PROTECTION) F-------------- - --- - --- _...--.---- - A- - - - `\ c \� \ VEGETATED b VEGETATED 6 VEGETATED PERIMETER SHELF to SHELF `/j���' SHELF SEDIMENT REMOVAL ELEVATION N� WET DETENTION POND SECTION NOT TO SCALE (SEDIMENT BASINS TO BE CLEANED OUT AFTER CONSTRUCTION AND USED AS PERMANENT WET DETENTION PONDS) VEGETATION SPECIFICATION FOR SUBMERGED PERIMETER SHELF (SWITCHGRASS, OR APPROVED EQUIVALENT) TCuollo AMV 1 IAIC0 C-MAW LAI II r•U LJCI n ROLL OUT STRIPS OF NETTING PAR, TO THE DIRECTION OF FLOW. JOIN STRIPS BY AND OVERLAPPIN GRASS LINED CHANNELS NOT TO SCALE VEGETATION SPECIFICATION FOR GRASS LINED CHANNEL (TALL FESCUE, BAHAIGRASS, OR APPROVED EQUIVALENT) REVISIONS MADE BASED ON COMMENTS FROM NCDENR IN A LETTER DATED NOVEMBER 29, 2004. REFER TO CATLIN'S DECEMBER 6,2004 RESPONSE LETTER. DESCRIPTION 12" CMP SEDIMENT BASIN /WET DETENTION POND DIMENSION DESCRIPTION BASIN A BASIN B PEAKFLOW REFER TO CALCULATION SHEETS BASIN VOLUME 38,265 FT 31 937 FT PERMANENT POOL SURFACE AREA 205 x68 MIN. 205 x65 MIN. A —ELEVATION 39.0 FT 37.0 FT B—ELEVATION 33.0 FT 31.0 FT C—LENGTH 70.0 FT MIN. 70.0 FT MIN, D—LENGTH 8 FT 8 FT £—ELEVATION 42.0 FT 40.0 FT F-•-ELEVATION 41.5 FT 39.5 FT G—ELEVATION 37.0 FT 31.0 FT EMERGENCY SPILLWAY SLOPE 4� 4� H—WIDTH 10 FT 10 FT I —WIDTH 20 FT 20 FT J —ELEVATION 38 FT 36 FT DESIGNED BY: JKB DRAWN BY: WHW CHECKED BY: MEM APPROVED BY: MEM DATE: DECEMBER 2004 JKB 12/06/04 BY 1 DATE SEEPAGE HOLES TO CONTROL RUNOFF FROM 1" STORM (3 - 1" DIA. HOLES -- -- --- 3d o do = 18- FLOW SEDIMENT BASIN/WET DETENTION POND CONSTRUCTION NOTES 1_ CUT-OFF TRENCH EXCAVATE A CUT-OFF TRENCH ALONG THE CENTERLINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT BUT IN NO CASE LESS THAN 2 FEET_ MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTION REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS. 2. CONDUIT SPILLWAYS SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTI -SEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. 3. FOR SEDIMENT BASIN/WET DETENTION POND MAINTENANCE REQUIREMENTS, REFER TO WET DETENTION BASIN SUPPLEMENT FORM SWU-102. K. i C SUAL n ANCH R O BAR SECTION A --A ANCHOR TO BARREL NOT TO SCALE I , C DAM (GRASSED) — I — RIPRAP TO EXTEND FROM SPILLWAY CREST TO OUTFALL SEDIMENT BASIN PLAN WET DETENTION POND PLAN AND OUTLET PROTECTION NOT TO SCALE PIPE OUTLET TO FLAT AREA — NO WELL DEFINED CHANNEL NOTES: 1. La IS THE LENGTH OF THE RIPRAP APRON. 2. d=1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL—DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSATALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. 5. W=Do + La. AVERAGE (DESIGN) WDTH RIPRAP SECTION TYPICAL SPILLWAY SECTION NOT TO SCALE PROJECT STORMWATER MANAGEMENT PLAN TITLE DETAILS LS SHEET APAC-ATLANTIC, INC DEPPE ASPHALT PLANT 4 WMINGTON, NORTH CAROL.INA DEPPE, N.C. SCALE: JOB NO. NO SCALE 204064-01-04 -. -' ,,-.- i+: , ; T-ry-�; :S,:S�n� •':��f •--� i % �r 111 rr.�+ -r'-i 7 rrAli ti�-:`--,�_T 4.' ��i ,j -IT' - t -. OCT 04 SWP-204064-01-04