Loading...
HomeMy WebLinkAboutSW8040916_COMPLIANCE_20040930STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW" DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE �(?JJ�edQ3�l YYYYMMDD STORMWATER DIVISION CODING SHEET PERMIT NO. DOC TYPE ❑FINAL PERMIT ❑ MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ YYYYMMDD STORMWATER CALCULATIONS FOR WILMINGTON POLICE HEADQUARTERS FOR NCDWQ WILMINGTON NORTH CAROLINA RECEIVED SEP 3 0 2004 Dwq PROJ # 5W 60409 ( (O ENGINEERS WK DICKSON & CO., INC. 909 MARKET STREET WILMINGTON, N.C. 28401 (910)762-4200 September 29, 2004 SEAL 19742 q 7 *qo'll r� Stormwater Narrative City of Wilmington Police Headquarters WKD#: 00720.80.WL September 29, 2004 GENERAL The City of Wilmington plans to develop the property commercially with a new police headquarters. The site is located at 615 Bess Street in Wilmington. The majority of the site is moderately flat and drains by means of sheet flow towards the existing C.S.X. railroad that runs along the eastern and western boundary of the proposed disturbed area. The remaining portion of the existing site drains by sheet flow to an existing ditch that runs along the southerly boundary of the proposed disturbed area. PROPOSED IMPROVEMENTS Proposed improvements will involve the construction of a 9.75 acre office development and will include the construction of a wet detention basin. This basin will improve water quality for post development runoff as well as ensure that our post -development flow (13.94 cfs) is less that that our pre -development flow (14.48 cfs) for the 10-year event. All of the surface water runoff from the developed impervious areas will be sent to a proposed wet detention system. DRAINAGE CONSIDERATIONS Runoff will be conveyed to the detention system by means of piped drainage systems. These piped systems will ensure positive drainage to the pond. The systems will be designed to transport the runoff from the 10-year storm event to the pond. The grades shown on the plans are final grade elevations. The plan currently proposed shows that the imperviousness of the drainage area being conveyed to the pond will be 71.6%. During construction silt fence, riprap aprons, inlet protection, and construction entrances will be placed in critical areas as directed by the Erosion Control Plan. All design criteria is based on City of Wilmington stormwater standards. Drainage areas were delineated for determining the correct culvert size for each drainage segment. WK DICKSON Engineering 909 Market Street Land Planning Wilmington, NC 28401 Surveying (910) 762-4200 WILMINGTON POLICE HEADQUARTERS TOTAL AREA DRAINING TO POND = 349,309 SF = 8.01 AC TOTAL PRE -DEVELOPMENT FLOW =(C)(I10-YR)(A)=(0.25)(7.23)(8.01) = 14.48 CFS TOTAL PROPOSED IMPERVIOUS SURFACE AREA DRAINING TO POND: BUILDINGS = 54,000 sf PARKING = 173,594 sf SIDEWALKS = 15,506 sf OTHER = 6,900 sf — walls and mechanical yard TOTAL = 250,000 SF 250,000/349,309 = 71.6% REQUIRED STORAGE FOR 1-INCH OF RUNOFF FOR POND: (use Schueler Method) = 0.05 + 0.009 (I) = 0.05 + 0.009(71.6) = 0.694 = (1")(0.694)(1/12)(349,309) = 20,202 CF (20,593 CF PROVIDED) POND DEPTH SA/DA % POND SURFACE AREA (MIN.) (FT) (SF) (c7bfU %75.� 7.5 2.38 8,314 IF POND DEPTH = 7.5 FT, MINIMUM SURFACE AREA = 8,314 SF USED 90% TSS CHART TO SIZE POND AREA @ ELEVATION 14.60 = 8,580 SF > 8,314 SF REQUIRED STORAGE FOR FOREBAY: 20% OF TOTAL PERMANENT POOL VOLUME = (0.2)(16,386 CF)<-- Z. = 3,277 CF (3,455 CF PROVIDED --- 21.1%) PROJECT: WILMINGTON POLICE HQ SUBJECT: POND CALCULAT ONS JOB NO.: 00720.80.WL PREPARED BY: MNH DATE: Z ,01CHECKED BY: MNH DATE: Z' p PAGE NO_L Off' % ` WK DICKSON Engineering 909 Market Street Land Planning Wilmington, NC 28401 Surveying (910) 762-4200 Pond Volume Contour Incremental Cumulative Elevation Area Volume Volume (ft) (sf) (cf) (cf) Bottom Elevation 7.10 198 0 0 8.00 478 304 304 9.00 827 653 957 10.00 1,270 1049 2005 11.00 1,827 1549 3554 12.00 2,621 2224 5778 13.00 3,528 3075 8852 14.00 4,893 4211 13063 `(D Permanent Pool 14.60 6,183 3323 16386 <- 2 AyQ Forebay Volume Contour Incremental Cumulative Elevation Area Volume Volume (ft) (sf) (cf) (cf) Bottom Elevation 10.60 55 0 0 11.00 118 35 35 12.00 432 275 310 13.00 952 692 1002 14.00 1,662 1307 2309 Permanent Pool 14.60 2,158 1146 3455 Forebay Volume is 21.1% PROJECT: WILMINGTON POLICE HQ SUBJECT: POND CALCULATIONS JOB NO.: 00720.80.WL PREPARED BY: MNH DATE:` _ c CHECKED BY: MNH DATE: PAGE NO2 OF 3 WK DICKSON Engineering Land Planning Surveying Temporary 1" Storage Volume Contour Incremental Cumulative Elevation Area Volume Volume (ft) (sf) (cf) (cf) Norm Pool Elev. 14.60 8,580 0 0 15.00 9,264 3,569 3,569 16.00 10,980 10,122 13,691 I" Storage Elev. 16.60 12,028 6,902 20,593 RECEIVED SEP 3 0 2004 owe PROD # �LV�U ULf 1 909 Market Street Wilmington, NC 28401 (910) 762-4200 M PROJECT: WILMINGTON POLICE Q SUBJECT: POND CALCUL TONS JOB NO.: 00720.80.WL PREPARED BY: MNH DATE: O'tHECKED BY: MNH DATE: I'PAGE NO / OF WK DICKSON Engineering Land Planning Surveying 909 Market Street Wilmington, NC 28401 (910) 762-4200 POND RELEASE TIME FOR CONTROL PIPE: POND ELEV. EFF. STORAGE VOL. RELEASED OUTFLOW RATE RELEASE TIME (FT) (CF) (CF) (CFS) (HOURS) 16.60 20,593 6,897 0.149 12.9 16.00 13,696 10,127 0.124 22.6 15.00 3,569 3,569 0.066 14.9 14.60 0 TOTAL HOURS 50.5 DAYS 2.1 CONTROL PIPE: 2 INCH ORIFICE HOLE USED ORIFICE EQUATION TO DETERMINE OUTFLOW RATE Q = Cd`A`(2gh)^112 PROJECT: WILMINGTON POLICE HQ SUBJECT. POND CALCULATIONS JOB NO.: 00720.80.WL PREPARED BY: MINH DATE 2 ' �~� CHECKED BY: MNH DATE: tr x�" I PACE NOS OF SGv _F04-0glG, ,j :v STORMWATER SUBMITTAL REQUIREMENTS DETENTION POND A. Site Plan i/ 1. a Develop ment/Project Name ✓ 2. Designers seal, signature, name and firm. ✓ 3. Legend ✓ 4. North Arrow 5. Location Map with direction, distance to named streets, NCSR numbers. 6. Scale 7. Date L 8. Revision number and date. 9. Original contours, proposed contours, spot elevations, finished floor elevations. 10. Existing drainage, including off -site. Provide a map of any offsite areas. ✓ 11. Property/Project boundary lines, dimensioned. ti A 12. Mean High Water Line, if project is adjacent surface waters. ✓ 13. '.Drainage easements, catch basins, pipe sizes, inverts. 14. :; Wetlands delineated, or a note on the plans that none exist. Ponds may not be located in a wetland. 15. ' Details of the road, parking, cul-de-sacs, including sidewalks, curb and gutter.. 0IA 16. Drainage area to each pond delineated. 17. Dimensions of the permanent pool. IDYo 18 'Vegetated filter detail if using 85% TSS. This is NOT a connector ditch. 19. Dimensions of the road, parking cul-de-sacs, sidewalks, and curb and gutter. 4_4 20. Unit footprint with dimensions and concrete wood deck areas noted.for apartments or condo development. c r BvC (d�„� dimenS icvls. 21. Forebay at each inlet. (Prefer one inlet) 22. Inlets located such that entire pond is used for treatment and no short- circuiting. 23. Pondlforebay section detail with. - Bottom elevation Li Permanent pool elevation PP Storage pool elevation SP Slopes: 3:1 above permancnt pool Vegetated shelf located below permanent pool, 6:1 slope, with begin and end elevations around main pond. (Not required inside forebay) Forebay bottom elevation, 3:1 slopes, Forebay weir elevation between PP and DP. 24. Outlet structure detail with trash rack and orifice size specified. Maximum trash 4A 25. rack opening size is 4". Note that drains be on plans all roof must directed so as to be picked up by the pond. — 21t dr2,:,is InEv j72rkilI lot c✓ 26. A 3:1 L:W ratio has been provided for the pond. 27. Maximum average pond depth of 6'. (Parts of pond may be deeper -up to 73) ✓ 28. Vegetation requirements for pond slopes and wetland species forthe 6:1 shelf are listed. Weeping Love grass is not suitable for use in North Carolina. STORMWATER SUBMITTAL REQUIREMENTS DETENTION POND (cont) B. Calculations 1. - 85% or 90% TSS Chart noted. 2. ..-Pond depth. 3. SAIDA ratio calculation. ✓ 4. :' Required surface area at permanent pool. ✓ 5. - Provided surface area at permanent pool (Based on pond dimensions) 6. Provided surface area at temporary design pool. 7. Required volume calculation. 8. Provided volume calculation. 9. Orifice size based on required 1" volume, using average head to design pool elevation. 10. Designer=s seal. t✓ 11. Built -upon area to each pond. t✓ 12. Forebay designed to hold 20% of the permanent pool volume. (Range of 18- 13. 22 OK.) Non -erosive flow for 10 yr. storm in the vegetated filter, if using 85% TSS. C. Supporting Documentation 1. ;-Completed permit application and supplement. a. Is the person who signed the landowner or a lessee? Must be landowner. v b. All sections and blanks completely filled in. �✓ C. Check signature per. 1003 (e). Make sure title is provided. till d. If agent signs, signatory authorization from owner. v e. Wet detention supplement sheet provided. f. Mailing address & phone of applicant- no CIO. ✓ g. Verify water body classification. u h. Justifications for not meeting a design requirement. uj i. If a modification, include Designer=s Certification. j. Hand initial design requirements. 2. Proposed deed restrictions