Loading...
HomeMy WebLinkAboutSW8040106_COMPLIANCE_20110715STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE 711 WYYMMDD Permit: SW8040106 County: Onslow Region: Wilmington Compliance Inspection Report Effective: 06/18/04 Expiration: 06/18/14 Owner: Edward E Penuel Project: Coastal Contractors, Inc. -Office Site US Hwy 17 New Bern Hwy Jacksonville NC 28540 Contact Person: Edward E Penuel Title: Owner Phone: 910-347-1479 Directions to Project: From intersection of US Hwy 17 & NC Hwy 24, North on US Hwy 17 approx. 5.60 miles site is on the right. Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC -.NSW) On -Site Representative(s): Related Permits: Inspection Date: 07/15/2011 Entry Time: 08:10 AM Primary Inspector: David W Cox Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: ■ Compliant Q Not Compliant Question Areas: ■ State Stormwater (See attachment summary) Exit Time: 08:20 AM Phone: 910-796-7215 Inspection Type: Compliance Evaluation Page: 1 Permit: SW8040106 Owner - Project: Edward E Penuel Inspection Date: 0711512011 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: System is in compliance per the engineer's stamp of 6/28/2011. File Review Yes No NA N Is the permit active? ■ Cl Q ❑ Signed copy of the Engineer's certification is in the file? ■ ❑ Q O Signed copy of the Operation & Maintenance Agreement is in the file? O Q Q Copy of the recorded deed restrictions is in the file? ❑ ❑ ❑ ■ Comment: Page: 2 w Compliance Inspection Report Permit: SW8040106 County: Onslow Region: Wilmington Effective: 06/18/04 Expiration: 06/18/14 Owner: Edward E Penuel Project: Coastal Contractors, Inc. -Office Site US Hwy 17 New Bern Hwy Jacksonvifle NC 28540 Contact Person: Edward E Penuel Title: Owner Phone: 910-347-1479 Directions to Project: From intersection of US Hwy 17 8 NC Hwy 24, North on US Hwy 17 approx. 5.60 miles site is on the right. Type of Project: State Stormwater - HD - Detention Pone! Drain Areas: 1 - (Northeast Creek) (03-05-02 ) ( SC;NSW) On -Site Representative(s): Related Permits: Inspection Date: 05/1612011 Entry Time: 01:00 PM Primary Inspector: Angela K Hammers Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: 0 Compliant ■ Not Compliant Question Areas: M State Stormwater (See attachment summary) Exit Time: 01:30 PM Phone: 919-796-7215 Ext.7317 Inspection Type: Compliance Evaluation Page: 1 40, Permit: SW8040106 Owner - Project: Edward E Penuel Inspection Date: 05/16/2011 Inspection type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The following deficiencies were noted during the inspection: 1. An engineers' certificate of the stormwater system was not found in the DWQ file. 2. Pond slopes appeared steeper than 3:1, especially near the inlet of the forebay and adjacent to the road of the main basin side. The overflow appears to extend only to the TOB, which is different than approved plan. 3. Pond slopes are steep and eroding, especially near the inlet of the forebay basin (a willow tree had fallen into the basin). Numerous willow trees and myrtles were observed on the pond slopes. To bring this system into compliance, the following must be completed: 1. Submit an engineers' certification of the stormwater system to DWQ. 2. Maintain pond slopes per the approved plan. Re -vegetate as needed. 3. Repair the overflow per the approved plan. 4. Repair erosion of pond slopes and re -vegetate as needed. 5. Remove woody plants along pond slopes below the permanent pool elevation. Note: If additional built upon area (BUA) is proposed, please submit a permit modification to notate the future BUA for approval prior to construction. Page: 2 ' Permit: Sw8040106 Owner -Project: Edward E Penue! Inspection Date: 05/16/2011 Inspection Type: Compliance Evaluation Reason for Visit: Routine File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: An engineers' certification was not found in the DWQ file. Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: Building, parking and gravel lot was observed as constructed on Parcel A. Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Pond slopes appear steeper than 3:1 especially near the inlet of the forebay and adjacent to the road on the main basin side. The overflow appears to extend only to the TOB, which is different than approved plan. Yes No NA NE ■000 D■nD ■n0D DD■O Yes No NA NE ■❑Dn ■DDD ■DDD Yes No NA NE D■D0 D0D■ DDD■ Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? fl ■ D f-1 Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO D 01 ■ upon request? Comment: Pond slopes are steep and eroding, especially near the inlet of the forebay basin (a willow tree had fallen into the basin). Numerous willow trees and myrtles were observed on the pond slopes. Page: 3