HomeMy WebLinkAboutSW8030229_COMPLIANCE_20140311STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW 'S056�A-`
DOC TYPE
El CURRENT PERMIT
❑ APPROVED PLANS
EJ HISTORICAL FILE
pCOMPLIANCE EVALUATION INSPECTION
DOC DATE
o2p�x(3''�GI
YYYYMMDD
Compliance Inspection Report
Permit SW8030229 Effective 03/11/04 Expiration 03/11/14
County Brunswick
Region Wilmington
Contact Person E Dale Richardson Title Owner
Directions to Project
Type of Project State Stormwater - HD - Detention Pond
Drain Areas 1 - (Allen Creek (Boiling Springs Lake)) (03-06-17) ( B,Sw)
On -Site Representative(s)
Related Permits
Inspection Date 02 I612010 Entry Time 08 50 AM
Primary Inspector Vincent Lewis
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type State Stormwater
Facility Status ❑ Compliant ❑ Not Compliant
Question Areas
0 State Stormwater
(See attachment summary)
Owner E Dale Richardson
Project E Dale Richardson Land Disturbing Activities
NC 87 garage Rd in
Brunswick County
Southport NC 28461
Phone
Exit Time 09 15 AM
Phone
Inspection Type Compliance Evaluation
Page 1
Permit SW8030229 Owner - Project E Dale Richardson
Inspection Date 02/15/2010 Inspection Type Compliance Evaluation Reason for Visit Routine
Inspection Summary
Site not constructed as of 02/15/2010
Flla RAVIAW Yes No NA NE
Is the permit active?
■ ❑ ❑ ❑
Signed copy of the Engineer's certification is in the file?
0000
Signed copy of the Operation & Maintenance Agreement is in the file?
■ ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file?
❑ ❑ ■ ❑
Comment
Built Upon Area
Yes No NA NE
Is the site BUA constructed as per the permit and approval plans?
❑ ❑ IN ❑
Is the drainage area as per the permit and approved plans?
❑ ❑ ■ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
❑ ❑ ■ ❑
Comment
Are the SW measures constructed as per the approved plans?
❑
❑
■
❑
Are the inlets located per the approved plans?
❑
❑
■
❑
Are the outlet structures located per the approved plans?
❑
❑
■
Cl
Comment
Operation and Maintenance
Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements?
011011
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ■ ❑
upon request?
Comment
Page 2
/ State Stormwater @nspee$ion Report
%eneral '•
Project Name
Permit No SW 3
Expiration Date
Contact Person
L1
Phone Number
Inspection Type
t
Inspection Date Z /1/ Z a L6
Time In r -6
Time Out
Current Weathei Ole- h
Recent Rain (Date)2
Ram - in
Location
Facility Address / Location
✓ c ILat� Long <WCity o
Rcs I r r r
Permit Information
Rule Subject to (circle one) 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule Session Law 2006-246
Goose Creek High Quality Waters Outstanding Resource Waters
Density (circle one) igh (HD Low (LD)
Stormwater Best Management Practices (BMPs) (insert number of each)
Wet Ponds Infiltration Basins Infiltration Trenches
Dry Ponds Bioretention Permeable Pavement
Cistern Level Spreader/Filter Strip Other (spec)
File Review
41) Swales Stormwater Wetlands
_Sand filters (circle one) Open Closed
Yes, No NIA NIE
I Is the permit active?
2 Signed Engineer's Certification on file?
3 Signed Operation and Maintenance agreement on file?
4 Recoided Deed Restiictions on file?
Shia Vigat Rm1f 19nnn AirPa 1R[1A1
ITI�->•��l��I��l1,Ili�
5 BUA is constructed and consistent with the ermat re uirements?
6 BUA aspermitted) is graded such that the runoff drains to the system? (high density only)
7 Drainage area is consistent with perrniO i e no un ermitted drainage to the SW BMPs
8 Drainage area is stabilized? (to reduce risk of sedimentation to the SW BMPs) _
1J
Site Visit Stormwater 13MPs
Yes No NIA NIE
9 Stormwater BMPs are located per the approvedplans?
10 Stormwater BMPs have dimensions (eg length, width, area matchin the approvedplans?
I I Stormwater BMPs are constructed per the approvedplans?
(/
Site Visit Operation and Maintenance Yes No NIA NIE
12 Access points to the site are clear and well maintained?
13 Trash has been removed as needed
vi�l__
14 Excessive landscape debris(grass clippmLs, leaves, etc is controlled
15 Stormwater BMPs being operated and maintained as per the pqmit re uirements?
16 Inspection and Maintenance records are available for inspection? (high density.only,1995 - present.only)
Site Visit Other Permit Conditions Yes No NIA NIE
17 Is the site compliant with other conditions of the permiO
Sate Visit Other Water Quality Issues Yes Nol NIA N/E
1 18 Is the site compliant with other water quality issues as noted durinu the mspection9 I I V I i
State Stormwater Inspecoon Report'version 3 0_3 09 Page 1 of
i IK
State Stormwater 8nspecfl®w Report
ft tf k"Je,1,1,41 lk 1f411a JG are -
Inspection Pictures (some of the oactures taken during the site
Comphance Status 0 Compliant fie' Non -Compliant
Letter Sent (clrcle one) Yes No Letter type CEI NOV NOVRE Other
Date Sent Refeience Number
Inspector Name and Signaturey -M41 e L"If &,
Date Z'1 `�%z 616
State Stormwater Inspection Report Version 3 0_3 09 Page 2 of 2
1 AL
WET DETENTION O & M Inspection Checklist
INLETS and FOREBAY
i
Inlets are located per the approved plans
❑
2
Inlet device (swale or pipe) is free of damage, clogs or erosion
❑
❑
❑
❑
3
Forebay berm is in place and without erosion
❑
❑
❑
❑
4
Forebay is free of excessive sediment
❑
❑
❑
❑
SIDE SLOPES AND BANKS
5
Vegetated slopes are 3 1 or less
❑
❑
❑
❑
6
Banks are stable and free of erosion or bare soil
❑
❑
❑
❑
7
Slopes or berms are free of woody vegetation
❑
❑
❑
❑
8
Free of muskrats or beaver activity
❑
❑
❑
❑
9
Grass is being maintained and mowed (not scalped) as required
❑
❑
❑
❑
PEIUMETER AND MAIN BAY
10
Vegetated shelf is 6 1 or 10 1 as permitted and properly vegetated
❑
❑
❑
❑
11
Algal growth covers less 54% of the area
❑
❑
❑
❑
12
Cattails, phragmites or other invasive plants cover less than 50% of the basin surface
❑
❑
❑
❑
13
Main treatment area is free from excess sediment accumulation
❑
❑
❑
❑
OUTLETS
14
Swale or emergency outlet bypass is in the correct place and is in good condition
❑
❑
❑
❑
15
Drawdown device is correctly sized free of damage or clogging
❑
❑
❑
❑
16
Orifice size matches the approved plans
❑
❑
❑
❑
17
Outlet is free of erosion or other signs of damage
❑
❑
❑
❑
18
Trash rack is installed
❑
❑
❑
❑
19
Vegetated filter is in place (if applicable)
❑
❑
❑
❑
20
Relative elevations match approved plans
❑
❑
❑
❑
21
Founta►n pump (if permitted) is less than or equal to the maximum allowable size
❑
❑
❑
❑
V3 3_09
•
Dale Richardson Property
Boiling Springs Lake, NC
Revised 12/27/03
Drainage Area
sq ft acres
Inflow 1 55 757 128
Impervious Area
Land Use
sq ft
acres
Buildings
2,646
0 06
Parking Area
21,400
049
Total
24 046
055
Detention Pond Design (Dry Detention)
Pond Size
Elevation
Surface Area
ft
sq ft
Bottom of Pond
930
840
Elevation 94
940
1,380
Elevation 95
950
2,340
,Top of Bank
960
3 250
% Impervious' = 0 431
= 43 1 %
Runoff Coefficient (Schueler)
Rv = 0 05 + 0 009(l)
where I = Percent Impervious of Drainage Area
Rv = 0 4381392
State Volume Required for Storage Runoff from 1st 1" of Rainfall
Volume = [i" X (1l12) X (DA) X (Rv)}
= 2 036 cu ft 777:�]
Required Sediment Storage Volume
Required Sediment Volume
Volume = 20% of Runoff Storage Volume
407 cu ft
Total Volume Required
Runoff Volume + Sediment Volume
Volume = 2 443 cu ft
RECEIVED
JAN 0 9 2004
DWQ
pROJ0 of 030ZZR
,�A CAROMS''.
SEAL
a
024400
�TY wrw'V y '�
L�ti�C``,���
Page 1 of 2
Determine Elevation of Control Orifice and Estimated Head Under 1" Rainfall
Required 1"Volume 2,036 Cu Feet
Sediment Volume 407 Cu Feet
Total Volume Req'd 2,443 Cu Feet
Elevation
feet) _
Basin
SA @ Elev
(Sq Feet
Basin
Incr Vol
Cu Feet
Total
Stored Vol
Cu Feet
930
840
0
0
931
894
87
87
932
948
92
179
933
1 002
98
276
934
1 056
103
379
935
1,110
108
488
936
1 164
114
601
937
1 218
119
720
938
1 272
125
845
939
1 326
130
975
940
1 380
135
1 110
941
1 476
143
1,253
942
1 572
152
1 405
943
1,668
162
1 567
944
1 764
172
1,739
945
1 860
181
1920
946
1,956
191
2 111
947
2052
200
2 311
948
2 148
210
2 521
949
2 244
220
2 741
950
2,340
229
2,970
951
2 431
239
3209
952
2 522
248
3 456
953
2,613
267
3 713
954
2 704
266
3 979
9551
2,7951
238
4,216
Outlet Structure Design
Flow for 2-day drawdown of 1 st i" of stormwater
Q = Required 1" Volume 1 172,800 sec
= 0 0118 cfs
Required Area of Pipe for 2-dav drawdown (1"
A= QI[Cd XSQRT(2XgXh)]
Cd = 065
g = 32 2 ft1sec2
h = (1" F P Elev - Orifice Elev) / 2
065
A = 0 00280138 sq It
Diameter of Pipe for 2-day Drawdown
DIA = SQRT[(A X 4)1 pi]
0 06 feet
= 0 72 inches
*Use 0 5 Inch Diameter Orifice
Set Orifice at El 93 5 to Provide
r Min Req'd Sediment Storage
Elevation is approximately 94 8
For Total Volume Storage
(1" Flood Pool Elevation)
4
C�L
Flow for 5-day drawdown of 1st 1" of stormwater
Q = Required 1" Volume 1432 000 sec
= 0 0047 cfs
Required Area of Pipe for 5-dav drawdown (1"
A= Q/(Cd XSQRT(2XgXh)]
Cd = 065
g = 32 2 ftlsec2
h = (1" F P Elev - Onfice Elev) / 2
= 065
A= 0001121 sq ft
Diameter of Pipe for 5-day Drawdown
DIA = SQRT[(A X 4)1 pi]
= 0 04 feet
= 0 45 inches
Page 2 of 2
STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT
S21DOM
NO.
SW
DOC TYPE
❑CURRENT PERMIT
❑ APPROVED PLANS
0• HISTORICAL FILE
III COMPLIANCE EVALUATION INSPECTION
DOC DATE
Z5?/J/4[J7iCI
YYWMMDD
Compliance Inspection Report
Permit SW8030229 Effective 03/11/04 Expiration 03/11/14
County Brunswick
Region Wilmington
Contact Person E Dale Richardson Title Owner
Directions to Project
Type of Project State Stormwater - HD - Detention Pond
Draln Areas 1 - (Allen Creek (Boding Springs Lake)) (03-06-17 } ( B,Sw)
On -Site Representative(s)
Related Permits
Inspection Date 02/15/2010 Entry Tlme 08 50 AM
Primary Inspector Vincent Lewis
Secondary Inspector(s)
Reason for Inspection Routine
Permit Inspection Type StateStormwater
Facility Status El Compliant ❑ Not Compliant
Questlon Areas
0 State Stormwater
(See attachment summary)
Owner E Dale Richardson
Project E Dale Richardson Land Disturbing Activities
NC 87 garage Rd in
Brunswick County
Southport NC 28461
Phone
Exit Time 09 15 AM
Phone
Inspection Type Compliance Evaluation
Page 1
Permit SW8030229 Owner - Project E Dale Richardson
Inspection Data 02/15/2010 Inspection Type Compliance Evaluation
Reason for Visit Routine
Inspection Summary
Site not constructed as of 02/15/2010
File Review
Yes No NA NE
Is the permit active?
0000
Signed copy of the Engineer's certification is in the file?
❑ ❑ ■ ❑
Signed copy of the Operation & Maintenance Agreement is in the file?
■ ❑ ❑ ❑
Copy of the recorded deed restrictions is in the file?
❑ ❑ ■ ❑
Comment
Built Upon Area
Yes No NA NE
Is the site BUA constructed as per the permit and approval plans?
❑ ❑ ■ ❑
Is the drainage area as per the permit and approved plans?
❑ ❑ ■ ❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
❑ ❑ ■ ❑
Comment
.�.....
Vwe U— UA UC
Are the SW measures constructed as per the approved plans? ❑ Cl ■ ❑
Are the inlets located per the approved plans? ❑ ❑ ■ ❑
Are the outlet structures located per the approved plans? ❑ ❑ ■ ❑
Comment
Operation and Maintenance Yes No NA NE
Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ■ ❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ■ ❑
upon request?
Comment
Page 2
r � /
,
State Storfr water Inspectoon Report
r;pnara@
Protect Name lUj
Permit No SW b3 Ow
Expiration Date
S(
Contact Person Wt
Phone Number
Inspection Type
Inspection Date �„ I I� Z 6
Time In U
Time Out l
Curient Weathei
Recent Ram (Date)?
Ram — in
Location
Facility Address / Location f // I -
City �G i / e 1 Zip Co�ity�fti, cY Lat 7 ° �it ` "N Long -2g Vb9«W
Permit Information
Rule Subject to (circle one) 1988 Coastal Rule
1995 Coastal Rule
2008 Coastal Rule Session Law 2006-246
Goose Creek
High Quality Waters
Outstanding Resource Waters
Density (circle one)
6iiHDpLow (LD)
Stormwater Best Management Practices (BMPs) (insert number of each)
i /
Wet Ponds
Infiltration Basins
infiltration Trenches
y LD Swales Storinwatei Wetlands
Dry Ponds
Bioretention
Permeable Pavement
Sand filters (circle one) Open Closed
Cistern
Level Spreader/Fthei Strip
Other (specify)
File Review
Yesr No NIA NIIE
I Is the erinrt active?
2 Signed En meer's Certification on file?
3 Signed Operation and Maintenance agreement on file?
4 Recorded Deed Restrictions on file9
Site Visit Built Unon Area IBUAI Yes No NIA NIE
5 BUA is constructed and consistent with the pennit requirements?
6 BUA aspermitted) is graded such that the runoff drains to the system? (high density onlyJ
7 Drainage area is consistent withpermit? 0 e no un ermitted drainage to the SW BMPs
8 Drainage area is stabtlize0 to reduce risk of sedimentation to the SW BMPs
L)
Site Visit Stormwater BMPs
Yes No NIA N/E
9 Stormwater BMPs are located per the approvedplans?
10 Stormwater BMPs have dimensions (eg length, width, area matching_the approvedplans?
V
1 I Stormwater BMPs are constructed er the a roved plans9
(/
Site Visit Oneration and Bilaintonanep Yps No / NIA NIE
12 Access gomts to the site are clear and well maintained?
13 Ti ash has been removed as needed?
14 Excessive landscape debris(grass clippings, leaves, etc is coati olled9
15 Stormwater BMPs being operated and maintained as per the permit requirements?
16 Inspection and Maintenance records are available for inspection? hi h densi only, 1995 — present only)
Site Visit Other Permit Conditions Yes Noy NIA NIE
17 Is the site coin leant with other conditions of thepermit?
Site Visit Other Water Quality Issues Yes No/ N/A NIB
1 18 Is the site compliant with other water duality issues as noted durine the inspection? I I v I 1 I
State Stormwater Inspeetzo:i Report Version 3 0_3-09 Page i of 2
19 OL
State Stormwaterr Inspectuon Report
In
�11,6
Q U,5 , �9�ifsl�I
e of the pictures taken durinq the site
Compliance Status 0 Compliant v
Letter Sent (circle one) Yes No Letter type CEI
Non -Compliant
NOV NOVRE Other
Date Sent Reference Number
Inspector Name and Stgnature� hx—u ze-. ,-�s _ e4me.W
Date
State Stoimwater Inspection Report Version 3 0_3-09 Page 2 of
4 AL
WET DETENTION O & M Inspection Checklist
INLETS and FORESAY
1 Inlets are located per the approved plans 0 ❑
2
Inlet device (swale or pipe) is free of damage, clogs or erosion
❑
❑
❑
❑
3
Forebay berm is in place and without erosion
❑
❑
❑
❑
4
Forebay is free of excessive sediment
❑
❑
❑
❑
SIDE SLOPES AND BANKS
5
Vegetated slopes are 3 1 or less
❑
❑
❑
❑
6
Banks are stable and free of erosion or bare sod
❑
❑
❑
❑
7
Slopes or berms are free of woody vegetation
❑
❑
❑
❑
8
Free of muskrats or beaver activity
❑
❑
❑
❑
9
Grass is being maintained and mowed (not scalped) as required
❑
❑
❑
❑
PERIMETER
AND MAIN BAY
10
Vegetated shelf is 6 1 or 10 1 as permitted and properly vegetated
❑
❑
❑
❑
11
Algal growth covers less 50% of the area
❑
❑
❑
❑
12
Cattails, phragmites or other invasive plants cover less than 50% of the basin surface
❑
❑
❑
❑
13
Main treatment area is free from excess sediment accumulation
❑
❑
❑
❑
OUTLETS
14
Swale or emergency outlet bypass is in the correct place and is in good condition
❑
❑
❑
❑
15
Drawdown device is correctly sized free of damage or clogging
❑
❑
❑
❑
16
Orifice size matches the approved plans
❑
❑
❑
❑
17
Outlet is free of erosion or other signs of damage
❑
❑
❑
❑
18
Trash rack is installed
❑
❑
❑
❑
19
Vegetated filter is in place (if applicable)
❑
❑
❑
❑
20
Relative elevations match approved plans
❑
❑
❑
❑
21
Fountain pump (if permitted) is less than or equal to the maximum allowable size
❑
❑
❑
❑
V3 3_09
r
Dale Richardson Property
Bolling Springs Lake, NC
Revised 12I27103
Drainacte—Area
sq ft acres
inflow 1 55,757 128
Impervious Area
Land Use
sq ft
acres
BuildincIs
2 646
006
Parking Area
21,400
049
Total
24 046
055
Detention Pond Design (Dry Detention)
Pond Size
Elevation
Surface Area
ft )
— - - - Asq ft
Bottom of Pond
930
840
Elevation 94
940
1 380
Elevation 95
950
2 340
Fop of Bank
960
3,250
% Impervious' = 0 431
43 1 %
Runoff Coefficient (Schueler)
Rv = 0 05 + 0 009(1)
where I = Percent Impervious of Drainage Area
Rv = 0 4381392
State Volume Required for Storage Runoff from 1sl 1" of Rainfall
Volume = [i" X (1l12) X (DA) X (Rv)]
L— 2,036 cu ft
Required Sediment Stora a Volume
Required Sediment Volume
Volume = 20% of Runoff Storage Volume
407 cu ft
Total Volume Required
Runoff Volume + Sediment Volume
Volume = 2 443 cu ft
RECEIVED
JAN 0 9 2004
DWQ
PRQJ # 5�k0 30ZZR
,'`�t4tltlflt!!�l
�AR0��''%
.y !I
'�Q40FESSIp���9
SEAL
824404
GINIE
Lt
,. 7 � P6r
Page 1 of 2
Determine Elevation of Control Onfice and Estimated Head Under 1" Rainfall
Required 1" Volume 2 036 Cu Feet
Sediment Volume 407 Cu Feet
Total Volume Req'd 2 443 Cu Feet
Elevation
Feet)
Basin
SA @ Elev
(Sq Feet
Basin
Incr Vol
Cu Feet
Total
Stored Vol
Cu Feet
930
840
0
0
931
894
87
87
932
948
92
179
933
1,002
98
276
934
1 056
103
379
935
1 110
108
488
936
1 164
114
601
937
1 218
119
720
938
1,272
125
845
939
1 326
130
975
940
1 380
135
1,110
941
1,476
143
1 253
942
1,572
152
1,405
943
1 668
162
1 567
944
1,764
172
1 739
945
1,860
181
1,920
946
1,956
191
2 111
947
2,052
200
2 311
94 B
2,14E
210
2,521
949
2,244
220
2 741
950
2 340
229
2 970
951
2 431
239
3209
952
2 522
248
3,456
953
2 613
257
3,713
954
2 704
266
3 979
9551
2,7951
238
4 216
Outlet Structure Design
Flow for 2-day drawdown of 1st 1" of stormwater
Q T Required 1" Volume! 172,800 sec
0 0118 cfs
Required Area of Pipe for 2-dav drawdown (1"
A= QI[Cd XSQRT(2X9Xh)]
Cd = 065
g = 32 2 ftlsec2
h = (V F P Elev - Orifice Elev)12
= 065
A = 0 002B0138 sq ft
Diameter of Pipe for 2-day Drawdown
DIA = SQRT((A X 4)1 pi)
= 0 06 feet
0 72 inches
"'Use 0 5 Inch Diameter Orifice
Set Orifice at El 93 5 to Provide
Min Req'd Sediment Storage
Elevation is approximately 94 8 Ft
For Total Volume Storage
(1" Flood Pool Elevation)
� L
Flow for 5-day drawdown of 1 st 1" of stormwater
0 = Required 1" Volume 1432,000 sec
- 0 0047 cfs.
Required Area Of Pipe for 5-dav drawdown (1"
A= O1(Cd XSQRT(2XgXh)]
Cd = 065
g = 322 ftlsec2
h = (1" F P Elev - Orifice Elev) 12
= 065
A= 0001121 so ft
Diameter of Pipe for 5-day Drawdown
DIA = SQRT[(A X 4)1 pi)
0 04 feet
0 45 inches
Page 2 of 2