HomeMy WebLinkAboutSW8000517_COMPLIANCE_20000710STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
El CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
f� COMPLIANCE EVALUATION INSPECTION
DOC DATE
�z067Go
YYYYMMDD
DETENTION POND ANALYSIS
FILE NAME S IWQSIPOND1000517-2 WK1
PROJECT # SW8 000517-2 Pond 2
PROJECT NAME Marsh Oaks Section 1
REVIEWER Lewis
DATE 10-J u I-2000
Receiving Stream Northeast Creek Class SC N_SW Chlorides n/a
Drainage Basin White Oak Index No 19-16-0 5
Site Area 7 94 acres
Drainage Area 99055.00 square feet needs to be verified
Area in Acres 227 acres
IMPERVIOUS AREA Rational C-list beside
each item below in E15 to E20
Building 1387800 square feet 1 00
Parking 1460900 square feet 1 00
SW & Patio 602400 square feet 1 00
square feet
square feet
square feet
TOTAL 34511 00 Cc= 048
% IMPERVIOUS 34 84% Des Depth 40 TSS 90
SURFACE AREA CALCULATION
Rational ? 1 00 If Rational is used put a
SA/DA 3 09% "1" in box E26 If not, leave it blank
Req SA 3058 square feet
Prov SA 4425 square feet [From plan Contours]
ORIFICE CALC
No of Orifices
ILI
Bottom
2 00 MSL
Perm Pool
6 00 MSL
Design Pool
8 00 MSL
Design SA
6507 square feet
Req Volume 8255 cubic feet
Prov Volume 10932 cubic feet
Avg Head =
Flow Q2, cfs 0 048
Flow Q5, cfs 0 019
Perm Pool Volume=
Req Forebay Volume=
Provided Volume=
Percent=
Des Storm
Rv=
SA @ _
Elevation=
098 ft
Area, in 144
Area, in 058
036356216
0
ERR
inches
1 Diameter, in 1001 Area = 0 785 in
Q, cfs = 0 026 Drawdown = 3 7 days
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines
DETENTION POND ANALYSIS
FILE NAME S IWQSIPOND1000517-1 WK1
PROJECT # SW8 000517-1 Pond 1
PROJECT NAME Marsh Oaks Section
REVIEWER
DATE 10-J u 1-2000
Receiving Stream Northeas-t Creek Class -$C N 1N Chlorides NIA
Drainage Basin White Oak Index No 19-16-0 5
�� I I 1 II 111 I1111� ^I
Site Area 7 94 acres
Drainage Area 126760 00 square feet needs to be verified
Area in Acres 291 acres
IMPERVIOUS AREA Rational C-list beside
each item below in E15 to E20
Buildings 18873 00 square feet 1 00
Parking 31571 00 square feet 1 00
SW & Patios 8750 00 square feet 1 00
square feet
square feet
square feet
TOTAL
59194 00
Cc= 057
% IMPERVIOUS 46 70%
Des Depth
4 0 TSS 90
SURFACE AREA CALCULATION
Rational ?
1 00 If Rational is used put a
SAIDA
4 04%
"1" in box E26 If not, leave it blank
Req SA
5116
square feet
Prov SA
6509
square feet
[From plan Contours]
VOLUME CALCULATION
Perm Pool Volume=
Req Forebay Volume= 0
Bottom
2 00
MSL
Provided Volume=
Perm Pool
�. 6 00
MSL
Percent= ERR
Design Pool
7 50
MSL
Design SA
8431
square feet
Des Storm 1 00
inches
Req Volume
10563
cubic feet
Rv= 047
Prov Volume
11205
cubic feet
SA @ _
Elevation=
ORIFICE CALCULATION
Avg Head =
072 ft
Flow Q2, cfs
0 061
Area, in'
216
Flow Q5, cfs
0 024
Area, in
086
No of Orifices IDiameter, in 1 160 Area = 1 767 in
Q, cfs = 0 050 Drawdown = 2 4 days
COMMENTS
Surface Area , Volume and Orifice are within Design Guidelines