Loading...
HomeMy WebLinkAboutSW7061108_CURRENT PERMIT_20061128STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE [ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE ,�,Ypll�S' YYYYMMDD pF W A rF9 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources p Alan W. Klimek, P.E. Director Division of Water Quality November 28, 2006 Father Dan Oschwald, Pastor Roman Catholic Diocese of Raleigh, NC 715 Nazareth St. Raleigh, NC 27606 Subject: Stormwater Permit No. SW7061108 Annunciation Catholic Church Redevelopment Stormwater Permit Craven County Dear Rev. Oschwald: The Washington Regional Office received a complete Stormwater Management Permit Application for Annunciation Catholic Church on November 27, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7061108 dated November 28, 2006, for the construction of the subject project. This permit shall be effective from the date of issuance until November 28, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611- 7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481, ince ly, Al Hodge Regional Supervisor Surface Water Protection Section AHlsav: C:ISTORMWATERIPERMIT1SW7061108 cc: Marc Christopher, Phillips Architecture Jamie Byrd, PE, Transite Consulting Craven County Building Inspections -'Washington Regional Office Central Files Nor`hCaro - _ - Natural North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (232) 946-9215 Customer Service Internet: www. ncwateraualirv.ore 943 Washington Square Mall, Washington, NC 27889 1-877-623-6748 An Equal QpperlunitylAffirrnative Acton Employer— 50% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7061108 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT REDEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Roman Catholic Diocese of Raleigh, NC Annunciation Catholic Church Craven County FOR THE construction, operation and maintenance of a bioretention area in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until November 28, 2016, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater controls have been designed to handle the runoff from 59,894 square feet of impervious area. 3. The tract will be limited to. the amount of built -upon area indicated in the application, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW7061108 [9 The following design criteria have been provided in the bioretention area and must be maintained at design condition: Drainage Area, acres: Total Impervious Surfaces, ft2: TSS removal efficiency: Bioretention Depth, inches: Temporary Ponded Depth Elevation, FMSL: Bioretention Planting Elevation, FMSL: Bioretention Surface Area, ft2: Permitted Storage Volume, ft3: Minimum Required Volume, ft3: Receiving Stream/River Basin: Stream Index Number: Classification of Water Body: Drainage Area 2 1.84 59;894 85% 12.0 23.95 22.95 3,956 5,003 4,809 East Prong Slocum Crk / Neuse 27-112-2 "C; Sw, NSW' II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its -entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (at least every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debns removal and unclogging of outlet structure, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 3of7 State Stormwater Management Systems Permit No. SV 7061108 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon.completion of construction, prior to issuance of a -Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. if the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc, b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was soug ht. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised pfans and certification in writing to the Director that the changes have been made. 13. This permit shall be effective from the date of issuance until November 28, 2016. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Page 4 of 7 State Stormwater Management Systems Permit No. SV 7061108 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. Permit issued this the 281h day of November, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION t� for Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7061108 Page 5 of 7 State Stormwater Management Systems Permit No. SV 7061108 Annunciation Catholic Church Stormwater Permit No. SW7061108 Craven County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems ' Permit No. SV 7061108 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10.- The inlets are located per the'approved-plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Craven County Building Inspections Page 7 of 7 .. - �, � �, � _ h_ • ��° �, ,�r -.�-0FEICE=_USEON[.Y :�.. � - ��,. AS Date Received Fee Paid Permit Number State of North Carolina �. RECEUVLED Department of Environment and Natural Resources Nov — 9 Zoos Division of Water Quality Q�14 )_ STORMWATER MANAGEMENT PERMIT APPLICATION FORM DWQ-WARD This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): ZoN�A GA7NcltG bEoc ec.— of R,A.LFt NG 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 'D,&\t4 Q5cHyALD -- PP&Iog� 3. Mailing Address for person listed in item 2 above: 11S LAAZARETt 4ST _ city: R AFL f_�t &++ State: r.1 G zip: 2�t Co d Telephone Number: ( C1(9 ) 92 l — 110 0 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): I' titIJUNGt�TtO CATHoL4G CHuR-C�i 5. Location of Project (street address): 24(o a BAST Mki hl S-r. City: H P-1\1 a L DC.ic. , W G 2? 5 3 2 County: C;KA Ve-t� 6. Directions to project (from nearest major intersection): _PRW FC-T IG UPCPAJeD 61- DAE, WTERSr--GTtoN of F--c66T MAIN ST. WS AD) AND GUMMIN_GHAM DR 7. Latitude: 3 4, 52 Longitude: `I(o.54 25 8. Contact person who can answer questions about the project: Name: Mj-� ?:G G tA?,I STO PH F_ R Telephone Number: P iLLIPS RCNIT�YU R� II. PERMIT INFORMATION: 1. Specify whether project is (check one): ✓ New Renewal of project sle -- lVO Modification Form SWU-101 Version 3.99 Page 1 of 4 2. If this application is being submitte as the result of a renewal or modification to an existing permit, list the existing permit number W and its issue date (if known)___ _ . 3. Specify the type of project (check one): Low Density High Density ✓ Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major ✓ Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Sen C-EIVED t1-877-623-6748. III. PROJECT INFORMATION NOV. z 7 2006 DWQ 1. In the space provided below, summarize how stormwater will be treated. Also att.?Tycw narrative (one to two pages) describing stormwater management for the project . 1W Vi6s2. 12 aDEP- W1LL Be TR -«n BY A, �15'x 22.5' p�IO&F-TeQT%ON SAc5014, IN, W7 . 'FL>WCTF WILL Be TRr--A.- aD Br A- CQOJBOaAT4Dt_DF CgE9LA%40 FLOW Agp F.QW-THRDU&H R1 PA'F'okw•S- 2. Stormwater runoff from this project drains to the River basin. 3. Total Project Area: 10 o % acres 4. Project Built Upon Area: 33, i y 5. How many drainage areas does the project have?a__ 6. Complete the following information for each drainage area. If there are more than two drainage areas in.the project, attach an additional sheet with the information for each area provided in the same format as below. "2 M Basin Information: _ ...; k , ram. Drainage Area 1� �r�.n�_.. L Drainage Area Z. ��.,,. Receiving Stream Name �r 5T pRM4& Receiving Stream Class S Drainage Area 0 % 1(0 AeC- Existing Impervious* Area 0.11 ACC, 1,25 A& Proposed Impervious*Area O. I 1 Ac, 1. 37 ►4G % Impervious* Area (total) (o .1-S 4 . 14 (� v Sa lmMaus rurface Area pen Mon eDrairia e ArealAVEDrainage P rea 2 -site Buildings 4 6-18. 5 SF iy5 4 .5 S F On -site Streets — Cl 1 013. 3 S On -site Parking — Z, 90 5l , D SF On -site Sidewalks 28 , b S F 110 1. 1 S f Other on -site Off -site Total: 4101,u SF 0, 11 A Total: 54644 SF 1'.3`i �G Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 . 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major _Sed im e ntation /Erosion Control �404/401 Permit NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project, 2. Stormwater runoff from this project drains to the 3. Total Project Area: acres 5. How many drainage areas does the project have? River basin. 4. Project Built Upon Area: % 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Inforrna[ion =*� = Drariia e AreaX � g .3a. •; D'rairi e A'rdar- � Receiving Stream Name EAST P MNG SLO U C ,� C-Wr PSG SLOv,-um GK Receiving Stream Class Drainage Area 0, 2 `j k G y{ C. Existing Impervious* Area O . D Ae, C. Proposed Impervious`Area O . p AG D, 26 i,G % Impervious* Area (total) 33.33 % 603. 41 °lo :. _ Impervious Surface Area, ,•_Drainage Area 3 ,f Drainage Area' .y, i� .'.g On -site Buildings 3 5 3 2 .-1 S F" 261. I S F On -site Streets — On -site Parking — 7A tq q 6 S F On -site Sidewalks 3 4 2- S SF 3 2 6 6. S S F Other on -site Off -site — Total: 3926.2 SF ().09 Total: 1144('6SF 4, 2.6 AC Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 . ?. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4, Additional Project Requirements (check applicable blanks): CAMA Major _Sedimentation/Erosion Control 404/401 Permit �NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748, III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. Stormwater runoff from this project drains to the River basin. 3. Total Project Area: acres 4. Project Built Upon Area: % 5. How many drainage areas does the project have? 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. =Basin Information' �- 1�Y t `�l 'Dra�riage Area Y $xy �. 9qi,_ „ Drainage:Area _ Receiving Stream Name EASY p & 6Lc)GQ M Gc SAS P G SLOGUm Cif Receiving Stream Class Drainage Area Q ,1 x A c 8. 50 k& Existing Impervious` Area O . 4-2 G Q ,' o AG Proposed lmpervious*Area Q , tit kc, d , 2.o AG % Impervious* Area (total) 51a, 3 3 % 40 , 01D ° lin ervious� Surface Area p �� < " :Drainage°Area �'$ v it Hama e°Area:2,� On -site Buildings S j S l .-I S F 3bl b ,S S On -site Streets 3 4 65. 5 SF 5, 35. 6 S F On -site Parking "� Cf (p(o , Z S — On -site Sidewalks Z , g S� Z 13, 3 SF Other on -site — - Off -site Total: 0,'4'i Ac Total: 83b�.�lSF 0, 2 �4G " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 8 8 Form SWU-141 Version 3.99 Page 2 of 4 ..2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): �CAMA Major Sedimentation/Erosion Control 404/401 Permit �NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. 2. Stormwater runoff from this project drains to the River basin. 3. Total Project Area: acres 4. Project Built Upon Area: % 5. How many drainage areas does the project have? 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. >Bas�n Ir formation , y fiDrainaee Area.1'j: 5` r:, 5-1 ' Drainae A greal' Receiving Stream Name Ppww& GLocu M CR EAST PRONG sLocum GR Receiving Stream Class Drainage Area 3 , +-{ 5 P-.rl C, Existing Impervious* Area 0. Q A r, O, o O A r— Proposed Impervious*Area 1.1)o Ar, d . O D A C. % Impervious* Area (total) 2 Q1, q q °% D , 00 b/0 Im envious*Surface Area s` ��" Drama e P:reaX Drairia e Area2'0' _ rir T On -site Buildings �'� �! , y 0.00 A c On -site Streets 5065.S SF On -site Parking E (0 1 65.9 SF On -site Sidewalks rJ g 4 Other on -site ( I s �= Off -site Total: g33cf0,35F 1.00 � Total: ©, ov I� fi Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. How was the off -site impervious area listed above derived? /A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS -w Nl,6r The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state storrnwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system, These connections to the storm water control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 . VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form J B • One copy of the applicable Supplement Form(s) for each BMP 8 • Permit application processing fee of $420 (payable to NCDENR) W/A1 • Detailed narrative description of stormwater treatment/management JB • Two copies of plans and specifications, including: J B Development/Project name Engineer and firm -Legend North arrow Scale - Revision number & date - Mean high water line Dimensioned property/project boundary Location map with named streets or NCSR numbers Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. P��1 rr Designated agent (individual j or firm).LJ>R I LL i P RIH 4 TEG�"U Mailing Address: tlD [�!�VAAo DR., SIE, 600 _ City: 4�G GG t �j N State: �,J G Zip: 2 e Phone: ( 1 _� �...._.. ) ��. `" tC� 10 Fax: VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed ,in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .10 Signature: Date: Farm SWU-101 Version 3.99 Page 4 of 4 All I av RDENR North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s), Fax or email this completed form along with a narrative and vicinity mara of the project location to the appropriate One -Stop Coordinator: • Fayetteville or Raleigh Region -David Lee 919-791-4203, davidlee@ncmaiLnet eEGERVED • Mooresville & Asheville Region -Patrick Grogan 704-663.3772 or Patrick -grogan @ncmail.net • Washington Region -Lyn Hardison 252-946-9215 or 1 n.hardison@ncmail.net a • Wilmington Region -Cameron Weaver 910-350.2004 or cameron.weaver@ncmail.net NOV - 9 2006 Project application received after 12 noon will be stamped in the following work day. DVIMMAM APPLICANT NameROVAAt4 GA,TtkoL[G DIOCESE ee RALiEl&b, h40 Company — Address _11 fiL S . CitylState RA�LEIG NC: Zip 2_1 Co D Phone IR Z1 ~ 91D i7ax92(- 5 Email -- PROJECT SYSTEMS) TRIBUTARY TO r6C-_Lo+,4SURFACE WATER CLASSIFICATION G 4aL 5 V� PROJECT Name C -k RGN CountyGR^Y E N PROJECT LOCATION (ADDRESS;' 2.t4& B EAST MRtiJ STKEET , 4AA\! E; ODIC , QC 26 5'32 Company T'RANSt e C49 A6UkA I N.G l Address 1300 PADDOGi_ DR. 'T G� - 10 CitylState PA LEI&B a t,1 C_ Zip 2"l(44q Phone(( ql1- 14rij Fax(atQ) @13- :240 q_ Emai1JBYR-D@tRA �r CONSQLT�k,G. COM State or National Environmental Policy Act (SEPA, NEPA) - FA or EIS Required ❑Yes No ❑ STREAM ORIGIN Determination: of Stream calls; Stream Name F:K-_,T pROt-16, 5LO&U M CAR• 0 STORMWATER []Low Density ❑ High Density -Detention Pond ❑ Low Density -Curb & Gutter ® High Density -Infiltration WETLANDS MUST BE ADDRESSED BELOW ❑ High Density -Other ❑ Off Site El COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑x Upland Development ❑ Marina Development ❑ Urban Waterfront ( �L �A -3s31 ® LAND QUALITY 0 Erosion and Sedimentation Control Plan with 3 • I acres to be disturbed.($ 00 00 (for DENR use)) 0 WETLANDS {401r Check all that apol *00T W vv H +ts kv-F- , Wetlands on Site ❑ Yes 0 No I Wetlands Delineation has been completed: ❑ Yes © No 1 US ALOE Approval of Delineation completed: ❑ Yes © No 404 Application in Process wl US ACOE: ❑ Yes ® No 1 401 Application required: []Yes Z No If YES, ❑ Regular Perennial, Blue line stream, etc on site R yes ❑ No DF C0t'lS-C9'aGT10N Isolated wetland on Property ❑ Yes 0 No Suffer Impacts: 0 No ❑ YES: acre(s) Permit Received from US ACOE ❑ Yes 0 No ❑ Express The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: .3 I? vv ) Total Fee Amount $ '4oG)n SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA LOS 4l - v b L CD C v SW HD; LID) 32-00-rF) 401: Stream Deter,, f Refer to this list of items to make sure all necessary documents are part of the SW application package A complete package (for Express submittals) includes all of the items listed below. Initial blank spaces for completion J� Original and one copy of the Stormwater Management Permit Application Form N One copy of the applicable Supplement Form(s) for each BMP Permit application processing fee J B Detailed narrative description of stormwater treatment/management J Two copies of plans and specifications, including: $ - Development/Project name $_- Engineer and firm B - Legend 8 - North arrow Ja - scale Revision number & date ��- Mean high water line E � V NOV - 9 2006 DWQ-WAR® J B - Dimensioned property/project boundary Cgou N VA RY ON LT, W0 D t M E N 5 10 N5) J8 - Location map with named streets or NCSR numbers J $ - Original contours, proposed contours, spot elevations, finished floor elevations J g - Details of roads, drainage features, collection systems, and stormwater control measures J.B - Wetlands delineated, or a note on plans that none exist J B -Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated - Vegetated buffers (where required) Note: High density project include soil report Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM BIORETENTION BASIN SUPPLEMENT D)KQ Stormwater Mana ment Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, a bioretention area supplement for each proposed system, sealed design calculations, soils report and 2 sets of plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : Contact Person: Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: bA #:Z. (musr match the DA # on the appllcarion) II. DESIGN INFORMATION -Attach supporting calculations/documentation. Provide a written soils report based on actual field investigations conducted by a qualified individual.. The soils report should include informational references to the County soils maps when available. All elevations shall be in feet mean sea level (fms]). Scon t Soils Report Summary WE W I L L T-012W !�� In -Situ Soil Type nklS pA�•T.& ot~L (t-1-06 In -Situ Soil Infiltration Rate . in./hr. (the most restrictive soil layer) •S,D Y�u,R A'Rt�• SHWT Elevation ft. (Seasonal High Water Table elevation NO E,lt PENCE. tar WATEtt TA6L 1W 6- must Soil Texture ,� _ must e a sandy loam, loamy son , or aam texture)t Planting Soil Infiltration RateE 02 in./hr. (estimate Basin Design Parameters Drainage Area �6O IS9. 4 sq.ft, (on -site and off -site drainage to the basin) Impervious Area 59 G 11 .2 sq.ft. (on -site and off --site drainage to the basin) Design Storm I inch (1.5 inch event for SA waters, 1 inch event for others) Design Volume L( 2)0 a c.f. (storage volume required) Inlet Velocity DrawdownTime•3 — fps hours(3'}�12"�+}{1•Q1 �� = 35,3 FIRS Basin Dimensions Basin Size 1 -15 • ft. x 2 2.50 ft. = 39 5 6.2 sq. ft. (surface area at basin bottom) Basin Volume Provided 5 003 c.f. (400 STSKS/Ac - MiWIMGtM) 3gS6.� ,O�iOS Minimum # of plantings. stems (1000 stems per acre of bioreterttion area) y I $ 6 b Total #of plantings provided 40 Trees 10 Shrubs 3 0 (must be a"t least 3 shrubs for each tree) Basin Elevations Temporary Pool Elevation 23.9S ' frnsl (elevation of the bypass/outlet structure) Planting Elevation �2 - 1Y fmsl (elevation of the ground surface bottom) Bottom Elevation 20 - 45 fmsl (elevation of the bottom of the planting media) Page 1 of 3 10 9- '=^ Permit No. W r7 00 (to be provided by DWQ) RECE[1VE:[) State of North Carolina Department of Environment and Natural Resources NOV y 9 2006 Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM 0vvQ-WAR0 BIORETENTION BASIN SUPPLEMENT DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, a bioretention area supplement for each proposed system, sealed design calculations, soils report and 2 sets of plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : Contact Person: Rx. _ { Phone Number: (_9_1E) 8-13 - Z- Z For projects with multiple basins, specify which basin this worksheet applies to; T)t, *-2 (must match the DA # on the application) II. DESIGN INFORMATION -Attach supporting calculations/documentation. Provide a written soils report based on actual field investigations conducted by a qualified individual. The soils report should include informational references to the County soils maps when available. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary ` In -Situ Soil Type C- vtv In -Situ Soil Infiltration Rate C1• X— R in./hr. (the most restrictive soil layer) SHWT Elevation ft. (Seasonal High Water Table elevation) �9r,tA- .jam -f No E,11I7trNCE OF WA-tF-P TAB1_E Its B-3. Planting Soil Texture SAt� D`( L DAM (must be a sandv loans, loamy sand, or loam texture) f Planting Soil Infiltration Rate 1, 02. in./hr. (estimated) �r w,C.*ol;.d. �'�'hc�►-j' Basin Design Parameters Drainage Area Impervious Area Design Storm Design Volume Inlet Velocity Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Minimum # of plantings Total #of plantings provided Basin Elevations Temporary Pool Elevation Planting Elevation Bottom Elevation Iap ISO. 4 sq.ft. (on -site and off -site drainage to the basin) 5Gl 6�7 •2 sq.ft. (on -site and off -site drainage to the basin) inch (1.5 inch event for SA waters, I inch event for others) Li (609 c.f. (storage volume required) 35.3 hours (3 �� C�I14 R� = 3S.3 li R5 115 - b3 ft. x 2 2.50 ft, = 3 9 5 b . 2 sq. ft. (surface area at basin bottom). 5 OQ_3 _.. c.f. (kpo STEAs/ptc _ MINI KatA) 31 stems (1000 .items per acre of bioretention area) 43 5 fa b 4 D Trees 10 Shrubs 30 (nnist be at least 3 shrubs for each tree) Z 3 - 9S fmsl (elevation of the bypass/outlet structure) 22 . 015 fmsl (elevation of the ground surface bottom) 20.95 fmsl (elevation of the bottom of the planting media) Page I of 3 III. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach written Justification. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials J B a. No vertical sand bed is proposed. JB b. The bioretention area is at least 40 feet by 15 feet. Jg c. Sheet flow is provided at the inlet. g d. A grass buffer strip is provided at the inlet. e. Seasonal High Water table depth is at least 2 feet below the planting elevation surface. B f. Pending depth of 6-12" is provided. JAJ/i� g. In -situ soils have a minimum hydraulic conductivity of 0.52 inches per hour. g h. An in-depth soils report is provided. C} $ i. The planting soil has a minimum hydraulic conductivity of 0.52 inches per hour and the type is noted on plans. j. The planting soil meets minimum -soil specifications per the latest version of the NCDENR Stormwater pp Best Management Practices Manual. JP k. The ponded area will draw down in less than 5 days. (calculations attached) 1. A planting plan and schedule with species and densities is provided on the plans. Jm. Mulch layer and depth is specified on plans. t n. Plan and section details for the bioretention area are provided. (including dimensions and elevations) o. Plan details for the inlet and outlet are provided. J B p. An operation and maintenance agreement signed and notarized by the responsible party is provided. This system (check one) ✓ does does not incorporate the use of an under -drain. IV. BIORETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT Maintenance activities shall be performed as follows: 1. Inspect the bioretention area system for soil and mulch erosion, vegetated cover, and general condition after every significant runoff producing rainfall event and at least monthly. Remove trash as needed. 2. Repair eroded areas immediately, re -seed and re -mulch as necessary to maintain good vegetative and mulch cover. Page 2of3 3. Remove accumulated sediment and old mulch as needed to maintain good infiltration. Replace, or add additional mulch as needed. Removal of the old mulch layer before applying the new layer is recommended every 2 to 3 years. 4. Prune trees and shrubs and remove debris on an annual basis. Grassed vegetation should not exceed 6 inches in height. 5. Treat all diseased trees and shrubs whenever needed. Remove and replace all dead and diseased vegetation considered beyond treatment every 6 months. 6. Replace support stakes yearly (in the Spring). Replace deficient stakes or wires whenever needed. 7, Soil testing shall be conducted annually to determine pH and any accumulation of toxins in the planting media. Lime or other alkaline substances shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. 8. All components of the bioretention area system shall be maintained in good working order. 1 acknowledge and agree by my signature below that 1 am responsible for the performance of the eight maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: DaG!'k Title: , ?Pc� T OR Address: 2 4 (v e—AVO M 6, Phone: (Z 5 Z) LA 4 -1 — 2.1 t 2- Signature: _ Date: r Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, i D6eeza, ` -TL" 1 GE , a Notary Public for the State of AlCM46 Ch&Oz/nCLI County of CP.Arle/1 do hereby certify that Fxthek %are D shw,41A- personally appeared before me this day of ND dear, here 7 , Q oo& , and acknowledge the due execution of the forgoing bioretention basin maintenance requirements. Witness my hand and official seal,o�L�C(tA .......... SUS =; 9'• psi B LAG : c; SEAL My commission expires /42l o� ODD Page 3 of 3