Loading...
HomeMy WebLinkAboutSW7060929_CURRENT PERMIT_20061214STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE „ 22(Q C , N YYYYMMDD • r\P4 q 7�9pG 7 r p � Mr. Peter Kauffman, Partner North Avon Condo Group, LLC P.O. Box-125 Manteo, NC 27954 Dear Mr. Kauffman: Michael F. Easley, Governor ilo��6 William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources December 14, 2006 Subject: Permit No. SW7060929 Sugar Creek South Condominiums High Density Stormwater Project Dare County Alan W. Klimek, P.E. Director Division of Water Quality The Washington Regional Office received a completed Stormwater Application for the subject project on September 27, 2006. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7060929 dated December 14, 2006 to North Avon Condo Group, Li_C for the construction and operation of two infiltration basins to serve the Sugar Creek South Condominiums development located at 7200 S. Croatan Highway in Nags Head, NC. This permit shall be effective from the date of issuance until December 14, 2016 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, orlimitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 2769M714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me or Roger Thorpe at (252) 946-6481. Sincerely, -h, Al Hodge, Regional Supervisor Surface Water Protection Section Washington Regional Office cc: Quible & Associates P.C. Tags Head.Building Inspections Department Dqug Huggett - CAMA ashington Regional Office Central Files North Carolina Division of Water Quality Internet: One 943 Washington Square Mall Phone {252} 946-6481 NO,-t•hCarolina Washington, NC 27889 Fax {252} 946-9215 atf r l ly v 111"'i4 `i It An Equal Opportun4/Affitmadve Action Employer— 50% Reeycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7060929 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL. RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO North Avon Condo Group, LLC Sugar Creek South Condominiums Dare County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for two infiltration basins and a vegetated filter to serve the Sugar Creek South Condominiums Development located at 7200 S. Croatan Highway in Nags Head, NC. This permit shall be effective from the date of issuance until December 14, 2016 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Receiving Stream: Classification of Water Body: Total Site Area: Drainage area Number Drainage area to Basin Impervious area in drainage basin Infiltration Basin Depth: Required Storage Volume: Provided Storage Volume: Overflow Elevation: DIVISION OF WATER QUALITY PROJECT DATA Sugar Creek South Condominiums SW7060929 Dare County North Avon Condo Group, LLC P.O. Box 125 Nags Head, NC 27954 9/27/2006 Roanoke Sound SA 4.82 ac #1 #2 47,923 sf 10,292 sf 47,923 sf 10,292 sf 2.0 ft 3.0 ft 5,990 cf 1,287 cf 14,326 cf 4,166 cf 6.5 ft 8.5 ft 4. No homeowner/lot owner/developer shall be allowed to fill in, after, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership, d. 'Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. - The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a... The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. Records -of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5• This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. A copy of the approved plans and specifications shall be maintained on file by'the Permittee for a minimum of five years from the date of the completion of construction. Ill, GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143- 215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. An application For permit renewal must be submitted at least 180 days prior the expiration of this permit along with the appropriate processing fee. Permit issued this the 14 th day of December, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ,&,Aldn W. Klimek, P.E. Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7060929 North Avon Condo Group, LLC — Sugar Creek South Condominiums Stormwater Permit No. SW7060929 Designer's Certification I, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodicailytweekly/full time) the construction of the project, Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet/bypass structure is located per the approved plans. 7. All slopes are grassed with permanent vegetation. 8. Vegetated slopes are no steeper than 11. 9. The inlets are located per the approved plans and do not cause short-circuiting of the system. 10. The permitted amounts of surface area and/or volume have been provided. 11. All required design depths are provided. 12. All required parts of the system are provided. 13. The required system dimensions are provided per the approved plans. 4U North Avon Condo Group, LLC - Sugar Creek South Condominiums Stormwater Permit No. SW7060929 Designer's Certification I,. _ &SF_PI4_ asaduly registered Professional.; Engineer in the State of North Carolina, eriodically/weeklylfuil time) the construction of the project, r C yu-u� Sow MAY 0 1 2009 , having been authorized., to observe C (Project) for _ N or3&= Av,,,- Co u.Q a Gt, !o .r , LLL (Pro1Ect Owner) hereby state that to the. best of my abilities,, due care and diligence was used in the observation of the project construction such that 'the", construction was observed to be "built within substantial compli'ar QGI'141` lllffea�of the . approved plans and specifications: �.�`�¢� �c , % Signature ' Registration Number a=Go mow.... _ a 0.�.:. s Date Z 8 0 CI Certification Rb�bire ntsi: ,�l�H �{► ���.�� The drainage area to the system contains appr&imateiy the permitted acreage. JN _2. The drainage area to,the system contains no more than the permitted amount of built -upon area. k Alt the built -upon area associatedwith the project is graded such that the runoff drainsto the system. J.)IA- 4. All roof drains are located such that the runoff is directed into the system. The outlet/bypass structure.elevations''are per the approved plan. _)36. The outlet/bypass structure is located per the approved plans. 3A 7. All slopes -are drassed with permanent vegetation. J30, S. Vegetated slopes are no steeper than 3:1. }n 9. The inlets are located per the approved plans and.do not cause short-circuiting of the system. 3-)A, 10, The permitted amounts of surface area and/or volume have been provided. �}A- 11, All required design depths are provided. 3Jrr 12. All required parts of the system are provided. ,)JJk- 13, The required system dimensions are provided per the approved plans. State of North Carolina ®Q-�D�e`p�aktinent of Environment and Natural Resources Division of Water Quality r.�i��n STGRMWATER MANAGEMENT PERMIT APPLICA1r0]TXOrRMVE 0 This form may be photocopied for use as� an original SEA 2 t 2006 L GENERAL INFORMATION .. fl WQ—W-- A ISO 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Mock A,,aLt- CoAL4 GYQup`, ► r_ 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Mailing Address for person listed in item 2 above:' . 0 -. n I9 City: a wiz c� Stater Zip: Z 7 2 54 Telephone Number: Z6 Z —. 00 547 4 Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans; specifications;-letleis;�opera`ti/�on anL�d^±maintienarice agreements, etc.): 5 �� C_�_e •L _ _ c�L�Ti�- 4 %,,LA 5. :Location of Project (street address): ' �%Z O O 5 .. C. rc� a�ar�.�. � a Ail u�r a✓►.. .. . .... . u U County 6. Directions to project (from' nearest major intersection): L o c �.fi�.1Z. �:- -{� i •.,4+cr c�' � o...,. o-�' !� : S ... � S 8 _ � �... l�f .. f s 7. Latitude:" K 35p54+33 ` Longitude: lAi 76Q:3b'05" of project S. Contact person who can answer questions about the project:'. Name: J125rAR1+5- A, Telephone Number. ( Z5?- } Z� ti •- 330_ a Q v � iO�t A�SOG i3'�GS - . ' , . Ii. PERMIT INFORMATION: 1. Specify whether project is (check one): _New Renewal Modification Form SWU-101 Version 3.99 Page I of 4 2 If this application is Tieing submitted:as the result of a renewal or modification to an existing permit, list'th r exis ing'perQiit numb and'its issue date`{if known). 3. Specify the type of project (check one): Low Density X_H}gh.-Density ::Redevelop General Permit Othe2 4. Additional Project Requirements (check applicable blanks): LAMA Major.Sedimentation/Erosion Control _404/401 Permit _NPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at I-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below,"st;e how stoninwater will be treated:. Also.attach a detailed narrative (one to two pages) describing stormwater-manageml!ent for the proje tct . Ap ruKO w.�1 iaC. �� (�elti� SG G �?sFt�w B-.aL O 2 11�-0 r 2 Stormwater runoff from this project drains to the. ?-A.s ook a w14 River basin. 3. Total Project Area: . SL . acres, 4_ . Project Built, Upon Area: • 7 % C.Z .91 a.cr.Ca up1 a P�rcw•� Cv~a`A- OplweAs Owl : 5. - How many drainage areas does the project have? Z 44A61, 6'. Complete the following infoiaiation -for each drainage area_' - f there are:more-than two drainage areas in th project, attach an additional sheet with the.information for -each area provided in the same format as -below. °Infarmatu Ac� ss4ua 2h pOY�i Vw.phk��s 6�Y31 L <.fG- +� �Y.I�+. i- ?r R9 i Receiving Stream Name orc E Souwao aha Receiving Stream.Class Drainage Area -141 9 ZZ. 85 -P� t 1 Q -Existing ImperviouserviousArea N Proposed Im ervious" Area 'JC1 iz 5- ?A Z. - _- %Im erviotis*.Area.(total). . rc�us nrfac'e Ares���`Ly a 'K � DramaFJCjjCa�= On -site Buildings ( 4 (o , L 10 . zg On -site Streets 31, +1,y N/A On -site Parking N On -site Sidewalks r.•. N' A Other on -site Pool I I t>4, f o A 4- DP Q oo . ao tilA Off -site N q K A Total: -7 9 2Z . S zr Total: 10 2 2 _F s Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel. areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 1'iaG(EC'i�aR t" ED jj]] 1lYYSp 'Z i 2006 DVVa-WAR® 8154 QUIBLE & ASSOCIATES, PC P.O. DRAWER 870 PH. 252-261-3300 KITTY HAWK, NC 27949 J y 1 66 679 531 DATE PTAY O THE ORDER OF / /� 1. 60 1 DOLLARS LI FOR II000008 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ; A complete package includes all of the items -listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials Original and one copy of the Stormwater Management Permit Application Form _ _ -1.1 A One copy of the applicable Supplement Form(s) for each BMP - Permit application processing fee of $420 (payable to NCDENR) - Detailed narrative description of stormwater treatment/management - Two copies of plans and specifications, including:la- - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Sac i . C . Mailing, Address: T . O • 6-70 City_k� A %A A,, L State: N C Zip:_ 2_7 SA8 Phone: ( Z52- ) 2-(0 1 33 o o Fax_ .( 25,2- ) ,2ro R i Z`0 VIII. APPLICANT'S CERTIFICATION 1, (print or type name of person listed in General Information, item 2) ���- o crw►aw �P�r-4,r..�+r certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protec ' m enants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 100(` Signatu Date: Z t [Le) Form SWU-101 Version 3.99 PaEte 4 of 4 7. How was the off -site impervious area listed above derived? _ N1A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than N f A, square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. BuiIt-upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall -be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these farms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-I01 Version 3.99 Page 3 of 4 Permit No. (to be provided kv DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT, This form may be photocopied for use as an original DW 4 Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : 5 uaaxr Cy,# -Lk Sou a4&&JgMM-. "� u Contact Person: Phone N6mber: (Z5Z) 4Z3 — ooszj This worksheet applies to: Basin No. 1 in Drainage Area l (as identified on plans) (from Farm SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation.. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation brLA `f ZO in/hr or cf/hr/sf (circle appropriate units) 0.5- fmsl (Seasonal High Water Table elevation) 3 inch (1.5 inch event far SA waters, 1 inch event for others) 17.17.0.7S c.f. Z . 01 Inaurr. yi Y re3 ft. x 1ia.r�s ft. = S o w . S 2- scl. ft. (bottom dimensions) Llo f!� _c.f. 5- frost (v • 5, fmsl 7.0 fmsl Form SWU-103 Rev 3.99 Page i of 3 III. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials a. System is located 50 feet from class SA waters and 30 feet from other surface waters. b. System is located at least 100 feet fro m water supply wells. c. Bottom of system is at least 2 feet above the seasonal high water table. .)JR d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. .3 A e. System ispefsited on or in fill material or DWQ approval has been obtained. �! f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to'the nearest public right-of-way. SA g. Drainage area for the device is less than 5 acres. »�P h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. 3A i. System captures and infiltrates the'runoff from the first 1.0 inch of rainfall 1.5 inch event for areas draining to SA waters ). Design volume and infiltration calculations attached. JJA j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. JJA k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). J�tA 1. A pretreatment device such as a catch basin, grease,trap, filter strip, grassed swale or sediment trap is provided. JJA m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. J)9 n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). o. Flow distribution mechanism within the basin is"provided. J p_ A benchmark is provided to determine the sediment accumulation in the pretreatment device. .I l a q. Runoff in excess of the design'volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. J�1R s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-1Q3 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads S.. 0 feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If.the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Wt %. VaA-Az 7s,r}s,%,r . both L .ra%n- CovAa Chcaup LLC- Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, �{ l u n � , a Notary Public for the State ofl"ttN 41�- 1? Glad i, M_ , County of � —,do hereby certify that _PE-rE - r 44t-WrK4personally appeared before me this day of 5�nm &,4r- Zbo , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL (UL14 j Q 4 u n KELLY A. GUNTER NOTARY PUBLIC My commission a it Oft CeroW1a 0 Form SWU-103 Rev 399 Page 3 of 3 Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: SjQN3v Cr-r- . '&out Cv.-.dcQvAiK+uuA-& Contact Person: Yew IrL7diiyAotA I_ exytv►r-g- Phone Number: ( Z62-) J-Z3 - 00S1 NOV*fl- A,vo.% CO%A4o 6vaup, "C- This worksheet applies to: Basin No. 2- in Drainage Area L (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Soils Report Summary Soil Type Infiltration Rate SHWT Elevation Basin Design Parameters Design Storm Design Volume Drawdown Time Basin Dimensions Basin Size Basin Volume Provided Basin Elevations Bottom Elevation Storage Elevation Top Elevation MA 10_ in/hr or cf/hr/sf (circle appropriate units) 2. fmsl (Seasonal High Water Table elevation) 4.3 inch (1.5 inch event far SA waters, 1 inch event for others) 34 8-7.42- c.f. 4.8(" krs, ,.da�- yow-c-" ft. X 4511. .5 c.f. S. S- fmsl $ . S'- fmsl 01.0 fmsl ft. = 555, GS sq. ft. (bottom dimensions) Form SWU-103 Rev 3.99 Page 1 of 3 I1I. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials 3JA a. System is located 50 feet from class SA waters and 30 feet from other surface waters. 3» b. System is located at least 100 feet from water supply wells. IDth C. Bottom of system is at least 2 feet above the seasonal high water table. I.& d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon. AAA e. System is jwrsited on or in fill material or DWQ approval has been obtained. f. System is located in a recorded drainage easement for the purposes of operation and maintenance and has recorded access easements to the nearest public right-of-way. JJlri g. Drainage area for the device is less than -5 acres. .�J Pr h. SoiIs have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters ). Design volume and 'infiltiation calculations attached. j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. J� k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V)_ ash 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap is provided. ,1 a'W m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. n. Vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA waters, 30 feet for other waters). . NIk o. Flow distribution mechanism within the basin is provided. J 1� P. A benchmark is provided to determine the sediment accumulation in the pretreatment device. 33pt q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. �► s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltration system for erosion, trash accumulation, vegetative cover, and general condition. 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetative cover, mow vegetated cover to maintain a maximum height of six inches, and remove trash as needed. 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specifications. 4. Remove accumulated sediment from the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed_ Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner that will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.). A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads Co.7-6' feet in the pretreatment unit, the sediment shall be removed from both the pretreatment unit and the infiltration basin. 5. If.the Division determines that the system is failing, the system will immediately be repaired to original design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H .1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:. T,_}e 1�C�a , h i ONE+& Jkyo' C,m�40 v 0. L %-C Address: T - O. Phone: C25 •-2 >1—_Oo501 Date: Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. i, . K{ 1l4 A u h*r e _ , a NotaryPublic for the State of X(04rW e"oC_I' - , Countyof , do hereby certify that'e-ke__ 6U ;"- - h-J _ personally appeared before me this day of `scj2A-c,et 6ce DU' , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, f��KEY %�. GUNTER I ov" pLJBLIC I Ors Om*A Notes Garin SEAL jl,1.t. Q �� My commission expirR �gltres 17J13010 Form SWU-103 Rev 3.99 Page 3 of 3