Loading...
HomeMy WebLinkAboutSW7060904_APPROVED PLANS_20061122PERMIT NO. DOC TYPE STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS sw 7c�Ce�QD�% ❑ CURRENT PERMIT C� APPROVED PLANS l ❑ HISTORICAL FILE DOC DATE YYYYMMDD N W E S W OW s>si HAM MEN17Y CAMPcot S ONG ez-GMIMAM � VICINITY MAP NOT TO SCALE .33 1 1� be LOCATION MAP NOT TO SCALE NOTES: 1. FINANCIALLY RESPONSIBLE PARTY: CAROLINA CREEK LLC 503 W. THURMAN ROAD NEW BERN, NC 28562 ATTN: KENNETH I. PEREGOY, GENERAL MANAGER 2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN AND ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION 'OF NCDENR—DLQ EROSION AND SEDIMENT CONTROL ORDINANCE. 3. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 15 DAYS OF COMPLETION OF GRADING. ALL REMAINING AREAS ARE TO BE SEEDED AND MULCHED MTHIN 21 DAYS OF COMPLETION. ALL NC ONE CALL BEFORE YOU DIG STOP 1-800-632-4949 VOID U11UTY DAMA PHONE# 1(800)632-4949 L� 11 1' t y y � t ► a i V - S �� t 4 � y f � % 4 y t t 0040 �000* � - - 1 f f = t d t CAROLINA CREEK LLC 503 W. THURMAN ROAD NEW BERN, NC. 28562 v 1VI�I�VI�CREED �2807 Neuse Boulevard Bldg 5 New Bern NC 28562 Phone: (252) 633-5899, Fax: (252) 633-6551 www.mckimcreed.com SHEET INDEX SHEET # FILE # D'-SCRIPTION 1 G-001 COVER 2 G-002 G.NERAL NOTES & LEGEND 3 CS-101 OVERALL SITE PLAN 4 CG-101 GRADING, DRAINAGE, AND EROSION CONTROL PLAN 5 CU-101 S,TE UTILITY PLAN 6 CU-701 PG_AN AND PROFILE GRAVITY SEWER RUNS 7 CU-501 U I ILITY DETAILS 8 CC-501 G;?ADING, DRAINAGE, & EROSION CONTROL DETAILS 9 CG-502 S,-ORMWATER MANAGEMENT DETAILS FINAL DESIGN NOT FOR CONSTRUCTION OCTOBER 13, 2006 j UTILITY/MUNICIPALITY CONTACT A. City of New Bern, North Carolina E. NCDEN2—Div. of Water Quality Engineering Department 943 Washington Square Mail P.O. Box 1129 Washington, NC 27889 New Bern, NC 28563 (252) 946-6431 phone (252) 636--4004 phone Contact: Bill Moore Contact: David Muse, PE F. Buried Cable Location B. City of New Bern, North Carolina ULOCO Electrical Department (800)632-4949 Carl Toler Office; (252) 636-4034 G_ North Carolina Dept. of Transportation Diviaion 2, District 2 C. Sprint /Telephone 209 South Glenburnie Road Dennis Strickland New Bern, NC 28560 Office; (252)637-1129 (252) 514-4716 phone Fax; (252)637-5168 Contact Aaron Everett (or) Janet Duke Office; (252) 637-6620 D. Cox Communications /Cable TV Marcus Edwards Office; (252) 638--7625 Fax; (252) 638-7631 STORUWATER APPROVED v RECEIVED NORTH CAROUNA ENV:�'R��fENTAL MANAGEMENT COMWW10N NOV �. �. DIVISICN OF WATER QUAUTY 20 ©ate NoVGwtihe,,,. 20 DWQ Stormwaier Pm* No PROD # ]3"'ENERAL PLAN tttitlll!!11l1f:, L.Hnv�ralvH VvlwVn� MENITY CAMPUS 0215v a ;Off �JiisFR' SEE INSET "A") L !� cp N �1 4 ^� 1 l CONSTRUCTION ENTRANCE---, CHECK D\,M_ _ l♦Is J ■( *,Y" N � % 1 N N h a 25.39- U 1 2J 50 a• 24.46 2 ry /MATS ♦ 0 F DUST ♦ `?� UReA 11 �X SEAL i SEAL. o % '•eeme• S� • • • W jo hltlrrl�trft�l f�� �'t� v �NFKM4&CREED 2807 Neuse Boulevard Bldg 5 New Bern, North Carolina 28562 Phone: (252)633-5899 , Fax: (252)633-6551 www.mckimcreed.com Ji C K DAM 123 J e / I �J CAROLINA CREEK LLC STORM SEWER PIPE DATA EL 6.00 / !` \ INY 16.00 / xr S a-AYM Iff"f a07ff LAW? � 1 a / a 1 CONCRE7E OUTLET STJ?UCTURE f 1 SEE NOTE 1 = 1 } PIPE # Length Pipe Type/Class SIZE ; INVERT IN OUT Slope From To 1 60 LF RCP1III 15" 18.82 18.211 1.01 CB #1 CB #2 2 104 LF RCPIIII 24" 18.21 18.00 0.20 CB #2 CB #3 3 176 LF RCP/III DUAL 24" 18.00 17.00 0.57 CB #3 FOREBAY 4 104 LF RCP1111 24" 18.21 18.00 0.20 CB #4 CB #3 5 152 LF RCPI111 24" 18.57 18.21 0.23 CB #5 CB #4 6 132 LF RCP/111 15" 19.32 18.5 0.57 CB #6 CB #5 7 240 LF RCP/III 24" 16.50 16.0 0.21 OS #1 FES 1 8 48 LF RCPI911 15" 121.65 21.50 0.31 OS #2 FES 2 9 48 LF RCPllll 18" 21.36 21.22 0.31 FES 3 FES 4 10 256 LF RCPIIII 16" 121.60118.211 1.28 FES 5 CB #2 NO TES: 1. WET DETENTION PONDS TO ACT AS TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION. INSTILL TEMPORARY SEDIMENT BARRIER AS SHOWN. REMOVE SEDIMENT AND BARRIER AFTER STABILIZA77ON OF ALL UPSTREAM AREAS. INSTALL OUTLET STRUCTURE AND EXCA VA TE POND TO DESIGN DEPTHS. 2. ALL CURB ELEVA77ONS SHOWN ARE BACK -OF -CURB. J. PUMPS WILL BE REQUIRED TO COMPLETELY DRAIN WET DETENTION PONDS NOV 2 0 2006 60' 0 60' 120' SCALE: 1 "=60' (Horiz.) CAROLINA COLOURS NEW BERN, NORTH CAROLINA EROSION CONTROL &GRADING AMENITY CAMPUS STAGE 2 u= n SCALE 1" = 60' STORM SEWER PIPE DATA CB # SIZE TOP ELEV *' DEPTH CB #1 2'x3' 21.82 3.00, CB #2 2'x3' 21.82 3.61' CB #3 2'x6' * 21.82 3.82' CB #4 2'x3' 21.82 3.61' CB #5 2'x3' 22,32 3.75' CB #6 2'x6" 22.32 -11 * INDICATES DOUBLE CATCH BASIN DESIGN ** ELEVATION SHOWN = TOP OF CURB TEMP- CONST. ENTRANCE TEMP. ROCK CHECK DAM ON TEMP. SEDIMENT TRAP � TST PERM. ROCK CHECK DAM SCALE EXISTING CONTOUR - - 5 - - - PROPOSED CONTOUR LIMITS OF FLOOD ZONE AE - LIMITS OF DISTURBANCE SILT FENCE TEMPORARY DIVERSION DITCH TDD - STREAM BUFFER ZONE EXISTING WETLANDS INLET PROTECTION DATE: OCT 2006 MCE PROJ. # 03134-0045 DRAWN RJL DESIGNED RJL CHECKED EJF PROJ. MGR. EJF SCALE HORIZONTAL 1' = 60, VERTICAL - NA M&C FILE NUMBER CG-101 C! ;TATUS: Final Design RED Not Released for Construction S:13t3410045\WDnw fngslnaAer0045.dn, 11116rM 5:27:11 PM, Ilnblf.w_Pk0ff ,• -_�.. ... -�. _. -- .�... _, r .1-... .�.. .i _-- I it -. ..a-_ .1 .-. r2 z F Ln X w 10Y MIN. _ _._.......:.' ... #4 STONE PLAN r= - X j z is CONSTRUCTION WITUOICE NOT TO SCALE ROCK CHECK DAM NOT TO SCALE 20" WOOD FRAME L 100' MIN. SECTION .s^-INT MAC O OM OAO FABRIC BURIED 1' DEEP MIN. STAKE DROP INLET WITH GRATE NOTES: 1. AS SYNTHETIC FABRIC, USE A PERVIOUS SHEET OF NYLON, POLYESTER, OR ETHYLENE YARN- EXTRA STRENGTH (501b/1 inch MINIMUM)- THAT CONTAINS ULTRAVIOLET RAY INHIBITORS AND STABILIZERS. FABRIC SHOULD BE SUFFICIENTLY POROUS TO PROVIDE ADEQUATE DRAINAGE OF THE TEMPORARY SEDIMENT POOL BURL.,P MAY BE USED FOR. SHORT-TERM APPLICATIONS. IT MUST BE REPLACED EVERY 60 DAYS. 2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. 3. FOR STAKES, USE 2X4-INCH WOOD (PREFERRED) OR EQUIVALENT METAL WITH A MINIMUM LENGTH OF 3 FT. 4. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3 FT. APART, AND SF.-'URELY DRIVE THEM INTO THE GROUND, APPROXIMATELY 18 INCHES DEEP- 5. TO PROVIDE NEEDED STABILITY TO THE INSTALLATION, FRAME WITH 2X4-INCH WOOD STRIPS AROUND THE CREST OF THE OVERFLOW AREA AT A MAXIMUM OF 1.5FT ABOVE THE DROP INLET CREST. 6. PLACE THE BOTTOM 12 INCHES OF THE FABRIC IN A TRENCH AND BACKFiLL THE TRENCH WITH AT LEAST 4 INCHES OF CRUSHED STONE OR 12 INCHES OF COMPACTED SOIL. 7. FASTEN FABRIC SECURELY TO THE STAKES AND FRAME. JOINTS MUST BE OVERLAPPED TO THE NEXT STAKE. 8. THE TOP OF THE FRAME AND FABRIC MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE FROM THE DROP INLET TO KEEP RUNOFF FROM BYPASSING THE INLET. IT MAY BE NECESSARY TO BUILD A TEMPORARY DIKE ON THE DOWN SLOPE SIDE OF THE STRUCTURE TO PREVENT BYPASS FLOW. MATERIAL FROM WITHINTHE THE SEDIMENT POOL MAY BE USED FOR DIKE CONSTRUCTION. SILT FENCE INLET PROTECTION NOT TO SCALE uar iou roAnr NOTES: 1• SEE PLAN FOR CLASS OF RIPRAP AND LENGTH. WIDTH AND DEPTH OF APRON. 2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 3. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TO THE SURFACE OF THE RECEIVING CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL- THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 4. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 g ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 95X OR GREATER. 6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED. 7. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT "LAYER OF FILTER FABRIC OF THE APRON WALL BE PERMITTED. NOTE: MINIMUM H=2/3 PIPE DIAMETER SECTION B -B RIP RAP APRON O NOT TO SCALE III *Aft German Millet 40 Ibs/acre in the piedmont and mountains, a small -stemmed sudongrass may be substituted at a rate of 50 ib/acre. � DAM Mountains - May 15 - Aug_ 15 Piedmont - May 1 - Aug. 15 Coastal Plain - Apr. 15 - Aug. 15 SM ACTS Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone snd 750 Ib//acre 10-10-10 fertillizer. MUM Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. RYeFertilliize if growth is not fully adequate. Reseed. refertilize and mulch immediately fallowing erosion or other damage. Rye (grain) 120 Ibs/acre Annual lespedeza (Kobe in Piedmont and Coastal Plain, 50 Ibs%acre Korean in Mountains) Omit annual lespedeza when diuration of temporary cover is not to extend beyond June. SUM M DAM Mountains -Above 2500 ft: Feb 15-May 15 Below 2500 ft. Feb 1 - May 1 Piedmon t - Jan 1 - May 1 Coastal Plain - Dec 1 - April 15 = ANE711orErVrs Follow recommendations of soil tests or apply 2,000 Ib/acre ground agricultural limestone snd 750 Ib//acre 10-10-10 fertillizer. Ii1AW Apply 4,000 Ib/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. 11AiY1R9UNCIE Refertillize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. :iw STRAND MIN. BY ENGINEER 10' MAX. STAY WIRES MIN. #12-1/2 BOTTOM STRAND MIN. f10 STEEL OR WOOD NOTES: 1. WIRE SHALL BE A MINIMUM OF 3Y IN AND 2 MINIMUM OF 6 LLIINE WIRES W/1TH STAY SPACING GROUND LINE 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WARE AS DIRECTED BY THE ENGINEER 3. STEEL POSS SHALL BE 5' 0" IN HEIGHT r N AND BE OF SELF FASTENER ANGLE En 0 do STEEL TYPE 02 I 4. WOOD POSTS SHALL BE A MINIMUM OF 6' sL 1 We IN HEIGHT AND 3" OR MORE IN DIAMETER D WARE FABRIC SHALL BE FASTENED TO WOODEN POST WITH NOT LESS THAN #9 WIRE STAPLES 1-1/2" LONG NOT • SCALE r r+ r r r j SEAL lfr,, o� �FESSI " 3 EAL 021554 ? t ��y�HGl J. �R /!hill illlml TER FABRIC FILL N I 6" iv Erosion Control Measures: 1. All work w►l! be done in accordance with the NCDENR No land disturbing activity beyond that required to install the appropriate erosion control measures may proceed until measures are approved by the NCDENR. 2. Following site clearing, all sediment basins, storm drainage culvert and structures shall be installed. Rock inlet Sediment Traps and Pipe Inlet Protection shall be placed around all drainage structures to collect surface runoff and control siltation and release water at a gradual rate. All easements outside the paved areas where storm pipes are installed will be graded, seeded and mulched. J. Streets shall have stone base placed on them for stabilization and shoulders shall be seeded to stabilize the soil. Seed bed preparation shall be conducted according to North Carolina Department of Transportation Standard Specifications for Roads and Structures. (D.O.T.). The ground surface shall be cleared of stumps, stones, roots, cables, wire, grade stakes, and other materials that might hinder proper grading 071age, seeding or subsequent maintenance operations. Grades on the area to be seeded shall be maintalned in a true and even condition. Maintenance shall include any necessary repairs to previously graded areas. All graded areas shall be thoroughly tilled to a depth of at least four (4) inches by plowing, disking, harrowing, or other approved methods until the condition of the soil is acceptable. On sites where soil conditions are such that high clay content and excessive compaction cause difficulty in getting clods and lumps effectively pulverized, the Contractor shall use the rotary tillage machinery until the mixing of the soil is acceptable and no clods or clumps remain larger than 1 1/2 inches in diameter- A fine and compact seed bed is required and after being graded, the seed bed shall be lightly compacted with a land roller, such as a cultipocker, before and after seeding. Limestone shall be dolomitic agriculture ground limestone containing not less than 10 percent magnesium oxides Lime shall be uniformly applied at t.':e rate of 2 tons per acre. Fertilizer shall be uniformly applied at a rate of 500 pounds per acre of 10-20-20 analysis. The fertilizer shall be incorporated into the upper three or four inches of prepared seed bed just prior to the last tillage operation, but in no case shall it be applied more than three days prior to seeding. Fertilizer shall be used immediately after delivery or stored in a manner that will not permit it to harden or destroy its effectiveness. When hydroseeding equipment is used for seeding, fertilizer shall be applied simultaneously with seed, using the above rates of application. Seed shall be certified seed or equivalent based on North Carolina Seed Improvement Association requirements for certification. All seed skull be furnished in sealed standard containers. Seed which has become wet, moldy, or otherwise damaged prior to seeding will not be acceptable. Seeding shall be accomplished with hand planters, power -drawn planters, hand packers, or hydroseeding equipment at the following rates: HOR FILTER FABRIC SKIRT DIRECTED BY THE ENGINEER 44 4 7 , "T ig1I 4 N1qa4&C �EM 2807 Neuse Boulevard Bldg 5 New Bern, North Carolina 28562 Phone: (252)633--5899 , Fax: (252)633-6551 www.mckimcreed.com MAI LEM Or mar OMAWM- C" SAM OW Ally LM 0 000M (Offsite drainage easements and shoulders on public streets): Lime - 2 tons per acre Fertilizer (10-20-20) -- 500 pounds per acre Seeding M;xture: (January 1 - March 31) Common Bermuda grass (unhulled) - 20 pounds per acre (April 1 - July 31) Common berrrrudagro'ss (hulAed - 15 pounds per acre Weeping Lovegross - 5 pounds per acre Cendipede - 8 pounds per acre (August 1 - December 31) Common Bermuda grass (unhulled) - 15 pounds per care Tail Fescue - 120 pounds per acre Centipede - 8 pounds per acre Seed Bed Protection: Straw Mulch - 2 tons per acre (visual) Asphalt Tack - 0.03 gallons per square yarn sufficient to restrain erosion for all exposed slopes within 15 wor*ing days or 3O calendar days of completion of any phase of grading. inspected by the Contractor after each rainfall. When inspection reveals the trap to be reduced to 50x of design capacity or the device to be deficient in its intended purpose such as fabric deterioration for silt fences the Contractor shall restore the device to its original condition. in place and be maintained by the Contractor until all seeding is established and construction areas have been stabilized. SEEDBED PREPARA11ON SEQUENCE 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFfiCE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOiL (SEE BELOW*). 5. CONTINUE TILLAGE UNTIL A WELL - PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RSEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED REESTABLISHED FOLLOWING ORIGINAL LiME, FERTILIZER AND SEEDING RATES. 9. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ACRE OR 3 TONS/ACRE IN CLAY SOILS FERTILIZER - 1000 LBS/ACRE (10-10-10) SUPERPHOSPHATE - 500 LBS/ACRE (20%) MULCH - 2 TONS/ACRE (SMALL GRAIN STRAW) If V TEIMKXVM sEr MEW RAINIM CAROLINA CREEK LLC GENERAL NOTES 1. SEDIMENT SHALL BE REMOVED AND TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA IN SUCH A MANNER THAT IT WILL NOT ERODE. 2. ALL SEDIMENT TRAPS SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NECESSARY. 3. CONSTRUCTION OPERATION SHALL BE CARRIED OUT IN SUCH A MANNER THAT EROSION AND WATER POLLUTION IS MINIMIZED. 4. ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER. 5. SEDIMENT BASIN EMBANKMENTS SHALL BE SEEDED OR OTHERWISE PROPERLY STABILIZED IMMEDIATELY FOLLOWING CONSTRUCTION. 6. STORAGE AREA IS SHOWN AS A RECTANGLE FOR ILLUSTRATIVE PURPOSES ONLY, AND MAY BE CONSTRUCTED IN ANY SHAPE PROVIDED THE MINIMUM STORAGE VOLUME REQUIREMENT IS MET. THE BASIN SHOULD ALSO BE ORIENTED SUCH THAT THE FiLTER AND THE MAIN FLOW OF WATER AND SEDIMENT ARE ON OPPOSITE ENDS ON THE LONGER BASIN DIMENSIONS. 7. REQUIRED SEDIMENT STORAGE IS 1800 CUBIC FEET OF STORAGE VOLUME PER DISTURBED ACRE. RECOMMENDED WEIR SIZE BASEDON SEDIMENT TRAP DRAINAGE AREA. 8. WHENEVER TOPOGRAPHY ALLOWS, THE TRAP LENGTH SHOULD BE TWICE (2X) THE BASIN WIDTH, TO ALLOW FOR SETTLING. 9. TOTAL DISTURBED AREA 10. ON -SITE BURIAL PITS REQUIRE AN ON --SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 11. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE CRAVEN COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 12. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN iS A VIOLATION OF THE NCDENR EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 13. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 15 DAYS OF COMPLETION OF GRADING. ALL REMAINING AREAS ARE TO BE SEEDED AND MULCHED WITHIN 30 DAYS- ANY SIGNIFICANT SLOPES SHOULD BE STABILIZED WITH AN APPROPRIATE EROSION CONTROL FABRIC TO PREVENT EROSION DURING A RAINFALL EVENT. 14. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF NCDENR. OR CRAVEN COUNTY NATURAL RESOURCES DEPT. 15. A GRADING PLAN MUST BE SUBMITTED FOR LOT GRADING EXCEEDING ONE ACRE WHICH WAS NOT INCLUDED IN A PREVIOUSLY APPROVED GRADING PLAN. 16. SAFETY FENCING 3' HIGH SHOULD BE PLACED AROUND ALL SEDIMENT BASINS- 17. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SiTE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 14 DAYS AFTER WORK HAS CEASED, UNLESS ACTIVITY IN THAT PORTION OF THE SITE WILL RESUME WITHIN 21 DAYS. 18. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED EVERY 7 DAYS OR AFTER EACH RAINFALL OCCURRENCE THAT EXCEEDS 1 /2 INCH. DAMAGED OR INEFFECTIVE DEVICES SHALL BE REPAIRED . OR REPLACED, AS NECESSARY. a The project consists of constructing a Recreation Center and associated parking lot with storm sewer, electric, telephone, gas, water and sanitary sewer service. 1. Contractor must. schedule a preconstruction conference with the owner prior to initiating land disturbing activity. 2. Construction and implementation of appropriate 1 week sedimentation and erosion control measures. J. Construction of Storm Drainage Facilities 1 Month 4. Rough Grading Site 3 weeks 5. Installation of Utilities 2 Months 6. Building Construction 5 Months 7. Installation of concrete curb & gutter 3 weeks 8. Fine Grading Parking Lot 1 week 9. Placement of Asphalt Pavement 2 weeks 10. L.andscoping / Seeding & Mulching 2 weeks 10. Install Bioretention Cells 2 weeks Several of the items listed above may be constructed simultaneously. ��C�rVED NOV p_g 20M nwe CAROLINA COLOURS A CLUSTER DEVELOPMENT) N W BERN, NORTH CAROLINA GRADING, DRAINAGE, AND EROSION CONTROL DETAILS AMENITY CAMPUS DATE. OCT 2006 MCE PROD. 03134-0045 DRAWN RJL DESIGNED EJF CHECKED EJF PROJ. MGR. EJF SCALE w&c FLE MRI CG--501 HORIZONTAL: MAWM iRA� NA VERTICAL: 8 NA STATUS: Final Design gal Not Released for Construction r ti �\,�'i k- . #i t. r•I, . .l�.� r5- .:ti ..... �r +�.� I. ,. �. .. 1' ���' ..- dl .j�'. ;1 �i'+�.; �'I"•j' ..j Vl �1i #1 �!')" u�_.,:It.. _.... ..._-..-.AF -__. r�_.. , __s i. u.1 1..a.._ v.� s•_; _•f .e. �ly.a..a�.av_._a_�1._etsSe , :-+.�..t..r-ns ++.;' SOD SIDE SLOPE AND BOTTOM KEY INTO EXISTING SLOPE 3' MIN. USE STAPLES TO FIRMLY FASTENI 3' MIN. BEHIND TOP OF BANK. r r EXISTING GRADE=111-r VARIES�� 5 5 TOP OF BANK VARIES SCALE SEC I . NOT TO SCALE SOD SIDE SLOPE AND BOTTOM KEY INTO EXISTING SLOPE 3' MIN. USE STAPLES TO FIRMLY FASTEN 3' MIN. BEHIND TOP OF BANK. WIDTH AS REQUIRED GRACE 25.00 1 I EXISTING ,\\ , GRADE 3 23.50�W�3� 1 TOP OF BANK 5' SINAL.E E&fficiENCY si'ILLWAY SECTION NOT TO SCALE (POND 2) BACK OF CURB X DOUBLE BASIN _ Y_r- - _ . Y .q - - -- II FRAME, GRATE AND HOOD DEWEY BROTHERS MODEL OR EQUAL STOP ELEVATION 12" L 3„ 6„ 6" fi" i _ CENTER SUPPORT BEAM f DOUBLE BASIN ONLY PLAN T SEE NOTFs.. SECTION X-X TOP ELEVATION „ �_ L I II II I�--- DOUBLE BASIN SECTION Y-Y S ---I #4 13ARS "V" 0 EQUAL SPACES 8" 6 GENERAL NOTES: 1. PROVIDE ALL CATCH BASINS OVER S-6" IN DEPTH WITH STEPS 12" ON CENTER, USE STEPS fi" fi" WHICH COMPLY WITH NCDOT STD. H 2. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, A - - 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS D AS DIRECTED BY THE ENGINEER. 3. USE FORMS FOR THE CONSTRUCTION OF THE BOTTOM SLAB. 4. IF REINFORCED CONCRETE PIPE IS SET 1N BOTTOM SLAB OF BOX, ADD TO SLAB PER NCDOT STD. 5. USE TYPE "E" GRATE UNLESS OTHERWISE INDICATED. 5 fi. FOR 8'-0" IN HEIGHT OR LESS USE 6" WALLS E AND BOTTOM SLAB. OVER 8'-0" TO 16'-0" IN 6 HEIGHT USE 8" WALLS AND BOTTOM SLAB. ADJUST QUANTITIES ACCORDINGLY. �14I 7. CONSTRUCT WITH PIPE CROWNS MATCHING. � A 8. CHAMFER ALL EXPOSED CORNERS 1 ". 9. DRAWING NOT TO SCALE. 113 IL cn m R rn En #8 "W" BARS Q _j FJ a _J F 6" j #4 BARS 4 BAR o 0 EQUAL SPACE 6" 12" '7 ul -0 1 _Z I„ I„ #4 BARS "U" in 6w PLAN OF SECTION S-S SECTION R-.R DOWELL TOP SLAB DIMENSIONS AND QUANTITIES FOR CATCH BASIN(SASED ON MIN. HEIGHT, H) DIMENSIONS OF BOX & PIPE CUBIC YARDS CONC. IN BOX DEDUCTIONS FOR ONE PIPE SPAN WIDTH MIN. HEIGHT ZD A B H BOTTOM SLAB WALL PE FT. HT: commm %m " C,M, R.C. 3'-0" 2'-0" 2 -0 0.222 0.222 0.592 0.015 0.026 15" 2 -3 0.648 0.023 0.036 18 2 -6 0.703 0.033 0.049 24 3 -0 0.814 0.059 0.085 3 -6 0.222 0.222 0.925 0.092 0.127 STANDAM C M INLET NOT TO SCALE IV MIN. IV MIN. VEGETATIVE SHELF VEG SHELF 6:1 SLOPE TYP. 6.1 SLOPE TYP AROUND POND AROUND POND OUTLET STRUCTURE PERMANENTEL NORMAL WATER SURFACE 1&0 EL- 17.50 _POOL FOREBAY 3 3 3a. 3 m 10' MIN. VEGETATIVE SHELF 6:1 SLOPE TYP. AROUND POND 3 FOREBAY �1 EL- 1ZD SEC 77ON DE TEN 77ON POND - if1 10' MIN. VEG SHELF 6:1 SLOPE TYP OUTLET STRUCTURE AROUND POND PERMANENT POOL EL NORMAL WATER SURFACES - EL= 21.50 3 a 3 t BOTTOM �W, EL.- 1a0 .SEC77QN DE l"N 77ON POND a SOD ALL SLOPES ABOVE PERMANENT POOL EL. 6:1 SHELF BELOW PERMANENT POOL PLANTED WITH SUITABLE WETLAND SPECIES 11n; OR VEGETATION. 1 MIN, 17 PERMANENT POOL EL VARIES r VET MENTION PONQ PL6UNG 3 DEPTH VARIES CONTRACTOR TO INSTALL ON THE 6:1 1 SLOPED SHELF, EQUAL NUMBERS OF EACH OF THE LISTED SUITABLE PLANTS. DURING INSTALLATION, GROUP SIMILAR SPECIES OF PLANTS TOGETHER. INSTALL PLANTS 24" POND SECTION A O.C. IN A CHECKERBOARD PATTERN. ABLE NOT TO SCALE AR ORUMNTs BLUE FLAG IRIS CANA LILY PICKEREL WEED RIP RAP A ENERGY DISSIPATOR OUTLET PIPING „IFllrf,SEAL_ pF�SS/0� .. L - 1554 a z yam$ lt' FNGiN��'��-�,•`+ J. NOT TO SCALE 50' VEGATATIVE FILTER RECI -.S, w w w w w w++ w w w + ♦ W w w w ♦ + w r w J r w � i w w w w w w ♦ + + w w w w w W ♦ w w a w w w w w w FLOW SPREADER MECHANISM 6" THICK CONCRETE NON -WOVEN GEOTEXTILE FABRIC MIRAFI 140-N 2' THICK CL B EROSION CONTROL STONE NOT TO SCALE 44 N4CIED,4 & C= 2807 Neuse Boulevard Bldg New Bern, North Carolina 28562 Phone: (252)633-5899 , Fax: (252)633-6 www.mckimcreed.com 1 A `4 NOTES: SHAPE TO BE �• BEVELED WITH 1. "H- MAY BE REDUCED UNTIL "X" REACHES A MINIMUM OF a WHERE MORTTARAR y- ENDWALL WOULD PROTRUDE ABOVE SHOULDER LINE. IN NO CASE SHALL TOP PILLWAY EL. 21.00 OF ENDWALL PROJECT ABOVE FILL SLOPE. DITCH SLOPE, OR SHOULDER. - - - - - - 2. ALL CAST IN PLACE CONCRETE TO BE CLASS A-3. THIS DETAIL TO BE OW USED WITH STRAIGHT CROSSINGS AND ALL SKEWS (070 451 FL 3. HEADWALL TO BE BEVELED IN ALL AREAS EXCEPT WHERE A CONFLICT WITH o INVERT OR WINGWALLS OCCUR. A . ` 4. BEVEL EDGE IS REQUIRED ON THE HEADWALL AT THE INLET END OF THE a CULVERT (WHERE THE FLOW ENTERS THE CULVERT). - 5. HEADWALL AT THE OUTLET END OF THE CULVERT MAY BE EITHER SQUARE - - - - - - - EDGE OR BEVEL EDGE. �- 6. ON SHALLOW FILLS, WHERE ENDWALLS ARE 12" OR LESS BELOW SHOULDER 0O NOT BEVEL LINE. THE TOP OF THE ENDWALLSHALL BE CONSTRUCTED PARALLEL TO THE a I INVERT GRADE OF THE ROAD. - o = 1.25"f/FOOT DIAMETER �' 7. 3/4' CHAMFER SHALL BE PROVIDED ON ALL EXPOSED EDGES. b = 1"/FOOT OIAMTER END EL NATION 'ILLWAY EL. 23.50 4" PVC SCREW TYPE PLUG 4" PVC TEE 4" PVC STUBBED TO 12" BELOW PERM POOL 4" PVC CAP WITH DRILLED OR11 (SEE CHART FOR ORIFICE SIZE ENDWALL FOR CIRCULAR PIPE 2e A B V-6" C D X-a" F V-9' H S-r L W-a' a W-r b 0'-2" �.-_.lot JIL 6„ ,.X" 6' 4" PVC INLET OUTLET PIPE ASSEMBLY (SEE PLANS) z f- NOTL I I --"--- --^ ..._--.._....._. POND f OUTLET STRUCTURE TO HAVE WEIR y. OPENING AND TRASH RACK ON ALL 4 SIDES - POND 2 OUTLET STRUCTURE TO HAVE WEIR OPENING AND TRASH RACK ON ONE SIDE ONLY.(SAME SIDE AS LOW FLOW ORIFICE) - - - - - - - I - - - - - - _ 41 If GRATE TRASH RACK EJIW V-4275 OR REMOVABLE 4OX4" BANDED GRATE TEMP POOL APPROVED EQUAL w ELEV. a" SECURED IN 1 X1,. X1/4r ANGLE = ELEV "A " POOL INLET ASSEMBL Y *USE 6" PVC FOR OUTLET STRUCTURE 1 OUTLET STRUCTURE DIMENSIONAL DATA z ANCHORED TO BOTTOM AND SIDES ` OF OPENING : ALL 4 SIDES >t N a WEIR ELEV ^ "C'p TEMP POOL AD017IONAL R£INF. AROUND ELEV. 'S" _ ;, PIPE OPENING L27X2 X-Y4 W/ WELDED AN / PERM POOL ELEV. "A" 71. FORM BOTTOM OF BOX TO INVERT *4" PVC INLET a ' OF OUTLET PIPE ASSEMBL Y INV OUT EL D" 2 x 4„ KEYWAY, TYP. SEC T1ON Z-Z SET RISER ON 12" 77-1K. 3/4" STONE BASE LEVELING PAD. GENERAL NOTES: OUTLET # A PERM POOL EL B TEMP POOL. EL C WVIER EL D INVERT OUT E ORIFICE (DIA) X Y OS 1 18.00 19.00 19.00 16.50 3.0" 3' 4' OS 2 22.00 22.5 22.50 21.65 '1.75" 2' 3' CAROLINA CREEK LLC 1. MORTAR JOINTS TO BE 2. CLASS "AA' 4000 PSI CONCRETE ® 28 DAYS TO BE USED. J. THE POURING OF FLOOR SLAB TO BE ACCOMPLISHED BY FORMING 4. ALL DROP INLETS OVER 3'-6' IN DEPTH 70 BE PROVIDED W11H METAL STEPS ON 1'-2' CENTERS 5. REINFORCEMENT 14 ® 9" OCEW (MIN.) 6. SEE NCDOT STD DWG. 840.45 FOR ADDITIONAL DETAILa NTS RECEIVRD CAROLINA COLOURS NEW BERN, NORTH CAROLINA STORMWATER MANAGEMENT DETAILS AMENITY CAMPUS NOV 0 6 2006 DWQ PROD # DATE: OCT 2006 MCE PROD. # 03134--0045 DRAWN RJL DESIGNED EJF CHECKED PROJ. MGR. EJF ATUS: t u&c FU MJMBM SCALE CG-502 HORIZONTAL MAMIM KA13M NA VERTICAL-9 NA of -a 7. s 7-irk :c i �Tt It tis <114{. q� � f- 1,1 F1�� j.ili rr N5-r a r,«k l,•ry l�rnl { l ,. , rr, � �'� � �: 1 � �a .? .. r 1 .. -i:l ,1: �%r �t �,t' ;��: rr.i:'t• � .TL