Loading...
HomeMy WebLinkAboutSW7060822_HISTORICAL FILE_20200420STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW '74&GLAW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE loJ YYYYMMDD ROY COOPER Covernar MICHAEL S. PECAN Secretary BRIAN WRENN Acting Director Craven Community College Attention: Dr. Ray Staats, President 800 College Court New Bern, NC 28562 Dear Dr. Staats: W " R,o NORTH CAROLINA Environmental Quality April 20, 2020 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7060822 Bosch & Siemens Advanced Manufacturing Center Craven County A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7060822 for a stormwater treatment system consisting of an infiltration basin serving the Bosch & Siemens Advanced Manufacturing Center located on the Craven Community College campus in New Bern, NC expires on October 3, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Also, it was noted in the file review that a designer's certification that the project was constructed in accordance with the approved plans as required by the permit has not been submitted. Please include this with your application. Permit application forms for renewal can be found on our website at: httl2s. 1Zd eq. nc.v about iv' i n r- i al-1 -r e e r- ral- - rules/stormwater-DroRram/host-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application form. You can request a copy by e-mailing me at roger; thorpe(a_ncdenr.clov. Sincerely, Rog r K. Thorpe Environmental Engineer North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ,r-o-,-RE Q Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 a�� 252946.6481 CCS STEWART r1rooNED DWQ— ARO TO FROM Scott Vinson David Boyette NCDENR - Wilmington Regional Office Civil Project Engineer Intern 943 Washington Square Mall 919.719.1045 x 204 Washington, NC 27889 DATE SENT VIA September 25, 2006 UPS Next Day Air (10:30 a.m.) 3R07ECT NUMBER PROTECT NAME F�—o Craven Community College - Bosch and Siemens Advanced Manufacturing Center COPIES DATE DESCRIPTION 2 1 9/25/06 1 Sheet C400 - Revised oer comment ® For approval ❑ For review & comment ❑ Returned for corrections ❑ For your use ❑ Approved as submitted ❑ Returned after review ❑ As requested ❑ Approved as noted ❑ Resubmit copies for approval COMMENTS Scott, Please find) the enclosed copies of Sheet C400. The detail for the basin riser has been revised per your comment (the (4) 1" holes have been removed and a note has been added indicating that emergency drawdown is to be provided by pump). Please let me know if you need anything else. Thank you, Dave Boyette SYG � David M Boyette, EI - Civil Project Engineer Intern COPIED TO ENGINEERING. INNOVATION. SOLUTIONS.T" 128 E. HARGETT ST RALEIGH, NC T 919.719.1045 SUITE 300 27601 F 919.719.1049 W'�rF,9P Michael F. Easley, Governor �OF G �� William G. Ross Jr., secretary � r North Carolina Department of Environment and Natural Resources p Alan W. Klimek, P.E. Director Division of Water Quality September 18, 2006 Mr. Johnny L. Peterson, VP Financial & Administrative Services Craven Community College 800 College Court New Bern, NC 28562 Subject: Stormwater Review SW7060822 Bosch & Siemens Advanced Manufacturing Center Craven County Dear Mr. Peterson: This office received a Coastal Stormwater permit application and plans for the subject project on August 31, 2006. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. ➢ Please note that within the plans and calculations there is 0.82 acres of drainage area and 0.72 acres of impervious area draining to the infiltration basin. I have modified Section I1T, no. 6 of the application form SWU-101 to reflect this. The application as submitted only listed 0.67 ac. of drainage area with 0.67 ac. of impervious. 9 Please note on sheet C400 of -the plans that the four — 1 emergency drawdown holes cored in the "Infiltration Basin Riser Detail" shall remained plugged until such time that the basin needs an emergency drawdown. The above requested information must be received in this office prior to September 26, 2006 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 214.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer cc: David Boyette, EI wl Stewart Engineering Washington Regional Office orthCaro r%I1tIh1m North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Internet: h2o.enr.state.nc.us 943 Washington Square Mall, Washington, NC 27889 An Equal OpportunitylAfrmative Action Employer — 50% Recycled110% Post Consumer Paper Customer Service I-877-623-6748 _NC_DENR`.... North Carolina Department of Environment and Natural Resources Request for Express Permit Review FILL-IN all information below and CHECK required Permit(s). Fax or email this completed form along with a narrative and vicinity map of the project location to the appropriate One -Stop Coordinator: • Winston Salem Region -Sonja Basinger 336-771.4633 or Sonia.basinQer@ncmall.net • Mooresville & Asheville Region -Patrick Grogan 704.663.3772 or Patrick:grogan@ncmail_not. • Fayetteville or Raleigh Region -David Lee 919-791-4203,.david.le'e@ncmail.net AUG 3 1 2006 • Washington Region -Lyn Hardison 252-946-9215 or lyn.hardison@ncmail net • Wilmington Region -Cameron Weaver 910-350.2004 or cameron.weaver@ncmail.net APPLICANT Name Craven Community College Company Address_ 800 College Court City/State New Bern NC Zip 28562 Phone_(252) 638-4134 __Fax _____ Email PROJECT SYSTEMS) TRIBUTARY TO Wilson Creek SURFACE WATER CLASSIFICATION C; Sw, NSW PROJECT Name Craven Community College — Bosch and Siemens Advanced Manufacturing Center County Craven PROJECT LOCATION ADDRESS Craven Communily College ENGINEER/CONSULTANT Company Stewart Engineering, Inc. — David Bo ette El Address. 128 E. Hargett Street City/State Raleigh Zip_27601 Phone (919) 719-1045 _ _Fax (919) 719-1049 Email_dboyette@stewart-eng.com State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑Yes ❑ No ❑ STREAM ORIGIN Determination: of Stream calls; Stream Name ® STORMWATER ❑Low Density ❑ High Density -Detention Pond ❑ High Density -Other ❑ Low Density -Curb & Gutter ® High Density -Infiltration ❑ Off Site WETLANDS MUST BE ADDRESSED BELOW ❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ® LAND QUALITY ® Erosion and Sedimentation Control Plan with 1.71 acres to be disturbed.(CK # ve for DENR use)) ❑ WETLANDS (401): Check all that apply Wetlands on Site ❑ Yes ❑ No 1 Isolated wetland on Property ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No 1 Buffer Impacts: ❑ No ❑ YES: acres) US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No 1 Permit Received from US ACOE ❑ Yes ❑ No 401 Application required: []Yes ❑ No If YES, ❑ Regular ❑ Express Perennial, Blue line stream, etc on site ❑ yes ❑ No The legislation allows additional fees, not to exceed 50% of the original Express Review permit application fee, to be charged for subsequent reviews due to the insufficiency of the permit applications. For DENR use only Fee Split for multiple permits: (Check # 9 CO 13 33 ) Total Fee Amount $ �M SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA LOS - 31-- G �. SW HD; 0 LD 401: