Loading...
HomeMy WebLinkAboutNCC204610_ESC Approval Submitted (2)_20201015DEPARTMENT OF PUBLIC UTILITIES Post Office Box 2263 SMITHFIELD, NC 27577 (919) 989-5075 September 22, 2020 Mr. Felton Thompson Creekside Development Partners, LLC 6131 Falls of the Neuse Road Suite 200 Raleigh, NC 27609 RE: Project Name: Baylee Ridge Phase 1— infrastructure only Project ID: JC# 20-065-P Submitted By: Blackburn Consulting Engineering HUC 03020201 Dear Mr. Thompson: We have reviewed the Stormwater Management Plan and calculations submitted for the above referenced site. Based upon the information submitted, the plans have been approved with the following conditions: 1. The maximum impervious surfaces approved for each lot in this phase is 6000 sqft with the exception that the reserved by owner tract 1 is 15,000 sqft and the reserved by owner tract 2 is 30,000 sqft. 2. Please indicate all drainage easements, riparian buffers, jurisdictional wetlands, driveway pipe sizes, impervious area limitations, and flood hazard areas on the Final Plat. 3. A stormwater certification by the engineer of record will be required at the completion of the project. A letter of credit or bond certified by the engineer of record must be submitted for any outstanding work prior to final plat recordation. A copy of this letter will be forwarded to the Planning Office for their files. If you have any questions or need additional information, please contact me at (919)628-8508 or my email at bumclaughlin(cr�,gmail.com. Sincerely, Beth McLaughlin McLaughlin Consulting Contractor for Johnston County Public Utilities cc: Jessica Batten, Johnston County