HomeMy WebLinkAboutSW8140211_Current Permit_20190214ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director February 14, 2019 Helms Port Master Association, Inc. Attn: Patrick D. Lennon, Vice President 60 Gregory Road, Suite 1 Belville, NC 28451 NORTH CAROLINA Environmental Quality Subject: Permit Transfer to HOA under SL 2011-256 State Stormwater Management Permit No. SW8 140211 Helms Port Subdivision New Hanover County Dear Mr. Lennon: On March 2, 2018, the Division of Energy, Mineral and Land Resources (DEMLR) received a request from SEL Property Investors, LLC, to transfer the subject stormwater management permit to a unit owners association, owners association, or other management entity identified in the condominium or planned community's declaration pursuant to NCGS 143-214.7(c2) and Session Law 2011-256. A file review and final site inspection was performed on February 8, 2019 by DEMLR staff and as noted in the enclosed inspection report, the site is currently in compliance with the terms and conditions of the current state stormwater permit. The current permittee has attested that the requirements of Session Law 2011-256 have been met, including: 1. The subdivision is subject to the requirements of Chapter 47F, aka the Planned Community Act. 2. The permittee has submitted a completed and signed Permit Transfer application; 3. The permittee has submitted a copy of the recorded deed conveying any common areas of the subdivision to the Association; 4. The Division has made a determination that the project is in compliance with the permit in writing no more than 90 days prior to the transfer. The following documents have been submitted to the Division: a. A copy of the designer's certification for any permitted BMP's; b. A copy of the recorded deed restrictions limiting the BUA on each lot; c. Verification that the permitted maximum built -upon area per lot has not been exceeded; d. A copy of the recorded subdivision plat(s) documenting the number of lots and the locations of all required drainage and maintenance access easements as depicted on the approved plans; e. Verification that more than 50% of the lots have been conveyed to individuals. The Division is hereby notifying you that the requirements of NCGS 143-214.7(c2), NCAC 02H.1045, and SL 2011-256 have been met and that permit SW8 140211 has been transferred on February 14, 2019 and to remind you that this permit shall be effective until March 6, 2022. For your records, please keep the following enclosed copies on file: the cover letter, updated permit and application documents; 0&M agreements; the inspection report; and the Permit Transfer Request Form. The project is subject to the conditions and limitations as specified in the updated and transferred permit. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. Off 7.7_ North Carolina DepartmentEnvironmentalof Envonmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 ceo-of NOM CAROUNA /`' 910.796.7215 State Stormwater Permitlo. SW8 140211 Page 2 of 2 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Linda Lewis with DEMLR in the Wilmington Regional Office at (910) 796-7215. Sincerely, For S. Daniel Smith, Interim Director Division of Energy, Mineral and Land Resources GDS/arl: G:\\\Stormwater\Permits & Projects\2014\140211 HD\2019 02 permit 140211 cc: Tim Clinkscales, P.E., Paramounte Engineering Wilmington Regional Office Stormwater File State Stormwater Management Permit'No. SW8 140211 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Helms Port Master Association, Inc. Helms Port Subdivision Aqua Vista Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of one (1) infiltration basin, seven (7) infiltration trenches and two (2) wet detention ponds, all located within Y2 mile of and draining to SA -class waters in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (hereafter, the Division or DEMLR) and considered a part of this permit. This permit shall be effective from the date of issuance until March 6, 2022 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Design Standard Conditions 1.9, 1.10 and 1.11 of this permit. The subdivision is permitted for 159 lots, each allowed a maximum amount of built -upon area as fisted in Schedule of Compliance Condition 11.9 of this permit. 3. The total maximum amount of built -upon allowed for this project is 1,247,556 square feet, as listed in the application documents. 4. The infiltration basin (DA-H) has been designed to meet the Alternative design criteria by infiltrating the 10 year 24 hour storm volume without overtopping at of the reported infiltration rate, therefore, an offline bypass and vegetated filter are not required. 5. Each of the two (2) wet detention ponds must be operated with a secondary BMP infiltration basin designed to infiltrate the 1 year 24 hour pre/post volume difference discharged from each pond. Page 1 of 7 State Stormwater :Management Permit 'No. SW8 140211 6. All stormwater collection and treatment systems must be located in either public rights -of -way or dedicated common areas or recorded drainage easements. The final plats for the project will be recorded showing all such required rights -of -way, common areas and easements, in accordance with the approved plans. 7. The project shall provide and maintain a 50-foot-wide buffer adjacent all surface `eaters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 8. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 9. The receiving stream for all of the permitted BMP's is Masonboro Sound, CPF24, Stream Index Number 18-87-25.7, classified SA ORW. 10. The following design criteria have been approved for the two (2) wet detention ponds and must be provided in the system at all times. DA-1 DA-2 a. Drainage Area, acres: 32.2 22.0 Onsite, ft2: 1,402,632 958,320 Offsite, ft2 N/A N/A b. Total Impervious Surfaces, ft2: 611,147 457,380 Onsite, ft2: 611,147 457,380 Offsite, ft2 N/A N/A C. Design Storm, inches: 3.85 3.85 d. Average Pond Design Depth, feet: 5.5 5 e. TSS removal efficiency: 90 90 f. Permanent Pool Elevation, FMSL: 20.0 19.0 g. Permanent Pool Surface Area, ft2: 97,422 43,252 h. Permitted Storage Volume, ft3: 157,795 80,532 i. Temporary Storage Elevation, FMSL. 21.5 20.65 j. Controlling Orifice, in: 3.5 3.0 k. Orifice flowrate, cfs: 0.23 0.20 I. Permitted Forebay Volume, ft3: 97,554 36,949 m. Fountain Horsepower 2 1/2 11. The following design criteria have been approved for the infiltration basin and must be provided in the system at all times: DA-H a. Drainage Area, acres: 1.95 Onsite, ft2: 84,942 Offsite, ft2 N/A b. Total Impervious Surfaces, ft2: 53,579 Onsite, ft2: 53,579 Offsite, ft2 N/A C. Basin Depth, feet: 4.0 d. Design Storm, inches: 3.85 e. Bottom Elevation, FMSL. 5.0 f. Permitted Surface Area @Bottom, ft2- 3.723 g. Permitted Storage Volume, ft3: 15,353 h. Storage/Bypass Elevation, FMSL: 8.0 i. Type of Soil: Course Fine Sand j. Expected Infiltration Rate, in/hr: 10 k. Time to Draw Down, hours: 3.6 I. Seasonal High Water Table, FMSL: 1.4 Page 2 of 7 12 State Stormwater Management Permit No. SW8 140211 The following design criteria have been approved for the seven (7) infiltration trenches and must be provided in the system at all times: DA-A DA-B DA-C DA-D a. Drainage Area, acres: 0.64 0.34 0.65 0.65 Onsite, ft2: 27,878 16,552 28,314 28,314 Offsite, ft2 N/A Nil/.A. nyA N/A b_ Total Impervious Surfaces, ft2: 13,504 9,147 13,068 17,859 Onsite, ft2: 13,504 9,147 13,068 17,859 Offsite; ft2 N/A N/A N/A N/A C. Design Storm, inches: 3.85 3.85 3.85 3.85 d. Trench Length, feet: 104 90 124 134 e. Trench Width, feet: 12 12 12 12 f. Trench Depth, feet: 4.5 4.5 4.5 4.5 g. Bottom Elevation, FMSL: 3.0 3.03 3.15 2.95 h. Bottom Surface Area, ft2: 1.222 1,057 1,457 1,574 i. Bypass Weir Elevation, FMSL: 8.32 8.26 8.24 8.33 j. Perforated Pipe Diameter, in.: 36 36 36 36 k. Perforated Pipe Length, ft: 188 160 228 248 I. Permitted Storage Volume, ft3: 2,930 2,534 3,495 3,778 M. Type of Soil: Fine Sand n. Expected Infiltration Rate, in/hr: 10 10 10 10 o. Seasonal High Water Table, FMSL: 1.4 1.4 1.4 1.4 p. Time to Draw Down, hours: 2.6 2.9 2.4 DA-E DA-F DA-G q. Drainage Area, acres: 0.45 0.58 1.79 Onsite, ft2: 19,602 25,264 77,972 Offsite, ft2 N/A N/A N/A r. Total Impervious Surfaces, ft2: 12,196 16,552 43,124 Onsite, ft2: 12.196 16,552 43,124 Offsite, ft2 N/A N/A N/A S. Design Storm, inches: 3.85 3.85 3.85 t. Trench Length, feet. 175 128 132 U. Trench Width, feet: 6.5 12 27.5 V. Trench Depth, feet: 4.5 4.5 4.5 W. Bottom Elevation, FMSL: 3.35 3.35 3.25 x. Bottom Surface Area, ft2: 1,137 1,504 3,630 y. Bypass Weir Elevation, FMSL: 8.42 8.4 8.45 Z. Perforated Pipe Diameter, in.: 36 36 36 aa. Perforated Pipe Length, ft: 172 236 610 bb. Permitted Storage Volume, ft .- 2,659 3;608 8,877 cc. Type of Soil: Fine Sand dd. Expected Infiltration Rate, in/hr-. 10 10 10 ee. Seasonal High Water Table, FMSL: 1.4 1.4 1.4 ff. Time to Draw Down; hours: 2.6 2.9 2.9 Page 3 of 7 State Stormwater Management Permit No. SW8 140211 II. SCHEDULE OF COMPLIANCE The permittee shall not alter any aspect or any component of the approved stormwater drainage and collection system, or pipe any ditches or swales shown on the approved plans, except for a minimum driveway pipe, unless and until the permittee shall have submitted a modification to the permit and received approval from the Division. Additionally, the permittee shall not allow any homeowner, lot owner, builder or developer to alter any aspect or any component of the approved stormwater collection system or to pipe any ditches or swales shown on the approved plans, except for minimum driveway crossings, unless and until the permittee shall have submitted a revision to the permit and received approval from the Division. 2. The permittee shall routinely monitor the project to ensure that the proposed built -upon area for the entire project including lot BUA, streets, recreation facilities and sidewalks, does not exceed the permitted maximum allowable built - upon area. Where the permittee finds a noncompliance with the permit on an individual lot, the permittee shall notify the lot owner in writing, requiring remediation of the noncompliance within a reasonable time frame, and shall follow-up to ensure that the noncompliance has been resolved. 3_ The permittee is responsible for approving and monitoring all driveway pipe installation on individual lots. The permittee shall assure that all piping shall be that minimum amount and diameter necessary to adequately pass the drainage underneath the driveway, while maintaining a 3.1 side slope. 4. The permittee shall not approve any lot plan where the permitted maximum BUA limit is exceeded, or where piping of ditches or swales is proposed, or where excessive driveway piping is proposed, without first submitting a permit modification and receiving approval from the Division. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. C. Further subdivision, acquisition, or sale of all or part of the project area. d. Filling in, altering, piping, relocating, regrading, redirecting, resizing, or removing any runoff conveyance measure (piped or vegetated) shown on the approved plan. e. The construction of any future BUA listed on the application. f. The construction of any areas of #57 stone or permeable pavement for BUA credit. g. Any other revision/modification as determined by the Director. 7. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 4of7 State Stormwater Management Permit No. SW8 140211 8. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. Infiltration systems should not be used as erosion control devices, due to the potential clogging. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. The following deed restrictions and protective covenants related to stormwater management have been recorded in Deed Book 5879 beginning at Page 850 of the New Hanover County Register of Deeds, are incorporated by reference, and must be maintained in perpetuity: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 140211, as issued by the Division under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division. f. For the maximum built -upon area per lot see table below: Lot Numbers I built -upon -Area 1-22 4,000 23-106 6,500 107-159 4,500 This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All affected lots shall provide a 50-foot-wide buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. h. Lots within CAMA's Area of Environmental Concern may be subject to a reduction in their allowable built -upon area due to CAMA regulations. i. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. j. Built -upon area in excess of the permitted amount will require a permit modification. k. Any individual or entity found to be in noncompliance with the provisions of a storrmwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. Page 5 of 7 State Stormwater Management Permit.'_`o. SW8 140211 10 The permittee shall keep records of maintenance activities in a known, set location and shall make them available upon request to authorized personnel of DEQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 11. The permitted system has been certified by an appropriate designer for the system installed, certifying that tl;,-- permitted facility has been installed accordance with this permit, the approved plans and specifications, and other supporting documentation. There are no deviations from the approved plans and specifications noted on the Certification. 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function as designed. The approved Operation and Maintenance Agreement must be followed in its entirety and maintenance must occur at the scheduled intervals listed in the O&M Agreement. 13. Prior transfer of the permit, the stormwater facilities must be inspected by the Division and must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer Records of maintenance activities performed to date will be required. 14. The facilities shall be constructed, operated and maintained in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data as attached to and on file with the Division. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed Permit Transfer Application Form, accompanied by the supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. An ownership change including the sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Bankruptcy; d. Foreclosure; e. Dissolution of the partnership or corporate entity; 2. The permittee shall submit a completed and signed Permit Information Update Form to the Division at least 30 days prior to any one of more of the following events: a. A name change of the current permittee; b. A name change of the project; c. A mailing address change of the permittee; 3. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 4. Any individual or entity found to be in noncompliance with the provisions of a storrmwater management permit or the requirements of the Stormwater Rules is subject to enforcement procedures as set forth in G.S. 143 Article 21. Page 6 of 7 State Stormwater Management Permit No. SW8 140211 5. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal' which have jurisdiction. 7. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 8. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. The Permittee grants permission to staff of the DEQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 10. Approved plans, supplement forms, O&M Agreements and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, the supplement forms, the Operation and Maintenance Agreements, and the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal application shall include the required application, appropriate application fee and documentation. Permit updated, transferred and reissued this the 14th day of February 2019. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION - ') S. Daniel Smith, Interim irector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 7 of 7 State of North Carolina Department of Environment and Natural Resources Division of Water Quality STATE STORMWATER PERMIT NAME/OWNERSHIP CHANGE FORM I. CURRENT PERMIT INFORMATION 1. Stormwater Management Permit Number: 2. Project Name: ff /m S Art 3. Current Permit Holder's Company Name/Organization: SQL PMVerA Inimsfar.5 LLC 4. Signing Official's Name: P • L0c,2h Title: Me►nb2r / M2n2ger 5. Mailing Address: 310 tJ, j'~Y- nt Stedr, Suife 200 City: 1 I Min QfDA State: N L Zip: 20 40 6. Phone: Fax: �) 1. Gin2tl - DLc;3eh a log2n ho0%eS, coYr, II. PROPOSED PERMITTEE / OWNER / PROJECT / ADDRESS INFORMATION This request is for: (please check all that apply) ❑ Name change of the owner (Please complete Items 1, 2 and 3 below) ❑ Name change of project (Please complete Item 5 below) Change in ownership of the property/company (Please complete Items 1, 2, 3, and 4 below) Mailing address / phone number change. (Please complete Item 4 below) ❑ Other (please explain): 1. Proposed permittee's company name/organization: q&IM5- pI} m+ti f e v 2. Proposed permittee's signing official's name: aAy�c, LI>. Le el D 3. Proposed permittee's title: 1/�G�. ✓tom+ c,({ n t 4. Mailing Address: CQ 0 &Y(Ab r d 100-0C + 6u, + k City: State: N(-• Zip: Z 8 yS I Phone: �1( 10 ) .509 I-) Fax:( ` 10) 332-- 35L3 5. New Project Name to be placed on permit: Please check the appropriate box. The proposed permittee listed above is: ❑ HOA or POA (Attach documentation showing that the HOA or POA owns, controls, or has a recorded easement for all areas that contain stormwater system features. Print name of HOA or POA in #1 above and provide name of HOA/POA's authorized representative in #2 above) ❑ The property owner ❑ Lessee (Attach a copy of the lease agreement and complete Property Owner Information on page 4) ❑ Purchaser (Attach a copy of the pending sales agreement. Final approval of this transfer will be granted upon receipt of a copy of the recorded deed) ❑ Developer (Complete Property Owner Information 4 JECA 1EIVE is AUG is MAR 0 2 2018 SSW N/O Change Rev24Sept2012 Page 1 of 43Y: iSGi ed Y III. REQUIRED ITEMS A request to transfer a permit will not be approved by the Division of Water Quality (DWQ) unless all of the applicable required items listed below are included with the submittal. Failure to provide the listed items may result in processing delays or denial of the transfer. 1. This completed and signed form. This certification must be completed and signed by both the current permit holder and the new applicant if this is a change of ownership. 2. Legal documentation of the property transfer to a new owner. 3. A copy of any recorded deed restrictions, covenants, or easements, if required by the permit. 4. The designer's certification (DWQ Engineer and Designer Certification Forms are available from each DWQ Regional office), if required by the permit and if not already submitted to DWQ. 5. If the proposed permittee is a firm, partnership, association, institution, corporation, limited liability company, or other corporate entity, provide documentation showing the authority of the named representative to act on behalf of the proposed permittee. 6. The $40.00 processing fee. If this is an initial transfer from the original permittee the processing fee is not required. Subsequent ownership transfers will require the $40.00 processing fee. IV. CURRENT PERMITTEE'S CERTIFICATION Please check one of the following statements and fill out the certification below that statement. ❑ Check here if the current permittee is only changing his/her/its name, the project name, or mailing address, but will retain the permit. I, , the current permittee, hereby notify the DWQ that I am changing my name and/or I am changing my mailing address and/or I am changing the name of the permitted project. I further attest that this application for a name/ownership change is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed or if all required supporting information and attachments listed above are not included, this application package will be returned as incomplete. KIT K" Check here if current permittee is transferring the property to a new owner and will not retain ownershi'�q f the permit I, SQL `i�ra cep krVc6-611t , the current permittee, am submitting this application for a transfer of owne ship for permit # 5 W 8 t 4 a z 11 . I hereby notify DWQ of the sale or other legal transfer of the stormwater system associated with this permit. I have provided a copy of the most recent permit, the designer's certification for each BMP, any recorded deed restrictions, covenants, or easements, the DWQ approved plans and/or approved - arcs, the approved operation and maintenance agreement, past maintenance records, an st recent DIVVQ stormwater inspection report to the proposed permittee named in Secti II d V of this form. I further attest that this application for aname/ownership change is accu a complete tot a best of my knowledge. I understand that if all required parts of this applicati re not completed* if all required supporting information and attachments listed above are not i ded, this application package will be returned as incomplete. I assign all rights and obligation as pe m ttee to the proposed permittee named in Sections II and V of this form. I understand that this transfer of ownership cannot be approved by the DWQ unless and until the faciiity is in compliance with the permit. r � Signature: ® Date: 7! z5"-/k I, <Z• Va kke"s , a Notary Public for the State of N o ea or a 11 I/10l.. , County of NC W l-o In b Vr ✓' , do hereby certify that Z Logan personally appeared before me this the SSW N/O Change Rev24Sept2012 �, and acknowledge the due execution of the seal, (Notary Seal) JESSICA Z. VAMVAKIAS NOTARY PUBLIC New Hanover County North Carolina 'y My Commission Expires Page 2 of 4 V. PROPOSED PERMITTEE CERTIFICATION: (This section must be completed by the Proposed Permittee for all transfers of ownership) I, "- a+v 4'elk, �b . Len viD Y-N , hereby notify the DWQ that I have acquired through sale, lease or legal transfer, the responsibility for operating and maintaining the permitted stormwater management system, and, if applicable, constructing the permitted system. I acknowledge and attest that I have received a copy of: (check all that apply to this permit) E�e most recent permit e designer's certification for each BMP any recorded deed restrictions, covenants, or easements ❑ e DWQ approved plans and/or approved as -built plans [�the approved operation and maintenance agreement ❑past maintenance records from the previous permittee (where required) DWQ stormwater inspection report showing compliance within 90 days prior to this transfer I have reviewed the permit, approved plans and other documents listed above, and I will comply with the terms and conditions of the permit and approved plans. I acknowledge and agree that I will operate and maintain the system pursuant to the requirements listed in the permit and in the operation and maintenance agreement. I further attest that this application for a name/ownership change is accur and complete to the best of my knowledge. I understand that if all required parts of this applicati n not completed or if all required supporting information and attachments listed above are not' e this application package will be returned as incomplete. Signature: Date: -7-2,3——� I,2.. VQ nn ila-ka a S , a Notary Public for the State of N o /`t`n ea ✓al I n tk,, , County of Ale W H-a A 0 V e r , do hereby certify that V 1+V � (.,�_ —D• LC A n O i(\ personally appeared before me this the o2 J day of , 201(z and acknowledge the due execution of the forgoing instrument. Witness my and and official seal, r JErc:.r,A 7_. �Valm VAMVAKIAS ✓ (NotaBLIC ota Si nature county rY 9 rJorth Carolina F % �� .fission Expires IL 0 Additional copies of the original permit and the approved Operation and Maintenance agreement can be obtained from the appropriate Regional Office of the Division of Water Quality. This completed form, including all supporting documents and processing fee (if required), should be sent to the appropriate Regional Office of the North Carolina Department of Environment and Natural Resources, Division of Water Quality, as shown on the attached map. Please note that if the Proposed Permittee listed above is not the property owner, the property owner must complete and sign page 4 of this document. Both the lessee / developer and the property owner will appear on the permit as permittees. E C E I V E AUG 15 20'5 13Y: SSW N/O Change Rev24Sept2012 Page 3 of 4 VI. PROPERTY OWNER CONTACT INFORMATION AND CERTIFICATION If the Proposed Permittee listed in Sections ll and V of this form is not the Property Owner, the Property Owner must provide his/her Contact Information below and sign this form: Printed Name: Organization: Title within the Organization: Street Address: City: Mailing Address: City: Phone: Email: State: (if different from street address) State: Fax: Zip: Zip: I certify that I own the property identified in this permit transfer document and have given permission to the Proposed Permittee listed in Sections II and V to develop and/or, lease the property. A copy of the lease agreement or other contract, which indicates the party responsible for the construction and/or operation and maintenance of the stormwater system, has been provided with the submittal. As the legal property owner I acknowledge, understand, and agree by my signature below, that I will appear as a permittee along with the lessee/developer and I will therefore share responsibility for compliance with the DWQ Stormwater permit. As the property owner, it is my responsibility to notify DWQ by submitting a completed Name/Ownership Change Form within 30 days of procuring a developer, lessee or purchaser for the property. I understand that failure to operate and maintain the stormwater treatment facility in accordance with the permit is a violation of NC General Statute (NCGS) 143-215.1, and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature of the property owner County of Date: a Notary Public for the State of do hereby certify that personally appeared before me this the day of , 20 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, Notary Signature (Notary Seal) RE.CEIVED qUG 15 2016 SSW N/O Change Rev24Sept2012 Page 4 of 4 DEMLR USE ONLY Date Regeived Zee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Helms Port 2. Location of Project (street address): 100 Aqua Vista Drive City:Wilmington County:New Hanover Zip:28409 3. Directions to project (from nearest major intersection): Just north of Masonboro Harbour subdivision at the intersection of Aqua Vista Drive and Masonboro Harbor Road 4. Latitude:34° 09' 19" N Longitude:77° 52' 58" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenezvals with modifications also requires SKU-102 - Renezval Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8140211 , its issue date (if known)3/6/14 and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ZHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, c ^ G'VE 4. a. Additional Project Requirements (check applicable blanks; information on re q ' ed state permits can obtained by contacting the Customer Service Center at 1-877-623-6748): PEP 2 2 20V x ®CAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Ar ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts 1692q b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:E 5. Is the project located within 5 miies of a public airport? ZNo ❑Yes If yes, see S.L. 2012-200, Part VI: http://portal.ncdenr.org/web/Ir/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns theyrroject): Applicant/Organization:Sel Property Investors, LLC Signing Official & Tit1e:D Logan, Member -Manager b. Contact information for person listed in item 1a above: Street vkl IL, State:NC Zip:2'1 ZJY Mailing Address (if applicable):P�ox� City:Wil Uin n StateA Zip:28W Phone: (910 ) 443-2869 Fax: Email:dlogan@loganhomes.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing Address:5 City: State: Zip: Phone: ( ) Fax: Email: 4. Local jurisdiction for building permits: Point of Contact: Phone #: Form SWU-101 Version Oct. 31, 2013 Page 2 of 7 IV. PROJECT INFORMATION Z. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be conveyed via a storm sewer system to wet detention ponds with secondarX treatments of infiltration basins for the upland portions. The property along the waterway will be conveyed via a storm sewer system and treated in underground infiltration trenches. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 75.2 acres 5. Total Coastal Wetlands Area: 1.2 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: 74 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHM line, and coastal wetlands landward from the NHW (or MHI9 line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 46.7 % 9. How many drainage areas does the project have?9 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version Oct. 31, 2013 Page 3 of 7 Basin Information Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 Receiving Stream Name See Chart see chart see chart see chart Stream Class * SC,Sw Stream Index Number * Total Drainage Area (sf) On -site Drainage Area (sf) 0 Off -site Drainage Area (sf) Proposed Impervious Area** s_ % Impervious Area** total hn ervious"" Surface Area Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 4 On -site Buildings/Lots (sf) see chart see chart see chart On -site Streets (sf) On -site Parking (sf) 0 On -site Sidewalks (sf) Other on -site (sf) 0 Future (sf) 0 Off -site (sf) 0 Existing BUA*** (sf) 0 Total (sf): Stream Class and Index Number can be determined at: littp�ortal.ncdenr.org&eb/zvq&s/csu/classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. *N" Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Proiects in Union County: Contact DEMLR Central Offlce staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http: / / portal.ncdenr.org/web/wg/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wg/ws/su/map!.) Please indicate that the following required information have been provided by initialinn in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. tia}s 1. Original and one copy of the Stormwater Management Permit Application Form. (ov 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) TAG 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) acid O&M agreement(s) for each BMP. �6 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopgxpress.html for information on the Express program Form SWU-101 Version Oct. 31, 2013 Page 4 of 7 Ln 0 N 0A to d Q1 c c O a=+ u _U Q Q 0 aJ a` (31 bLO Ca c to L r) U O V) Q ►C r- Izi- 00 O 4- 0 L W O c V a 1-+ E N � O 00 t to E N L 0 V) C: 3 o m ❑ O Ln N O O m Ln Ln Ln 0)°° M o 3'0 m m p 00 Co C 00 N N -1 O a cu Ln � J 0 Or CJ 0 Lf) N 1-I 7-1 lD g0 m cn p o 00 00 CW _ = 00 im-I 0 Q r m v c 0 3 o m Co Lf) O N n'M m e O ^ 1n Ln ^ LD a C CI � Lr LD � LD O N RCS, -0 c = oo H .-1 Ln Ln o ca Q r a c 3 o m Q NO O Ln N 00 Op Q o C 3 m 00 p in M 00 m C N N O Q m Un C 7 ry 1 N O O O �o O N m N m 00 m m O0 O n C -0 C1 in Ln �- c Ln a C 7 O OC N N �-+ an O ul N m m n o �o co 2 0 3 m p o o v a° c zU 00 a H r ,� o Q m Ln c c ^ LnN O N N In m O 0O 00 00 Ln o n W O r, t00 t00 0C 00 UD lD N O Q N N m In y 3F !D � v Q m -05 m Nm v '0 N O + E D Q Q ca 2 N bn 0n nJ iF * M M CL N + m 0 m c c E (n f9 — O c V C: > E E p n c '� m m to U d y p c w m CC V) 11 vi H O O a 3� ❑ 07 O CD 14 CT) Ln U Z> p o m 0 0 0 0 0 0 0 00 0 (9 O ^ m Go 2 p o� o MOCCO CO W to a Q O p O w O O 0m0 O CD O O p] lD N M N C o m Ol0 00 Clrr� O O Lr�j `V O O O M v 0 a O m m V � N m r1 O O O O O V CD 0 O IQ 00 1, mO M O mLn t J) N H 0 O (D 1j I" Ict c-� a D Q d3 E � b0 m O �= V 'U *' Vn O mm @ a l:!=! O v y in O � Q m zi c 0 O u a CO O `O v 1 tF � > O a m m .on E C W v Q m c w m i @ y r'4 & (a f3- i _0 § m \ o j ) 7 \ $ Ln § 3 @ / 0 \ F / m / g G j i _ e 2\ § cc ° _ § Ln § e R s: p ~ o& & @ / m g L, / U. % 0 e 2 § 7 ° a\" a$ { z e UD m § a o m G 3 » G W m ] La 2 m§ Ln 2 0 a\ » m§ § 0 m & e 0 I & o_@ + & e ® & m .0 U, . . co E m nIv \ ^ < 2// \ 3 G \ E f t J ] ) r ƒ ƒ / § $ 7 ® / \ ) ` ) 2 ! % 3 / $ & 01 u q / 1# » \ f �\\ o o§ 0 0 0/ I / / ® § § 0/ & 0 0 0 0 0 o { f ,\ m o o c o 0 0 Ln o -I6 / §\/ o 0 o c o o/ \ co § ƒ « k \ 0 /) / \ D 2 $ 0,m 2 / 2 ƒ j G = = m y _ | _ e 0 £ 3 / 3 / § § §a 3 and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) C 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). �-Gc S. TVY V SetS of piaiiS fOided tv °.5" X 14" (sealed, 3igited, &: dated), including: a. Development/Project name. b. Engineer and firm. c. Location xinap with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. in. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify 64A- elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHVVT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: (o Page No: ,777Y,�!� C 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. bttR://www.secre!giy.state.nc.us/C orations / CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state- stormwater-forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. Form S'dVU-101 Version Oct. 31, 2013 Page 5 of 7 VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tim Clinkscales, PE, PLS Consulting Firm: Paramounte Engineering, Inc. Mailing Address:122 Cinema Drive City:Wilmington Phone: (910 ) 791-6707 Email:tclinkscales@paramounte-eng.com State:NC Zip:28403 Fax: (910 ) 791-6760 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item la) with (print or type name of organization listed in Contact Information, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of . County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version Oct. 31, 2013 Page 6 of 7 • e X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item la) D Logan certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. Signature-- 6 Date: ,? I I j3 I 1 7 I, ire- 5* V4%KOW 160 , a Notary Public for the State of Noe*6yo I/014. County of NSW lean 0yIG' , do hereby certify that Z L-01M rl personally appeared before me this // day of Q M 64e✓ COD / 7, an owledge tl-�e due a ecution of the application f& a stormwater permit. Witness my hand JESSICA Z. VAMVAKIAS NOTARY PUBLIC New Hanover County North Carol in My Commission Expires 0 ���� and official seal, �t" SEAL My commission expires' cof Form SWU-101 Version Oct. 31, 2013 Page 7 of 7 Permit No. -���// (to be provided by DWQ) 'AA A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted akmg with all of the required information. 9, It7,i[;CT INFORMATION Project name Contact person Chris Millis, PE Phone number 910-791.6707 Date 2012014 Drainage area number 1 il. DESIGN INFORMAYIJN Site Characteristics Drainage area 1,402,632 fe Impervious area, post -development 611,147 ft % impervious 43.57 % Design rainfall depth 1.5 or 1 year in Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided to Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24•-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity:)-yr, 24-hrstorm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow PrelPost 1-yr, 24-hrpeak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment deanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 77,520 ft3 75.166 ft3 215,355 ft3 140,169 ft3 157,795 ft3 N (Y or N) 3.9 in n1a (unitless) nla (unitless) nla in/hr OK ft3/sec felsec ft3/sec 21.50 fmsl 20:00 fmsl n/a fmsl 20.50 fmsl 19.50 fmsl 13.00 fmsl 12 00 fmsl 1.00 It (Y or N) t'tl i. V r fmsl FEB $ 1014 BY: Form SW401-Wet Detention Basin-Rev.9-4118/12 Parts I. & II. Design Summary, Page 1 of Permit (to be provided by DWQ) tt. rF.%dM 7N Surface Areas Area, temporary pool 102,640 le Area REQUIRED, permanent pool 38,152 ftz SAIDA ratio 2.72 (unitless) Area PROVIDED, permanent pool, A�m_pw 97,422 ft OK Area, bottom of 1Oft vegetated shelf, Ate, s,eff 90,563 f' Area, sediment cleanout, top elevation (bottom of pond), AWLP.d 44,402 f? Volumes Volume, temporary pool 157,795 ft3 Volume, permanent pool, V,„ryw 499,701 ft3 Volume, forebay (sum of forebays if more than one forebay) 97,554 ft3 Forebay % of permanent pool volume 19.5% % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vper,,,-PW Area provided, permanent pool, Aper,yW Average depth calculated Average depth used in SAIDA, d,,,,, (Round to nearest 0.511) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, AP.,„-P.I Area, bottom of 1Oft vegetated shelf, Ana span Area, sediment cleanout, top elevation (bottom of pond), AbOLP d "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,,,, (Round to down to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice ('If circular) Area of orifice (if -non -circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr Peak flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies is: 90 % y (Y or N) n (Y or N) 2.72 (unitless) n (Y or N) 499,701 ft3 97,422 ft ft ft y (Y or N) 97,422 e 90,563 ft 92 OK Need 3 ft min. 44,402 fe 6.50 ft 5.30 ft OK 5.5 ft OK Y (Y or N) 3 50 in in 0.60 (unitless) 0.50 it N (Y or N) (unitless) (unitless) ft ft ft�isec ft"/sec 0 23 ft3/sec Storage volume discharge rate greater than pre-dev.1 yr24hr. 3.94 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft 5:1 OK OKAEC- , 5-0 :1 OK Y 2.5 ft orN) OK OK FEB B 18 cu Y (Y or N) OK Y (Y or N) OK BY. Y (Y or N) OK Pump Forth SW401-Wet Detention Basin-Rev.9-4/18/12 _ Parts I. & Ir. Design Summary, Page 2 of 2 Permit Number: (to be p ovided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available u on request. P q VE Inspection activities shall be performed as follows. Any problems that ar u1EM18 2014 be repaired immediately. BY: BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash/ debris. The perimeter of the wet detention basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or Swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BUT. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 7 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 7 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM ill in the blanks) 13 Pe anen -------------- -- Volume 12 -ft Min. Sediment Storage FOREBAY Permanent Pool Elevation 20 Pool - - - - - - Sediment Removal Elevation 13 ............. Volume Bottom Elevation MAIN POND 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Helm Point BMP drainage area number: I Print name:D Logan Title:Member Manager Address: 310 North Front Street Wilmington NC 28401 Phor Sign. Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, C_AV LA CKLc L. rAt.: t x , a Notary Public for the State of Kkbr{In. ea,roi.r,(j, County of „ru,� ,c c , do hereby certify that 7 • L eea n personally appeared before me this !- day of R6_L•ayy, VQt , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, EN 0 NOTARY ?4 PUBLIC v Rr��'fG sWI cKG0 SEAL My commission expires_IL1 , 20 t4- Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit No. (to be provided by DWQJ AHl NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. jL PROJECT INFORMATIONT Project name Contact person Phone number Date Drainage area number Helms Port Chris Millis, PE 9*791-6707 217/2014 i1 DESIGN INFORMATION. —_— Site Characteristics Drainage area 958,320 fe Impervious area, post -development 457,380 fe % impervious 47.73 % Design rainfall depth 1.5 or 1 year in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: $A Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hrrunoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp, pool? Elevation of the top of the additional volume fe fe 57.445 ft3 51,369 f? 129,731 fO 78,362 fP 80,532 i N (Y or N) In nia (unitless) n/a (unitless) n/a in/hr OK ft3/sec P,3/sec f?/sec 20.65 fmsl 19,00 fmsl nla fmsl 19.50 fmsl 18.50 fmsl 13,00 fmsl 12.00 fmsl 1.00 ft N (Y or N)+''lid %'►�. yam. 'y- 207 fmsl OK;� FEB 18 20% &Y: Form SW401-Wet Detention Basin-Rev,9-4118/12 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Ft1tflATJPf Surface Areas Area, temporary pool 52.447 fe Area REQUIRED, permanent pool 32,008 ft? SAIDA ratio 3.34 (unitless) Area PROVIDED, permanent pool, Aperm_pw 43,252 fe OK Area, bottom of 10ft vegetated shelf, Ab,t $her 38,919 fe Area, sediment cleanout, top elevation (bottom of pond), Ab,imnd 15,442 fiz Volumes Volume, temporary pool 80,532 ft3 OK Volume, permanent pool, Vp--P d 171814 fe Volume, forebay (sum of forebays if more than one forebay) 36,949 fe Forebay % of permanent pool volume 21.5% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 3.34 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, VP,,--PW 171,814 ft3 Area provided, permanent pool, Ap._p., 43,252 fe Average depth calculated ft Need 3 It min. Average depth used in SAIDA, d,,,, (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, Awm_pw 43,252 fe Area, bottom of 10ft vegetated shelf, AWLAdf 38,919 fe Area, sediment cleanout, top elevation (bottom of pond), AWt nd 15,442 fe "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 5.50 ft Average depth calculated 5.00 ft OK Average depth used in SAIDA, d,,,, (Round to down to nearest 0.5ft) 5.0 it OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 3.00 in Area of orifice (if -non -circular) in' Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.55 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) ft Pre -development 1-yr, 244hr peak flow if"sec Post -development 1-yr, 24-hr peak flow fe/sec Storage volume discharge rate (through discharge orifice or weir) 020 Osec Storage volume discharge rate greater than pre-dev. ly124hr. Storage volume drawdown time 3.79 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width in It OK Length of flowpath to width ratio 5 :1 OK Length to width ratio 5.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK �a r Freeboard provided 2 4 ft OK `�••�,.. Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N OK FEB2�14 Capures all runoff at ultimate build -out? Y (Y or N) D OK Drain mechanism for maintenance or emergencies is: Pump Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit Number: __­5� efl (to be provided by DWQ) Drainage Area Number: �, Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ❑ does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ❑ does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. ., M :rM ��W �yy .1=.F�.vp Inspection activities shall be performed as follows. Any problems that re o cY s a � j be repaired immediately. FEB 1 a 2014 BMP element: Potentialproblem: How I will re diate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximatelv six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate the problem: The inlet device: pipe or swale The pipe is clogged. Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of rriuskrat or Use traps ro remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 6 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 6 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 19 13 Pe anen Pool - - - - - - - - - - - - - - - t-- Volume Sediment Removal Elevation 13 Volume 12-------------------------------------------- ------ _ -ft Min. Sediment Bottom Elevation 12 1-ft n Storage Sedimer Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Helm Point BMP drainage area number:2 Print name:D Logan Title:Member Manager Address:310 North Front Street Wilmington NC 28401 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Avvf LChen , a Notary Public for the State of Nuv4"L Cav6V%n4 , County of "L,,, yi j�,rk , do hereby certify that 17. 1-a. aL., personally appeared before me this day of , ?ate_, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, Ilk �4 C7 NOTARY X 03 PUBLIC 2 SEAL My commission expires" Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit No. " 1 ` / � // (to be provided by DWQ) WAT (�pF�]��E,�q\O NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information I!. PROJECT INFORMATION — Project name Helms Port Contact person Tim Clinkscales, PE Phone number 910-791-6707 Date 6/27/2017 Drainage area number A II. DESMINFORMATION Site Characteristics Drainage area 27,878-00 ftZ Impervious area 13,504.00 ftz Percent impervious 48.4% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity Whir Pre -development 1-yr, 24-hrdischarge ft3lsec Post -development 1-yr, 24-hr discharge ft3lsec Pre/Post 1-yr, 24-hr peak flow control fi3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 1693.00 ft3 Pre -development 1-yr, 24-hr runoff volume 1,494.00 ft3 Post -development 1-yr, 24-hr runoff volume 4,10800 ft3 Minimum volume required 2614.00 ft3 Volume provided 2,930-00 ft3 OK Soils Report Summary Soil type Coarse Fine Sand Infiltration rate 10.00 inlhr SHWT elevation 1.40 fmsl Trench Design Parameters Drawdown time 0.11 days OK Perforated pipe diameter 3600 in Perforated pipe length 188.00 ft Number of laterals 2 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.00 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 8.32 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 10400 ft Width (short dimension) 12.00 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.74 ac-in OK Length of vegetative filter for overflow 95.00 ft OK Number of observation wells 4 OK Distance to structure nla ft OK Distance from surface waters 98.00 ft OK Distance from water supply well(s) nla ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 1.60 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB wl Sump RECEIVED JUL 0 3 zon Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. /-d ATA(to be provided b�oWQdJ STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and submitted along with all of the required information. I. PACT WORMATION Project name Contact person Phone number Date Drainage area number Helms Port _ Tim Clinkscales, PE 910-791-6707 6/27/2017 B . DESIGN tWORUTION Site Characteristics Drainage area 16,552.00 ftz Impervious area 9,147.00 ftz Percent impervious 55.3% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 385 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 1133.00 ft3 Pre -development 1-yr, 24-hr runoff volume 887.00 ft3 Post -development 1-yr, 24-hr runoff volume 2,753.00 ft3 Minimum volume required 1866.00 ft3 Volume provided 2,534.00 fta Soils Report Summary Soil type Coarse Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 1.40 fmsl Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? OK 0,12 days OK 36.00 in 160.00 ft No. 57 40 Y (Y or N) OK G V E'V G JUL 0 3 20V BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & Il. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.03 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 8.26 fmsl Top elevation 7,50 fmsl Trench Dimensions I ength (long dimension) 90 no ft Width (short dimension) 12.00 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.51 ac-in OK Length of vegetative filter for overflow 76.00 ft OK Number of observation wells 4 OK Distance to structure nla ft OK Distance from surface waters 80.00 ft OK Distance from water supply well(s) nla ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 1.63 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB wl Sump ' ECEIVE JUL 0 3 2017 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & 11. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) _ �['► C NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must hn filled out; printed and submitted. The Required Items Checklist (Part 111) must be printed, idled out and submitted along with all of the required information. t. PROJECT INFORMATION Project name Helms Port Contact person Tim Clinkscales, PE Phone number 910-791-6707 Date 6/27/2017 Drainage area number C 8. DESIGN INFORMATION Site Characteristics Drainage area 28,314.00 ft2 Impervious area 13,068.00 ft2 Percent impervious 46.2% % Design rainfall depth 1.5' or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1,5" runoff volume 1518.00 ft3 Pre -development 1-yr, 24-hr runoff volume 1,32400 ft3 Post -development 1-yr, 24-hr runoff volume 4,172.00 ft3 Minimum volume required 2848.00 ft3 Volume provided 3,495.00 ft3 OK Soils Report Summary Soil type Coarse Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 1.40 tmsl Trench Design Parameters Drawdown time 0.10 days OK Perforated pipe diameter 36.00 in Perforated pipe length 228,00 ft Number of laterals 2 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK Form SW401-Infiftration Trench-Rev.4 EVEIo/E JUL 0 3 2017 BY; Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.15 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 8.24 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 124,00 ft Width (short dimension) 12.00 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0,78 ac-in OK Length of vegetative filter for overflow 13Z00 ft OK Number of observation wells 4 OK Distance to structure n/a ft OK Distance from surface waters 136.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 1,75 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ Sump RECEIVE JUL 0 3 2011 BY.. Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be prc by SA STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out; printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. t. PROJECT 114FORMATION Project name Helms Port Contact person Tim Clinkscales, PE Phone number 910-791-6707 Date Drainage area number 217/2014 Ill. t3ESM WORNATION Site Characteristics Drainage area 28,314.00 ft Impervious area 17,859.00 ftz Percent impervious 63.1 % % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hrdischarge Pre/Pori 1-yr, 24-hr peak flow twntrol Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum volume required Volume provided Solis Report Summary Soil type Infiltration rate SHWT elevation Trench Design Parameters Drawdown time Perforated pipe diameter Perforated pipe length Number of laterals Stone type (if used) Stone void ratio Stone is free of fines? 385 in in/hr ft3/sec ft3/sec ft3/sec ft3 ft3 2186.00 ft3 1,518,00 ft3 5,284.00 ft3 3766.00 ft3 3,778.00 ft3 OK Coarse Fine Sand 1000 in/hr 1,40 fmsi 0.12 days OK 36.00 in 248.00 ft 2 No.57 40 Y (Y or N) OK ECEIVE� JUL 0 3 2017 BY.• Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 2.95 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 8.33 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 134.00 ft Width (short dimension) 1200 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 1.03 ac-in OK Length of vegetative filter for overflow 95.00 ft OK Number of observation wells 4 OK Distance to structure nla ft OK Distance from surface waters 10000 ft OK Distance from water supply well(s) nla ft OK Separation from impervious soil layer nla It OK Depth of naturally occuring soil above SHWT 155 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB wl Sump ECEIVE01 JUL 032017 BY: Form SW401-Infiltratlon Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. 0 Mod (to be provided by DWQ) OF W A TF9 AA NC YDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must he filled out, printed and submitted. The Required Items Checklist (Part ill) must be printed, filled out and submitted along with all of the required information. 1, PROJECT WFORMATION Project name Helms Port Contact person Tim Clinkscales, PE Phone number 910-791.6707 Date Drainage area number N. DEWA WOMATION Site Characteristics 6/27/2017 E Drainage area 19,602.00 ft2 Impervious area 12,196,00 ft Percent impervious 62.2% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1,5' runoff volume 1495.00 ft3 Pre -development 1-yr, 24-hr runoff volume 1,05100 ft3 Post -development 1-yr, 24-hr runoff volume 3,645.00 ft3 Minimum volume required 2594.00 ft3 Volume provided 2,659.00 ft3 OK Solis Report Summary Soil type Coarse Fine Sand Infiltration rate 10,00 in/hr SHWT elevation 1.40 fmsl Trench Design Parameters Drawdown time 0.11 days OK Perforated pipe diameter 36.00 in Perforated pipe length 172.00 ft Number of laterals 0 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK ECEIVE JUL 0 3 2017 RY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 3.35 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 8.42 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dimension) 17500 ft Width (short dimension) 6.50 ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.72 ac-in OK Length of vegetative filter for overflow 96.00 ft OK Number of observation wells 2 OK Distance to structure n/a ft OK Distance from surface waters 100.00 ft OK Distance from water supply well(s) n/a ft OK Separation from impervious soil layer n/a ft OK Depth of naturally occuring soil above SHWT 195 it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB w/ Sump ECESVE JUL 0 3 2017 BY: Form SW401-infiltration Trench-Rev.4 Parts 1. & It. Design Summary, Page 2 of 2 Permit No.� (to be provided bD WvIAle,9oG y NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number Helms Port Tim Clinkscales, PE 910-791-6707 6/27/2017 F IN. DES WFOMTION Site Characteristics Drainage area 25,264.00 ft2 Impervious area 16,552.00 ft Percent impervious 65.5% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3lsec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1,5" runoff volume 202000 ft3 Pre -development 1-yr, 24-hr runoff volume 1,354.00 ft3 Post -development 1-yr, 24-hr runoff volume 4,893.00 ft3 Minimum volume required 3539.00 ft3 Volume provided 3,608,00 ft3 OK Soils Report Summary Soil type Coarse Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 140 fmsl Trench Design Parameters Drawdown time 012 days OK Perforated pipe diameter 36.00 in Perforated pipe length 23600 ft Number of laterals 2 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK ECE6VE JUL 0 3 2011 BY.. Form SW401-Infiltration Trcnch-Rcv.4 Parts i. & li. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Trench Elevations Bottom elevation 335 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage/overflow elevation 840 fmsl Top elevation 7.50 fmsl Trench Dimensions Length (long dlmonslon) 128.00 ft Width (short dimension) 1200. ft Height (depth) 4.50 ft OK Additional Information Maximum volume to each inlet into the trench? 0.97 ac-in OK Length of vegetative filter for overflow 112.00 ft OK Number of observation wells 4 OK Distance to structure n/a ft OK Distance from surface waters 11800 ft OK Distance from water supply well(s) nla ft OK Separation from impervious soil layer nla ft OK Depth of naturally occuring soil above SHWT 1 95 ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided CB wl Sump ECEIVEP- JUL 0 3 2011 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No. o ) /" (to be provided by 0WQ) o`erOp W,,ATF9� i ATA ATER MANAGEMENT PERMIT APPLICATION FORM STORMWNCDENR 401 CERTIFICATION APPLICATION FORM =r INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. [I. PROJECT RIWORMATION � Project name Helms Port Contact person Tim Clinkscales, PE Phone number 910-791-6707 Date 6/2712017 Drainage area number G N. [HIV WFORMATION Site Characteristics Drainage area 77,972.00 ftZ Impervious area 43,124 00 ftZ Percent impervious 55.3% % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr discharge ft3/sec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr Beak flow control ft3/sec Storage Volume: Non -SA Waters Minimum volume required ft3 Volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 5339.00 ft3 Pre -development 1-yr, 24-hr runoff volume 4,18000 ft3 Post -development 1-yr, 24-hr runoff volume 12,969.00 ft3 Minimum volume required 8789.00 ft3 Volume provided 8,877 00 ft3 OK Soils Report Summary Soil type Coarse Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 1.40 hnsl Trench Design Parameters Drawdown time 0.12 days OK Perforated pipe diameter 36.00 in Perforated pipe length 610.00 ft Number of laterals 5 Stone type (if used) No. 57 Stone void ratio 40 Stone is free of fines? Y (Y or N) OK ECEIVE JUL 0 3 20V BY; Form SW401-Infiltration "Drench-Rev.4 Parts I. & II. Design Summary, Page 1 of 2 Permit (to be provided by DWQ) Trench Elevations Bottom elevation Storageloverflow elevation Top elevation Trench Dimensions Length (long dimension) Width (short dimension) Height (depth) Additional Information Maximum volume to each inlet into the trench? Length of vegetative filter for overflow Number of observation wells Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Depth of naturally occuring soil above SHWT Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Trench wrapped with geotextile fabric? Pretreatment device provided 3.25 fmsl Raise basin bottom, Must be at least 2-ft above SHWT 8.45 fmsl 7.50 fmsl 132.00 ft 27.50 ft 4.50 ft OK 2.42 ac-in Maximum of 2 acre -inches allowed 102.00 ft OK 10 OK n/a ft OK 295.00 ft OK n/a ft OK n/a ft OK 1.85 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK CB w/ Sump ECEIVE JUL 0 3 2017 BY: Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Drainage Area Number: Infiltration Trench Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash/ debris. The grass filter strip or other pretreatment area Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion structure (if applicable) The structure is clogged. Unclog the conveyance and dispose of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Form SW401-Infiltration Trench O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The trench Water is ponding on the Remove the accumulated sediment surface for more than 24 from the infiltration system and hours after a storyi. dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75 % of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants, preferably by growing on the surface of the hand. If pesticide is used, wipe it on trench. the plants rather than s ra mi . The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow berm Erosion or other signs of damage have occurred at the The emergency overflow berm will be repaired or replaced if beyond outlet. repair. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Trench O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:Helms Port BMP drainage area number:A,B,C,D,E,F,G Print name:D Logan Title:Member Manger Address: 310 North Front Street Wilmington NC 28401 Phone:910-520-1991 Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, by eActneA L. IJ &A k , a Notary Public for the State of MCIA . Cdkfb\,^& County of -Cy" S V.i, c k , do hereby certify that D • L,-A An personally appeared before me this day of Eebvua" , -f o , and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Witness my hand and official seal, SEAL My commission expires O'a. tb , Zo 14 Form SW401-Infiltration Trench O&M-Rev.3 Page 3 of 3 Permit No.SW v ` To oft (to be provided by DWQ) OF W ATF9 02O \QATA G STORMWATER MANAGEMENT PERMIT APPLICATION FORM y 1� o MCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION t— INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I. PROJECT 04FWMATKM Project Name Helms Port Contact Person Tim Clinkscales Phone Number 910-791-6707 Date 11127/2017 Drainage Area Number DA-H 11. D1 WN INFORMATION Site Characteristics Drainage area 84,942,00 ft2 Impervious area 53,579.00 flz Percent impervious 63.08 % Design rainfall depth 1.5" or 1 year in Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.85 in 1-yr, 24-hrintensity in/hr Pre -development 1-yr, 24-hr discharge ft3lsec Post -development 1-yr, 24-hr discharge ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3/sec Storage Volume: Non -SA Waters Minimum design volume required ft3 Design volume provided ft3 Storage Volume: SA Waters 1.5" runoff volume 6559-00 ft3 Pre -development 1-yr, 24-hr runoff volume 4.553.00 ft3 Post -development 1-yr, 24-hr runoff volume 15,852.00 ft3 Minimum required volume 11299.00 ft3 Volume provided 15,353.00 ft3 OK Soils Report Summary Soil type Course Fine Sand Infiltration rate 10.00 in/hr SHWT elevation 1.40 fmsl Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 015 days OK 300 :1 OK 5.00 fmsl OK 8.00 fmsl 6,587.00 ft 900 fmsl 1 %00 ft 35.00 ft 3,723.00 fe ECEIVE DEC 0 12017 BYt Form SW401-Infltration Basin-Rev.5 11Apr2o11 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soli above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 311 ac-in Maximum of 2 acre -inches allowed n/a ft OK 45.00 ft OK 350.00 ft OK n/a ft OK n/a ft OK 360 ft OK Y ;Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK CB / Sump ECEIVE DEC 0 1 2017 RYi - Form SW401-Infiftration Basin-Rev.5 11Ap2011 Parts I. & It. Design Summary, Page 2 of 2 Permit Number:- V */ (to be provided DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. - Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. - The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/ debris is present. Remove the trash/ debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Regrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or swale The pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off -site. The pipe is cracked or otherwise damaged (ifr applicable). Rep '"� Ma Erosion is occurring in the Regif de the swale if nec ss . to swale (if applicable). smooth it over and provide rosion control devi� rced ce��o turf matting or riprap to avoid future problems with erosion. Fonn SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 BMP element: The forebay The main treatment area The embankment The outlet device Potential problem: Sediment has accumulated and reduced the depth io 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Helms Port BMP drainage area number:H, Secondary BMP's for 1 and 2 Print name:D Logan Title:Member Manager Address: 310 North Front Street, Suite 201 Phor Sign Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, RvPtc (%en L. Mei i Y , a Notary Public for the State of p.tov-kLt County of 1", C*_ , do hereby certify that 17 • La A a v, personally appeared before me this 1-A day of Febv�a+�.� Z.�ll{- , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, O „, (9 NOTARY c� PUBLIC U G.�SWICK �'�.•''��• SEAL My commission expires iJ4.c4 (.0. t. Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 Compliance Inspection Report Permit: SW8140211 Effective:01/16/18 Project: Helms Port formerly Emmarts Landing Owner: Sel Property Investors LLC County: New Hanover Region: Wilmington Expiration: 03/06/22 Adress: 100 Aqua Vista Dr City/State/Zip: Wilmington NC 28409 Contact Person: D Logan Title: Directions to Project: Off Masonboro Loop Road just north of Masonboro Harbor Drive. Type of Project: State Stormwater - HD - Infiltration State Stormwater - HD - Detention Pond Drain Areas: 1 - 2- A- B- C- D- E F- G- H- On-Site Representative(s): Related Permits: Inspection Date: 02/05/2019 Entry Time: 12:30PM Primary Inspector: Alida R Lewis Secondary Inspector(s): Reason for Inspection: Follow-up Permit Inspection Type: State Stormwater Facility Status: Compliant ❑ Not Compliant Question Areas: M State Stormwater (See attachment summary) Phone: 910-452-7175 Exit Time: 12:45PM Phone: 910-796-7215 Inspection Type: Transfer Renewal page: 1 Permit: SW8140211 Owner - Project: Sel Property Investors LLC Inspection Date: 02/0512019 Inspection Type Transfer Renewal Reason for Visit: Follow-up Inspection Summary: The project was inspected for compliance prior to transfer. The project had been inspected on August 9, 2018, and was found to not be in compliance due to the standing water in the small infiltration basin (DA-H). Since then Hurricane Florence came through and it continued to rain, so the Division had to delay the inspection to get a stretch of dry weather, and to allow sufficient time for the SCM's to be restored to design condition. All basins and ponds appear to be in compliance as of the date of this report. Built -upon area records have been provided, common area has been conveyed, certifications are in place, and copies of the recorded documents have been provided. The permit can be transferred to the Association. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ upon request? Comment: 1. All infiltration basins have been inspected and appear to be operating as designed. Yes No NA NE ■ ❑❑❑ ■ ❑❑❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE ■ ❑❑❑ ❑ ❑ ❑ page: 2 03-10-' 14 09:37 FR011- T-549 P0010/Ml i F-953 *7tatq. uw1111Wat01 wIMIIIMyanIFlIt, u1roweces Permit No. SW8140211 Helms Port Stormwater Permit No. SW8140211 New Hanover County Designer`s Certifeation Page 1 of 2 as a duly registered0"I rewf in the Stale of North Carolina, hasping been authorized to obsery enodi klylfull time) the construction of the project, A,--r (Project) for ! 7 I''4C'J'ly,�� .(Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: fv/ �i^°!{t' fr"',� f n n e4 y 4 - (- , '9.70,lo Cam• 1 l ;...( ,9-� 0611, 011*44w , $W41 C-1 f-64 --'W' �701-r rt/ NJar,fi'14Aer' [ ,%f t'4-n s) Signature Registration Number o"r7 Date 01011� 0' u:-47 L ��•il:l�l1:111It111511\11\`. pt%n-9ofto '//-IpX / #0 / eo, w•r r� SEAL ECEIVE AUG 15 2015 BY: 03-10-'14 09:38 FROIi- T-549 P0011/0011 F-953 1.3MLV yy VaV111V Permit No. SW8140211 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. .l 2. The drainage area to the system contains no more that; the permitted amount of built -upon area. f 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff Is directed into the system. A. The outlet/bypass structure elevations are per the approved plan. AThe outlet structure Is located per the approved plans. e/ 7. Trash rack is provided on the outlet/bypass structure. _-/ 8. All slopes are grassed with permanent vegetation. ✓ 9. Vegetated slopes are no steeper than 3:1. The inlets are located per the approved plans and do not cause short- circulting of the system_ 11. The permitted amounts of surface area and/or volume have been provided, 42. Required drawdowrn devices are correctly sized per the approved plans. _13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a 7 forebay, and the level spreader / vegetated filter strip. �16. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DEMLR Wilmington Regional t3ftice New Hanover County Building Inspections ECEIVE AUG 15 2016 Page 10 of to 03-0-' 14 0-9:37 FROM - Helms Part Stormwater Permit No. SW8140211 Ngw Hanover_County Designer's Cartification T-549 POO1O/OO11 F-953 atatc t7l flivy tof 1,4101 Iowa#$ OVI it fsxow aIa Perrrlit No. SW81AA211 Page 1 of 2 K 1, " <<,''� •" k'p , as a duty registered ��r/rss�� �fr��— in the State of North Carolina, having been authorized to observe (periodically/weekiylfull time) the construction of the project, 4 (M) 41- (Project) for �t ( P� e t) >��f� GLG (Project Owner) hereby state that, to the best of my abiliti , d6e care and diligence was used in the ob"mation of the project construction such that the construction was observed to be built within Substantial compliance and intent of the approved plans and specifications. The checkUt of items on page 2 of this form are a part of this Certification. Noted deviations from approved plans and specifications: Signature 4—/ .. Registration Number /)C aft }% Date ECEIVE JUL 0 6 2016 BY: Page 9 of 10 03-10-' 14 09:38 FROM- i - 49 P0011/0011 r-953 •.�Ctxv YtiVlf lfilANi/ IIIfGN /f13.jM11ffr1li VyHV/f.N Permit No. SW8140211 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff strains to the system. All roof drains are located such that the runoff Is directed into the system. 5 The outlet/bypass, structure elevations are per the approved la P pP plan. j The outlet structure is located per the approved plans. 7. - Trash rack is provided on the outlet/pypass structure. _Z8, All slopes are grassed with permanent vegetation. 9.: Vegetated slopes are no 61�eper than 3:1. `' 10... The inlets are located per the approved plans and do not cause short- rirrult ne of the srt - 11. The permitted amounts of surface area and/or volume Dave been provided. 124 Required drawdown devices are correctly sized per the approved plans. 13: All required design depths are provided. 4 Ail required arts of the system are provided,such as a vegetated shelf, a 1 forebay, and he level spreader / veetated flter strip. � 15. The required dimensions of the system are provided, per the approved plan. Kq t. -(w- NCDENI- DEMLR Wilmington Regional Office Now Hanover County Building Inspections 144 flA"6-1 150�• eq Page 10 of to a� p,wnloejQ 3�/(0 � HMI ��I 1�� I�UI l��l IUI U!H �NI Il�f ��N ICI 1�II 2015009268 FOR REGISTRATION REGISTER OF DEEDS NEW ANOVER COUNTYPH NC jq 8K 5879 PG950-907 iFEE g 94 00 lUSf # M519268 MASTER DECLARATION OF PROTECTIVE COVENANTS FOR HELMS PORT Prepared by - Block, Crouch, Keeter, Behm & Sayed, LLP 310 North Front Street, Suite 200 Wilmington, North Carolina 28401 NORTH CAROLINA NEW HANOVER COUNTY THIS MASTER DECLARATION OF PROTECTIVE COVENANTS FOR HELMS PORT (these "Protective Covenants") is made this 7/ day ofzV2015, by SEL PROPERTY INVESTORS, LLC, a North Carolina limited liability company ("Declarant"). Declarant is the developer of the real property described in Exhibit A. which is attached hereto and incorporated by reference These Protective Covenants are being executed and recorded by Declarant in order to facilitate the development of the Property as a planned community to be known as "Helms Port" (which will likely be composed of single family communities known as Saylor's Haven, Kathryn's Retreat, and Parker's Shores) and to fix and establish certain covenants, conditions and restnctions upon and subject to which the Property shalt be improved, held, leased, sold and/or conveyed These Protective Covenants impose restrictions upon the Properties (as defined in Article 1 herein) under a general scheme of development for the mutual benefit of the owners of each portion of the Properties Declarant hereby declares that all of the property described in Exhibit A. as well as any additional property subjected to these Protective Covenants by Supplemental Declaration in accordance with the terms hereof, shall be held, conveyed, hypothecated, encumbered, used, occupied, and unproved subject to the following easements, restrictions, covenants, conditions, obligations and limitations, all of which are declared to be in furtherance of a plan of the improvement of the described property, which shall run with the real property subjected to these Protective Covenants, and to the provisions of the North Carolina Planned Community Act These Protective Covenants shall be a burden and benefit to, and binding on, the Declarant, its successors and assigns, and any person or entity acquiring or owning any right, title or interest in the Properties or any part thereof, their heirs, successors, and assigns Retumed To Block,Crouch,K ftr,BehM & Sayed imposition of fines for violations thereof, which fines shall be Individual Assessments and may be enforced in accordance with the provisions of Article 9 (x) Declarant's Activities (1) This subsection 115 shall not apply to any activity conducted by the Declarant or its assigns with respect to its development and sale of the Properties or any commercial activities of the Declarant or its assigns, including any sales office maintained by Declarant or its assigns, and (2) Declarant shall be specifically authorized to rent or lease any Lot which it owns or manages for other Owners, and to maintain model Lots or sales offices in any Lot which it owns or leases 116 Stormwater Runoff Rules The covenants in this Section 116 are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8140211 (the "Permit"), as issued by the North Carolina Division of Water Quality ("NCDWQ") under NCAC211 1000 (a) The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Permit (b) The covenants under this Section 11 6 are to run with the land and be binding on all persons and parties claiming under them (e) The covenants under this Section 116 pertaining to stormwater regulations may not be altered or rescinded without consent of NCDWQ (d) Alteration of the drainage as shown on the plans for the Subdivision approved by NCDWQ may not take place without the concurrence of NCDWQ (e) The maximum built upon area per lot is set forth as Exhibit C attached hereto This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the tight -of -way between the front lot line and the edge of the pavement Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquma, driveways, and parking areas, but does not include raised, open wood decking or the water surface of swimming pools (f) Affected lots shall provide a 50-1oot-wide buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters (g) Lots within CAMA's Area of Environmental Concern may have the permitted built -upon area reduced due to CAMA jurisdiction within the AEC (h) All runoff on the lot must drain into the permitted system This may be accomplished through providing roof dram gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street Lots that will naturally drain into the system are not required to provide these measures (t) Built -upon area in excess of the permitted amount will require a permit modification 0) Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or therequirements of the stormwater rules is subject to enforcement procedures as set forth in G.S. 143 Article 21 25 (k) Declarant hereby reserves the right to impose additional restrictions upon the Properties as and to the extent required by the terms of the Permit Further, Declarant may re- allocate any unused BUA for any Loi: to any other Property within Helms fort, by modzfymg the Stormwater Permit Such additional restrictions, or permitted reallocation of BUA, may be imposed or established by Declarant, by the recording of an Amendment to the Declaration, and no joinder or consent of the Association or any Owner or other Person shall be required ARTICLE I2 EASEMENTS 121 Easements for Utilities There are hereby reserved unto Declarant (for the duration of the Class "B" Control Period) and for the Association, and for the designees of each, access and maintenance easements upon, across, over, and under all of the Properties to the extern reasonably necessary for the purpose of replacing, repairing, and maintaining any cable television system, any master television antenna system, irrigation systems, any security and similar systems, roads, walkways, bicycle pathways, recreation pathways, trails, ponds, lakes, wetlands, drainage systems, street lights, signage, and all utilities, including, but not limited to, water, sewer, meter boxes, telephone, garbage pickup, and electricity, irrigation and for the purpose of installing any of the foregoing on property which it owns or within easements designated for such purposes in these Protective Covenants or on recorded plats of the Properties Any damage to a Lot resulting from the exercise of this easement shall promptly be repaired by, and at the expense of, the Person exercising the easement rights Utilities may not be installed or relocated on the Properties, except as approved by the Board or Declarant 122 Easement for Utility Installation (a) All of the Property, including Lots and Common Area, shall be subject to a perpetual non-exclusive easement for water lines, sanitary sewers, storm drainage facilities, telephone and electric power lines, television antenna lines, and other public utilities as shall be established by the Declarant as may hereinafter be designated on any plat or replat of parcels within the Residential Community whether the same be within the boundaries of any Lot(s) (b) Easements and rights of way over and upon the rear, front and side five (5) feet of each Lot for drainage and the installation and maintenance of utilities and services, including, without Imitation, water, sewer, drainage and stormwater runoff facilities, are reserved to Declarant and its successors and assigns for such purposes as Declarant may deem incident and appropriate to its overall development plan If the side setback is less than five (5) feet then the reserved easement shall be the width of the setback. The easements and right of way areas reserved by Declarant on each Lot pursuant hereto shall be maintained continuously by the Owner, but no structures or plantings or other material shall be placed or permitted or remain upon such areas or other activities undertaken thereon which may damage or interfere with the installation or maintenance of utilities or other services, or which may retard, obstruct or reverse the flow of water or which may damage or interfere with established slope ratios or create erosion problems. Improvements within such areas also shall be maintained by the respective Owner except those for which a public authority or utility company is responsible These easements and rights expressly include the right to cut any trees, bushes or shrubbery, make any gradings of the soil, or to take any other similar action reasonably necessary in the opimon of the Declarant to provide an economical and safe installation The Declarant shall have no maintenance responsibilities for such easement areas (c) The Declarant reserves a perpetual, non-exclusive easement for the installation, maintenance and repair of water, sewer, drainage and all other utilities within the right of way of 26 142 Rights of Declarant and Approved Builders Notwithstanding anything in these Protective Covenants to the contrary, so long as sales of Lots by the Declarant shall continue, the Declarant, and Approved Builders, way maintain and cai'iy on such facilities and activities as, to the sole opinion of the Declarant, may be reasonably required, convenient, or incidental to the construction or sale of such Lots, including, but not limited to, the construction and use of sales and business offices, signs and model Lots, and the use of any Common Areas and any facilities therein The Declarant and Approved Builders shall have easements for access to and use of such facilities 143 Rights to Alter The rights reserved by Declarant in these Protective Covenants (including, without limitation, the right to annex property under Article 8 herein) include the right to change, alter or designate Lot(s), roads, utility and drainage facilities and easements, and to change, alter or redesignate such other present and proposed amenities or facilities as may in the sole judgment of the Declarant, be necessary or desirable The rights reserved in this Section specifically include the right of Declarant to redesignate, change, or alter any platted Lot(s) into road(s) ARTICLE 15 DURATION, AMENDMENT AND TERMINATION 15 1 Lots,Persons and Entities Subject to the Protective Covenants Duration and Termination All present and future Owners, tenants, and occupants of Lots and their guests or invitees, licensees, employees or agents, shall be subject to, and shall comply with the covenants, conditions, restrictions and affirmative obligations set forth in these Protective Covenants, and as the Protective Covenants may be amended from time to time The acceptance of a deed of conveyance or the entering into of a lease or the entering into occupancy of any Lot shall constitute an agreement that the provisions of these Protective Covenants are accepted and ratified by such Owner, tenant or occupant and that they will fully comply with the terms and conditions of said Protective Covenants The covenants, conditions, restrictions, and affirmative obligations of these Protective Covenants shall inure to the benefit of and be enforceable by the Association, or the Owner of any Lot, their respective legal representatives, heirs, successors and assigns, for a term of forty (40) years from the date these Protective Covenants are recorded in the New Hanover County Registry, after which date these Protective Covenants shall be automatically extended for successive periods often (10) years, unless these Protective Covenants are terminated as provided in §47F- 2-118 of the Planned Community Act (provided that, during the Class "B" Control Period, any termination shall also require the consent of Declarant) The covenants, restrictions, conditions and affirmative obligations of these Protective Covenants shall run with and bind the land and shall bind any person having at any time any interest or estate in any of the Properties as though such provision were made a part of each and every deed of conveyance or lease 152 Amendment During the Class "B" Control Penod, these Protective Covenants may be amended by Declarant in its discretion Retention of this right by the Declarant is not intended to affect the general or common scheme of development for the property herein described but to correct and/or modify situations or circumstances which may arise during the course of development Thereafter, these Protective Covenants may be amended by vote of not less than sixty-seven percent (67%) of the Class "A" Members, and an instrument must be recorded at the New Hanover County Registry for such an amendment to be effective In addition, the Declarant may amend these Protective Covenants to annex additional property and make it subject to the terms, conditions, restrictions, obligations and covenants of these Protective Covenants as provided in Article 8 herein No amendments may remove, revoke, or modify any benefit, right or privilege of the Declarant hereunder without the written consent of the Declarant or the assignee of such right or privilege 30 153 StormWater Restrictions Notwithstanding the foregoing to the contrary, Declarant shall be entitled to unilaterally amend these Protective Covenants as provided in Section t 1 6 herein ARTICLE 16 COMPLIANCEWITH THESE PROTECTIVE COVENANTS THE ARTICLES THE BYLAWS AND THE RULES AND REGULATIONS OF THE ASSOCIATION In the case of failure of an Owner to comply with the terms and provisions contained in these Protective Covenants, the Articles, the By -Laws or Rules and Regulations of the Association, the following relief shall be available 161 Enforcement The Association, the Declarant and any aggrieved Owner within the Residential Community shall have the right to enforce by any proceeding at law or in equity, all of the conditions, covenants and restrictions of these Protective Covenants and the Articles, By -Laws and Rules and Regulations of the Association and any and all laws hereinafter imposed pursuant to the terms of these Protective Covenants The prevailing party shall be entitled to collect all costs thereof, including reasonable attorney's fees (which shall be determined using reasonable hourly rates) 16 2 Remedies The Association shall have the right to remedy the violation and assess the costs of remedying same against the offending Owner as an Individual Assessment as provided in Article 9 herein 16 3 Suspension of ftbts For any violation by an Owner, including, but not limited to, the nonpayment of any general, special or individual assessment, the Association shall have the right to suspend the offending Owner's voting rights and the use by such Owner, his agents, lessees, employees, licensees and invitees of the Common Areas and recreational facilities in the Residential Community for any period during which a violation continues 16 4 Fines The Association may establish a schedule of fines for the violation of these Protective Covenants, the Articles, By -Laws and Rules and Regulations. If an Owner does not pay the. fine within fifteen (15) days the fine shall be an Individual Assessment against the property and may be enforced by the Association in accordance with Article 9 herein 16 5 Remedies Cumulative. The remedies provided by this Article are cumulative, and are in addition to any other remedies provided by law 16 6 Waiver The failure of the Association or any person or Owner to enforce any restriction contained in these Protective Covenants, the Articles, the By -Laws or the Rules and Regulations shall not be deemed a waiver of the right to do so thereafter ARTICLE 17 GENERAL PROVISIONS 17 1 Common Area and Amenities All of the Common Area and any other park, recreation area, recreation facility, dedicated access or other amenity appurtenant to the Properties, whether or not shown and delineated on any recorded plat of the Properties, shall be considered private and for the sole and exclusive use of the Owners of Lots within the Properties. Neither Declarant's execution nor the recording of any plat nor any other act of Declarant with respect to such area is, or is intended to be, or shall be construed as a dedication to the public of any such areas, facilities, or amenities 31 FVHIRrr r BUILT UPON AREA LIMITATIONS Helms Port LOT NUMBER BUILT UPON AREA Lots 1 — 22 4,000 square feet Lots 23 — 106 6,500 square feet Lots 107 —159 4,500 square feet 55