Loading...
HomeMy WebLinkAboutSW8091204_Current Permit_20191008Burd, Tina 1 From: Burd, Tina J Sent: Tuesday, October 8, 2019 9:26 AM To: john.nichols@brunswickcountync.gov; pollardma@cdmsmith.com; boonekr@cdmsmith.com Subject: SW8 091204 - Northwest WTP Attachments: SW8 091204 Northwest WTP.pdf The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) completed their review of the Express Stormwater Permit Application for the subject project. Attached is the cover letter and permit issued on October 7, 2019 that will be mailed separately, along with any other supporting documents. Please direct any questions to your reviewer. DO NOT RESPOND TC Tf 'IS EMAlLs Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 f rr.�i' ca�respar�de+�ce to and h-om this adclresr, rs subject to ffie .Vorth Caro?i,)Q Pvbl+c Records Law and may be disclo,->F.► to third par;res. ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Director October 7, 2019 NORTH CAROLINA EnY&wunenWQuality Brunswick County Attn: John Nichols, Utilities Director (email. iohn.nicholsCa)brunswickcoun, ncacLo 7) PO Box 249 Bolivia, NC 28422 Subject: Approved Minor Modification Stormwater Permit No. SW8 091204 Northwest WTP Brunswick County Dear Mr. Nichols: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. On September20, 2019, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources received and accepted a complete minor modification Express permit application for changes to the approved plans for Stormwater Management Permit Number SW8 091204. It has been determined that the nature of the proposed change meets the definition of a minor modification in that it does not result in an increase in the size of the permitted stormwater control measure (SCM) and does not increase the amount of permitted built -upon area. As described in detail on Attachment C. the modification is to add 96,808 sf of BUA to the site, while reducing the future BUA allocation to 103,192 sf, for no net increase in BUA. We are forwarding you an approved copy of the modified plans for your files depicting the proposed locations of the additional built -upon area. Please replace the old approved plan sheet(s) with the new one(s). Please replace the previously issued permit with the revised permit, dated October 7, 2019, attached, and replace Page 3 of the previous application form with the attached revised Page 3. This revised permit does not impose new or different terms; it merely reorganizes and restates some of the previous terms to provide you with a better understanding of your obligations under the permit. Please be aware that all terms and conditions of the low density permit originally issued on December 29, 2009, and modified/revised on November 9, 2011, and again on April 27, 2015, remain in full force and effect. Please also understand that the approval of this minor modification to the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be approved through this Office prior to construction. The approval of this minor modification does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. ;Q North Carolina Department of Environmental Quality I Division of Energy, Nneral and land Resources MEWIrlington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 rani cnnoLM State Stormwater Permit No. S W8 091204 Page 2 of 2 If you have any questions concerning this matter, please do not hesitate to call any of the Stormwater Staff in the Wilmington Regional Office at (910) 796-7215. Sincerely, Z Linda Lewis, E.I. Environmental Engineer Enclosures: Attachment A -Certification Documents Attachment C - Permitting History Permit and Application Documents GDS\arl: G:\\\Stormwater\Permits & Projects\2009\091204 LD\2019 10 permit minor 091204 cc: Michael Pollard, PE, CDM Smith (email: uo1lardma0cdmsmith.com) Brunswick County Engineering NCDOT District Engineer Wilmington Regional Office Stormwater File State Stormwater Management Permit Number SW8 091204 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Brunswick County Northwest Water Treatment Plant 3954 Clearwell Drive, Leland, Brunswick County FOR THE construction, operation and maintenance of a 24% low density project in compliance with the provisions of Session Law 2008-211 and Title 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS The overall tract built -upon area percentage for the project must be maintained at or below 24% per the requirements of the stormwater rules. This permit covers the construction of a total of 267,644 square feet of built -upon area (BUA), which includes 96,808 sf for this modification, 67,644 sf feet of previously permitted BUA, and 103,192 square feet of remaining future BUA allocation. The result of this permit modification is that the built -upon area allocation for future development is now 103,192 sf. 2. The project area for this permit has been reduced to 8,482,100 sf to account for the pre- 1988 BUA of 147,126 sf that exists on the property, as per NCAC 02H.1003(1)(b). 3. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 4. No piping shall be allowed except those minimum amounts necessary to direct runoff beneath an impervious surface such as a road or under driveways to provide access and those amounts shown on the approved plans. 5. The project shall provide and maintain a minimum 50-foot wide vegetative buffer adjacent all surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of each side of streams and rivers and the mean high water line of tidal waters. All runoff directed into and through the vegetative buffer must flow through the buffer in a diffuse manner. Roof drains must terminate at the outer edge of the buffer. 6. Stormwater runoff that is directed to flow through any wetlands shall flow into and through these wetlands at a non -erosive velocity. Page 1 of 4 State Stormwater Management Systems Permit No. SW8 091204 II. SCHEDULE OF COMPLIANCE The permittee shall construct, operate and maintain the approved stormwater control measures and built -upon areas in accordance with the conditions of this permit, the approved plans and specifications and the supporting documentation attached to and on file with the Division. 2. No person shall alter the approved stormwater management system or fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system, except for minimum driveway crossings, unless and until the permittee submits a modification to the permit and receives approval from the Division. 3. The permittee is responsible for verifying that the proposed built -upon area for the project does not exceed the maximum allowed by this permit. 4. Swales, vegetated areas and other vegetated conveyances shall be constructed in their entirety, vegetated, and operational for their intended use prior to the construction of any built -upon surface, per the approved plans. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 6. The permittee shall at all times provide and perform the operation and maintenance necessary as listed in the signed Operation and Maintenance Agreement, such that the permitted stormwater management system functions at its optimum efficiency. 7. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina, driveways, and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 8. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Redesign or addition to the approved amount of built -upon area. c. Further subdivision, acquisition or sale of the project area in whole or in part, as reported on the permit application documents. d. Filling in, piping, altering, removing, redirecting, regrading or resizing any vegetative conveyance shown on the approved plan. e. The development of any future area or additional phase(s) noted on the approved plans. f. The construction of any areas of #57 stone, permeable pavement, or certain landscape materials for BUA credit. g. Any other revision as determined by the Director. 9. The permittee must certify in writing that the projects stormwater controls, and impervious surfaces have been constructed within substantial intent of the approved plans and specifications. Any deviation from the approved plans must be noted on the Certification. The permittee shall submit the Certification to the Division within 30 days of completion of the project. 10. The permittee shall submit all information requested by the Director or his representative within the time frames specified in this permit or in a written information request. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 2 of 4 State Stormwater Management Systems Permit No. SW8 091204 III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. A request to transfer the permit will be considered on its merits and may or may not be approved. The permittee shall complete, sign and submit a Permit Transfer Application Form, available online. The Transfer Application Form must be accompanied by the supporting documentation as listed on the form and must be submitted to the appropriate Regional Office of the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part; b. The dissolution of the corporate entity, LLC, or General Partnership; c. Bankruptcy and/or foreclosure proceedings; 2. The permittee shall submit a completed "Permit Information Update Form" to the Division at least 30 days prior to any one of the following events: a. A name change of the permittee; b. A name change of the project; c. A mailing address change of the permittee. 3. The Permittee is responsible for compliance with all the terms and conditions of this permit until such time as the Division approves the permit transfer in writing. Neither the sale of the project area, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the stormwater permit. 4. Any "person" found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in North Carolina General Statute 143 Article 21. 5. The permit issued shall continue in force and effect until the permittee receives official notification from the Division of Energy, Mineral and Land Resources that the permit has been revoked or terminated. 6. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, or rescission; however, these actions do not stay any permit conditions. 7. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. al. 8. The issuance of this permit does not preclude the Permittee from complying with and obtaining any and all other permits or approvals that are required in order for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 9. Approved plans, application, supplements, operation & maintenance agreements and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, the operation and maintenance agreements, and the approved plans and specifications shall be maintained on file by the Permittee at all times. 10. The Permittee grants permission to DEQ Staff to enter the property during normal business hours for the purposes of inspecting the stormwater control system and its components. Page 3of4 State Stormwater Management Systems Permit No. SW8 091204 11. Unless specified elsewhere, permanent seeding requirements for the swales must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Permit updated, modified and reissued this the 7th day of October 2019. NORT CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -- — ------ ----------- ------------- d�r S. Daniel S h, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4of4 State Stormwater Management Permit Number SW8 091204 ATTACHMENT A AS -BUILT PERMITTEE CERTIFICATION I hereby state that I am the current permittee for the project named above, and I certify by my signature below, that the project meets the below listed Final Submittal Requirements found in NCAC 02H.1042(4) and the terms, conditions and provisions listed in the permit documents, plans and specifications on file with or provided to the Division. H Check here if this is a partial certification. Section/phase/SCM #? Check here if this is part of a Fast Track As -built Package Submittal. Printed Name I, County of Signature a Notary Public in the State of do hereby certify that personally appeared before me this day of , 20 and acknowledge the due execution of this as -built certification. (SEAL) Witness my hand and official seal My commission expires F_ — - Permittee's Certification NCAC .1042(4) A. BEE" E.STRICTIONS / BUA RECORDS CMV[Cu+d Pm%i& Y or N NIA - J 1. The utility has recorded the necessary language to ensure that the pro ect is maintained consistent with the stormwater regulations and with the permit conditions. B. MAPfUNANCE ACCESS 1 _ 1. The site is accessible for inspection, maintenance and repair. Y or N 2. The access is a minimum of 10 feet wide. Y or N 3. The access extends to the nearest public right-of-way. Y or N C. EAS-EMENTS —_ ---- , - 1. The SCMs and the components of the runoff collection / conveyance system are located in recorded drainage easements as necessary. Y or N 2. A copy of the recorded plat(s) is provided. Y or N _ D. OPERATION AND MAINTENANCE AGREE-MUNT ; Y or N 1. The site is being operated and maintained in accordance with the approved plan. Y or N Provide an explanation for every requirement that was not met, and for every "N/A" below. Attach additional sheets as needed. Page 1 of 1 State Stormwater Management Permit Number SW8 091204 ATTACHMENT C — PERMIT HISTORY See Excel file Page 1 of 1 Received I Fee Paid I Permit Number 9-W-20" co I V r__ ,. STORNWATER PERK i?TTI14O ORIV! 7: Standard Permitting Program — No Fee for Minor Modification BY: Express Permitting Program — See Express Fee Schedule Only complete applications packages will be accepted and reviewed. This form and the required items (with original signatures) must be sent to the appropriate DEMLR Regional Office, which can be determined by locating the project on the interactive online map at: http://deg.nc.gov/contact/regional-offices. This form is to only to be used by the current permittee to notify the Division of a minor modification. Pursuant to Rule 15A NCA C 02H .1002 a minor modification is a change to the project that: 1) does not increase the net built -upon area; and(or 2) does not change the size or design of the SCM(s). A. GENERAL iNFORiWATIOt 1. State Stormwater Permit Number: SW8 091204 2. Current Permit Holder's Company Name/Organization: Brunswick County 3. Signing Official's Name: John Nichols 4. Signing Official's Title: Utilities Director 5. Mailing Address: PO Box 249 City: Bolivia State: NC ZIP: 28422 6. Street Address (if different): 3954 Clearwell Drive, NE City: Leland State: NC ZIP: 28451 7. Phone: (910) 253-2653 Email: iohn.nichols brunswickcoun nc_ ov 8. Describe the minor modifications that you are requesting, including any revised BUA allocations (attach additional pages or supporting tables similar to Section IV.10 of the original application, if needed): The existing April 2015 permit (SW8 091204) categorizes the Northwest WTP as a 24% low -density development. The maximum permitted BUA is 267,644 square feet (sf). The existing BUA is 67,644 sf. The proposed upgrades at the NWTP will increase the impervious area by 96,808 sf, bringing the total BUA at the site to 164,452 sf, which is beneath the maximum. leaving 103,192 sf of future BUA As a low -density development, the only new runoff conveyance systems allowed are vegetated swales with minimum 3:1 side slopes. Per the existing Stormwater Permit for the NWTP minimal piping is allowed to direct stormwater runoff to these swales. The design of the stormwater management system follows the design requirements for low -density proiects as outlined in 15A NCAC 02H .1003(2). The existing 36-inch RCP drainage system within the northern driveway, which discharges to Hood Creek will remain unchanged except for adjustments to catch basins and manholes required for the reconfiguration of the northern driveway area S. SUBINW7 W REQ 1iREMENTS Please mark "Y" to confirm the items are included with this form. Please mark W if previously provided. If not applicable or not available, please mark N/A.: Y 1. Two hard copies (with original signatures) and one electronic copy of this completed form. Y 2. Two hard copies and one electronic copy of the revised plan sheets (must be a revision of the originally approved plan sheets). N/A 3. If there is reallocation of lot BUA, a copy of the revised recorded deed restrictions and protective covenants OR the proposed recorded deed restrictions and protective covenants documenting the changes and a signed agreement to provide the final recorded document. Y 4. If applicable, the appropriate Express review fee. Storm,,e ater Permit Form 7: Minor Modification Page 1 of 2 Juiy 14, 2017 C. CONTACT INFORMATION 1. The Design Professional who is authorized to provide information on the Applicant's behalf: Design Professional's Name:Michael Pollard, P.E. Consulting Firm: CDM Smith Mailing Address:5400 Glenwood Avenue, Suite 400 City: Raleigh State: NC Zip: 27612 Phone: (919) 325-3594 Fax: (919) 781-5730 Email: nollardmat-cdmsmith.com 2. [OPTIONAL] If you would like to designate another person to answer questions about the project: Name & Title: Kellv Boone. P.E. Organization: CDM Smith Mailing Address:5400 Glenwood Avenue, Suite 400 City: Raleigh State: NC Zip: 27612 Phone: (919) 325-3508 Fax: (919) 781-5730 Email: boonekrO-)cdmsmith.com D. CERTIFICATION OF PERMITTEE I, W10611 t4+ C N0( 5 , the current permittee, certify that I have authorized the minor modifications listed in Section A and shown in the attached revised plan sheets. I further attest that this information is accurate and complete to the best of my knowledge. Signature: t I. , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this the 11 f''- day of ,R u9lt._...L.� , 20_A, and acknowledge the due execution of the forgoing instrument. Witness m hand and official seal, %%% i f" My COl mm• gplres My corfifi IQQQOUD4 hires It - IS - 2d 19 Stormwater Permit Form 7: Minor Modification Page 2 of 2 Oct 6, 2017 USE ONLY Number Applicable Rfiles: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Co traction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Northwest Water Treatment Plant Phase 2 Improvements 2. Location of Project (street address): 3954 Clearwell Drive City:Leland County:Brunswick ZiP: 28451 3. Directions to project (from nearest major intersection): From Wilmindon: West on Hwy 74 Take right on Mt Misery Road; continue 6 miles; then left on Butler Road for 0.3 miles: slight left on Clearwell Drive 4. Latitude:340 18' 10.335" N Longitude:78* 06' 23.484" W of the main entrance to the project. HT. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification ❑ Renewal w/ Modificationt tRenewals with modifications also requires SWLI 102 - Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 091204 , its issue date (if known)11/9/11 . and the status of construction: ❑Not Started []Partially Completed* N Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density []High Density ❑Drains to an Of -site Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on requirerkurwueR'4�s obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA MajorNSedimentation/Erosion Control: 4.1 ac ofi 2015 �- NPDES Industrial Stormwater - ❑ ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/—P—en-m-rNrunber, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? NNo ❑Yes If yes, see S.L. 2012-200, Part VI: htW://portal.ncdenr.org/web/lr/rules-and-regulations Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III.. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Brunswick County Signing Official & Title:Ann Hardy, County Manager b. Contact information for person listed in item la above: Street Address:30 Government Center Drive City:Bolivia State•NC Zip:28422 Mailing Address (if applicable):PO Box 249 City:Bolivia StateNC Zip:28422 Phone: (910 ) 253-2016 Fax: (910 ) 253-2022 Email:ann.hardy@brunswickcountync goy c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project. Other Contact Person/Organization: Signing Official & b. Contact information for person listed in item 3a above: Mailing City:_ Phone: Email: State: Fax: L 4. Local jurisdiction for building permits: Brunswick County Point of Contact:Brunswick County_ Planning Dept Phone #: (910 ) 253-2025 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. r- V ` 1 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph Il - Post Construction 3. Stormwater runoff from this project drains to the 4. Total Property Area: acres River basin. 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal Hi h Water (Nri M line or Mean High Water (MH[M line, and coastal wetlands landward from the NHW (or = line. The resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 9. How many drainage areas does the project have? (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. ZoVI H GP 6ve-r2t ( Basin unformAtion Dralna , e Area 1a Drrai Area 1b Dr"ge Area I rAuiage Area, Receiving Stream Name Hood Creek Hood Creek Stream Class * C; Sw C; Sw Stream Index Number * 18-66 18-66 Total Drainage Area (sf) 8.482,100 sf 8.482,100 sf 64S2, W On -site Drainage Area (sf) 8.482,100 sf 8.482,100 sf 645 Z (9O Off -site Drainage Area (sf) 0 sf 0 sf Q Proposed Impervious Area** s 67,600 sf 96.800 sf % Impervious Area** total 0.8 2.0 im rviuus" Surface Area Dr ' Ar+ea laI Dran-Lage Area 1b rah- age Area __ I pra na Area On -site Buildings/Lots (sf) 58,000 52,300 110301 On -site Streets (sf) 2,600 22,700 Zej 2$ 4- On-site Parking (sf) 1,700 2,300 4 pV l On -site Sidewalks (so 2,400 7,400 163 S Other on -site (so 2,900 12,100 150 ( ( Future (so 200,000 103,200 J(�3 Off -site (sf) 0 0 Existing BUA*** (sf) 0 67,600 Total (so: 267,600 1 267,600 ?(0'7&4-4 * Stream Class and Index Number can be determined at: http://portal.nerienr.org,,Lveb/v s/csu/classifccations Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing B LIA that will remain after development. Do not report any existing B UA that is to be removed and which will be replaced by new BUA. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DEMLR Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per 1 SA NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhffp://12ortal.ncdenr.org/web/wa/ws/su/bmt>-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Energy, Mineral and Land Resources (DEMLR). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/walws/su/statesw/forms does. The complete application package should be submitted to the appropriate DEMLR Office. (The appropriate office may be found by locating project on the interactive online map at htt2://portal ncdenr org/web/w`M/ws/su/maps.) Please indicate that the following rewired information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue inkDownload the latest versions for each submitted application package from bttp://12ortal,ncdenr.org/web wo/ws/su/statesw/forms does. Icitials 1. Original and one copy of the Stormwater Management Permit Application Form. A tw 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants -h_ Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M 01A— agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to yd f4A) httn: / /www.envhelp.org/pages/onestopeWress html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor .the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'h mile of the site boundary, include the'f1 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). Al _tw 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded . structures, the banks of streams or rivers, and the MHW (or NHW) of tidal �� i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevatio 1. Details of roads, drainage features, collection systems, and stormwater control asures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineate by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). Form SWU-101 Version Oct. 31, 2013 Page 4 of 6 A copy of the most current property deed. Deed book: 489 Page No: 729 For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. h2R://www.secre!diy.state.nc.us/Corporations/CSeardi.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to de the) as ll f th I-1 p we as a map o e orh% ocations with the existmg elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DEMLR to verify the SHWT prior to submittal, (910) 796-7378.) -N �A- For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/lr/state-stormwater- forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DEMLR, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:G. Eric Williams, PE Consulting Firm:_HDR Engineering Inc. of the Cazolinas Mailing Address:1780-2 Chandlers Lane City:Sunset Beach Phone: f 910 ) 575-8800 Email:eric.williams@hdrinc.com State:NC Zip:28468 Fax: (910 1 575-8801 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or type name of person Iisted in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. MAR 0 6 2015 BY: Form SWU-101 Version Oct. 31, 2013 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults m their lease agreement, or pending sale, responsibility for compliance with the DEMLR Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DEMLR immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-213.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of do hereby certify that before me this _ day of County of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Ann Hardy certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000 and any other applicable state stormwater requirements. <.k,-/ Date: I, And nto- & - U-) k' `k--a Notary Public for the State of 46 ti44q 06 yo r iaL County of r ukisu .i; t . do hereby certify that A v) n •A • Cst r J personally appeared before me this ZZ day of b lu fcE 'ZD 15 , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, U-1 �e%'4T00eeeeoes9..®r� 4q0 � o°cpe moo : � �sP u Ue o G° m �13000C 000 �OO` 40o ��jJl OOO OOO OCO ��,�� �O�oti1�1( co��'a90°° SEAL My commission expires d `l b-7 1 nL-6 l EC# MAR 0 6 2015 IBYU, : Form SWU-101 Version Oct. 31, 2013 Page 6 of 6 V. SWALE SYSTEM MAINTENANCE REQUIREMENTS 1. Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time; and grass will not be mowed too close to the ground or "scalped". 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. 3. Accumulated sediment and trash will be removed as necessary. Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. Side slopes must be maintained at the permitted slope. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title:MgAy K. Lawing, Brunswick County Manager Address:Building E, 45 Courthouse Drive NE, Bolivia, NC 28422 Date: /Z - ' Signature: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, (�y-201 G- • VV h l le— , a Notary Public for the State of O (. ra 1i nog. , County of 1'1AY15 W I G , do hereby certify that _ MQY-i'y K . �-a w; vLq personally appeared before me this 1_8 day of Der_eyvJQ_eN , 'lo69 , and acknowledge the due execution of the forgoing swale maintenance requirements. Witness my hand and official seal, Notary signature wy; a. 8066098 zli ..sRAr'G cy ♦ • Puq%� 'Z .�A\ e;w DEC 2 8 2009 BY: SAS c�l2o� My commission expires 0 ! - I &I �D 1 4 Form SW401-1.ow Density-Rev.4-2004Oct20 Page 4 of 4 �Aw of WWAA'7 �F9 nn�, 2 IL JMWI 1r\7d�1 r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I I. PROJECT INFORMATION Project name NorthwestWater Treatment Plant Improvements Contact name Matthew Jones. Phone number glg gg3 7152 Date December 18, 2009 Drainage area number 1t>q-U II. DESIGN INFORMATION For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cis For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity,10-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 in/hr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? 81,600.00 ffz 30,474 00 ftz 37.35 % 0.56 1.05 cis 5.00 min 9.35 in/hr 9.81 cfs Y (Y or N) (Y or N) (Y or N) (Y or N) ft ft Please complete filter strip characterization below. 400.00 ft 400.00 ft 4000 fmsi 33.00 fmsl 1.75 % OK N (Y or N) OK 55000 sq ft OK 65 ft/cfs 11 (Y or N) (Y or N) (Y or N) cfs (Y or N) t G There is too much flow to be handled by a level spreader. A bypass device is not needed. foaee Ar-t 11' Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts 1. and 11. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? 40.00 ft Level spreader is not long enough. N (Y or N) Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M 0 W y Peak velocity in the channel during the 10-yr storm Channel lining material * W M (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. 1Y Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. 1 f--------- y M 1 B 1 cis Do not complete this section of the worksheet Do not complete this section of the worksheet 1 M Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 2 of 2 FNW REQUiRiED ITENIS CRECKUST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initial Sheet No. SSW-1 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. SSW-2 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass system, - One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. C12 3. Section view of the level spreader (1" 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. Imp 4. A date -stamped photograph of the filter strip that clearly shows the type of vegetation that is present. SSW-2 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire IV drainage area is stabilized. � d 6. The supporting calculations. 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. NIA 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Permit Number: 51o8 cqoo (to be provided by DWQ) Drainage Area Number: Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the level spreader. After the level spreader is installed, it will be inspected quarterly and within 24 hours after every storm event greater than 1.5 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remedlate thisproblem: Entire system Trash/debris is present Remove the trash/debris The swale and the level lip The swale is clogged with sediment Remove the sediment and dispose of it off -site The level lip is cracked, Repair or replace lip settled, undercut, eroded, or otherwise damaged There is erosion around Regrade the soil to create a berm the end of the level that is higher than the level lip, and spreader that shows then plant a ground cover and water stormwater has bypassed it until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have Remove them begun to grow on the swale or just downslope of the level lip The receiving Erosion or other signs of Contact the NC Division of Water water damage have occurred at Quality local Regional Office the outlet Page 1 of 2 Permit Number: 4 119 oR (Z-0 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. i agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Northwest Water Treatment Plant Improvements BMP drainage area number: 1 Print name: Marcy K. Lawing Title: County Manager Address: Building E, 45 Courthouse Drive NE, PO Box 249 Bolivia NC 28422 Phone: 910-253-2000 Signature: Date: / 1z , -0 C 1, A-o Jr-ee, & - W h i*2 , a Notary Public for the State of K04h Oan k na , County of �Br-L4 vy i c(<, , do hereby certify that hA a flq K • �-a w f n q personally appeared before me this i day of L7erP mbe r , 2-069 , and acknowledge the due execution of the forgoing level spreader maintenance requirements. Witness my hand and official seal, OAIJ,,.�, W-" .''• �` $ CJTI °r • w • i • �• i z • CCU My. cfission expires o Page 2 of 2 S_J I STATE OF NORTH CAROLINA BOOK 489 F.,L: 729 COUNTY OF BRUNSWICK THIS WARRANTY DEED, rude and entered into this the 31st day of December, 1981, by and between ADDIE W. BUTLER (Widow) of Brunswick County, North Carolina, hereinafter referred to as the party of the first part; and BRUNSWICK COMM, a body politic and subdivision of the State of North Carolina, hereinafter referred to as the party of the second part; W I T N E S S E T It : THAT for and in consideration of the sum of FIVE HUNDRED THOUSAND ($500,000) DOLLARS and other valuable considerations, in hand paid by the said party of the second part, the receipt of which is hereby acknowledged, the said party of the first part, Grantor, has bargained and sold, and by these presents does hereby give. grant, bargain, sell and convey unto the party of the second part, Grantee, in fee simple, SUBJECT HOWEITR, to the terms and conditions hereinafter set forth, all that certain tract or parcel of land located in Northwest Township, Brunswick County, North Carolina, and more particularly described as follows: egg RTefiurkgsby: R6110viaoi, North Carolina BEGINNING at an iron pipe in the eastern right-of-way line of a proposed entrance road to the property, said iron pipe and place and point of Beginning being from the intersection of the center lines of SR 1426 and SR 1460. S 20 degrees 45 minutes 07 seconds W, along the centerline of SR 1460 1198.94' to a pipe in the centerline of SR 1450; Thence, perpendicular to the centerline of SR 1460, easterly 30' to a pipe in the eastern right-of-way line of SR 1460; Thence S 4 degrees 19 minutes 12 seconds E, CH. 374.78' R= 442.22', along the eastern right -of -any line of the proposed entrance road to an iron pipe in the eastern right-of-way line of the proposed entrance road; Thence, continuing with the eastern right-of-way line of the proposed entrance road S 29 degrees 23 minutes 30 seconds E 465.05' to the Place and Point of Beginning; Thence from the Beginning Point, R=1427.11' S 10 degrees 05 minutes E CH. 943.75' to an iron pipe; Thence S 9 degrees 19 minutes 30 seconds W 2978.08' to an iron pipe in the centerline of the North Carolina Natural Gas Pipeling Easement; Thence s 73 degrees 07 minutes 47 seconds W 1103.02' to a new iron rod in the northern right-of-way line of the railroad right-of-way; Thence with the northern right-of-way line of the railroad N 94 degrees 42 minutes 17 seconds W 1538.80' to a point in the intersection STATt of �.:� Real EstategriRTH = .. a i J!3•ST2 �•�•- 5 0 0. 0-0 0 c !.&INSI ao" 489 F, "130 of the northern right-of-way line of the railroad right-of-way and the centerline of the run of Hoods Creek as plotted from the Brunswick County Tax Department's Tax Map• Thence, with the centerline of the run of Hoods Creek northerly, as plotted from the Brunswick County Tax Department's Tax ?Sap, more than 3000' to a point in the intersection of the centerline of the run of Hoods Creek and the boundary line of the Butler property with the Hoffman property; The::ce; with the Hoffman line, from the centerline of the run of Hoods Creek N 89 degrees 49 minutes 53 seconds E 20' to a new iron rod in the Hoffman line; Thence, continuing with the Hoffman line N 89 degrees 49 minutes 53 seconds E 310.23' to an existing iron pipe in the Hoffman line; Thence, leaving the Hoffman line S 18 degrees 55 minutes 15 seconds E 95' to an iron rod; Thence S 36 degrees 10 minutes 15 seconds E 135' to an iron rod; Thence S 5 degrees 10 minutes 15 seconds E 463' to an iron rod; Thence S 75 degrees 55 minutes 15 seconds E 165' to an iron rod; Thence S 4 degrees 56 minutes 30 seconds E 256.67' to an existing iron pipe; Thence N 86 degrees 02 minutes E 1016.12' to a Bolt; Thence N 05 degrees 30 minutes 33 seconds W 213.85' to a new iron pipe and 15 inch Gum; Thence S 59 degrees 46 minutes E 801.41' to a new iron rod in the center of a light wood stump; Thence N 9 degrees 40 minutes 49 seconds W 684.15' to a new iron rod: Thence N 80 degrees 19 minutes 11 seconds E 177.46 to an iron rod; Thence N 7 degrees 26 minutes E 117.19' to an iron rod; Thence N 11 degrees 17 minutes E 114.10' to an iron rod; Thence N 29 degrees 23 minutes 30 seconds W 44.93' to an iron rod; Thence S 82 degrees 34 minutes E 74.96' to the Place and Point of BEGINNING. And containing 200 acres more or less all according to a survey by G. Douglas Jefferys, RLS dated May June, 1981, Updated December, 1981. This conveyance is made SUBJECT to the following terms and conditions: 1. The Grantor, party of the first part, reserves unto herself, her successors, heirs and assigns, the right to use, with the Grantee, its successors and assigns, that certain maintenance road proposed to be constructed by the Grantee along the eastern boundary of its property hereby conveyed, for ingress and egress to and from the property conveyed and the property of the Grantor located on the eastern boundary of the described property in this conveyance. 2, The Grantor, party of the first part, reserves unto herself, her successors, heirs and assigns, the right to enter upon the described property for a period until and through December, 1983, but no longer, in o?der to take and remove all the merchantible timber located on the property described, SO LONG AS, the said activity of the Grantor, her agents, successors, heirs and assigns, in cutting and removing the said timber does not interfere with, hinder or delay the construction and operation of the water treatment plant and its appurtenances, to be constructed and oersted on the property conveyed. a soox 489 rm,6 76i 3. The Grantor, party of the first part, reserves unto herself, her successors, heirs and assigns, the right of ingress and egress to and from the NCKG gas pipeline and the railroad located on the property conveyed, large enough for the movement of tractor - trailer rigs anu other heac> equipment at such place on the property as may be mutually agreed to by the parties hereto. 4. The Grantor, party of the first part, reserves unto herself, her successors, heirs and assigns, and specifically does not convey the ASCA tobacco acreage and poundage allotment assigned to this property to the Grantee. TO HAVE AND TO HOLD the aforesaid tract or parcel of land to its own use and behoof, and that of its successors and assigns, forever, SUBJECT HOWEVER, only to the foregoing terms and conditions of .this conveyance, in fee simple. AND the Grantor, party of the first part, covenants with the grantee, party of the second part, that the Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title Ell against the lawful claims of all persons whomsoever. I I IN WITNESS WHEREOF, the Grantor has hereunto set her hand and seal, this, the day and year first above written. gq l I. � (Seal) Addie W. Butler STATE OF NORTH CAROLINA COUNTY OT SRUNSWICK I, K_ 'I" '-5- a Notary Public do hereby certify that ADDIE V. BUTLER personally appeared before me this date and acknowledged the due execution of the foregoing instrument for the purposes therein set forth. WITNESS, My Hand and Notarial Seal, this the 1s�day of iaee"ey , 1981 . W111M.M. Ell . � r (SEAL) Ily commission expires: ldy COMMISSi,10 8rp7res Noy. I4, I98 STATE OF NORTH CAROLINA. Brunswick County The Fotecoing Certificate(s) of Kathryn J. Suggs Notary Public Recorded this Sth doy of January 19 RZar (isxare) certified to be correct. 1-59 oclock P- M. fd Robert J Robinson. negister of Deeds 0 Lewis,Linda From: Lewis,Linda Sent: Monday, October 07, 2019 11:07 AM To: Pollard, Michael A. Cc: John Nichols; Boone, Kelly, Velardocchia, Dianne; Treadway, Jonathan; Roy, Gregory A. Subject: RE: [External] RE: SW8 091204 Minor Mod - Express Review comments Michael: I finally understand and have documented all the numbers. My oniy concern is that the description of the modifications in Section A.8 of the minor mod application form has some numbers in it that don't seem to agree with the numbers in the BUA summary attachment. Please revise that section on page 1 of the application and email me that revised page. Thanks, Linda From: Pollard, Michael A. <pollardma@cdmsmith.com> Sent: Wednesday, October 02, 2019 10:31 AM To: Lewis,Linda <linda.lewis@ncdenr.gov> Cc: John Nichols <john.nichols@brunswickcountync.gov>; Boone, Kelly <BooneKR@cdmsmith.com>; Velardocchia, Dianne <VelardocchiaDE@cdmsmith.com>; Treadway, Jonathan <TreadwayJB@cdmsmith.com>; Roy, Gregory A. <royga @ cd msm ith.co m> Subject: [External] RE: SW8 091204 Minor Mod - Express Review comments Linda, See attached spreadsheet for updated BUA numbers along with the updated table in the Word document. The spreadsheet summarizes the calculations really well. The new calculations represent the project area without pre-88 BUA. In summary, we have the following: • Pre-88 BUA is 147,126 sf per your email below. Our spreadsheet represents this. • Pre-88 BUA has been excluded from the project area. • Any proposed imperviousness within existing pre-88 imperviousness was not included in the calculations due to no net change. • Current existing imperviousness is 67,644 sf (Construction between 1988 to present) • Proposed additional imperviousness is 96,808 sf • Total proposed imperviousness is 164,452 sf • Total permitted BUA is 267,644 sf • As you can see, we are well under the permitted BUA • Total site imperviousness will be approximately 2% (Excludes pre-88 BUA) Let me know if you have anymore questions or concerns. Thanks. V V m 1. rn CO LD 1, N Lf) 00 O N LD m V O OO N r4 Ln N a-1 C) i .. f0 Q O ~ Q w Y C E N 00 m hcu ; `m a Y m cn a in 0— m 0) m 02 Y i+ Y }+ Y !2 Ln T in T T H 00 000, r, o D) r, .-1 a m , n D) N a a to 00 N a--1' N' N 1. Ln w Y 01 m Y (U O +L+ m f% d 17) O ts w d O O/ 0) Y 2 A2 Y A 1n in L2 1n in h O O O O O D) N O O d* w 00 1, n N n N O0 O N O 00 ri V 00 r-1 a ei G O �p G q o Q ~ Y Ol hN0 0) 7 Y ` Y CO [` m cn D. in 0 Y Y Y Y Y 0 0 �n 0 0 0 fO =+ L N E O � Y m � ao 7 X -0 L CU fi0 Y N 00 07 � O 3 r O t U m Y 7 O u) m C 0 07 m x O \ d 0) Z N m oo 0 0 m v Ccu 3 CL O c E ° m o � c u a ¢ 2 $ m o'' Ci raw CV w ( e y"''p' �..e-,., �±',:. gee}„+♦ r-I c-1 m N 11 1 Ln m N O 00 O a' O Lr' V 01 Lfj a r-I N a--1 tp ei rl G pO G cu a o w Y a � 3 L •7 '0 �+ ` Y f0 E L? 1n 1n Ln 17' u�f O O O O O U N h R 00 lD LD C7 }+ 00 m N -a p Cl) N a --I wi iT O) n N N r OO lD .-I �@ a0 � N Q E O_ CDM=th DM-26 Design Memorandum To: Brunswick County Public Utilities From: Dianne Velardocchia, PE, CDM Smith Date: September 11, 2019 Subject: Northwest Water Treatment Plant Upgrade/Expansion Stormwater Management Design Project No. 232662 1.1 Codes Reviewed 101/l11110N• /_1y/0S 1. North Carolina Administrative Code,15A NCAC 02H .1003, "Requirements That Apply to All Projects," Effective January 1, 2017 2. North Carolina Environmental Quality, "Erosion and Sediment Control Planning and Design Manual," Chapters 6 and 8, revised May 2013 1.2 Applicable Stormwater Permit The existing April 2015 State Stormwater Management Permit (No. SW8 091204) categorizes the Northwest Water Treatment Plant (WTP) as a 24 percent low density development. As such, the maximum allowable built -upon area (BUA) is 414,770 sf. The existing BUA is 67,644 sf. The proposed new impervious area is 103,600 sf, of which 19,200 sf is existing BUA that will be removed and replaced with new BUA. Thus, the existing BUA is reduced to 48,400 sf. As a low density development, the only new runoff conveyance systems allowed are vegetated swales with minimum 3:1 side slopes. Minimal piping is allowed to direct stormwater runoff to these swales. The design of the stormwater management system follows the design requirements for low density projects as outlined in 15A NCAC 02H .1003(2). The existing 36-inch RCP drainage system within the northern driveway, which discharges to Hood Creek, will be maintained. The pipe diameter will not change, but the location of catch basins and manholes will be adjusted as part of the reconfiguration of the northern drive way area. Figure 1 in Appendix A provides an existing drainage map that shows the area tributary to the drainage system. DM-26 ppsi.AEP6!i 95andum - Northwest WTP Upgrade/Expansion - Storm, v , ei� lgviggeWdpt Design Septeivib :1 201-9' ¢"� Page 2 a • a y:, sa; <•,"'� w 1. .Urain.age And lysis Metliodorlogy anAssumptions CDM Smithf performed drainage analyses for the Northwest WTP Upgrade for existing and proposed conditions. The drainage analyses determined peak rates of runoff using HydroCAD, version 10.0. This computer model simulates stormwater runoff flows through drainage areas and stormwater management facilities and is based on the Natural Resources Soil Conservation Service (NRCS) Method. Following is a summary of the methodology used to perform the drainage analyses. The design frequency for the swales and closed drainage system is the 10-year, 24-hour storm. Precipitation data for the standard storm was taken from NOAA Atlas 14, Volume 2, Version 3. The estimated precipitation depth during the 10-year, 24-hour storm is 7.18 inches (see Appendix B). The NRCS Web Soil Survey was consulted to determine the hydrologic soil groups (HSG) at the project site. The NRCS has classified nearly all the soils as "Baymeade fine sand", with a small amount of "Leon fine sand" present in project area. Baymeade fine sand is assigned to HSG "A" soils, while Leon fine sand is assigned to HSG "A/D" soils. The soils data are provided in Appendix C. ■ In determining the drainage areas for calculating peak rates of runoff, open surfaces (e.g., gravity thickener) were subtracted from the contributory area. However, in calculating the BUA, open surfaces are included as impervious area. ■ Curve Numbers (CNs) for the different land uses on the site were selected based on HSG "A" soils for existing and proposed conditions. Land uses included grass cover, buildings, and paved areas. Weighted CNs were calculated in HydroCAD. ■ The minimum time of concentration, Tc, used in the calculations is 6 minutes. The calculation of the Tc's for larger drainage areas is provided in the HydroCAD model. ■ The recycled water pump station currently discharges to the existing closed drainage system, and will continue to discharge to this system under proposed conditions. The maximum instantaneous flow is 3,100 gpm (6.9 cfs). In the HydroCAD model this flow is entered as a constant baseflow to determine if the existing 36-inch RCP in the northern driveway has the capacity to convey the recycled water pump station discharge concurrently with the peak rate of runoff from the area tributary to the drainage system. The Manning's n roughness coefficient value for the vegetated swales is 0.035. This value is taken from Table 8 in Part B of the North Carolina Department of Environmental Quality "Stormwater Design Manual." DM-26 Design Memorandum - Northwest WTP Upgrade/Expansion - Stormwater Management Design September 11, 2019 Page 3 Design Approach The design approach for managing stormwater runoff under proposed conditions maintains the overall hydrologic pattern of directing stormwater runoff towards Hood Creek, while complying with the requirements of 15A NCAC 02H .1003 to use swales as a stormwater conveyance system. Below is a summary of the stormwater management approach for the proposed upgrades at the WTP. Refer to Figure 2 in Appendix A, the proposed drainage area map, and Sheets C-GD-2. C-GD-3, C-GD-4, C-GD-5. ■ The proposed driveway south of the Filter Module Building, the western half of the Filter Module Building, and the southwestern section of the vegetated area between the clarifiers and driveway (drainage area DA Clarifier West) will drain to a swale (South Swale 2) located between the existing fence line and south driveway. ■ The area between the existing fence line and the driveway located south of the Reverse Osmosis Building (drainage area DA Tank Storage) will sheet flow to the swale along the fence line (South Swale 2). This swale terminates at a riprap pad, approximately 30 ft inside the fence line. Roof drains (10 total) from ',he southern and eastern sides of the Reverse Osmosis Building (drainage areas DA RO Building South and DA RO Building East) drain to a pipe that runs along the perimeter of the building and discharges to a swale (South Swale 1) that commences in the southwestern corner of the driveway located along the southern side of the Reverse Osmosis Building. Stormwater runoff from this driveway and from the southern half of the driveway located west of the Reverse Osmosis Building, also drains to this swale via a catch basin in the southwestern corner of the driveway (drainage area DA South Driveway). The catch basin conveys stormwater to the swale via an 18-inch pipe that terminates at a flared end. Roof drains (4 total) from the northern side of the Reverse Osmosis Building (drainage area DA RO Building North) drain to a pipe that runs along the perimeter of the building and discharges to a swale (North Swale) that commences in the northwestern corner of the driveway located along the western side of the Reverse Osmosis Building. Stormwater runoff from the northern half of the western driveway and from the some of the northern driveway near the proposed gravity thickener will also drain to this swale via a catch basin in the northwestern corner of the driveway (drainage area DA West Driveway). The catch basin conveys stormwater to the swale via an 18-inch pipe that terminates at a flared end. Stormwater runoff from the driveway along the eastern side of the Clarifier; the driveway and parking area north of the Administration Building; the driveway located to the east of the Reverse Osmosis Building; and the driveway and parking area to the north of the Reverse Osmosis Building (drainage areas DA Clarifier East, DA Admin Building, and DA Parking Lot) will drain into the existing 36-inch RCP. This overall proposed tributary area is similar to the existing tributary area to the 36-inch RCP. DM-26 Design Memorandum - Northwest WTP Upgrade/Expansion - Stormwater Management Design September 11, 2019 Page 4 Drainage Analysis for 36-inch RCP The existing 36-inch RCP was modelled in HydroCAD for existing and proposed conditions to confirm that the proposed impervious area tributary to the drain system and the peak rate of runoff do not exceed existing conditions. As shown in Table 1, which summarizes the modeling results, there is an overall reduction in the total tributary area, impervious area and peak rate of runoff under proposed conditions. The construction of the Reverse Osmosis Building removed some of the area south of the northern driveway that formerly had been tributary to the 36-inch RCP, reducing the overall tributary area. The addition of Thickener No. 2 (an open tank) in the location of the cul-de-sac at the end of the northern driveway and the removal of the driveway south of the clarifiers removed impervious area from the area tributary to the 36-inch RCP. This removal of impervious area was partially offset by the addition of parking area in front of the Reverse Osmosis Building and the eastern half of the Filter Module Building, resulting in an overall net reduction in impervious area tributary to the 36-inch RCP. Thus, the reconfigured area tributary to the 36-inch RCP remains consistent with the existing permitted conditions for the WTP. The calculated capacity of the 36-inch RCP is 51 cfs. The HydroCAD model for existing and proposed conditions is provided in Appendix D, Table 1 Northwest WTP Upgrade/Expansion Comparison of Existing and Proposed Conditions at 36-inch RCP �, ■Proposed c1langeValue Total Tributary Area (ac) 5.68 4.07 -1.61 Total Impervious Area (ac) 2.12 2.07 -0.07 Peak Rate of Runoff during 10-yr, 24-hour storm with recycled water pump station 23.5 22.6 -0.9 flow (cfs) Peak Rate of Runoff during 10-yr, 24-hour storm without recycled water pump station 16.6 15.7 -0.9 flow (cfs) Drainage Analysis for Swales As shown on the site plan, three swales are proposed to convey stormwater runoff from the area of the proposed WTP upgrade to riprap aprons. The swales were designed to meet the following criteria outlined in 15A NCAC 02H .1003(2): Vegetated swale shall convey peak rate of runoff for 10-year, 24-hour storm (Qlo) at a non - erosive velocity. ■ Longitudinal slope (SL) of the swale shall not exceed 5 percent. 0 Swale's cross-section shall be trapezoidal with a minimum bottom width (B) of 2 feet. DM-26 Design Memorandum - Northwest WTP Upgrade/Expansion - Stormwater Management Design September 11, 2019 Page 5 ■ Swale side slopes (Z) shall be no steeper thari 3:1. ■ Minimum length (L) of swale shall be 1001 ■ Minimum depth (D) of swale is one foot. Table 8.05a in the North Carolina Environmental Quality, "Erosion and Sediment Control Planning and Desigr. Manual," presents the maximum allowable design velocities for vegetated channels. For channel longitudinal slopes up to 5 percent and with easily erodible non -plastic soils (i.e. sands and silts, which applies to this project site), the maximum permissible velocity is 3.5 fps for a grass -legume mixture, but ranges up to 5 fps, depending on the variety of the grass. For the design of the swales at the WTP, the velocity of flow was maintained below 3.5 fps. The minimum depth of the swales, D, is one foot. Table 2 summarizes the design of the swales. As shown in the table, all the swales meet the criteria presented in 15A NCAC 02H .1003(2), and have velocities less than 3.5 fps. See Appendix E for the calculations. Table 2 Northwest WTP Upgrade/Expansion Summary of Swale Design 19 MI North Swale74.6 2 3 Ranges btw. 228 1 3.1 0.0096-0.0260 South Swale 1 6.0 2 3 0.024 116 1. 3.3 South Swale 2 5.7 3 3.5 to 5 Ranges btw. 377 1 2.5 0.0109-0.0146 *Velocity at steepest section of swale Design of Riprap Outlet Protection The three swales terminate to riprap aprons located in flat areas in order to mitigate the potential for erosion. Stormwater runoff on the riprap aprons will dissipate into wooded areas that slopes down to the Hood Creek. The design of the riprap pads was based on the New York DOT Dissipator Method for Use in Defined Channels as presented in Section 8.06 ("Design of Riprap Outlet Protection") in the North Carolina Environmental Quality, "Erosion and Sediment Control Planning and Design Manual." This method estimated the stone size and dimensions of the riprap apron. The sizing calculation of the riprap apron is provided in Appendix E and is summarized in Table 3. However, in order to tie into the existing topography, the amount of riprap provided exceeds the calculated required area. The actual area of riprap provided is shown in Table 3. For all three swales the stone size for the riprap apron is classified as Class A stone for erosion control per the NC Department of Transportation (Table 6.15b of the "Erosion and Sediment Control Planning and Design Manual.") Class A stone ranges in size between 2 and 6 inches. Per Section 6:15 of the manual, the depth of the riprap should be 1.5 times the maximum stone diameter. Thus, with a DM-26 Design Memorandum - Northwest WTP Upgrade/Expansion - Stormwater Management Design September 11, 2019 Page 6 maximum stone size of 6 inches, the depth of the riprap is 9 inches, which will be underlain with a 6-inch layer of screened gravel and filter fabric. See Appendix F for the calculations. Calculations indicate that for the North Swale and South Swale 1, the riprap protection at the end of the 18-inch flared end is Class A stone, with an apron length of 10 ft and a total width of 5 ft These calculations are also provided in Appendix F. Table 3 Northwest WTP Upgrade/Expansion Summary of Riprap Outlet Protection Note: La = length of riprap apron 31)o = upstream width of riprap apron W = downstream width of riprap apron Spread Analysis for Driveways A spread analysis was performed for the new and reconfigured driveways at the WTP to check whether localized ponding will affect accessibility to the facilities at the WTP and to design the spacing of catch basins. The Federal Highway Administration's Hydraulic Engineering Circular No. 22, Third Edition, "Urban Drainage Design Manual" (Revised August 2013) recommends the minimum design frequency and spread for local streets is a 10-year storm with a design spread of one-half a driving lane. This recommendation was followed for the design for the driveways around the upgraded WTP facilities to the maximum extent practicable. The spread calculation was performed using a spreadsheet. The analysis of the catch basin capacity was performed using the FHWA Hydraulic Toolbox computer program, version 4.4 Quly 10, 2018). This analysis assumed a North Carolina DOT standard detail 840.02 for the concrete catch basin. Appendix G provides the spread and catch basin capacity calculations. DM-26 Design Memorandum - Northwest WTP Upgrade/Expansion - Stormwater Management Design September 11, 2019 Page 7 able 4 Northwest WTP Upgrade/Expansion Summary of Spread and Catch Basin Capacity Driveway 'IWr.0 1 ' Roadway Width in Sag (ft) Capture West RO Driveway North (To 1.3 7 20 10 100 North Swale) West RO Driveway South (To 0.4 4 20 12 100 South Swale 1) South RO Driveway (To South 1.9 10 20 12 100 Swale 1) East RO Driveway* 1.6 9 20 - - orth Driveway Parking Lot (in F 6'B NA -Parking NA -Parking 19 100 ont of Administration Building) Lot Lot `This is the spread on the driveway only. There are no catch basins. Appendix A Drainage Area Maps c mitt 2 0 U 0 0 EL rn� s -o 0 vi a �_ a� mLLI c _ •� z oLd �w c = N C3 Lu l0 Z 0 W y U U x f0 N U = o z� 15 oy U �c CV O U ao �o IEl �I a. 00 Z In m Z U W N p3 ID c m� g0 o a3 0 U w W w� u m W CD Lo w m In wo Lo m o cio Lu xo J wL al Nz ce_ am E N U � Z 3 vw 00 G� CDPA--S�th I •- ,, r r i J 7• 't f I COUNTY OF BRUNSWICK NORTHWEST WATER TREATMENT PLANT EXPANSION AND UPGRADES r N 1 " = 100' 50 0 100 FIGURE 1 EXISTING DRAINAGE MAP JULY 2019 O �1 ui a m 0 EL rn� c � � z v G3 y w O = a d im w CE N O a U 0 Z �w U U f0 cn U o =1 .L—y ZO Mn 2: NN U w2 cv O iU a �Z 0 IoF- LU N �o lad Z U)a y ZU• Z U W N o3 w C 'y H N w= 0 03 0 U N W• w 05 d of w a) W 00 of co w O N Lu M cn M La p pl o o W d w3 IM z o_ = C 8 ceV) <m '1 S, �j / - METERING - VAULT r 1 t 4! r� i THICKENER FEED THICKENED SOLIDS PUMP STATION PUMP STATION 16' EFF-RCP 49 50 + G \ 49 49 s1 THICKENER 51 51 NO. 2 50 ' 50 CHLORINE fir, ~ f J BUILDING • + 36' STORM -RCP I DI RIM FF: 52.0' i CB RIM Y 01 RIM 16' STORM -RCP a.Y • •- a' 49.0 �;tr�-?3 St 51 'i�'4: LLL �� DI RIM ��v'. �;, ,e'sc� `�+A •�jn`+~� Y'.ti 49.449 : a_..•.,'s' r�.Ni1;:�- +jy rat". +a'��' .L?'iy.~� e 50 � � �� +' ;� _ - `y, _ • . ...r ^�:, • . l"�•i`;``a,'.r ►' DA WEST DA PARKING LOT 4` `� 4IXB:4e RIM DRIVEWAY 1 a DA ADMIN BLDG 6 , I M ter• CO2 16- DI ROOF 2' ROLLED u 52 INJECTION DRAIN CUURRB D Mw MANHOLE _ DA NORTH SWALE - C3 LIME %-4 ; MANHOLE DA RO BUILDING NORTH 16'x8' PRECAST b I OO�S FF. 52.5' 12' DI ROOF SEPTIC TANK BUILDING m o ti STEM 2• BOLTED DA RO BUILDING SOUTH ;. �- A CURB AND 12'x16' DI CLASS GUTTER REDUCER DA CLARIFIER EAST RIPRAP OUTLET 16' DI ROOF • s'.i DRAIN 7 •,xy.1 DA SOUTH SWALEI ElCHEMICAL PAD DA SOUTH DRIVEWAY " CB M =1.v;• I ' "46 147T46 49 CLASS A , EAST Al D WEST RIPRAP OUTLET FlL 5-6],57 16' STORM -RCP HIC LE .r : fi I o 53 FF: 48.23 y IYr I BACKWASH r _ ►, a EO TANK ❑ ?: 53 CO2 52 + FF: 55.3MIX STORAGE { FF- 40' r SPLmIIt2i' ROLLED CURB AND LIME ANTISCALANi FUEL TANK p�\ GUTTER STORAGE sroRAGE DA TANK STORAGE DA CLARIFIER WEST FUTURE / > x A� RIPRAPCLASS A OUTLET. � FUEL TANK 8) 4—� 50 51 r_ 52 63 SOUTH SWALE 2 r CHAINLINK FENCE 'GOV. Smith COUNTY OF BRUNSWICK NORTHWEST WATER TREATMENT PLANT EXPANSION AND UPGRADES N 1 " = 100' 0 0 100 FIGURE 2 PROPOSED DRAINAGE MAP AUGUST 2019 Appendix Rainfall Dal NOAA Atlas 14, Volume 2, Version 3 Location name: Leland, North Carolina, USA* ' Latitude: 34.2374% Longitude:-78.00930 ,p ` Elevation: 20.94 ft** 1 * source: ESRI Maps ** source: USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnln, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOA& National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Mans & aerials PF tabular PDS-rased point precipitation frequency estimates with 90% confidence intervals in Inches)' Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 � 5-min 0 520 (0.485-0.561 0.618 (0.575-0.666 0.722 (0.672-0.778 0.804 (0.745-0.866) 1 08 (0.837-0.975 0.986 (0.905-1.06) 1.07 (0.973-1.15) 1.15 (1.04-1.23) 1.25 (1.2-1.35) 1.34 (1.19-1.44) 10-min 1. 0.7774-0896 0.920s1..07 1.0811..25 1.1921..39 1.33-1.55 1.4451.69 1.5561..82 1.6581..95 1.77 2.13 1.87 2.27 1.04 1.24 1.46 7.63 1.83 1.99 2.14 2.29 2-A9 2.64 15-min (0.968-1.12) (1.16-1.34) (1.36-1.58) (1.51-1.75) (1.69-1.97) (1.83-2.14) (1.96-2.30) ( 2.08-2.47) (223-2.69) ( 2.35-2.85) 142 1.72 2.08 2.36 2-32 99 3.26 3.57 3.95 4.27 30-min (1.33-1.54) 1 (1.60-1.85) 1 (1.93-2.24) 1 (2.18-2.54) 1 (2.51-2.92) (2.75-3.22) (2.99-3.53) (3.23-3.84) (3.55-4.27) (3.80-4.62) 60-min 1.65718.92 2.0112.32 2. 8 2.87 2.8403.31 3.4 3.88 37 2-436 4. 254.86 4.5405.38 5. 0g613 5. 5-6.75 2.11 2.57 3.27 3.85 4.69 5.41 6.18 7.03 8.29 9.37 2-hr 1.94-2.30 (2.37-2.81) (3.01-3.57) (3.54-4.20 ) ( 4.28-5.11 ) ( 4.91-5.88) (5.59-6.73) 6.31-7.64 36-9.02 8.25-10.2) 3-hr 2 2.25 (.08-2A7) 2.74 (2.53-3.01) 3.51 (3.23-3.84) 4.17 (3.82-4.56) 5.14 (4.68-5.61) 5.99 (5A2-6.54) 6.93 (623-7.56) 7.98 ) (7.11-8.68 ( 9.57 ) 8.42-10.4 ( 11.0 9.53-12.0) 6-hr FFI 257-7306 3.343.73 3.934. 4.73-15.67 58246.99 fi.7517 .7969.47 8.90- 0.9 106213.2 12A 5.2 12-hr 2.98-3 62 3. 394.40 467-i5.6 5.56-i6.7 8.87-8 42 8. 399.87) (9. 1015.5 (10.7� 3.4 12 84 6.3) (14.7- 8.9 24hr 3.81 (3.47-4.25) 4.62 (4.21-5.16) 5.98 (5A4-6.67) R8.26 M10.3 10.7 (9A7-11.8) 12.5 (11.0-13.9) 14.7 ) (12.7-16.3 ( 18.0 ) 15.2-20.1 ( 20.9 ) 17A-23.5 2{lay 4.09-4 95 4.s445.99 63 3-7.69 10 8� 3.4 12.4- 5.7 14 2618.3 16 9922.4 19 23 6.0 2022.E 21 3-dey 4. 5 525 (5. 576.4 6.6738.08 .87-9.9..58 9.64- 1.8 112� 3.8 1284 6.1 146E 8.7 172.7 194326.2) 5.02 6.05 7.67 9.05 11.1 12.9 14.9 17.0 20.4 23.3 4-day (4.60-5.54) (5.55-6.69) (7.01-8.47) (8.24-10.00)( 10.0-12.3) ( 11.5-14.3) (13.2-16.5) ( 14.9-19.0) (17.5-22.9) (19.7-263) 21.2 7-day 5.3376.30 64 3-7.7.59 80679.55 9A0--1 11 3-13.6 12.9- 5.6 14 6017.8 16.4$ 0.3 18 9, 4.0 21 0427.2 10-day 6. 37.0E 7.2278.47 8.91.1 0.5 10 37 2.2 124 14.E 14.0-6.7 15.7719.0 17 6921.5 20.1� 5.2 222 8.4) 8.73 10.4 12.7 14.5 17.2 19.4 27.8 24.3 27.8 30.7 20-day (8.14-9.40) (9.70-11.2) (11.8-13.7) 1 (13.5-15.7) 1 (15.9-18.5) (17.9-21.0) (19.9-23.6) (21.9-26.4) (24.8-30.4) (27.0-33.8) lF- 30-day 1010161.5 12 0213.7 14 451 6.4 16 37 8.6 19_-021.7 21.0-42 23215 6.9 25 27 9.6 28 00 3.5 303336.7) 45-day 12 6314.3 14 9516.9 17.78 0.0 19 9, 22.E (22.9-26.1) (25 27 8.9) 1(27 6031.8 29 9- 4.9 33 00 9.1 35 4042.B 16.1 19.0 22.2 24.7 28.2 30.9 33.5 36.2 39.7 42.5 60-day (15.2-17.1) L.L17.9-20.1) 21.0-23.5) (23.3-26.2) (26.5-29.9) (28.9-32.8) (31.3-35.7) (33.6-38.7) (36.6-42.7) (38.8-45.9) FPmdpitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). umbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency (far a given duration and average recurrence Interval) will be greater than the upper bound (or less than the lower bound) Is 5%. Estimates at hestimates upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. (Please refer to NOAA Atlas 14 document for more information. Back to Top 45 40 - 35 4� 30 -Gs 25 20 15 o. 10 5 0 PF graphical PD5-based depth -duration -frequency (DDF) curves Latitude: 34..23740, Longitude:-78.00930 ... ....................I..... ... ... _.. .. • ... _... .. ... •• ... ... J .. .. ... ... .t............ .. .. _.L. :. -./ , f •Pi in Mural on 45 40 30 25 Cl .� 1J IL 10 5 0 KOAA Atlas 14, Volume 2, Version 3 N CM .14 o eQi rA v''S Average recurrewe.. inkewal (years) Created {GMU Vied jug 1215:35:25 20y4 Back to Top Amrwge recum a17te�al 2 F� 2G too 200 sco 1000 1�41tr w-- i.ANY t R-Min d -dEav 1G- in 4-li'y .ZO'-i in —y- T-rtny -^�• iL it 20--dRi — 12+1 — (t-day Z4 4,,jr Maps $ aerials Small scale terrain ��• f ila _ .L"d E� Large scale terrain te e�,'k;onvill i N A vt;k2r: 7C►nt7n u Say r lany� Bay 1ROk:n hoop ..I Onu Large scale map of a I?�yrattev�tla � Ja�cunv�e r - �rroire�tn 140km orth �`i Large scale aerial Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.QuestionsCa noaa.00v Disclaimer Appendi Geotechnical In MAT a eU miss 4L ■ d Z Z rn oe�e ae�srE msears oa�eacE � � i i I I r O t MAT H .K � m � O7 CD l0 - 4, Z � m cor o m Co a a 12 0 z B Cd x e Ny a FS I8 8 Iwo �c ZQ C Z0 M.9E8 aBL z fn m Im Z W 0 W J a a E 3 N O O N = N m- U ° OO T O U O O rn U E 8.2 (D C 07 CL m Q E m w 3 w O L m•a3 w w v_ E 0 Ewa 10 > N.� +- 6� a �0 C ma N Q 7 co 8 E w E EL d m CL co (6 wL+ E mH y O ' c 14 U E c co E f0 cc C w N C 01 W E 8 $ r a COO M ° C ` 3 a°° N U CD O C d ch E N A � E L C m w N C E = N p C .,.0 � 3 m Z N a V C a O M V O 0 E 0.0 w O M N N U co (0 - U 0 O O co M CL m 0 O d ° Q: U co w O N CL N C7 C y Z -° Z -C O N N L E w N> m E a. w N w 7 ns m O d Q 0 Z O O y L L 2 0) 3 w m m U m a as m co c a o, Q a m N c`Oi o c o O = 3 03 N m m a vi w o 3 TN U �'v ° M ° o-0 Unj (3 0 O a T a ca d m a°i m y co w f0 0I � co Z O a "O .O U O 'O O N in C L 3 d N N 0 3 a O co O C °) 7 3 J U (A w a r �0 m a w L ve C O M m 01 Q' ZEE N a N Q 8 C maim° y w d:? m 9 m N N 21 O N O "-°c O M C w T a m >, � L a) `) 10 N U 01 07 7 cm w -° 07 N m w T 3 o a (o a cow co 3° ° : o = '� m 2 '-� o rc m m E E o- W O C o o m aai?? a m C> aa) Za ao Co 0 (D mr- o w L-o 0 �_ 01 3 (w6 N U) 'O ja O w U 7 C w G�.� N 3 a w r 3 T N O �O .w.. 0 NN O O) C ° acm N N a E o 0 o co 0 (0 O w a U 2 a v¢ m L w I- o 'p 3 CO CO 'p In cn - N Q o M = E E y I c4 ._ N W m eA > _ W LL U a rn W T oCL C = w W O Q 3 E 2 'o W x a � tn > 0 (A w _ a t1' C co 7 m o J 0 ,O Q 4�7y t' 7 3 m � g W m o 3 E a d v Q a a a �' a# CL O a a O W o Q _ID � C 'O O 's IL C Q T Cp W O > > 'O a (fJ W W C 0W0 U w N Y a C W 'O lC0 W N Ad C m O M W V) p m m U U C9 C9 -i m>(p J a. m (A y (a N co d "lii Yp Iqa Q Q x y M M m Z d v Soil Map —Brunswick County, North Carolina Brunswick WTP Map Unit Legend Map Urdt Symbol . Map Urdt Name Acres in AOI Pereeent of AOI . BaB Baymeade fine sand, 1 to 6 percent slopes 19.2 96.8% KrB Kureb fine sand, 1 to 8 percent slopes 0.0 0.0% Lo Leon fine sand 0.6 3.2% Totals for Area of Interest 19.8 100.0% LjspA Natural Resources Web Soil Survey 6/12/2019 Conservation Service National Cooperative Soil Survey Page 3 of 3 M.6T 9 oU M.8E9 oK z h _W IT O N P N N KD (D f0 C. - aTi Z m o ZV) N � o CO a a 32 c z i6 y� s K � x ,4 v p C r I � z e z0 M.9E9 .K Y� z Tn m C 2 U t 0 0 z 0 Q Q Z a in Z W 0 W J N W 'p — UJ nm U ° O f`0 Co LD m 0 0 E c W CL a ° is N E c w wmmo w OCL 3 mm W U W O W w E m > c > a c O t a as m � W O L O E cL cc E=�w ° c C O ca W w (o E c W tm W �p E f_0 7 CL W 3 w`E8 o .Lm w m m y N m 0) v 4) a w 3 c$ _g 0 W U w O N m 2[ C m W �%—' d 'Q c a mE - W ° c is n m Q E v°ia o w c ay S m ` �� o W p.: y W c w aZi C7 °wZ� z o in CEca:2 '> O. cow E ca C N O d W� m w C 7 m Ca 2 O N Q O N z O' 3 O •� W O W L ,k m L CiLU w W c n w `m j c a a c o ami � =m.c° w3 'oU � $° a w E y Z N �a o E y �t c N� m a 12 w m m mow a)— �' Umm�° Q a W G [ a m a)L` a)C a J m� 0 ° m O.'C ° La 8 c H> o;� °� cc 3 m W -O O o o.0 w Z N U ca 2 W cm m l0 @ 07 E °� T 7 tip �cq-_ to 3 m O'D oa aW >'� 2Uw? E m y 5 o am w E 2 W 7 ° •O C_ W Q O W W .W.� `t��qq U m C O m �' > Q 7 >. O.O W O E W f- r t a O W O m w `�� a m N warm? to Z O +m' N P) E m nm. o c�°n3ci a s m F COCC �r �M 3 H a > W T L ` 10 E N O a e C± U C Z w tq ¢ o 0 0 c COL v W . m m .c Q W m � a Q c co c o c `o dO Q a m m U e a Z c CI Q Q 1 m U �U Q Z c _ c c fr' L�J '� I��J 11 Ll El c i c a ❑ tl0 N �p .co (ID rnv 016 N W `O a U) Z� 7 m O to n ca C 0 z d Z 7 � O C � a 7 m o z U Hydrologic Soil Group —Brunswick County, North Carolina Brunswick WTP Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI BaB Baymeade fine sand, 1 to 6 percent slopes A 19.2 96.8% KrB Kureb fine sand, 1 to 8 percent slopes A 0.0 0.0% Lo Leon fine sand A/D 0.6 3.2% Totals for Area of Interest 19.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Limx Natural Resources Web Soil Survey 6/12/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Brunswick County, North Carolina Brunswick WTP Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher t15� Natural Resources Web Soil Survey 6/12/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 9 Existing and Pro Smith Existing Conditions 6P Q--- 1L MH-11 (DM-8) ReWded Water Pump Station A7-P®-- 5P 4 4P �-- M 10 (DM-7) CB-5 ( I-) C13.4 (CI5) �.. \ 04� 1R 3P M" (DM-4) CB-3 (DI3)\ CB-11CB-2 (CI-1/C7-2) is 33 Imo! -•--' Maintenance Building- Clarifier West- Existing Hood Creek Outfall - Existing PJdstirrg Proposed Conditions AdminBuilding- ClarifierEast- Existing Exisdng [[ Recycled Water Pump M1 (DM-8) Station M"(D") CB-3\) CB-iJCB-2 1/CI-2) Hood Creek OuHall - MFF10 (DM-7) Parking Lot C New Cti-4 1 \\ Proposed 7S �$ Parldng Lot - Proposed 18� 16S 14S North le - Proposed W, t Driveway - Proms Rilding North - Proposed 17 JJ CB to North Sw I RO Roof Drain North RO Roof Drain North Admin Building - CladBer East - Proposed Proposed S (i) Tedsto age - Cla ier West - P osed ` roposed 4� '3ciR' 4-- a -- 3bR 3aR North Swale a a South Swale 2b South Swele 2b SouthSwale 2b South Swale 2a SbR; L/iorthSwale 12� So Swale 1 Proposed Salth Driveway - RO ilding South - Proposed Proposed ROB ilding East - North Swale {// roposed A Go ft South Swale 1 CB to South Swale 1 RO Roof Drain South RO Roof Drain South RO Roof Drain Fast Su6cat [Reekc L.111k Brunswick WTP Ex and Pr rev3 Type/1/ 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Pape 2 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points x 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment1S: Clarifier East- Existing Runoff Area=86,924 sf 31.77% Impervious Runoff Depth=2.53" Flow Length=565' Tc=7.0 min CN=58 Runoff=5.50 cfs 0.421 of Subcatchment2S: Admin Building - Runoff Area=34,092 sf 75.44% Impervious Runoff Depth=5.31" Flow Length=186' Tc=6.0 min CN=84 Runoff=4.75 cfs 0.346 of Subcatchment3S: Clarifier West- Existing Runoff Area=65,135 sf 27.57% Impervious Runoff Depth=2.24" Flow Length=612' Tc=6.5 min CN=55 Runoff=3.62 cfs 0.279 of Subcatchment4S: Maintenance Building- Runoff Area=61,289 sf 34.02% Impervious Runoff Depth=2.63" Flow Length=451' Tc=11.9 min CN=59 Runoff=3.45 cfs 0.309 of Subcatchment5S: Clarifier East - Runoff Area=80,781 sf 33.68% Impervious Runoff Depth=2.63" Flow Length=443' Tc=9.6 min CN=59 Runoff=4.88 cfs 0.407 of Subcatchment6S: Admin Building - Runoff Area=62,270 sf 63.00% Impervious Runoff Depth=4.42" Flow Length=480' Tc=8.4 min CN=76 Runoff=6.80 cfs 0.526 of Subcatchment7S: Parking Lot - Proposed Runoff Area=34,124 sf 69.39% Impervious Runoff Depth=4.86" Tc=6.0 min CN=80 Runoff=4.42 cfs 0.317 of Subcatchment8S: Clarifier West- Runoff Area=76,670 sf 24.59% Impervious Runoff Depth=2.14" Flow Length=217' Tc=10.7 min CN=54 Runoff=3.49 cfs 0.314 of Subcatchment9S: Tank Storage- Runoff Area=61,118 sf 25.11% Impervious Runoff Depth=2.14" Flow Length=160' Tc=6.4 min CN=54 Runoff=3.23 cfs 0.251 of Subcatchment10S: RO Building East- Runoff Area=5,027 sf 100.00% Impervious Runoff Depth=6.94" Tc=6.0 min CN=98 Runoff=0.81 cfs 0.067 of Subcatchment11S: RO Building South - Runoff Area=15,924 sf 100.00% Impervious Runoff Depth=6.94" Tc=6.0 min CN=98 Runoff=2.58 cfs 0.211 of Subcatchment12S: South Driveway- Runoff Area=20,497 sf 57.48% Impervious Runoff Depth=4.09" Tc=6.0 min CN=73 Runoff=2.26 cfs 0.160 of Subcatchment13S: South Swale 1 - Runoff Area=4,954 sf 33.35% Impervious Runoff Depth=2.63" Tc=6.0 min CN=59 Runoff=0.34 cfs 0.025 of Subcatchment14S: RO Building North - Runoff Area=18,512 sf 100.00% Impervious Runoff Depth=6.94" Tc=0.0 min CN=98 Runoff=3.65 cfs 0.246 of Subcatchment15S: West Driveway- Runoff Area=22,939 sf 42.81 % Impervious Runoff Depth=3.14" Tc=6.0 min CN=64 Runoff=1.92 cfs 0.138 of Subcatchment16S: North Swale -Proposed Runoff Area=15,735 sf 0.81 % Impervious Runoff Depth=0.83" Tc=6.0 min CN=39 Runoff=0.18 cfs 0.025 of Brunswick WVTP Ex and Pr rev3 Type /// 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 02016 HydroCAD Software Solutions LLC Page 3 Reach 1 R: Hood Creek Outfall - Existing Inflow=23.53 cfs 42.478 of Outflow=23.53 cfs 42.478 of Reach 2R: Hood Creek Outfall - Proposed Inflow=22.60 cfs 42.373 of Outflow=22.60 cfs 42.373 of Reach 3aR: South Swale 2a Avg. Flow Depth=0.27' Max Vet=1.94 fps inflow=3.49 cfs 0.314 of n=0.035 L=382.0' S=0.0157 'P Capacity=40.25 cfs Outflow=3.31 cfs 0.314 of Reach 3bR: South Swale 2b Avg. Flow Depth=0.47' Max Vet=2.30 fps Inflow=5.81 cfs 0.565 of n=0.035 L=76.0' S=0.0132 'P Capacity=27.91 cfs Outflow=5.81 cfs 0.565 of Reach 3cR: South Swale 2b Avg. Flow Depth=0.50' Max Vet=2.08 fps Inflow=5.81 cfs 0.565 of n=0.035 L=198.0' S=0.0101 'P Capacity=24.45 cfs Outflow=5.74 cfs 0.565 of Reach MR: South Swale 2b Avg. Flow Depth=0.48' Max Vet=2.54 fps Inflow=5.74 cfs 0.565 of n=0.035 L=68.5' S=0.0146 '/' Capacity=24.56 cfs Outflow=5.74 cfs 0.565 of Reach 4bR: South Swale 1 Avg. Flow Depth=0.51' Max Vet=3.27 fps Inflow=5.98 cfs 0.464 of n=0.035 L=102.6' S=0.0244'/' Capacity=23.59 cfs Outflow=5.96 cfs 0.464 of Reach 5aR: North Swale Avg. Flow Depth=0.58' Max Vet=2.19 fps Inflow=4.74 cfs 0.409 at n=0.035 L=52.0' S=0.0096'P Capacity=14.82 cfs Outflow=4.69 cfs 0.409 of Reach 5bR: North Swale Avg. Flow Depth=0.48' Max Vet=2.84 fps Inflow=4.69 cfs 0.409 of n=0.035 L=100.0' S=0.0200 'P Capacity=21.37 cfs Outflow=4.64 cfs 0.409 of Reach 5cR: North Swale Avg. Flow Depth=0.44' Max Vet=3.12 fps Inflow=4.64 cfs 0.409 of n=0.035 L=77.0' S=0.0260 '/' Capacity=24.36 cfs Outflow=4.63 cfs 0.409 of Pond 1P: C13-1/C13-2(CI-1/CI-2) Peak Elev=46.51' Inflow=5.50 cfs 0.421 of 36.0" Round Culvert n=0.015 L=203.6' S=0.0073 7 Outflow=5.50 cfs 0.421 of Pond 213: C13-3 (DI-3) Peak Elev=44.75' Inflow=10.16 cfs 0.768 of 36.0" Round Culvert n=0.015 L=69.5' S=0.0187'P Outflow=10.16 cfs 0.768 of Pond 3P: MH-9 (DM-4) Peak Elev=43.48' Inflow=10.16 cfs 0.768 of 36.0" Round Culvert n=0.015 L=96.4' S=0.0187'P Outflow=10.16 cfs 0.768 of Pond 413: C13-4 (CI-5) Peak Elev=42.12' Inflow=13.78 cfs 1.047 of 36.0" Round Culvert n=0.015 L=300.4' S=0.0054'P Outflow=13.78 cfs 1.047 of Pond 513: C13-5 (CI-6) Peak Elev=40.78' Inflow=16.60 cfs 1.355 of 36.0" Round Culvert n=0.015 L=60.1' S=0.0023'P Outflow=16.62 cfs 1.355 of Pond 6P: MH-11(DM-8) Peak Elev=42.46' Inflow=6.91 cfs 41.123 of 15.0" Round Culvert n=0.013 L=124.9' S=-0.0008'P Outflow=6.91 cfs 41.123 of Pond 7P: MH-10 (DM-7) Peak Elev=40.28' Inflow=23.53 cfs 42.478 of 36.0" Round Culvert n=0.015 L=665.1' S=0.0078'P Outflow=23.53 cfs 42.478 of Brunswick WTP Ex and Pr rev3 Type 11124-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 4 Pond 8P: CB-1/CB-2 (CIA/CI-2) Peak Elev=46.46' Inflow=4.88 cfs 0.407 of 36.0" Round Culvert n=0.015 L=203.6' S=0.0073 '/' Outflow=4.88 cfs 0.407 of Pond 9P: C13-3 (DI-3) Peak Elev=44.84' Inflow=11.61 cfs 0.933 of 36.0" Round Culvert n=0.015 L=69.5' S=0.0187 '/' Outflow=11.61 cfs 0.933 of Pond 10P: MH-9 (DM-4) Peak Elev=43.54' Inflow=11.61 cfs 0.933 of 36.0" Round Culvert n=0.015 L=96.4' S=0.01877 Outflow=11.61 cfs 0.933 of Pond 11 P: New C13-4 Peak Elev=41.97' Inflow=11.61 cfs 0.933 of 36.0" Round Culvert n=0.015 L=300.4' S=0.0054 '/' Outflow=11.61 cfs 0.933 of Pond 12P: Parking Lot CB's Peak EIev=40.72' Inflow=15.67 cfs 1.250 of 36.0" Round Culvert n=0.015 L=60.1' S=0.0023'/' Outflow=15.69 cfs 1.250 of Pond 13P: MH-11 (DM-8) Peak EIev=42.41' Inflow=6.91 cfs 41.123 of 15.0" Round Culvert n=0.013 L=124.9' S=-0.0008 '/' Outflow=6.91 cfs 41.1.23 of Pond UP: MH-10 (DM-7) Peak EIev=40.24' Inflow=22.60 cfs 42.373 of 36.0" Round Culvert n=0.015 L=665.1' S=0.0078'P Outflow=22.60 cfs 42.373 of Pond 1513: RO Roof Drain East Peak EIev=51.26' Inflow=0.81 cfs 0.067 of 12.0" Round Culvert n=0.013 L=171.0' S=0.0041 '/' Outflow=0.81 cfs 0.067 of Pond 16aP: RO Roof Drain South Peak EIev=50.97' Inflow=3.39 cfs 0.278 of 16.0" Round Culvert n=0.013 L=232.0' S=0.0043 '/' Outflow=3.39 cfs 0.278 of Pond 16bP: RO Roof Drain South Peak EIev=49.91' Inflow=3.39 cfs 0.278 of 16.0" Round Culvert n=0.013 L=110.0' S=0.0073 '/' Outflow=3.39 cfs 0.278 of Pond 16cP: CB to South Swale 1 Peak EIev=49.17' Inflow=5.64 cfs 0.439 of 18.0" Round Culvert n=0.013 L=39.0' S=0.0090 '/' Outflow=5.64 cfs 0.439 of Pond 17aP: RO Roof Drain North Peak EIev=50.64' Inflow=3.65 cfs 0.246 of 16.0" Round Culvert n=0.013 L=124.0' S=0.0056 '/' Outflow=3.65 cfs 0.246 of Pond 17bP: RO Roof Drain North Peak EIev=49.77' Inflow=3.65 cfs 0.246 of 16.0" Round Culvert n=0.013 L=169.0' S=0.0175 'P Outflow=3.65 cfs 0.246 of Pond 17cP: CB to North Swale Peak EIev=46.97' Inflow=4.72 cfs 0.384 of 18.0" Round Culvert n=0.013 L=35.0' S=0.0071 '/' Outflow=4.72 cfs 0.384 of Link 1 L: Recycled Water Pump Station Link 19L: Recycled Water Pump Station Manual Hydrograph Inflow=6.91 cfs 41.123 of Primary=6.91 cfs 41.123 of Manual Hydrograph Inflow=6.91 cfs 41.123 of Primary=6.91 cfs 41.123 of Brunswick WTP Ex and Pr rev3 Prepared by CDM Smith HydroCAD®10.00-19 s/n M15318 © 2016 Type/1/ 24-hr 10-Year, 24-hr Rainfall=7.18" Printed 8/15/2019 Summary for Subcatchment 1S: Clarifier East - Existing Runoff = 5.50 cfs @ 12.11 hrs, Volume= 0.421 af, Depth= 2.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 27,618 98 Impervious areas, HSG A 59,306 39 >75% Grass cover, Good, HSG A 86,924 58 Weighted Average 59,306 68.23% Pervious Area 27,618 31.77% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.5 45 0.0335 0.21 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.3 41 0.1225 2.45 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 1.5 174 0.0173 1.97 Shallow Concentrated Flow, Grass swale Grassed Waterway Kv= 15.0 fps 1.7 305 0.0211 2.95 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fps 7.0 565 Total Summary for Subcatchment 2S: Admin Building - Existing Runoff = 4.75 cfs @ 12.09 hrs, Volume= 0.346 af, Depth= 5.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 25,720 98 Impervious areas, HSG A 8,372 39 >75% Grass cover, Good, HSG A 34,092 84 Weighted Average 8,372 24.56% Pervious Area 25,720 75.44% Impervious Area Brunswick WTP Ex and Pr rev3 Type 1/124-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 6 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 35 0.1445 0.37 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.3 25 0.0408 1.41 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.4 18 0.0122 0.77 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.5 64 0.0122 2.24 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fps 0.1 44 0.0591 4.94 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fps 2.9 186 Total, Increased to minimum Tc = 6.0 min Summary for Subcatchment 3S: Clarifier West - Existing Runoff = 3.62 cfs @ 12.10 hrs, Volume= 0.279 af, Depth= 2.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description * 17,956 98 Impervious areas, HSG A 47,179 39 >75% Grass cover, Good, HSG A 65,135 55 Weighted Average 47,179 72.43% Pervious Area 17,956 27.57% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.2 42 0.0359 0.22 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.3 45 0.1109 2.33 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 3.0 525 0.0201 2.88 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fps 6.5 612 Total Summary for Subcatchment 4S: Maintenance Building - Existing Runoff = 3.45 cfs @ 12.17 hrs, Volume= 0.309 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Brunswick WTP Ex and Pr rev3 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by GDM Smith Printed 8/15/2019 HydroCADS 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Pace 7 Area (sf) CN Description * 20,853 98 Impervious areas, HSG A 40,436 39 >75% Grass cover, Good, HSG A 61,289 59 Weighted Average 40,436 65.98% Pervious Area 20,853 34.02% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.6 50 0.0210 0.18 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.9 55 0.0210 1.01 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 1.8 103 0.0195 0.98 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.8 59 0.0340 1.29 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 3.8 184 0.0133 0.81 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fos 11.9 451 Total Summary for Subcatchment 5S: Clarifier East - Proposed Runoff = 4.88 cfs @ 12.14 hrs, Volume= 0.407 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description * 27,209 98 Impervious areas, HSG A 53,572 39 >75% Grass cover, Good, HSG A 80,781 59 Weighted Average 53,572 66.32% Pervious Area 27,209 33.68% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.2 50 0.0101 0.14 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 1.2 49 0.0100 0.70 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.5 56 0.0180 2.01 Shallow Concentrated Flow, Grass Grassed Waterway Kv= 15.0 fps 1.7 288 0.0188 2.78 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fas 9.6 443 Total Brunswick WTP Ex and Pr rev3 Type Ill 24-hr 10-Year, 24-hr Rainfall=7. 98" Prepared by CDM Smith Printed 8/15/2019 HydroCADO 10,00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Pape 8 Summary for Subcatchment 6S: Admin Building - Proposed Runoff = 6.80 cfs @ 12.12 hrs, Volume= 0.526 af, Depth= 4.42" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description * 39,233 98 Impervious areas, HSG A 23,037 39 >75% Grass cover, Good, HSG A 62,270 76 Weighted Average 23,037 37.00% Pervious Area 39,233 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.7 50 0.0197 0.18 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.2 11 0.0197 0.98 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.7 69 0.0545 1.63 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 2.8 350 0.0108 2.11 Shallow Concentrated Flow, Pavement Paved Kv= 20.3 fps 8.4 480 Total Summary for Subcatchment 7S: Parking Lot - Proposed Runoff = 4.42 cfs @ 12.09 hrs, Volume= 0.317 af, Depth= 4.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description * 23,680 98 Impervious areas, HSG A 10,444 39 >75% Grass cover, Good, HSG A 34,124 80 Weighted Average 10,444 30.61 % Pervious Area 23,680 69.39% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Brunswick WTP Ex and Pr rev3 Type Ill 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD® 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 8S: Clarifier West - Proposed Runoff - 3.49 cfs @ 12.16 hrs, Volume= 0.314 af, Depth= 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 18,854 98 Impervious areas, HSG A 57,816 39 >75% Grass cover, Good, HSG A 76,670 54 Weighted Average 57,816 75.41 % Pervious Area 18,854 24.59% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.6 50 0.0059 0.11 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 1.1 35 0.0059 0.54 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 1.1 59 0.0169 0.91 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.9 73 0.0409 1.42 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 10.7 217 Total Summary for Subcatchment 9S: Tank Storage - Proposed Runoff = 3.23 cfs @ 12.10 hrs, Volume= 0.251 af, Depth= 2.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description " 15,347 98 Impervious areas, HSG A 45,771 39 >75% Grass cover, Good, HSG A 61,118 54 Weighted Average 45,771 74.89% Pervious Area 15,347 25.11% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.1 50 0.0162 0.16 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4,62" 0.2 12 0.0162 0.89 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 1.1 98 0.0102 1.51 Shallow Concentrated Flow, Grass Swale Grassed Waterwav Kv= 15.0 fps 6.4 160 Total Brunswick WTP Ex and Pr rev3 Type 11124-hr 90-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 10S: RO Building East - Proposed Runoff = 0.81 cfs @ 12.08 hrs, Volume= 0.067 af, Depth= 6.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 5,027 98 Roofs, HSG A 5,027 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 11S: RO Building South - Proposed Runoff = 2.58 cfs @ 12.08 hrs, Volume= 0.211 af, Depth= 6.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 15,924 98 Roofs, HSG A 15,924 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 12S: South Driveway - Proposed Runoff = 2.26 cfs @ 12.09 hrs, Volume= 0.160 af, Depth= 4.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description * 11,782 98 Impervious areas, HSG A 8,715 39 >75% Grass cover, Good, HSG A 20,497 73 Weighted Average 8,715 42.52% Pervious Area 11,782 57.48% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Brunswick WTP Ex and Pr rev3 Type M 24-hr 10-Year, 24-hrRainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 © 2016 HvdroCAD Software Solutions LLC Page 11 Summary for Subcatchment 13S: South Swale 1 - Proposed Runoff = 0.34 cfs @ 12.09 hrs, Volume= 0.025 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 1,652 98 Impervious areas, HSG A 3,302 39 >75% Grass cover, Good, HSG A 4,954 59 Weighted Average 3,302 66.65% Pervious Area 1,652 33.35% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 14S: RO Building North - Proposed [46] Hint: Tc=O (Instant runoff peak depends on dt) Runoff = 3.65 cfs @ 12.00 hrs, Volume= 0.246 af, Depth= 6.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 18,512 98 Roofs, HSG A 18,512 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 15S: West Driveway - Proposed Runoff = 1.92 cfs @ 12.09 hrs, Volume= 0.138 af, Depth= 3.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 9,821 98 Impervious areas, HSG A 13,118 39 >75% Grass cover, Good, HSG A 22,939 64 Weighted Average 13,118 57.19% Pervious Area 9,821 42.81% Impervious Area Brunswick WTP Ex and Pr rev3 Type Ill 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Page 12 Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 16S: North Swale - Proposed Runoff = 0.18 cfs @ 12.14 hrs, Volume= 0.025 af, Depth= 0.83" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 128 98 Impervious areas, HSG A 15,607 39 >75% Grass cover, Good, HSG A 15,735 39 Weighted Average 15,607 99.19% Pervious Area 128 0.81 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Reach 1 R: Hood Creek Outfall - Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 5.680 ac, 37.24% Impervious, Inflow Depth > 89.74" for 10-Year, 24-hr event Inflow = 23.53 cfs @ 12.11 hrs, Volume= 42.478 of Outflow = 23.53 cfs @ 12.11 hrs, Volume= 42.478 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Summary for Reach 2R: Hood Creek Outfall - Proposed [40] Hint: Not Described (Outflow-- Inflow) Inflow Area = 4.067 ac, 50.87% Impervious, Inflow Depth >125.01" for 10-Year, 24-hr event Inflow = 22.60 cfs @ 12.11 hrs, Volume= 42.373 of Outflow = 22.60 cfs @ 12.11 hrs, Volume= 42.373 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Summary for Reach 3aR: South Swale 2a Inflow Area = 1.760 ac, 24.59% Impervious, Inflow Depth = 2.14" for 10-Year, 24-hr event Inflow = 3.49 cfs @ 12.16 hrs, Volume= 0.314 of Outflow = 3.31 cfs @ 12.20 hrs, Volume= 0.314 af, Atten= 5%, Lag= 2.4 min Brunswick VVTP Ex and Pr rev3 Type Ill 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by ODM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Pace 13 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 1.94 fps, Min. Travel Time= 3.3 min Avg. Velocity = 0.63 fps, Avg. Travel Time= 10.2 min Peak Storage= 651 cf @ 12.20 hrs Average Depth at Peak Storage= 0.27' Bank -Full Depth= 1.00' Flow Area= 10.0 sf, Capacity-- 40.25 cfs 5.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 5.0 '/' Top Width= 15.00' Length= 382.0' Slope= 0.0157 '/' Inlet Invert= 59.00', Outlet Invert= 53.00' Summary for Reach 3bR: South Swale 2b [62] Hint: Exceeded Reach 3aR OUTLET depth by 0.24' @ 12.10 hrs Inflow Area = 3.163 ac, 24.82% Impervious, Inflow Depth = 2.14" for 10-Year, 24-hr event Inflow = 5.81 cfs @ 12.15 hrs, Volume= 0.565 of Outflow - 5.81 cfs @ 12.15 hrs, Volume= 0.565 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 2.30 fps, Min. Travel Time= 0.6 min Avg. Velocity = 0.81 fps, Avg. Travel Time= 1.6 min Peak Storage= 192 cf @ 12.15 hrs Average Depth at Peak Storage= 0.47' Bank -Full Depth= 1.00' Flow Area= 8.0 sf, Capacity= 27.91 cfs 3.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 5.0 '/' Top Width= 13.00' Length= 76.0' Slope= 0.0132 '/' Inlet Invert= 53.00', Outlet Invert= 52.00' Brunswick WTP Ex and Pr rev3 Type /// 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 14 Summary for Reach 3cR: South Swale 2b [62] Hint: Exceeded Reach 3bR OUTLET depth by 0.04' @ 12.27 hrs Inflow Area = 3.163 ac, 24.82% Impervious, Inflow Depth = 2.14" for 10-Year, 24-hr event Inflow = 5.81 cfs @ 12.15 hrs, Volume= 0.565 of Outflow = 5.74 cfs @ 12.18 hrs, Volume= 0.565 af, Atten= 1 %, Lag= 1.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 2.08 fps, Min. Travel Time= 1.6 min Avg. Velocity = 0.73 fps, Avg. Travel Time= 4.5 min Peak Storage= 547 cf @ 12.18 hrs Average Depth at Peak Storage= 0.50' Bank -Full Depth= 1.00' Flow Area= 8.0 sf, Capacity= 24.45 cfs 3.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 5.0 'P Top Width= 13.00' Length= 198.0' Slope= 0.0101 T Inlet Invert= 52.00', Outlet Invert= 50.00' Summary for Reach MR: South Swale 2b [61] Hint: Exceeded Reach 3cR outlet invert by 0.48' @ 12.18 hrs Inflow Area = 3.163 ac, 24.82% Impervious, Inflow Depth = 2.14" for 10-Year, 24-hr event Inflow = 5.74 cfs @ 12.18 hrs, Volume= 0.565 of Outflow = 5.74 cfs @ 12.18 hrs, Volume= 0.565 af, Atten= 0%, Lag= 0.3 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 2.54 fps, Min. Travel Time= 0.5 min Avg. Velocity = 0.85 fps, Avg. Travel Time= 1.3 min Peak Storage= 155 cf @ 12.18 hrs Average Depth at Peak Storage= 0.48' Bank -Full Depth= 1.00' Flow Area= 6.5 sf, Capacity= 24.56 cfs 3.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 3.5'/' Top Width= 10.00' Length= 68.5' Slope= 0.0146 T Inlet Invert= 50.00', Outlet Invert= 49.00' Brunswick WTP Ex and Pr rev3 Type /// 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by ODM Smith Printed 8/15/2019 HydroCADO 10.00-19 s/n M15318 © 2016 HvdroCAD Software Solutions LLC Paae 15 Summary for Reach OR: South Swale 1 Depth at channell at discharge = 2.75 ft Inflow Area = 1.065 ac, 74.10% Impervious, Inflow Depth = 5.22" for 10-Year, 24-hr event Inflow 5.98 cfs @ 12.09 hrs, Volume= 0.464 of Outflow = 5.96 cfs @ 12.09 hrs, Volume= 0.464 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 3.27 fps, Min. Travel Time= 0.5 min Avg. Velocity = 0.95 fps, Avg. Travel Time= 1.8 min Peak Storage= 187 cf @ 12.09 hrs Average Depth at Peak Storage= 0.51' Bank -Full Depth=1.00' Flow Area= 5.0 sf, Capacity= 23.59 cfs 2.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 3.07 Top Width= 8.00' Length= 102.6' Slope= 0.0244 '/' Inlet Invert= 47.50', Outlet Invert= 45.00' Summary for Reach 5aR: North Swale Inflow Area = 1.313 ac, 49.77% Impervious, Inflow Depth = 3.74" for 10-Year, 24-hr event Inflow = 4.74 cfs @ 12.00 hrs, Volume= 0.409 of Outflow = 4.69 cfs @ 12.01 hrs, Volume= 0.409 af, Atten= 1 %, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 2.19 fps, Min. Travel Time= 0.4 min Avg. Velocity = 0.68 fps, Avg. Travel Time= 1.3 min Peak Storage= 112 cf @ 12.01 hrs Average Depth at Peak Storage= 0.58' Bank -Full Depth= 1.00' Flow Area= 5.0 sf, Capacity= 14.82 cfs Brunswick WTP Ex and Pr rev3 Type 1/124-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Paae 16 2.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 3.0 '/' Top Width= 8.00' Length= 52.0' Slope= 0.0096 T Inlet Invert= 45.50', Outlet Invert= 45.00' Summary for Reach 5bR: North Swale [61] Hint: Exceeded Reach 5aR outlet invert by 0.48' @ 12.02 hrs Inflow Area = 1.313 ac, 49.77% Impervious, Inflow Depth = 3.74" for 10-Year, 24-hr event Inflow = 4.69 cfs @ 12.01 hrs, Volume= 0.409 of Outflow = 4.64 cfs @ 12.02 hrs, Volume= 0.409 af, Atten= 1%, Lag= 0.5 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 2.84 fps, Min. Travel Time= 0.6 min Avg. Velocity = 0.86 fps, Avg. Travel Time= 1.9 min Peak Storage= 163 cf @ 12.02 hrs Average Depth at Peak Storage= 0.48' Bank -Full Depth= 1.00' Flow Area= 5.0 sf, Capacity= 21.37 cfs 2.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 3.0 '/' Top Width= 8.00' Length= 100.0' Slope= 0.0200 '/' Inlet Invert= 45.00', Outlet Invert= 43.00' Summary for Reach 5cR: North Swale [61] Hint: Exceeded Reach 5bR outlet invert by 0.44' @ 12.02 hrs Inflow Area = 1.313 ac, 49.77% Impervious, Inflow Depth = 3.74" for 10-Year, 24-hr event Inflow = 4.64 cfs @ 12.02 hrs, Volume= 0.409 of Outflow = 4.63 cfs @ 12.02 hrs, Volume= 0.409 af, Atten= 0%, Lag= 0.3 min Brunswick WTP Ex and Pr rev3 Type /// 24-hr 10-Year, 24-hrRainfa11=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCADO 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Paae 17 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Max. Velocity= 3.12 fps; Min. Travel Time= 0.4 min Avg. Velocity = 0.94 fps, Avg. Travel Time= 1.4 min Peak Storage= 114 cf @ 12.02 hrs Average Depth at Peak Storage= 0.44' Bank -Full Depth= 1.00' Flow Area= 5.0 sf, Capacity= 24.36 cfs 2.00' x 1.00' deep channel, n= 0.035 Side Slope Z-value= 3.0 T Top Width= 8.00' Length= 77.0' Slope= 0.0260 T Inlet Invert= 43.00', Outlet Invert= 41.00' Summary for Pond 1P: CB-1/CB-2 (CI-1/0-2) Inflow Area = 1.996 ac, Inflow = 5.50 cfs @ Outflow = 5.50 cfs @ Primary = 5.50 cfs @ 31.77% Impervious, Inflow Depth = 2.53" 12.11 hrs, Volume= 0.421 of 12.11 hrs, Volume= 0.421 af, 12.11 hrs, Volume= 0.421 of for 10-Year, 24-hr event Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 46.51' @ 12.11 hrs Flood Elev= 50.57' Device Routing Invert Outlet Devices #1 Primary 45.57' 36.0" Round 36" RCP L= 203.6' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 45.57' / 44.08' S= 0.0073 7 Cc= 0.900 n= 0.015 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf Primary OutFlow Max=5.50 cfs @ 12.11 hrs HW=46.51' TW=44.74' (Dynamic Tailwater) t-1=36" RCP (Barrel Controls 5.50 cfs @ 4.37 fps) Inflow Area = 2.778 ac, Inflow = 10.16 cfs @ Outflow = 10.16 cfs @ Primary = 10.16 cfs @ Summary for Pond 212: CB-3 (13I-3) 44.08% impervious, inflow Depth = 3.32" 12.10 hrs, Volume= 0.768 of 12.10 hrs, Volume= 0.768 af, 12.10 hrs, Volume= 0.768 of for 10-Year, 24-hr event Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 44.75' @ 12.10 hrs Flood Elev= 49.43' Brunswick WTP Ex and Pr rev3 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD® 10 00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 18 Device Routing Invert Outlet Devices #1 Primary 43.53' 36.0" Round 36" RCP L= 69.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 43.53' / 42.23' S= 0.0187'/' Cc= 0.900 n= 0.015, Flow Area= 7.07 sf rimaryOutFlow Max=10.15 cfs @ 12.10 hrs HW=44.75' TW=43.47' (Dynamic Tailwater) 1=36" RCP (Inlet Controls 10.15 cfs @ 3.76 fps) Summary for Pond 3P: MH-9 (DM-4) Inflow Area = 2.778 ac, 44.08% Impervious, Inflow Depth = 3.32" for 10-Year, 24-hr event Inflow = 10.16 cfs @ 12.10 hrs, Volume= 0.768 of Outflow = 10.16 cfs @ 12.10 hrs, Volume= 0.768 af, Atten= 0%, Lag= 0.0 min Primary = 10.16 cfs @ 12.10 hrs, Volume= 0.768 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 43.48' @ 12.10 hrs Flood Elev= 50.01' Device Routing Invert Outlet Devices #1 Primary 42.23' 36.0" Round 36" RCP L= 96.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 42.23' / 40.43' S= 0.0187'/' Cc= 0.900 n= 0.015, Flow Area= 7.07 sf rimary OutFlow Max=10.14 cfs @ 12.10 hrs HW=43.47' TW=42.12' (Dynamic Tailwater) 1=36" RCP (Outlet Controls 10.14 cfs @ 5.40 fps) Summary for Pond 413: CB-4 (CI-5) Inflow Area = 4.273 ac, 38.30% Impervious, Inflow Depth = 2.94" for 10-Year, 24-hr event Inflow = 13.78 cfs @ 12.10 hrs, Volume= 1.047 of Outflow = 13.78 cfs @ 12.10 hrs, Volume= 1.047 af, Atten= 0%, Lag= 0.0 min Primary = 13.78 cfs @ 12.10 hrs, Volume= 1.047 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 42.12' @ 12.10 hrs Flood Elev= 50.13' Device Routing Invert Outlet Devices #1 Primary 40.28' 36.0" Round 36" RCP L= 300.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 40.28' / 38.65' S= 0.0054'/' Cc= 0.900 n= 0.015, Flow Area= 7.07 sf Primary OutFlow Max=13.77 cfs @ 12.10 hrs HW=42.12' TW=40.78' (Dynamic Tailwater) t-1=36" RCP (Outlet Controls 13.77 cfs @ 4.33 fps) Brunswick WTP Ex and Pr rev3 Prepared by CDM Smith HvdroCADS 10.00-19 s/n M 15318 © 201 Type/1/ 24-hr 10-Year, 24-hr Rainfall=7.18" LLC Summary for Pond 5P: CB-5 (CI-6) [90] Warning: Qout>Qin may require smaller dt or Finer Routing Inflow Area = 5.680 ac, Inflow = 16.60 cfs @ Outflow = 16.62 cfs @ Primary = 16.62 cfs @ 37.24% Impervious, Inflow Depth = 2.86" 12.11 hrs, Volume= 1.355 of Printed 8/15/2019 for 10-Year, 24-hr event 12.11 hrs, Volume= 1.355 af, Atten= 0%, Lag= 0.0 min 12.11 hrs, Volume= 1.355 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 40.78' @ 12.11 hrs Flood Elev= 48.55' Device Routing Invert Outlet Devices #1 Primary 38.50' 36.0" Round 36" Culvert L= 60.1' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.50' / 38.36' S= 0.0023'/' Cc= 0.900 n= 0.015, Flow Area= 7.07 sf rimary OutFlow Max=16.60 cfs @ 12.11 hrs HW=40.78' TW=40.28' (Dynamic Tailwater) 1=36" Calvert (Outlet Controls 16.60 cfs @ 3.98 fps) Summary for Pond 6P: MH-11 (DM-8) Inflow = 6.91 cfs @ 0.00 hrs, Volume= 41.123 of Outflow = 6.91 cfs @ 11.99 hrs, Volume= 41.123 af, Atten= 0%, Lag= 719.4 min Primary = 6.91 cfs @ 11.99 hrs, Volume= 41.123 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 42.46' @ 12.11 hrs Flood Elev= 48.07' Device Routing Invert Outlet Devices #1 Primary 38.57' 15.0" Round 15" DI Pipe L= 124.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.47' 138.57' S=-0.0008 T Cc= 0.900 n= 0.013 Cast iron, coated, Flow Area= 1.23 sf rimary OutFlow Max=6.91 cfs @ 11.99 hrs HW=42.00' TW=39.82' (Dynamic Tailwater) 1=15" Di Pipe (Outlet Controls 6.91 cfs @ 5.63 fps) Summary for Pond 7P: MH-10 (DM-7) [80) Warning: Exceeded Pond 5P by 0.82' @ 24.24 hrs (2.84 cfs 2.754 af) Inflow Area = 5.680 ac, 37.24% Impervious, Inflow Depth > 89.74" for 10-Year, 24-hr event Inflow = 23.53 cfs @ 12.11 hrs, Volume= 42.478 of Outflow = 23.53 cfs @ 12.11 hrs, Volume= 42.478 af, Atten= 0%, Lag= 0.0 min Primary = 23.53 cfs @ 12.11 hrs, Volume= 42.478 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Brunswick WTP Ex and Pr rev3 Type/1/ 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HvdroCAD® 10 00-19 s/n M15318 © 2016 HvdroCAD Software Solutions LLC Page 20 Peak Elev= 40.28' @ 12.11 hrs Flood Elev= 48.06' Device Routing Invert Outlet Devices #1 Primary 38.31' 36.0" Round 36" RCP L= 665.1' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.31' / 33.11' S= 0.0078'/' Cc= 0.900 n= 0.015 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf Primary OutFlow Max=23.51 cfs @ 12.11 hrs HW=40.28' TW=0.00' (Dynamic Tailwater) t-1=36" RCP (Barrel Controls 23.51 cfs @ 6.77 fps) Summary for Pond 8P: CB-1/CB-2 (CI-1/CI-2) Inflow Area = 1.854 ac, 33.68% Impervious, Inflow Depth = 2.63" for 10-Year, 24-hr event Inflow = 4.88 cfs @ 12.14 hrs, Volume= 0.407 of Outflow = 4.88 cfs @ 12.14 hrs, Volume= 0.407 af, Atten= 0%, Lag= 0.0 min Primary = 4.88 cfs @ 12.14 hrs, Volume= 0.407 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 46.46' @ 12.14 hrs Flood Elev= 50.57' Device Routing Invert Outlet Devices #1 Primary 45.57' 36.0" Round 36" RCP L= 203.6' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 45.57' / 44.08' S= 0.0073 T Cc= 0.900 n= 0.015 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf Primary OutFlow Max=4.88 cfs @ 12.14 hrs HW=46.46' TW=44.83' (Dynamic Tailwater) t-1=36" RCP (Outlet Controls 4.88 cfs @ 4.15 fps) Summary for Pond 9P: CB-3 (13I-3) Inflow Area = 3.284 ac, 46.45% Impervious, Inflow Depth = 3.41" for 10-Year, 24-hr event Inflow = 11.61 cfs @ 12.13 hrs, Volume= 0.933 of Outflow = 11.61 cfs @ 12.13 hrs, Volume= 0.933 af, Atten= 0%, Lag= 0.0 min Primary = 11.61 cfs @ 12.13 hrs, Volume= 0.933 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 44.84' @ 12.13 hrs Flood Elev= 49.43' Device Routing Invert Outlet Devices #1 Primary 43.53' 36.0" Round 36" RCP L= 69.5' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 43.53' / 42.23' S= 0.0187'/' Cc= 0.900 n= 0.015, Flow Area= 7.07 sf rimary OutFlow Max=11.60 cfs @ 12.13 hrs HW=44.84' TW=43.54' (Dynamic Tailwater) 1=36" RCP (Inlet Controls 11.60 cfs @ 3.90 fps) Brunswick WrP Ex and Pr rev3 Prepared by CDM Smith HydroCADO 10.00-19 s/n M15318 © 2011 Inflow Area = 3.284 ac, Inflow = 11.61 cfs @ Outflow = 11.61 cfs @ Primary = 11.61 cfs @ Type/1/ 24-hr 10-Year, 24-hr Rainfall=7.18" Summary for Pond 10P: MH-9 (DM-4) 46.45% Impervious, Inflow Depth = 3.41" 12.13 hrs, Volume= 0.933 of 12.13 hrs, Volume= 0.933 af, 12.13 hrs, Volume= 0.933 of Printed 8/15/2019 for 10-Year, 24-hr event Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 43.54' @ 12.13 hrs Flood Elev= 50.01' Device Routing Invert Outlet Devices #1 Primary 42.23' 36.0" Round 36" RCP L= 96.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 42.23' / 40.43' S= 0.0187'P Cc= 0.900 n= 0.015, Flow Area= 7.07 sf Primary OutFlow Max=11.60 cfs @ 12.13 hrs HW=43.54' TW=41.97' (Dynamic Tailwater) 'L1=36" RCP (Inlet Controls 11.60 cfs @ 3.90 fps) Inflow Area = 3.284 ac, Inflow = 11.61 cfs @ Outflow = 11.61 cfs @ Primary = 11.61 cfs @ Summary for Pond 11 P: New CB-4 46.45% Impervious, Inflow Depth = 3.41" 12.13 hrs, Volume= 0.933 of for 10-Year, 24-hr event 12.13 hrs, Volume= 0.933 af, Atten= 0%, Lag= 0.0 min 12.13 hrs, Volume= 0.933 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 41.97' @ 12.12 hrs Flood Elev= 50.13' Device Routing Invert Outlet Devices #1 Primary 40.28' 36.0" Round 36" RCP L= 300.4' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 40.28' / 38.65' S= 0.0054 T Cc= 0.900 n= 0.015, Flow Area= 7.07 sf rimary OutFlow Max=11.60 cfs @ 12.13 hrs HW=41.97' TW=40.71' (Dynamic Tailwater) 1=36" RCP (Outlet Controls 11.60 cfs @ 4.08 fps) Summary for Pond 12P: Parking Lot CB's [90] Warning: Qout>Qin may require smaller dt or Finer Routing Inflow Area = 4.067 ac, Inflow = 15.67 cfs @ Outflow = 15.69 cfs @ Primary = 15.69 cfs @ 50.87% Impervious, Inflow Depth = 3.69" 12.11 hrs, Volume= 1.250 of 12.11 hrs, Volume= 1.250 af, 12.11 hrs, Volume= 1.250 of for 10-Year, 24-hr event Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0,00-72.00 hrs, dt= 0.01 hrs / 3 Brunswick WTP Ex and Pr rev3 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10 00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Page 22 Peak Elev= 40.72' @ 12.11 hrs Flood Elev= 48.55' Device Routing Invert Outlet Devices #1 Primary 38.50' 36.0" Round 36" Culvert L= 60.1' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.50' / 38.36' S= 0.0023'P Cc= 0.900 n= 0.015, Flow Area= 7.07 sf Primary OutFlow Max=15.66 cfs @ 12.11 hrs HW=40.72' TW=40.24' (Dynamic Tailwater) 't-1=36" Culvert (Outlet Controls 15.66 cfs @ 3.90 fps) Summary for Pond 13P: MH-11 (DM-8) Inflow = 6.91 cfs @ 0.00 hrs, Volume= 41.123 of Outflow = 6.91 cfs @ 12.01 hrs, Volume= 41.123 af, Atten= 0%, Lag= 720.6 min Primary = 6.91 cfs @ 12.01 hrs, Volume= 41.123 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 42.41' @ 12.11 hrs Flood Elev= 48.07' Device Routing Invert Outlet Devices #1 Primary 38.57' 15.0" Round 15" DI Pipe L= 124.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.47' 138.57' S=-0.0008'/' Cc= 0.900 n= 0.013 Cast iron, coated, Flow Area= 1.23 sf rimary OutFlow Max=6.91 cfs @ 12.01 hrs HW=42.05' TW=39.88' (Dynamic Tailwater) 1=15" DI Pipe (Outlet Controls 6.91 cfs @ 5.63 fps) Summary for Pond 14P: MH-10 (DM-7) [801 Warning: Exceeded Pond 12P by 0.82' @ 24.22 hrs (2.84 cfs 2.793 af) Inflow Area = 4.067 ac, 50.87% Impervious, Inflow Depth >125.01" for 10-Year, 24-hr event Inflow = 22.60 cfs @ 12.11 hrs, Volume= 42.373 of Outflow = 22.60 cfs @ 12.11 hrs, Volume= 42.373 af, Atten= 0%, Lag= 0.0 min Primary = 22.60 cfs @ 12.11 hrs, Volume= 42.373 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 40.24' @ 12.11 hrs Flood Elev= 48.06' Device Routing Invert Outlet Devices #1 Primary 38.31' 36.0" Round 36" RCP L= 665.1' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 38.31' / 33.11' S= 0.0078'/' Cc= 0.900 n= 0.015 Concrete sewer w/manholes & inlets, Flow Area= 7.07 sf Brunswick WTP Ex and Pr rev3 Prepared by CDM Smith HydroCAD®10.00-19 s/n M 15318 © 201 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" LLC Printed 8/15/2019 rimary OutFlow Max=22.57 cfs @ 12.11 hrs HW=40.24' TW=0.00' (Dynamic Tailwater) 1=36" RCP (Barrel Controls 22.57 cfs @ 6.70 fps) Summary for Pond 15P: RO Roof Drain East Inflow Area = 0.115 ac,100.00% Impervious, Inflow Depth = 6.94" for 10-Year, 24-hr event Inflow = 0.81 cfs @ 12.08 hrs, Volume= 0.067 of Outflow = 0.81 cfs @ 12.08 hrs, Volume= 0.067 af, Atten= 0%, Lag= 0.0 min Primary = 0.81 cfs @ 12.08 hrs, Volume= 0.067 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 51.26' @ 12.08 hrs Flood Elev= 52.50' Device Routing Invert Outlet Devices #1 Primary 50.50' 12.0" Round 12" DI Pipe L= 171.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 50.50' / 49.80' S= 0.0041 T Cc= 0.900 n= 0.013, Flow Area= 0.79 sf rimary OutFlow Max=0.81 cfs @ 12.08 hrs HW=51.26' TW=50.96' (Dynamic Tailwater) 1=12" DI Pipe (Outlet Controls 0.81 cfs @ 1.74 fps) Summary for Pond 16aP: RO Roof Drain South Inflow Area = 0.481 ac,100.00% Impervious, Inflow Depth = 6.94" for 10-Year, 24-hr event Inflow = 3.39 cfs @ 12.08 hrs, Volume= 0.278 of Outflow = 3.39 cfs @ 12.08 hrs, Volume= 0.278 af, Atten= 0%, Lag= 0.0 min Primary = 3.39 cfs @ 12.08 hrs, Volume= 0.278 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 50.97' @ 12.08 hrs Flood Elev= 52.50' Device Routing Invert Outlet Devices 41 Primary 49.80' 16.0" Round 16" DI Pipe L= 232.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 49.80' / 48.80' S= 0.0043 '/' Cc= 0.900 n= 0.013, Flow Area= 1.40 sf Primary OutFlow Max=3.38 cfs @ 12.08 hrs HW=50.96' TW=49.91' (Dynamic Tailwater) 1-1=16" Dl Pipe (Outlet Controls 3.38 cfs @ 3.49 fps) Summary for Pond IMP: RO Roof Drain South Inflow Area = 0.481 ac,100.00% Impervious, Inflow Depth = 6.94" for 10-Year, 24-hr event Inflow = 3.39 cfs @ 12.08 hrs, Volume= 0.278 of Outflow = 3.39 cfs @ 12.08 hrs, Volume= 0.278 af, Atten= 0%, Lag= 0.0 min Primar; = 3.39 cfs @ 12.08 hrs, Volume= 0.278 of Brunswick WTP Ex and Pr rev3 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HVdroCAD®10 00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Paoe 24 Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 49.91' @ 12.08 hrs Flood Elev= 52.00' Device Routing Invert Outlet Devices #1 Primary 48.80' 16.0" Round 16" DI Pipe L= 110.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 48.80' / 48.00' S= 0.0073 T Cc= 0.900 n= 0.013, Flow Area= 1.40 sf rimary OutFlow Max=3.38 cfs @ 12.08 hrs HW=49.91' TW=49.16' (Dynamic Tailwater) 1=16" DI Pipe (Outlet Controls 3.38 cfs @ 3.70 fps) Summary for Pond 16cP: CB to South Swale 1 Inflow Area = 0.952 ac, 78.97% Impervious, Inflow Depth = 5.53" for 10-Year, 24-hr event Inflow = 5.64 cfs @ 12.09 hrs, Volume= 0.439 of Outflow = 5.64 cfs @ 12.09 hrs, Volume= 0.439 af, Atten= 0%, Lag= 0.0 min Primary = 5.64 cfs @ 12.09 hrs, Volume= 0.439 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 49.17' @ 12.09 hrs Flood Elev= 51.10' Device Routing Invert Outlet Devices #1 Primary 47.85' 18.0" Round 18" Pipe L= 39.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 47.85' / 47.50' S= 0.0090 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf rimary OutFlow Max=5.63 cfs @ 12.09 hrs HW=49.16' TW=48.01' (Dynamic Tailwater) 1=18" Pipe (Barrel Controls 5.63 cfs @ 4.58 fps) Summary for Pond 17aP: RO Roof Drain North Inflow Area = 0.425 ac,100.00% Impervious, Inflow Depth = 6.94" for 10-Year, 24-hr event inflow = 3.65 cfs @ 12.00 hrs, Volume= 0.246 of Outflow = 3.65 cfs @ 12.00 hrs, Volume= 0.246 af, Atten= 0%, Lag= 0.0 min Primary = 3.65 cfs @ 12.00 hrs, Volume= 0.246 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 50.64' @ 12.00 hrs Flood Elev= 52.00' Device Routing Invert Outlet Devices #1 Primary 49.50' 16.0" Round 16" DI Pipe L= 124.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 49.50' / 48.80' S= 0.0056 ? Cc= 0.900 n= 0.013, Flow Area= 1.40 sf Brunswick WTP Ex and Pr rev3 Type /// 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by MM Smith Printed 8/15/2019 HydroCADO 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 25 Primary OutFlow Max=3.65 cfs @ 12.00 hrs HW=50.64' TW=49.77' (Dynamic Tailwater) t1=16" DI Pipe (Outlet Controls 3.65 cfs @ 3.87 fps) Summary for Pond 17bP: RO Roof Drain North Inflow Area = 0.425 ac,100.00% Impervious, Inflow Depth = 6.94" for 10-Year, 24-hr event Inflow = 3.65 cfs @ 12.00 hrs, Volume= 0.246 of Outflow = 3.65 cfs @ 12.00 hrs, Volume= 0.246 af, Atten= 0%, Lag= 0.0 min Primary = 3.65 cfs @ 12.00 hrs, Volume= 0.246 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 49.77' @ 12.00 hrs Flood Elev= 51.30' Device Routing Invert Outlet Devices #1 Primary 48.80' 16.0" Round 16" DI Pipe L= 169.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 48.80' / 45.85' S= 0.0175 7 Cc= 0.900 n= 0.013, Flow Area= 1.40 sf Primary OutFlow Max=3.65 cfs @ 12.00 hrs HW=49.77' TW=46.97' (Dynamic Tailwater) 1=16" DI Pipe (Inlet Controls 3.65 cfs @ 3.35 fps) Summary for Pond 17cP: CB to North Swale Inflow Area = 0.952 ac, 68.35% Impervious, Inflow Depth = 4.84" for 10-Year, 24-hr event Inflow = 4.72 cfs @ 12.00 hrs, Volume= 0.384 of Outflow = 4.72 cfs @ 12.00 hrs, Volume= 0.384 af, Atten= 0%, Lag= 0.0 min Primary = 4.72 cfs @ 12.00 hrs, Volume= 0.384 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Peak Elev= 46.97' @ 12.00 hrs Flood Elev= 49.00' Device Routing Invert Outlet Devices #1 Primary 45.75' 18.0" Round 18" Pipe L= 35.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 45.75' / 45.50' S= 0.0071 T Cc= 0.900 n= 0.013, Flow Area= 1.77 sf rimary OutFlow Max=4.69 cfs @ 12.00 hrs HW=46.97' TW=46.07' (Dynamic Tailwater) 1=18" Pipe (Barrel Controls 4.69 cfs @ 4.17 fps) Summary for Link 1 L: Recycled Water Pump Station Inflow = 6.91 cfs @ 0.00 hrs, Volume= 41.123 of Primary = 6.91 cfs @ 0.00 hrs, Volume= 41.123 af, Atten= 0%, Lag= 0.0 min Primary outflow - Inflow, Time Span= 0.010-72.00 hrs, dt= ^.01 hrs Brunswick WTP Ex and Pr rev3 Type M 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10 00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 26 16 Point manual hydrograph, To= 0.00 hrs, dt= 5.00 hrs, cfs = 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 Summary for Link 19L: Recycled Water Pump Station Inflow = 6.91 cfs @ 0.00 hrs, Volume= 41.123 of Primary = 6.91 cfs @ 0.00 hrs, Volume= 41.123 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs 16 Point manual hydrograph, To= 0.00 hrs, dt= 5.00 hrs, cfs = 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 6.91 Appendix E Swale Design N q* d O 0 i c d E � o m m m F 9 L 3 a & cL C4 N S M M 8&L. to u M O co $ o o J c Ln M 0 0 co Y co rl N M d C C Ln L u o al a 0 N L N a co F F z a IV a 3 -0 0 -0 T N � Lfl O O C c e-1 N s s v m o to 'I'0 ' W W of H O FA J M 0 C f/!CY c; E� ar E Ln m L t id 3 a o Ta1 YI 41 an' N ci cn LL O U W Ln M � O Ln a 3 O a Ln m 0 0 Do Y Do ei N en cC C 10 N u T Lq � C al a O v N � N f0 F ;F 3 0 u u u .n T N 4 If V- L" 0 0 Lb Ln Lc o of N d 3 s t v m u1 w N 0 0 CL a 0 VA w rr I. Ln it d s d E 'q o a Lo L t id 3 � a 0 U. w Ln LV C1 LLL n U uj L VI M CC O Do Q N N 0 O N O LA M O O LO Y � e-1 N Ln fM cc c c U T d U � C N a O To s a Li a 2k' z T N Appendix F Riprap Outlet Protectio Source: Appendix 8 in NC Erosion and Sediment Control Planning and Design Manual, dated May 2013 25 - 5— NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS North Swale Appendices (Source: `Bank and channel lining procedures", New York Department of Transportation, Division of Design and Construction; 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Qio (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step l) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = Ao where A. = cross -sectional area of flow at outlet. For multiple culverts, use D,, =1.25 x D. of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). Q10=4.6cfs Do = Ao = 1.5 ft"2 = 18 inches Vo = 3.1 fps ®a .gym o �'.mt•■1.KW :mo mom, mamma trm�cc�� ■m��Qn�m-mod ®; omaon�mm®—vmm, wirminnininninam hm�a m®�■msuo�au� NE" Q v .ms■�o■m.i or" v.B.mmmQ�u� m.onn.. ■o aoa•...� ;vomm m Q.mONNMUEENUM■d'mmsaQuum� s�m�■or m �m■o.�.� ueR..n i I I 3 10' is, 20' 25- DIAMETER (Ft.) Figure 8.06c Rev. 12/93 8.06.5 0 La=3XDo=3x1.5=4.5ft Use min La =10 ft Width at beginning of apron: W = 3Do = 3x1.5 = 4.5 ft use 5 ft. Width at end of apron: W=Do+La=1.5+10= 11.5 ft, use 12 ft tU o N APRON MATERIAL LENGTH OF APRON TO PROTECT CULVERT L1 TO PREVENT SCOUR HOLE USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 X Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x D. 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.M4 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 North Swaie Source: Appendix 8 in NC Erosion and Sediment 18" RCP Control Planning and Design Manual, dated May Appendices 2013 NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: `Bank and channel lining procedures", New York Department of Transportation, Division of Design and Construction, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Quo (3) V fu11 (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, D = A0 where A. = cross -sectional area of flow at outlet. 0 For multiple culverts, use Do =1.25 x Do of single culvert. Step 3) For apron grades of 100/6 or steeper, use recommendations For next higher zone. (Zones 1 through 6). 010 = 4.7 cfs Do = 1.5 ft =18 inches Vo = 4.2 fps r mrr�m�vsm�ma�v� Cit 5— 0 it xi 3d +d qY 0' S' Figure 8.06c dim Q'm�It lei ��aaaaao �aaauo®o►•��fr3i - ��m��mn Q� �mz��iu's-mm® Q=1�ma�7 ®QQ .-.....�oa o te .m®aOWMAIREnEWE �o� �<O fa8�i0i�RQIlOII�Ofi�1�RQf�7 'm R11�`�nml�l.�Qt1�mLQ��am�1� �m u�mn��amnm�umsnoumm�-�mm� � �aom®aia®o I I I- - -I 10' 15' 20' 25' DIAMETER (Ft.) Rev. 12/93 8.06.5 B La = 3xDo = 3x1.5 = 4.5 ft Use min La =10 ft Width of riprap: W = 3Do = 3x1.5 = 4.5 ft use 5 ft. W Z 0 N APRON MATERIAL LENGTH OF APRON TO PROTECT CULVERT L1 TO PREVENT SCOUR HOLE USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 X Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x D. 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 Source: Appendix 8 in NC Erosion and Sediment South Swale 1 Control Planning and Design Manual, dated May Appendices 2013 NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: `Bank and channel lining procedures", New York Department of Transportation; Division of Design and Construction; 1971.) NOTE: To use the following chart you must know: (1) Q fiili capacity (2) Q,0 (3) V fitll (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel. outlets, Do = A. where A. = cross -sectional area of flow at outlet. For multiple culverts, use Do = 1.25 x D„ of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 010 = 6.0 cfs Do = Ao =1.9 ft^2 = 23 inches Vo=3.3fps 0' 5' 10' 15' 20' 25 DIAMETER (Ft.) Figure 8.06c Rev. 12/93 8.06.5 0 La = 3xDo = 3x1.9 = 5.7 ft Use min La =10 ft Width at beginning of apron: W = 3Do = 3x1.9 = 5.7 ft use 6 ft. Width at end of apron: W=Do+La=1.9+10= 11.9 ft, use 12 ft W Z 0 N APRON MATERIAL LENGTH OF APRON TO PROTECT CULVERT L1 TO PREVENT SCOUR HOLE USE L2ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 X Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 X D,, 6 x D. 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x Do 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x D. PSPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 5501bs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev.12/93 5outn 5waie 1 Source: Appendix 8 in NC Erosion and Sediment 18" RCP Control Planning and Design Manual, dated May Appendices 2013 NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: `Bank and channel lining procedures", New York Department of Transportation; Divi.si.on. of Design and Constry Lion, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Q10 (3) V full (4) V10 where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERT APRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts Do is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = A. where A. = cross -sectional area of flow at outlet. For multiple culverts, use Do =1.25 x Do of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 010 = 5.6 cfs Do = 1.5 ft =18 inches Vo=4.6fps 0' 5' 10' 15' M. 26 DIAMETER (Ft.) Figure 8.06c Rev. 12/93 8.06.5 0 La = 3xDo = 3x1.5 = 4.5 ft Use min La -10 ft Width of riprap: W = 3Do = 3x1.5 = 4.5 ft use 5 ft. w Z 0 N APRON MATERIAL LENGTH OF APRON TO PROTECT CULVERT L1 TO PREVENT SCOUR HOLE USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 X DO 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x D. 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x Da 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNE, L LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-500 lbs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev. 12/93 Source: Appendix 8 in NC Erosion and Sediment South Swale 2 Control Planning and Design Manual, dated May Appendices 2013 NEW YORK DOT DISSIPATOR METHOD FOR USE IN DEFINED CHANNELS (Source: `Bank and channel lining procedures", New York Department of Transportation, Division of Design. and Construction, 1971.) NOTE: To use the following chart you must know: (1) Q full capacity (2) Q10 (3) V full (4) Vio where Q = discharge in cfs and V = Velocity in FPS. ESTIMATION OF STONE SIZE AND DIMENSIONS FOR CULVERTAPRONS Step 1) Compute flow velocity V at culvert or paved channel outlet. Step 2) For pipe culverts R is diameter. For pipe arch, arch and box culverts, and paved channel outlets, Do = A,,where A. = cross -sectional area of flow at outlet. For multiple culverts, use Do = 1.25 x D , of single culvert. Step 3) For apron grades of 10% or steeper, use recommendations For next higher zone. (Zones 1 through 6). 010 = 5.7 cfs Do=Ao=2.3ft"2=28inches Vo = 2.5 fps 2s lam= 5- 0 ¢ ai aC sa 0' S' Figure 8.06c I�7Q�0� fll®� nmvooc�'®a®� Q.®.va�>.mm®qua �am.ams �►�a�®c��®o mom O alp .\mom /SOL!\�f® - - -- QO O Mm�l� 0►' 11�.1 om Wm>o�►'mmr mM MImSURK1�m-�fommaomms-�m� I I 1 I 10' 15' 20' 25' DIAMETER (Ft.) Rev. 12/93 8.06.5 B La = 3xDo = 3x2.3 = 6.9 ft Use min La = 10 ft Width at beginning of apron: W = 3Do = 3x2.3 = 6.9 ft use 8 ft. Width at end of apron: W = Do + La = 2.3+10 12.3 ft, use 13 ft to Z 0 N APRON MATERIAL LENGTH OF APRON TO PROTECT CULVERT L1 TO PREVENT SCOUR HOLE USE L2 ALWAYS L2 1 STONE FILLING (FINE) CL. A 3 X Do 4 x Do 2 STONE FILLING (LIGHT) CL. B 3 X Do 6 x Do 3 STONE FILLING (MEDIUM) CL. 1 4 X Do 8 x Do 4 STONE FILLING (HEAVY) CL. 1 4 X Do 8 x Do 5 STONE FILLING (HEAVY) CL. 2 5 X Do 10 x Da 6 STONE FILLING (HEAVY) CL. 2 6 X Do 10 x Do 7 SPECIAL STUDY REQUIRED (ENERGY DISSIPATORS, STILLING BASIN OR LARGER SIZE STONE). Figure 8.06d Width = 3 times pipe dia. (min.) DETERMINATION OF STONE SIZES FOR DUMPED STONE CHANNEL, LININGS AND REVETMENTS Step 1. Use figure 8.06.b.3 to determine maximum stone size (e.g. for 12 Fps = 20" or 550 lbs. Step 2. Use figure 8.06.b.4 to determine acceptable size range for stone (for 12 FPS it is 125-500 lbs. for 75% of stone, and the maximum and minimum range in weight should be 25-5001bs.). NOTE: In determining channel velocities for stone linings and revetment, use the following coefficients of roughness: Diameter Manning's Min. thickness (inches) "n" of lining (inches) Fine 3 0.031 9 12 Light 6 0.035 12 18 Medium 13 0.040 18 24 Heavy 23 0.044 30 36 (Channels) (Dissapators) 8.06.6 Rev.12193 Practice Standards and Specifications Table 6.15b Sizes for Riprap and Erosion Control Stone Specified by the N.C. Department of Transportation Depth of riprap =1.5 x max stone size: 6 x 1.5 = 9 inches Riprap Erosion Control Class Class Class Class 1 2 A B 5 to 200 lb 25 to 250 lb V to 6" 5" to 150 30% shall 60% shall weigh a weigh a minimum of 60 minimum of 100 ibs each lb each No more than No more than 10% tolerance 10% shall 5% shall weigh top and bottom weigh less than less than 50 lb sizes 15 lb each each Equally Equally distributed, distributed, no gradation no gradation specified specified source: North Carolina Aggregates Association on exposure to water or weathering, and suitable in all other respects for the purpose intended. The specific gravity of the individual stones should be at least 2.5. Size of stone —The sizes of stones used for riprap protection are determined by purpose and specific site conditions. • Slope stabilization—Riprap stone for slope stabilization, not subject to flowing water or wave action, should be sized for stability for the proposed grade. The gradient of the slope to be stabilized should be less than the natural angle of repose of the stone selected. Angle of repose of riprap stones may be estimated from Figure 6.15a. Riprap used for surface stabilization of slopes does not add significant resistance to sliding or slope failure, and should not be considered a retaining wall. The inherent stability of the soil must be satisfactory before riprap is used for surface stabilization. Slopes approaching 1.5:1 may require special stability analysis. Outlet protection —Design criteria for sizing stone, and determining the dimensions of riprap pads at channel or conduit outlets are presented in Practice 6.41, Outlet Stabilization Structure. • Channel stabilization and streambank protection —Design criteria for sizing stone for stability of channels are contained in Appendix 8.05. Filter blanket A filter blanket is a layer of material placed between the riprap and the underlying soil to prevent soil movement into or through the riprap. 6.15.3 Appendi) Spread Analysis and Catch B__... nith 27S East Driveway - Proposed CB for North Swale West Driveway - Proposed Spread Subck eac Link 124 4orth 40R 4-- oss CB for South Swale 1 South Driveway - Proposed Spread Sc Brunswick WTP Ex and Pr rev3 Type 111 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCADO 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Page 2 Time span=0.00-72.00 hrs, dt=0.01 hrs, 7201 points x 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment27S: East Driveway- Runoff Area=23,174 sf 38.78% Impervious Runoff Depth=2.93" Flow Length=393' Tc=10.4 min CN=62 Runoff=1.55 cfs 0.130 of Subcatchment120NS: South Driveway- Runoff Area=3,376 sf 57.17% Impervious Runoff Depth=4.09" Tc=6.0 min CN=73 Runoff=0.37 cfs 0.026 of Subcatchment120SS: South Driveway- Runoff Area=17,121 sf 57.54% Impervious Runoff Depth=4.09" Tc=6.0 min CN=73 Runoff=1.89 cfs 0.134 of Subcatchmentl40S: West Driveway- Runoff Area=17,605 sf 36.09% Impervious Runoff Depth=2.73" Tc=6.0 min CN=60 Runoff=1.26 cfs 0.092 of Reach 40R: CB for South Swale 1 Inflow=2.26 cfs 0.160 of Outflow=2.26 cfs 0.160 of Reach 51 R: CB for North Swale Inflow=1.26 cfs 0.092 of Outflow=1.26 cfs 0.092 of Brunswick WTP Ex and Pr rev3 Type I// 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HydroCADS 10.00-19 s/n M15318 © 2016 HydroCAD Software Solutions LLC Paae 3 Summary for Subcatchment 27S: East Driveway- Proposed Runoff = 1.55 cfs @ 12.15 hrs, Volume= 0.130 af, Depth= 2.93" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 8,987 98 Impervious areas, HSG A 14,187 39 >75% Grass cover, Good, HSG A 23,174 62 Weighted Average 14,187 61.22% Pervious Area 8,987 38.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.3 50 0.0067 0.11 Sheet Flow, Grass Grass: Short n= 0.150 P2= 4.62" 0.7 24 0.0067 0.57 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 0.9 69 0.0325 1.26 Shallow Concentrated Flow, Grass Short Grass Pasture Kv= 7.0 fps 1.5 250 0.0190 2.80 Shallow Concentrated Flow, Paved road Paved Kv= 20.3 fps 10.4 393 Total Summary for Subcatchment 120NS: South Driveway - Proposed Spread North Runoff = 0.37 cfs @ 12.09 hrs, Volume= 0.026 af, Depth= 4.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 1,930 98 Impervious areas, HSG A 1,446 39 >75% Grass cover, Good, HSG A 3,376 73 Weighted Average 1,446 42.83% Pervious Area 1,930 57.17% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Brunswick WTP Ex and Pr rev3 Type ill 24-hr 10-Year, 24-hr Rainfall=7.18" Prepared by CDM Smith Printed 8/15/2019 HvdroCAD®10.00-19 s/n M15318 © 2016 HvdroCAD Software Solutions LLC Page 4 Summary for Subcatchment 120SS: South Driveway - Proposed Spread South Runoff = 1.89 cfs @ 12.09 hrs, Volume= 0.134 af, Depth= 4.09" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 9,852 98 Impervious areas, HSG A 7,269 39 >75% Grass cover, Good, HSG A 17,121 73 Weighted Average 7,269 42.46% Pervious Area 9,852 57.54% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Subcatchment 140S: West Driveway - Proposed Spread Runoff = 1.26 cfs @ 12.09 hrs, Volume= 0.092 af, Depth= 2.73" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs Type III 24-hr 10-Year, 24-hr Rainfall=7.18" Area (sf) CN Description 6,353 98 Impervious areas, HSG A 11,252 39 >75% Grass cover, Good, HSG A 17,605 60 Weighted Average 11,252 63.91 % Pervious Area 6,353 36.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.0 Direct Entry, Direct entry by inspection Summary for Reach 40R: CB for South Swale 1 [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 0.471 ac, 57.48% Impervious, Inflow Depth = 4.09" for 10-Year, 24-hr event Inflow = 2.26 cfs @ 12.09 hrs, Volume= 0.160 of Outflow = 2.26 cfs @ 12.09 hrs, Volume= 0.160 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 Brunswick WTP Ex and Pr rev3 Type 111 24-hr 90-Year, 24-hr Rainfall=7.98" Prepared by CDM Smith Printed 8/15/2019 HydroCAD®10.00-19 s/n M15318 ©2016 HydroCAD Software Solutions LLC Paae 5 Summary for Reach 51 R: CB for North Swale [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 0.404 ac, 36.09% Impervious, Inflow Depth = 2.73" for 10-Year, 24-hr event Inflow = 1.26 cfs @ 12.09 hrs, Volume= 0.092 of Outflow = 1.26 cfs @ 12.09 hrs, Volume= 0.092 af, Atten= 0%, Lag= 0.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.01 hrs / 3 r� 7 a to r! I� o F- 0 -t rn is LD W LD LD Y Vi to Lq vi 0 0 0 O oo c in ui r-I N O O to O O O O O O O O N N N N k H M M cn M O O O O Coco .... IOU O O O O +�+ a O N O N O N O N 3 L cn Rt CA Lo ;? r-1 O r-1 r-I 0 ar r� m v L 4- 3 N ` C O Z N O O ~ O ~ 41 O L C c� 4. to O Z O Z Q O F Ln m two 3 � j N > > o I= o L ir- c4�i1 3 In W Hydraulic Analysis Report Project Data Project Title: Northwest Water Treatment Plant - Brunswick County Designer: DVelardocchia Project Date: Tuesday, June 25, 2019 Project Units: U.S. Customary Units Notes: "" Curb and Gutter Analysis: Curb and Gutter Analysis North Swale Notes: Parameters Longitudinal Slope of Road: 0.0130 (ft/ft) Cross -Slope of Pavement: 0.0200 (ft/ft) Cross -Slope of Gutter: 0.0200 (ft/ft) Mannings: 0.0130 Gutter Width: 0.5400 (ft) Design Flow: 2.0200 (cfs) Width of Spread: 8.2634 (ft) Gutter Depression: 0.0000 (in) Area of Flow: 0.6828 (ft^2) Eo (Gutter Flow to Total Flow): 0.1651 Gutter Depth at Curb: 1.9832 (in) Inlet Location: Inlet in Sag Percent Clogging: 0.0000 % Inlet Type: Equal -length Combo Grate Type: P - 1-1/8 Grate Width: 2.1700 (ft) Grate Length: 3.0000 (ft) Length of Inlet: 3.0000 (ft) Curb opening height: 8.0000 (in) Local Depression: 2.0000 (in) Perimeter: 7.3400 (ft) Effective Perimeter: 7.3400 (ft) Area: 6.4060 (ft"2) Effective Area: 6.4060 (ft^2) Depth at center of grate: 0.2034 (ft) Computed Width of Spread at Sag: 10.4401 (ft) Flow type: Weir Flow Efficiency: 1.0000 Curb and Gutter Analysis: Curb and Gutter Analysis South Swale 1 Notes: Parameters Longitudinal Slope of Road: 0.0110 (ft/ft) Cross -Slope of Pavement: 0.0200 (ft/ft) Cross -Slope of Gutter: 0.0200 (ft/ft) Mannings: 0.0130 Gutter Width: 1.0000 (ft) Design Flow: 2.4300 (cfs) Width of Spread: 9.1381 (ft) Gutter Depression: 0.0000 (in) Area of Flow: 0.8350 (ft^2) Eo (Gutter Flow to Total Flow): 0.2661 Gutter Depth at Curb: 2.1931 (in) Inlet Location: Inlet in Sag Percent Clogging: 0.0000 % Inlet Type: Equal -length Combo Grate Type: P -1-1 /8 Grate Width: 2.1700 (ft) Grate Length: 3.0000 (ft) Length of Inlet: 3.0000 (ft) Curb opening height: 8.0000 (in) Local Depression: 2.0000 (in) Perimeter: 7.3400 (ft) Effective Perimeter: 7.3400 (ft) Area: 6.4060 (ft"2) Effective Area: 6.4060 (ft"2) Depth at center of grate: 0.2301 (ft) Computed Width of Spread at Sag: 12.0035 (ft) Flow type: Weir Flow Efficiency: 1.0000 Curb and Gutter Analysis: Curb and Gutter Analysis Admin Building Notes: Parameters Longitudinal Slope of Road: 0.0300 (ft/ft) Cross -Slope of Pavement: 0.0200 (fUft) Cross -Slope of Gutter: 0.0200 (ft/ft) IMannings: 0.0130 Gutter Width: 1.0000 (ft) Design Flow: 6.8000 (cfs) Width of Spread: 11.1364 (ft) Gutter Depression: 0.0000 (in) Area of Flaw: 1.2402 (ft^2) Eo (Gutter Flow to Total Flow): 0.2221 Gutter Depth at Curb: 2.6727 (in) Inlet Location: Inlet in Sag Percent Clogging: 0.0000 % Inlet Type: Grate Grate Type: P - 1-1/8 Grate Width: 2.1700 (ft) Grate Length: 6.0000 (ft) Local Depression: 2.0000 (in) Perimeter: 10.3400 (ft) Effective Perimeter: 10.3400 (ft) Area: 7.8120 (ft"2) Effective Area: 7.8120 (ft^2) Depth at center of grate: 0.3636 (ft) Computed Width of Spread at Sag: 18.6781 (ft) Flow type: Weir Flow Efficiency: 1.0000