HomeMy WebLinkAboutSW7170706_Final Permit_20170823Energy, Mineral &
Land Resources
ENVIRONMENTAL QUALITY
August 23, 2017
Barnhill Contracting Company
Attn: Mr. Shannon Douglas
1304 US17 South
Elizabeth City, NC 27909
ROY COOPER
cuve,nor
MICHAEL S. REGAN
Secretary
TRACY DAVIS
Director
Subject: Stormwater Permit No. SW7170706
Asphalt Plant Site - Sungro Drive
Low Density Stormwater Project
Pasquotank County
Dear Mr. Douglas:
The Washington Regional Office received your stormwater application on July 24,
2017, for the subject project. Staff review of the plans and specifications has determined
that the project, as proposed, will comply with the Stormwater Regulations set forth in
Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7170706 dated August 23,
2017 for the construction of the subject project.
This permit shall be effective from the date of issuance until rescinded and shall
be subject to the conditions and limitations as specified therein, and does not supersede
any other agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable,
you have the right to request an adjudicatory hearing upon written request within thirty
(30) days following receipt of this permit. This request must be in the form of a written
petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-
6714. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter,
please contact this office at (252) 946-6481.
Sincerely,
Samir Dumpor, PE
Regional Engineer
cc: Eastern Carolina Engineering, PC
Elizabeth City Planning/Inspections
Washington Regional Office
Nothing Compares_
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mall I Washington. NC 27889
252 946 6481
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STORMWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Barnhill Contracting Company
Asphalt Plant — Sungro Site
FOR THE
construction, operation and maintenance of a low density project in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications, and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral, and
Land Resources (Division) and considered a part of this permit for a new asphalt plant
site located at 841 Sungro Drive in Elizabeth City, NC.
This permit shall be effective from the date of issuance until rescinded and shall be subject
to the following specific conditions and limitations:
I. DESIGN STANDARDS
This permit is for the construction of a new asphalt plant site on an existing 20-
acre industrial site. The total proposed impervious area for this project, including
the existing built -upon area, will be 11.2 acres.
2. The overall tract built -upon area percentage for the project must be maintained at
or below 24%, as required by Section 2H .1005 of the stormwater rules.
Approved plans and specifications for projects covered by this permit are
incorporated by reference and are enforceable parts of the permit and shall be kept
on file by the permittee at all times.
The only runoff conveyance systems allowed will be vegetated conveyances such
as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules
and approved by the Division.
5. No piping is allowed except that minimum amount necessary to direct runoff
beneath an impervious surface such as a road or to provide access.
6. The built -upon areas associated with this project shall be located at least 50 feet
landward of all perennial and intermittent streams or other surface waters.
Nothing Compares
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, NC 27889
252 946 6481
Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated
with the permitted development, except for average driveway crossings, is strictly
prohibited by any persons.
The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modifications to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of the project area in whole or in
part. The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering or piping any vegetative conveyance shown on the
approved plan.
8. Swales and other vegetated conveyances shall be constructed in their entirety,
vegetated, and be operational for their intended use prior to the construction of any
built -upon surface.
9 During construction, erosion shall be kept to a minimum and any eroded areas of
the swales or other vegetated conveyances will be repaired immediately.
10 The permittee shall at all times provide the operation and maintenance necessary
to operate the permitted stormwater management systems at optimum efficiency
to include:
a. Inspections
b Sediment removal.
C. Mowing, and re -vegetating of the side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
11. Within 30 days of completion of the project, the permittee shall certify in writing
that the project has been constructed in accordance with the approved plans.
12. The permittee shall submit all information requested by the Director or his
representative within the time frame specified in the written information request.
III. GENERAL CONDITIONS
This permit is not transferable to any person or entity except after notice to and
approval by the Director. The Director may require modification or revocation and
re -issuance of the permit to change the name and incorporate such other
requirements as may be necessary. In the event of a name or ownership change,
a completed Name/Ownership Change form, signed by both parties, must be
submitted to the Division accompanied by the supporting documentation as listed
on page 2 of the form. The approval of this request will be considered on its merits,
and may or may not be approved.
Nothing Compares
State of North Carolina I Environmental Quality 1 Energy, Mineral and Land Resources
Washington Regional Office 1 943 Washington Square Mall I Washington, NC 27889
252 946 6481