Loading...
HomeMy WebLinkAboutSW7170706_Final Permit_20170823Energy, Mineral & Land Resources ENVIRONMENTAL QUALITY August 23, 2017 Barnhill Contracting Company Attn: Mr. Shannon Douglas 1304 US17 South Elizabeth City, NC 27909 ROY COOPER cuve,nor MICHAEL S. REGAN Secretary TRACY DAVIS Director Subject: Stormwater Permit No. SW7170706 Asphalt Plant Site - Sungro Drive Low Density Stormwater Project Pasquotank County Dear Mr. Douglas: The Washington Regional Office received your stormwater application on July 24, 2017, for the subject project. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7170706 dated August 23, 2017 for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded and shall be subject to the conditions and limitations as specified therein, and does not supersede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699- 6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact this office at (252) 946-6481. Sincerely, Samir Dumpor, PE Regional Engineer cc: Eastern Carolina Engineering, PC Elizabeth City Planning/Inspections Washington Regional Office Nothing Compares_ State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington. NC 27889 252 946 6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Barnhill Contracting Company Asphalt Plant — Sungro Site FOR THE construction, operation and maintenance of a low density project in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit for a new asphalt plant site located at 841 Sungro Drive in Elizabeth City, NC. This permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: I. DESIGN STANDARDS This permit is for the construction of a new asphalt plant site on an existing 20- acre industrial site. The total proposed impervious area for this project, including the existing built -upon area, will be 11.2 acres. 2. The overall tract built -upon area percentage for the project must be maintained at or below 24%, as required by Section 2H .1005 of the stormwater rules. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit and shall be kept on file by the permittee at all times. The only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 5. No piping is allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent streams or other surface waters. Nothing Compares State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, NC 27889 252 946 6481 Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the permitted development, except for average driveway crossings, is strictly prohibited by any persons. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modifications to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area in whole or in part. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, altering or piping any vegetative conveyance shown on the approved plan. 8. Swales and other vegetated conveyances shall be constructed in their entirety, vegetated, and be operational for their intended use prior to the construction of any built -upon surface. 9 During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately. 10 The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b Sediment removal. C. Mowing, and re -vegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. 11. Within 30 days of completion of the project, the permittee shall certify in writing that the project has been constructed in accordance with the approved plans. 12. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and re -issuance of the permit to change the name and incorporate such other requirements as may be necessary. In the event of a name or ownership change, a completed Name/Ownership Change form, signed by both parties, must be submitted to the Division accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits, and may or may not be approved. Nothing Compares State of North Carolina I Environmental Quality 1 Energy, Mineral and Land Resources Washington Regional Office 1 943 Washington Square Mall I Washington, NC 27889 252 946 6481