Loading...
HomeMy WebLinkAboutNCC204096_ESC Approval Submitted_20201001Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: September I I1h 2020 LETTER OF APPROVAL WITH MODIFICATIONS Barry P. Marcus GS Statesville Green Land, LLC cr'o Greenfield Partners, LLC 2 Post Road West Westport, CT 06880 RE: Project Name: Project Big Bertha Acres Approved with Modifications: 72.6 Project ID: STVLE-2021-015 Project Location: PIN 4752150203.000 Submitted By: Oak Engineering Date Received: August 24"' 2020 Plan Type: New Dear Mr. Marcus: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by IredeIl County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Appendix H of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix H of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Letter of Approval with Modifications Project Big Bertha September 11'h 2020 Page 2 of 3 Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute l I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. It is the responsibility of the applicant to obtain all other required permits or approvals. As of May 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Failure to notify this office of the starting date may result in a Notice of Violation and civil penalty. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, �Za7vti ,;, Jonathan Williams Erosion Control Inspector II Enclosures: Modifications Letter of Approval with Modifications Project Big Bertha September 1 l `h 2020 Page 3 of 3 Fact Sheet on the New NCG01 Permit Permit MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Project Big Bertha Project ID: STVLE-2021-015 County: Iredell Reviewed by: Jonathan Williams Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Add an emergency spillway to Temporary Skimmer Basin 1 and provide detail including trial weir length (minimum of 9.8 feet) and trial weir depth of flow (minimum of 0.7 feet). —RC 2. Adjust Temporary Skimmer Basin 1 skimmer orifice size to 1.5 inches to dewater the required volume of 7,380 ft3 in as close to 3 days' (3.11 days) time possible. —RC 3. Turn silt fence up at all basin skimmer outlets to discharge treated water directly outside the limits of disturbance. —RC 4. Provide protected inlet entry into basins for diversions fed to basins by natural draws of the land in Phase 1. -SC 5. Adjust Riser Sediment Basin 3 skimmer size to 2.5 inches and orifice size to 2 inches in Phase 2 to dewater the required volume of 13,896 ft3 in as close to 3 days' (3.30 days) time possible. —SC 6. Adjust Riser Sediment Basin 2 skimmer orifice size to 3.5 inches in Phase 2 to dewater the required volume of 48,924 ft3 in as close to 3 days' (3.00 days) time possible. —SC