Loading...
HomeMy WebLinkAboutSW3200601_Add Info_20200728ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Della Shaw, PE 421 Fayetteville Street, Suite 600 Raleigh, NC 27601 NORTH CAROLINA Environmental Quality July 28, 2020 Subject: Request for Additional Information Stormwater Permit No. SW3200601 Speedway Substation Cabarrus County Dear Ms. Shaw: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on June 24, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The signing official for the Applicant, Swinerton Builders is not listed on the Secretary of State information page (Section III, 1a & Section VI 11). Please provide official documentation showing that Jennifer Kirby can sign on behalf of Swinerton Builders. 2. Based on the USGS topographic map of the area, it appears that there are surface waters located within the project area (Section IV, 6, Section VI, 8h & Section VI, 8p). The drainage feature in the southeastern corner of the property, downstream of the off -site pond is shown on the USGS topographic map so it should be considered in accordance with 15A NCAC 02H .1017(10). Please include the surface waters in the Application, show the surface water area (in acres or square feet) in the plan set, and include the requisite vegetated buffer. 3. Please ensure that the proposed percent impervious area is calculated correctly (Section IV, 8). The Application indicates that there are 1.35 acres of new BUA proposed and that the total project area is 10 acres (1.35 ac / 10.0 ac = 13.5% not 13.7%). Please revise as needed for consistency. 4. There appears to be an inconsistency in the amount of proposed BUA that will be added for this project. Section IV, 10 of the Application ant the calculations show that there will be 1.35 acres (1.02 acres + 0.33 acres) of proposed BUA whereas the Plans (C0.0), DNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources E Q�� _ 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH C aROLINA oan.rtm.M iEnvironmental auaiN F ` 919.707.9200 Section IV, 8, and the Stormwater Narrative indicate that there will be 1.37 acres of prosed BUA. Please revise for consistency. 5. Generally with a low density project, the drainage area, as reported in Section IV, 10, is taken to be the entire site (Since there are no proposed SCMs). However, in cases where a low density project spans multiple watersheds (Such as this project), the entire site area is still reported in Section IV, 10, but is divided among the watersheds (We do not require drainage areas to a POA to be shown unless there are State quantity requirements for a project, but this project does not have any). Since there is no proposed BUA located outside of the shown drainage areas, the "Total Drainage Area" line of the table in Section IV, 10 can be updated so that the sum of this value for the two drainage areas adds up to the project area, 10.0 acres (Section IV, 7). The "On -site Drainage Area" and Proposed Impervious Area" lines will need to be updated as well. 6. It is strongly recommended to complete a Supplement EZ form and O&M Agreement form since the provided form has not been updated since 2009 (Section V). Both forms can be found at the following link: https://deq.nc.gov/about/divisions/energy-mineral- land-resources/energy-mineral-land-permit-guidance/stormwater-bmp-manual. If you decide to keep using the provided Low Density Supplement, please make the following changes to the form: a. First Page: i. Allowable Built Upon Area Per Lot - This value should be in square feet and should be taken from the "Uniform Lot Size" calculation on the second page of the form. Also, the maximum allowable BUA percentage for this project is 24% (Please refer to 15A NCAC 02H .1017(4) for more information). This should also be changed in the Stormwater Narrative. b. Second Page: i. Please complete the "Uniform Lot Size" calculation at the top of the page. 7. Please provide original initials on all included items of the Supplemental Requirements Checklist (Section VI) per the Application. 8. Section IV, 3 - This item is required, but either has been provided (In the form of the Low Density Supplement Form), or will be provided (In the form of a Supplement-EZ Form and an O&M Agreement Form). Please initial this item. 9. Please provide a USGS topographic map clearly showing the project area (Section VI, 6). 10. Please dimension the Project Area Boundary on the plans and include the bearings and distances (Section VI, 8i). 11. Please delineate the wetlands on the plans or provide a note stating that no wetlands exist (Section VI, 8m). It is noted that there is a note in the General Notes that states wetlands will not be affected by this project, however a note stating that there are no wetlands on - site must be included if there are no wetlands on -site. 12. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hgps://edocs.deq.nc.gov/Forms/SW Project Submittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to August 27, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3200601 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Jim.Farkas@ncdenr.gov or (919) 707-3646. Sincerely, )evd� Jim Farkas Environmental Engineer Stormwater Program cc: Mooresville Regional Office