HomeMy WebLinkAboutNCS000156_Email re DMR_20200909McCoy, Suzanne
From:
McCoy, Suzanne
Sent:
Wednesday, September 9, 2020 3:04 PM
To:
ronald.bazinet@hexion.com
Subject:
NCS000156_Stormwater DMR
Good afternoon Ronald.
I wanted to take this opportunity to introduce you to an electronic way to submit the Stormwater Data Monitoring
Reports for Hexion.
How to Submit Paper DMRs Before eDMR is Implemented
The Stormwater Program is planning for NPDES Stormwater Industrial permitted facilities to use electronic
Data Monitoring Reports by January 1, 2022. Until your facility begins using eDMR, follow this NEW
procedure for submitting eDMRs:
• Download the applicable DMR from the NPDES Stormwater Industrial Individual website or the NPDES
Stormwater General Permit website.
• Complete, sign, scan and upload the DMR to the NPDES Stormwater Permit Data Monitoring Report (DMRj
Upload form within 30 days of receiving sampling results.
• Mail the original, signed hard copy of the DMR to the appropriate DEMLR Regional Office.
• Do not send DMRs to Central Files in Raleigh! (This is a change from the previous procedure.)
• Note that DMR forms have recently been updated.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Suzanne McCoy
Stormwater Program Administrative Specialist
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Physical: 512 N. Salisbury Street, Office 640K, Raleigh, NC 27604
Mailing: 1612 Mail Service Center, Raleigh, NC 27699-1612
Email: Suzanne.mccoyQncdenr.gov
Phone: 919-707-3640
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
-1- 0'
DE
NQrTT11 UAR( I.1
INWmIRIWhYM C7rdf9rhvwWI
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.