HomeMy WebLinkAboutSW5200702_SuppEZ-Signed_20200827SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name .... Snow Hill Road Pump Station 2 Project Area (ac) .... 21.91. .... 3 Coastal Wetland Area (ac) 0 .... 4 Surface Water Area (ac) 0 5 Is this project High or Low Density? Low 6 Does this..project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A - no surface water or buffers on site 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No ....................................................................................................................................................................................................................................................................................................................................................................................................................................................................................... NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond. 0 .. 14 Stormwater Wetland 0 15 Permeable Pavement 0 .... 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 .... 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 D Pond 0 23 StormFilter 0 .... 24 Silva Cell... 0 25 Bayfilter .... 0 .... 26 Filterra 0 IfflIOl l ldlic Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete, and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer ��N CAR�� Z��oF� �ss�oti���v SEAL 044600 � FNGI NE�-� OS O�jNNE E. ally signed by Corinne E. s,Date: 2020.08.27 14:58:37-0 Signature of Designer Wilson 'Wte DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this project have low density areas? Yes 4 If so number of i a areas drama low density g. 2 Is all/part of this project subject to previous rule 5 versions? No FQEMn ..aa P.M. DRAINAGE AREA INFORMATION Entire Site 4 Type of SCM N/A 5 ITotal drainage area (sq ft 670509 sf 6 Onsite drainage area (sq ft) 128117 sf 7 Offsite drainage area (sq ft) 542392 sf 8 Total BUA in project (sq ft) 34597 sf New BUA on subdivided lots (subject to permitting) 9 (sq ft) sf New BUA not on subdivided lots (subject to 10 permitting) (so 34597 sf 11 Offsite BUA (sq ft).... 218987 sf 12 Breakdown of new BUA not on subdivided lots: sf Parking (sq ft) 835 sf Sidewalk (sq ft) 2525 sf Roof (sq ft) 2830 sf Roadway (sq ft., .... sf.... Future (sq ft) sf.... Other, please specify in the comment box below (sq ft) 28407 sf New infiltrating permeable pavement on 13 subdivided lots (sq ft) sf New infiltrating permeable pavement not on 14 subdivided lots (sq ft) sf Existing BUA that will remain (not subject to 15 permitting) (sq ft) sf 16 Existing BUA that is already permitted (sq ft) sf 17 Existing BUA that will be removed (sq ft) 4449 sf 18 Percent BUA 8%....... 19 Design storm (inches) N/A 20 Design volume of SCM (cu ft) N/A 21 Calculation method for design volume N/A ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): Other = driveway, Removed impervious established prior to the baseline period (2001) for the Percent BUA calculation LID 1 LID 2 N/A N/A 228484 sf 442025 sf 27894 sf 100223 sf 200590 sf 341802 sf 9095 sf 25502 sf sf sf 9095 sf 25502 sf 135100 sf 83887 sf sf 835 sf sf 2525 sf.... sf 2830 sf.... sf sf .... .... sf sf 9095 sf 19312 sf sf sf sf sf sf sf..... sf..... 10% N/A N/A N/A sf sf .... 4449 sf 7%u .... N/A N/A N/A LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) 3H:1V 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 4.3 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (%) N/A 8 Bottom width of curb outlet swale(s) (feet) N/A 9 Maximum side slope of curb outlet swale(s) (H:V) N/A 10 Minimum length of curb outlet swale(s) (feet) N/A 11 Are treatment swales used instead of curb outlet swales? No 12 Is stormwater released at the edge of the setback as dispersed flow? Yes 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 Please use 00tnis space to provide any additional information about this low density project: Three swales are proposed to carry a majority of the site stormwater from the site. Two swales drain to the first drainage area, and one to the second drainage area. These swales are proposed with permanent lining to avoid erosive flows during and after construction, and to reduce velocities to below 4.5 Is. Outlet protection is used at one swale outlet that carries off -site flow to the forested area south of the site. All swales were designed with outlet protection to disperse and slow stormwater flow prior to entering existing channels and forested areas. Water that is not carried in vegetated swales will sheet flow toward existing drainage channels. Offsite drainage area from the Durham Tech Community C011ege Campus (constructed before the baseline date) will be connected to a new pipe designed for the 25-year storm to extend the discharge oint of the outflow to the south of the new drive wa .Outlet rotection was de ned for the 10- ear storm event. Swale Drainage BUA PerviousFO.41 Q Slope Va„ —F24 Flow depth # Area (ac) area(cfs) N (fps) (ft) ac __Laces 1 3.20 2.58 0.62 14.74 1.00 4.50 2.10 2 0.22 0.12 0.10 1.40 2.00 4.50 0.40 3 1.20 0.19 1.01 3.00 2.00 4.50 0.60 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28