HomeMy WebLinkAboutSW6200501_2020-07-17 SW & EC Narrative REV - Medlin SS_20200717TABLE OF CONTENTS NARRATIVES Site Location and Description Project Development Erosion Control Stormwater Management SUPPORT DOCUMENTS USGS Topography Map FEMA Floodplain Map NRCS Soils Information Stream Classification CALCULATIONS & ANALYSIS Stormwater Management Calculations Ditch Calculations Calculations Outlet Protection Calculations Sediment Basin Calculations SHWT Analysis 3 NARRATIVES Site Location & Description DSM Investment Properties, LLC, plans to develop a new outdoor self-storage lot located on NC 210 (PIN 0673-15-9630.000) in Angier, NC, on a 6.25 acre parcel that is cleared and unoccupied. The adjacent parcel is also included in this analysis to accommodate future development (3.34 ac for a total of 9.59 ac). The site is immediately south of the intersection of NC 210 and Matthews Mill Pond Road. Surrounding properties are residential and agricultural. The property is not in a flood hazard area as per FEMA map 3720068900J, dated May 2, 2006. The site is in the Cape Fear River basin. Figure 1 -Vicinity Map –Courtesy of Google Maps 2020 4 Project Development The Owner plans to construct a new outdoor self-storage facility totaling 158 spaces on the property in question. The property is zoned to GC (General Commercial) which is an acceptable zoning for the proposed use. The property recently received Town of Angier Board of Adjustment approval for the intended use. The property will be graded as need for the outdoor storage area with associated storm drainage and stormwater management. Utilities are not necessary for the intended use and none are proposed. There is an existing fire hydrant across the street from the property. Erosion Control The project will consist of clearing and grubbing and grading within the limits of disturbance on the erosion control plan. The property is privately owned. See owner information on cover sheet C-00. The site is currently undeveloped and cleared. Approximately 6.9 acres will be disturbed during construction. The maximum fill will be approx. 2 feet and maximum cut will be approximately 10 feet (pond excavation). This project will involve removal of topsoil and associated fill to construct the outdoor storage lot. A ditch system will be installed to convey stormwater to a permanent stormwater management area. The project is scheduled to begin construction in Summer 2020 with project completion and final stabilization by Fall 2020. The erosion and sediment control program for this project will include the installation of a suitable construction entrance, temporary silt fencing, silt fence outlets, and a sediment basin. The soils at this site are predominately Fuquay sandy loams (FaB) according to the NRCS and Harnett County soils information, which is a type B soil with Ksat ranges from moderately high to high. Soils information has been obtained through the USDA & NRCS website as well as Harnett County published soils information:http://websoilsurvey.nrcs.usda.gov/app/ for Web Soil Survey and Harnett County soil mapping for additional information. 5 Stormwater Management The site drains to the northwest corner and off-site to a pond on the adjacent parcel, also owned and managed by DSM Investment Properties. There is a requirement for detention of the 1-yr, 2-yr and 10- yr storm events per the Town of Angier Stormwater ordinance and NCDEQ standards. Additional future development was assumed to also drain to the pond in question as documented in the plans and calculations. The project area was analyzed with multiple points of analysis as shown on the enclosed plans (SEE SW-01 and SW-02) and as documented in the enclosed calculations. The proposed system incorporates a wet-pond facility which was modeled using Hydraflow Hydrographs by AutoDesk. The SCS method was utilized for determining pre/post flow rates. The wet pond provides the required reduction in post-development runoff rates as summarized in the excerpt below. It is the engineer’s opinion that this reduction meets the intent of the stormwater requirements and offers satisfactory performance. Water Quantity Summary Tables POA #1 (HYD #1, 9) Storm Event Pre-Development Peak Flow (cfs) Post-Development Peak Flow w/SCM (cfs) Net Change (cfs)Net Change (%) 1 yr 3.48 1.45 -2.03 -58% 2 yr 6.04 3.84 -2.21 -37% 10 yr 14.93 10.86 -4.07 -27% POA #2 (HYD #2, 10) Storm Event Pre-Development Peak Flow (cfs) Post-Development Peak Flow w/SCM (cfs) Net Change (cfs)Net Change (%) 1 yr 0.57 0.50 -0.07 -13% 2 yr 0.99 0.73 -0.26 -27% 10 yr 2.45 1.46 -0.99 -40% POA #3 (HYD #3, 11) Storm Event Pre-Development Peak Flow (cfs) Post-Development Peak Flow w/SCM (cfs) Net Change (cfs)Net Change (%) 1 yr 2.30 0.60 -1.70 -74% 2 yr 3.89 1.10 -2.80 -72% 10 yr 9.39 2.85 -6.53 -70% 6 TOTAL SITE (HYD# 4, 12) Storm Event Pre-Development Peak Flow (cfs) Post-Development Peak Flow w/SCM (cfs) Net Change (cfs)Net Change (%) 1 yr 6.35 1.55 -4.80 -76% 2 yr 10.89 4.10 -6.79 -62% 10 yr 26.76 14.84 -11.92 -45% Wet Detention Basin Water Quality Summary Required Provided Surface Area (ft2)8,238 9,953 Treatment Volume (ft3)19,122 19,343 Average Depth 3.0 3.84 Storm Drainage The project will require the use of ditch drainage to convey stormwater to the proposed stormwater wet pond. The ditches were sized for the 10-year storm and checked to ensure non-erosive flow. Refer to the calculations section for permanent ditch calculations. SUPPORT DOCUMENTS USGS Topo Map E N G I N E E R I N G Curry 205 S. Fuquay Avenue Fuquay-Varina, NC 27526 (919) 552-0849 (919) 552-2043 N C L I C . N O . P -0 7 9 9 T F MEDLIN SELF-STORAGE USGS 7.5 MINUTE MAP PROPERTY BOUNDARY SUPPORT DOCUMENTS FEMA Floodplain Map E N G I N E E R I N G Curry 205 S. Fuquay Avenue Fuquay-Varina, NC 27526 (919) 552-0849 (919) 552-2043 N C L I C . N O . P -0 7 9 9 T F MEDLIN SELF-STORAGE FEMA MAP PROPERTY BOUNDARY EFFECTIVE DATE: OCTOBER 3, 2006 MAP NUMBER: 3720066200J SUPPORT DOCUMENTS NRCS Soils Information E N G I N E E R I N G Curry 205 S. Fuquay Avenue Fuquay-Varina, NC 27526 (919) 552-0849 (919) 552-2043 N C L I C . N O . P -0 7 9 9 T F MEDLIN SELF-STORAGE NRCS SOILS MAP - 1970 PROPERTY BOUNDARY SUPPORT DOCUMENTS Stream Classification CALCULATIONS Stormwater Management Project #No Date Project Name 1 7/17/2020 Date 1)Calculate percent impervious draining to pond. Drainage Area =8.18 acres Road/Parking 3.97 ac Impervious Area =5.38 acres Future 1.41 ac % Imperv. =65.75 % 2)Find the volume of the 1.0" storm using the "Simple Method" (Schueler 1987): Rv = 0.05 + 0.009 (I) Rv = runoff coefficient (ratio of runoff to rainfall in inches) I = percent impervious Rv =0.642 in/in Volume of 1.0" storm (must exceed 3630 cf): WQv = 3630 x RD x Rv X A WQv = volume of runoof gnerated from design storm RD =Design storm =1 inch Rv = Runoff Coef =0.642 inch/inch A= Drainage Area = 8.18 acre WQv =19,055 ft 3 3)Determine Surface Area to Drainage Area Ratio & Surface of Permanent Pool (Water Quality) Desired Depth =3 ft Imp. %Ratio Lower Limit =60.00 2.09 Upper Limit =70.00 2.51 8,307 ft 2 Acutal =65.75 2.33 The volume of the 1" storm must be detained in the pond above the permanent pool and must be drawn down over a period of two to five days. Minimum SA Required = Project Data Revisions Description State Stormwater Comments WATER QUALITY & SURFACE AREA CALCUALTION Wet Detention Pond #1 2020-010 Medlin Shelf Storage 7/17/2020 Impervious Project #No Date Project Name 1 7/17/2020 Date Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf) 0 303 4156 0 0 Main Pool Vol = 32658 cf 1 304 5060 4608 4608 Main Pool SA = 9953 sf 2 305 5976 5518 10126 3 306 6923 6450 16576 4 307 7903 7413 23989 4.5 307.5 8411 4079 28067 5 308 9953 4591 32658 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)Main Pool Vol = 32658 cf 0 305 1093 0 0 Total Forebay Vol = 5854 cf 1 306 1629 1361 1361 Is Forebay ~ 15-20%YES 18% 2 307 2232 1931 3292 3 308 2892 2562 5854 Stage Level Elevation (ft) Area (sf) Stage Volume (cf) Cumulative Storage (cf)WQ Volume = 19055 cf 0 308 13678 0 0 Temp. Pool Vol = 19343 cf 0.5 308.5 15562 7310 7310 Volume Enough YES 1.25 309.25 16526 12033 19343 Average Depth Calculation: Vshelf = 378 cf Dmax over shelf =0.5 ft Peimeter =504 ft Width =3 ft VPP = 32658 cf Abottom of shelf =8411 sf Davg =3.84 ft Project Data Revisions 2020-010 Description Medlin Shelf Storage State Stormwater Comments 7/17/2020 POND VOLUMES Wet Detention Pond #1 Total Main Pool Permanent Pool Volume Check Total Forebay Volume Forebay Volume Check Temporary Pool Volume Temporary Pool Volume Check Project #No Date Project Name 1 7/17/2020 Date 1)Input Orifice and Spillway Information 2.00 in 0.60 Volume Provided =19,343 cf Number Orifices =1.00 Inv Orfice =308.00 Inv Primary Spillway =309.25 2)Calculate Area, Head and Discharge Flow g=32.2 ft/s2 h= use h/3 to simulate decreasing head A= cross section area of orifice Q= discharge cfs Q=discharge cfs 0.022 sf 0.417 feet 0.068 cfs 3)Calculate Drawn Down Time Time =Volume/Flowrate 3.30 days Check =OK Drawdown Time = Orifice Diameter = Orfice Coefficent = Orfice Cross Section Area = Average head = Discharge = 7/17/2020 WATER QUALITY VOLUME DRAW DOWN CALCULATION Wet Detention Pond #1 Project Data Revisions 2020-010 Description Medlin Shelf Storage State Stormwater Comments ghACQ20 Project #No Date Project Name 1 7/17/2020 Date Step 1.DETERMINE BOUYANT FORCES Volume = Depth * Area Depth = Riser Top Elev - Riser Bottom Elev Riser Top Elev. =310 ft Bottom of Riser Elev. =307.50 ft Riser Wall Thickness =6.00 in Diameter of Manhole =5.00 ft Area = pi * diameter^2 / 4 Area (@ outside diam)=28.27 sf Volume =70.69 cf times wt of water 62.4 lbs/cf Bouyant Force =4,411 lbs Step 2.DETERMINE COUNTERWEIGHT REQUIREMENTS Riser Top Top Elevation =310 Thickness =0 inches Outside Diam =6.00 ft Volume =0.00 cf Riser Walls Inside Diam =5.00 ft Wall Thickness =6.00 in Height =2.50 ft Volume =21.60 cf Riser Bottom - Extended Base Bottom Elevation =307.50 Diameter =0.00 ft Thickness=6.00 in Volume =0.00 cf 21.60 cf 150 lbs/cf 3,240 lbs 0.73 Y 2,494 lbs Step 3.ADD CONCRETE BELOW INVERT IN RISER 19.63 sf Volume Required =28.47 cf 1.45 ft 18 in 29.45 cf 2580 lb 1.32 Y Summary Amount of Concrete Required = Area of Riser (@inside diam) = Factor of Safety > 1.30 (Y/N) = Calculated Depth of Concrete = Actual Depth Used = Backcheck Volume = Backcheck Weight of Added Conc (150-62.4) = Factor of Safety = Total Volume = x unit weight of reinforced conc. CounterweIght = Factor of Safety Provided (FSP) = Additional Concrete Required (Y/N) = Add minimum 18 inches below invert of pond 7/17/2020 RISER ANTI-FLOATATION Wet Detention Pond #1 Project Data Revisions 2020-010 Description Medlin Shelf Storage State Stormwater Comments Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =5.31 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 5.31 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 4.50 ac 0.00 ac 0.81 ac Poor Fair Good 77 67 60 Fair - Agricultural Land Open Space Impervious Wooded Weighted CN Value Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Pre-Developed DA#1 Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =0.87 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 0.87 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 0.75 ac 0.00 ac 0.12 ac Poor Fair Good 77 67 60 Open Space Impervious Wooded Fair - Agricultural Land Weighted CN Value Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Pre-Developed DA#2 Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =3.41 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 3.41 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 3.18 ac 0.00 ac 0.23 ac Poor Fair Good 78 68 61 Open Space Impervious Wooded Fair - Agricultural Land Weighted CN Value Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Pre-Developed DA#3 Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =8.18 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 8.18 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 2.80 ac 5.38 ac 0.00 ac Poor Fair Good 91 88 85 Open Space Impervious Wooded Weighted CN Value Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Post-Developed DA#1 to SCM Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =0.37 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 0.37 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 0.37 ac 0.00 ac 0.00 ac Poor Fair Good 79 69 61 Open Space Impervious Wooded Weighted CN Value Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Post-Developed DA#2 By-Pass SCM Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =0.27 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 0.27 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 0.17 ac 0.10 ac Future 0.00 ac Poor Fair Good 86 80 75 Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Post-Developed DA#3 Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Open Space Impervious Wooded Weighted CN Value Project #No Date Project Name 1 7/17/2020 Date A B C D 68 79 86 89 49 69 79 84 39 61 74 80 Impervious Areas 98 98 98 98 83 89 98 98 76 85 89 91 72 82 85 88 Poor Condition 45 66 77 83 Fair Condition 36 60 73 79 Good Condition 30 55 70 77 1/8 acre or less 65 77 85 92 38 61 75 87 30 57 72 86 25 54 70 85 20 51 68 84 12 46 65 82 Drainage Area =0.78 ac Total Area in "A" Soils =0.00 ac Total Area in "B" Soils 0.78 ac Total Area in "C" Soils 0.00 ac Total Area in "D" Soils =0.00 ac Poor Fair Good 79 69 61 98 98 98 66 60 55 85 85 85 0.72 ac 0.06 ac Driveway 0.00 ac Poor Fair Good 80 71 64 Curve Numbers for Hydrologic Soil Group Project Data Revisions 2020-010 Description Medlin Self Storage State Stormwater Comments 7/17/2020 SOIL WEIGHTED CN VALUES Post-Developed DA#4 Residential Open Space (Lawns, Parks) Poor Condition Fair Condition Good Condition Parking Lots, Roofs Paved; Curbs Paved; Open Ditches Gravel Dirt Woods 1/4 acre 1/3 acre 1/2 acre 1 acre 2 acre Types of Soils with in Drainage Area Soil Area in Drainage Area Soil Name Hydrologic Group Fuquay B Land Uses in Sub-Basin Use the following CN Values for each Land Use Open Space = Impervious Surface = Wooded Area = Gravel Area = Open Space Impervious Wooded Weighted CN Value 1 2 3 4 6 7 8 9 10 11 12 1 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Project: Medlin Self Storage Routing.gpw Friday, 04 / 24 / 2020 Hyd.Origin Description Legend 1 SCS Runoff Pre-Development => DA#1 2 SCS Runoff Pre-Development => DA#2 3 SCS Runoff Pre-Development => DA#3 4 Combine Pre-Development Total 6 SCS Runoff Post Development => DA#1 To SCM 7 Reservoir SCM Routing 8 SCS Runoff Post Development => DA#1 By-Pass SCM 9 Combine Post Development => DA#1 Total 10 SCS Runoff Post Development => DA#2 11 SCS Runoff Post Development => DA#3 12 Combine Post Development Total Hydrograph Return Period Recap 2 Hyd. Hydrograph Inflow Peak Outflow (cfs)Hydrograph No.type hyd(s)Description (origin)1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 SCS Runoff ------3.481 6.044 --------------14.93 21.19 -------32.41 Pre-Development => DA#1 2 SCS Runoff ------0.570 0.990 --------------2.446 3.472 -------5.310 Pre-Development => DA#2 3 SCS Runoff ------2.295 3.894 --------------9.386 13.22 -------20.06 Pre-Development => DA#3 4 Combine 1, 2, 3 6.347 10.89 --------------26.76 37.80 -------57.65 Pre-Development Total 6 SCS Runoff ------24.59 32.67 --------------56.74 71.75 -------97.02 Post Development => DA#1 To SCM 7 Reservoir 6 1.430 3.769 --------------10.27 34.90 -------79.31 SCM Routing 8 SCS Runoff ------0.198 0.403 --------------1.178 1.738 -------2.761 Post Development => DA#1 By-Pass 9 Combine 7, 8 1.451 3.836 --------------10.86 35.79 -------81.71 Post Development => DA#1 Total 10 SCS Runoff ------0.496 0.727 --------------1.460 1.938 -------2.770 Post Development => DA#2 11 SCS Runoff ------0.602 1.097 --------------2.852 4.090 -------6.318 Post Development => DA#3 12 Combine 9, 10, 11 1.545 4.099 --------------14.84 38.78 -------89.55 Post Development Total Proj. file: Medlin Self Storage Routing.gpw Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strge used Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 SCS Runoff 3.481 1 725 11,904 ------------------Pre-Development => DA#1 2 SCS Runoff 0.570 1 725 1,950 ------------------Pre-Development => DA#2 3 SCS Runoff 2.295 1 725 7,986 ------------------Pre-Development => DA#3 4 Combine 6.347 1 725 21,840 1, 2, 3 ------------Pre-Development Total 6 SCS Runoff 24.59 1 718 49,923 ------------------Post Development => DA#1 To SCM 7 Reservoir 1.430 1 773 37,658 6 309.71 27,691 SCM Routing 8 SCS Runoff 0.198 1 719 532 ------------------Post Development => DA#1 By-Pass 9 Combine 1.451 1 772 38,190 7, 8 ------------Post Development => DA#1 Total 10 SCS Runoff 0.496 1 718 1,004 ------------------Post Development => DA#2 11 SCS Runoff 0.602 1 719 1,433 ------------------Post Development => DA#3 12 Combine 1.545 1 766 40,627 9, 10, 11 ------------Post Development Total Medlin Self Storage Routing.gpw Return Period: 1 Year Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 1 Pre-Development => DA#1 Hydrograph type = SCS Runoff Peak discharge = 3.481 cfs Storm frequency = 1 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 11,904 cuft Drainage area = 5.310 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.50 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Pre-Development => DA#1 Hyd. No. 1 -- 1 Year Hyd No. 1 TR55 Tc Worksheet 5 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 1 Pre-Development => DA#1 Description A B C Totals Sheet Flow Manning's n-value = 0.170 0.011 0.011 Flow length (ft)= 100.0 0.0 0.0 Two-year 24-hr precip. (in)= 3.70 0.00 0.00 Land slope (%)= 1.00 0.00 0.00 Travel Time (min)=13.29 +0.00 +0.00 =13.29 Shallow Concentrated Flow Flow length (ft)= 403.67 0.00 0.00 Watercourse slope (%)= 3.45 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s)=3.00 0.00 0.00 Travel Time (min)=2.24 +0.00 +0.00 =2.24 Channel Flow X sectional flow area (sqft)= 0.00 0.00 0.00 Wetted perimeter (ft)= 0.00 0.00 0.00 Channel slope (%)= 0.00 0.00 0.00 Manning's n-value = 0.000 0.015 0.015 Velocity (ft/s)=0.00 0.00 0.00 Flow length (ft)({0})0.0 0.0 0.0 Travel Time (min)=0.00 +0.00 +0.00 =0.00 Total Travel Time, Tc ..............................................................................15.50 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 2 Pre-Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 0.570 cfs Storm frequency = 1 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 1,950 cuft Drainage area = 0.870 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.90 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (hrs) Pre-Development => DA#2 Hyd. No. 2 -- 1 Year Hyd No. 2 TR55 Tc Worksheet 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 2 Pre-Development => DA#2 Description A B C Totals Sheet Flow Manning's n-value = 0.170 0.011 0.011 Flow length (ft)= 100.0 0.0 0.0 Two-year 24-hr precip. (in)= 3.70 0.00 0.00 Land slope (%)= 1.00 0.00 0.00 Travel Time (min)=13.29 +0.00 +0.00 =13.29 Shallow Concentrated Flow Flow length (ft)= 320.00 0.00 0.00 Watercourse slope (%)= 1.00 0.00 0.00 Surface description = Paved Paved Paved Average velocity (ft/s)=2.03 0.00 0.00 Travel Time (min)=2.62 +0.00 +0.00 =2.62 Channel Flow X sectional flow area (sqft)= 0.00 0.00 0.00 Wetted perimeter (ft)= 0.00 0.00 0.00 Channel slope (%)= 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s)=0.00 0.00 0.00 Flow length (ft)({0})0.0 0.0 0.0 Travel Time (min)=0.00 +0.00 +0.00 =0.00 Total Travel Time, Tc ..............................................................................15.90 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 3 Pre-Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 2.295 cfs Storm frequency = 1 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 7,986 cuft Drainage area = 3.410 ac Curve number = 68 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 17.70 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 8 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Pre-Development => DA#3 Hyd. No. 3 -- 1 Year Hyd No. 3 TR55 Tc Worksheet 9 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hyd. No. 3 Pre-Development => DA#3 Description A B C Totals Sheet Flow Manning's n-value = 0.400 0.170 0.011 Flow length (ft)= 10.0 90.0 0.0 Two-year 24-hr precip. (in)= 3.70 3.70 0.00 Land slope (%)= 1.00 1.50 0.00 Travel Time (min)=4.18 +10.39 +0.00 =14.56 Shallow Concentrated Flow Flow length (ft)= 302.00 0.00 0.00 Watercourse slope (%)= 1.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s)=1.61 0.00 0.00 Travel Time (min)=3.12 +0.00 +0.00 =3.12 Channel Flow X sectional flow area (sqft)= 0.00 0.00 0.00 Wetted perimeter (ft)= 0.00 0.00 0.00 Channel slope (%)= 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s)=0.00 0.00 0.00 Flow length (ft)({0})0.0 0.0 0.0 Travel Time (min)=0.00 +0.00 +0.00 =0.00 Total Travel Time, Tc ..............................................................................17.70 min Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 4 Pre-Development Total Hydrograph type = Combine Peak discharge = 6.347 cfs Storm frequency = 1 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 21,840 cuft Inflow hyds.= 1, 2, 3 Contrib. drain. area = 9.590 ac 10 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Pre-Development Total Hyd. No. 4 -- 1 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 6 Post Development => DA#1 To SCM Hydrograph type = SCS Runoff Peak discharge = 24.59 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 49,923 cuft Drainage area = 8.180 ac Curve number = 85 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 11 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Post Development => DA#1 To SCM Hyd. No. 6 -- 1 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 7 SCM Routing Hydrograph type = Reservoir Peak discharge = 1.430 cfs Storm frequency = 1 yrs Time to peak = 12.88 hrs Time interval = 1 min Hyd. volume = 37,658 cuft Inflow hyd. No.= 6 - Post Development => DA#1 To SCMMax. Elevation = 309.71 ft Reservoir name = Wet Pond #1 Max. Storage = 27,691 cuft Storage Indication method used. 12 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) SCM Routing Hyd. No. 7 -- 1 Year Hyd No. 7 Hyd No. 6 Total storage used = 27,691 cuft Pond Report 13 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Pond No. 1 - Wet Pond #1 Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 308.00 ft Stage / Storage Table Stage (ft)Elevation (ft)Contour area (sqft)Incr. Storage (cuft)Total storage (cuft) 0.00 308.00 13,678 0 0 0.50 308.50 15,562 7,310 7,310 1.00 309.00 16,526 8,022 15,332 2.00 310.00 18,495 17,511 32,843 3.00 311.00 20,521 19,508 52,351 4.00 312.00 22,604 21,563 73,913 5.00 313.00 24,744 23,674 97,587 Culvert / Orifice Structures Weir Structures [A][B][C] [PrfRsr][A][B][C][D] Rise (in)= 15.00 2.00 6.00 0.00 Span (in)= 15.00 2.00 6.00 0.00 No. Barrels = 1 1 3 0 Invert El. (ft)= 307.50 308.00 309.25 0.00 Length (ft)= 60.00 0.00 0.00 0.00 Slope (%)= 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes Yes No Crest Len (ft)= 15.71 40.00 0.00 0.00 Crest El. (ft)= 310.00 311.50 0.00 0.00 Weir Coeff.= 3.33 3.00 3.33 3.33 Weir Type = 1 Rect ------ Multi-Stage = Yes No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 200.0 220.0 240.0 Stage (ft) 0.00 308.00 1.00 309.00 2.00 310.00 3.00 311.00 4.00 312.00 5.00 313.00 Elev (ft) Discharge (cfs) Stage / Discharge Total Q Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 8 Post Development => DA#1 By-Pass SCM Hydrograph type = SCS Runoff Peak discharge = 0.198 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 532 cuft Drainage area = 0.370 ac Curve number = 61 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 14 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (hrs) Post Development => DA#1 By-Pass SCM Hyd. No. 8 -- 1 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 9 Post Development => DA#1 Total Hydrograph type = Combine Peak discharge = 1.451 cfs Storm frequency = 1 yrs Time to peak = 12.87 hrs Time interval = 1 min Hyd. volume = 38,190 cuft Inflow hyds.= 7, 8 Contrib. drain. area = 0.370 ac 15 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#1 Total Hyd. No. 9 -- 1 Year Hyd No. 9 Hyd No. 7 Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 10 Post Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 0.496 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,004 cuft Drainage area = 0.270 ac Curve number = 75 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 16 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (hrs) Post Development => DA#2 Hyd. No. 10 -- 1 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 11 Post Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 0.602 cfs Storm frequency = 1 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 1,433 cuft Drainage area = 0.780 ac Curve number = 64 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.05 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 17 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (hrs) Post Development => DA#3 Hyd. No. 11 -- 1 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 12 Post Development Total Hydrograph type = Combine Peak discharge = 1.545 cfs Storm frequency = 1 yrs Time to peak = 12.77 hrs Time interval = 1 min Hyd. volume = 40,627 cuft Inflow hyds.= 9, 10, 11 Contrib. drain. area = 1.050 ac 18 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development Total Hyd. No. 12 -- 1 Year Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Summary Report 19 Hyd. Hydrograph Peak Time Time to Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strge used Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 SCS Runoff 6.044 1 724 18,828 ------------------Pre-Development => DA#1 2 SCS Runoff 0.990 1 724 3,085 ------------------Pre-Development => DA#2 3 SCS Runoff 3.894 1 725 12,478 ------------------Pre-Development => DA#3 4 Combine 10.89 1 724 34,390 1, 2, 3 ------------Pre-Development Total 6 SCS Runoff 32.67 1 718 67,109 ------------------Post Development => DA#1 To SCM 7 Reservoir 3.769 1 738 54,698 6 310.09 34,568 SCM Routing 8 SCS Runoff 0.403 1 718 921 ------------------Post Development => DA#1 By-Pass 9 Combine 3.836 1 738 55,619 7, 8 ------------Post Development => DA#1 Total 10 SCS Runoff 0.727 1 718 1,461 ------------------Post Development => DA#2 11 SCS Runoff 1.097 1 718 2,361 ------------------Post Development => DA#3 12 Combine 4.099 1 737 59,441 9, 10, 11 ------------Post Development Total Medlin Self Storage Routing.gpw Return Period: 2 Year Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 1 Pre-Development => DA#1 Hydrograph type = SCS Runoff Peak discharge = 6.044 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 18,828 cuft Drainage area = 5.310 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.50 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 20 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Pre-Development => DA#1 Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 2 Pre-Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 0.990 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 3,085 cuft Drainage area = 0.870 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.90 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 21 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (hrs) Pre-Development => DA#2 Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 3 Pre-Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 3.894 cfs Storm frequency = 2 yrs Time to peak = 12.08 hrs Time interval = 1 min Hyd. volume = 12,478 cuft Drainage area = 3.410 ac Curve number = 68 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 17.70 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 22 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Pre-Development => DA#3 Hyd. No. 3 -- 2 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 4 Pre-Development Total Hydrograph type = Combine Peak discharge = 10.89 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 34,390 cuft Inflow hyds.= 1, 2, 3 Contrib. drain. area = 9.590 ac 23 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Pre-Development Total Hyd. No. 4 -- 2 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 6 Post Development => DA#1 To SCM Hydrograph type = SCS Runoff Peak discharge = 32.67 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 67,109 cuft Drainage area = 8.180 ac Curve number = 85 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 24 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Post Development => DA#1 To SCM Hyd. No. 6 -- 2 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 7 SCM Routing Hydrograph type = Reservoir Peak discharge = 3.769 cfs Storm frequency = 2 yrs Time to peak = 12.30 hrs Time interval = 1 min Hyd. volume = 54,698 cuft Inflow hyd. No.= 6 - Post Development => DA#1 To SCMMax. Elevation = 310.09 ft Reservoir name = Wet Pond #1 Max. Storage = 34,568 cuft Storage Indication method used. 25 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) SCM Routing Hyd. No. 7 -- 2 Year Hyd No. 7 Hyd No. 6 Total storage used = 34,568 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 8 Post Development => DA#1 By-Pass SCM Hydrograph type = SCS Runoff Peak discharge = 0.403 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 921 cuft Drainage area = 0.370 ac Curve number = 61 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 26 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (hrs) Post Development => DA#1 By-Pass SCM Hyd. No. 8 -- 2 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 9 Post Development => DA#1 Total Hydrograph type = Combine Peak discharge = 3.836 cfs Storm frequency = 2 yrs Time to peak = 12.30 hrs Time interval = 1 min Hyd. volume = 55,619 cuft Inflow hyds.= 7, 8 Contrib. drain. area = 0.370 ac 27 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Post Development => DA#1 Total Hyd. No. 9 -- 2 Year Hyd No. 9 Hyd No. 7 Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 10 Post Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 0.727 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 1,461 cuft Drainage area = 0.270 ac Curve number = 75 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 28 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (hrs) Post Development => DA#2 Hyd. No. 10 -- 2 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 11 Post Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 1.097 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,361 cuft Drainage area = 0.780 ac Curve number = 64 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 3.70 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 29 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#3 Hyd. No. 11 -- 2 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 12 Post Development Total Hydrograph type = Combine Peak discharge = 4.099 cfs Storm frequency = 2 yrs Time to peak = 12.28 hrs Time interval = 1 min Hyd. volume = 59,441 cuft Inflow hyds.= 9, 10, 11 Contrib. drain. area = 1.050 ac 30 0 5 10 15 20 25 30 35 40 45 50 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Post Development Total Hyd. No. 12 -- 2 Year Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Summary Report 31 Hyd. Hydrograph Peak Time Time to Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strge used Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 SCS Runoff 14.93 1 724 43,282 ------------------Pre-Development => DA#1 2 SCS Runoff 2.446 1 724 7,091 ------------------Pre-Development => DA#2 3 SCS Runoff 9.386 1 724 28,180 ------------------Pre-Development => DA#3 4 Combine 26.76 1 724 78,553 1, 2, 3 ------------Pre-Development Total 6 SCS Runoff 56.74 1 717 119,661 ------------------Post Development => DA#1 To SCM 7 Reservoir 10.27 1 727 107,018 6 311.31 59,062 SCM Routing 8 SCS Runoff 1.178 1 718 2,396 ------------------Post Development => DA#1 By-Pass 9 Combine 10.86 1 722 109,414 7, 8 ------------Post Development => DA#1 Total 10 SCS Runoff 1.460 1 718 2,959 ------------------Post Development => DA#2 11 SCS Runoff 2.852 1 718 5,749 ------------------Post Development => DA#3 12 Combine 14.84 1 719 118,122 9, 10, 11 ------------Post Development Total Medlin Self Storage Routing.gpw Return Period: 10 Year Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 1 Pre-Development => DA#1 Hydrograph type = SCS Runoff Peak discharge = 14.93 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 43,282 cuft Drainage area = 5.310 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.50 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 32 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 Q (cfs) Time (hrs) Pre-Development => DA#1 Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 2 Pre-Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 2.446 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 7,091 cuft Drainage area = 0.870 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.90 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 33 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Pre-Development => DA#2 Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 3 Pre-Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 9.386 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 28,180 cuft Drainage area = 3.410 ac Curve number = 68 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 17.70 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 34 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (hrs) Pre-Development => DA#3 Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 4 Pre-Development Total Hydrograph type = Combine Peak discharge = 26.76 cfs Storm frequency = 10 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 78,553 cuft Inflow hyds.= 1, 2, 3 Contrib. drain. area = 9.590 ac 35 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (hrs) Pre-Development Total Hyd. No. 4 -- 10 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 6 Post Development => DA#1 To SCM Hydrograph type = SCS Runoff Peak discharge = 56.74 cfs Storm frequency = 10 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 119,661 cuft Drainage area = 8.180 ac Curve number = 85 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 36 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Post Development => DA#1 To SCM Hyd. No. 6 -- 10 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 7 SCM Routing Hydrograph type = Reservoir Peak discharge = 10.27 cfs Storm frequency = 10 yrs Time to peak = 12.12 hrs Time interval = 1 min Hyd. volume = 107,018 cuft Inflow hyd. No.= 6 - Post Development => DA#1 To SCMMax. Elevation = 311.31 ft Reservoir name = Wet Pond #1 Max. Storage = 59,062 cuft Storage Indication method used. 37 0 4 8 12 16 20 24 28 32 36 40 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) SCM Routing Hyd. No. 7 -- 10 Year Hyd No. 7 Hyd No. 6 Total storage used = 59,062 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 8 Post Development => DA#1 By-Pass SCM Hydrograph type = SCS Runoff Peak discharge = 1.178 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,396 cuft Drainage area = 0.370 ac Curve number = 61 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 38 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#1 By-Pass SCM Hyd. No. 8 -- 10 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 9 Post Development => DA#1 Total Hydrograph type = Combine Peak discharge = 10.86 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 1 min Hyd. volume = 109,414 cuft Inflow hyds.= 7, 8 Contrib. drain. area = 0.370 ac 39 0 3 6 9 12 15 18 21 24 27 30 33 36 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Post Development => DA#1 Total Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 7 Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 10 Post Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 1.460 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 2,959 cuft Drainage area = 0.270 ac Curve number = 75 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 40 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#2 Hyd. No. 10 -- 10 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 11 Post Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 2.852 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 5,749 cuft Drainage area = 0.780 ac Curve number = 64 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 5.58 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 41 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Post Development => DA#3 Hyd. No. 11 -- 10 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 12 Post Development Total Hydrograph type = Combine Peak discharge = 14.84 cfs Storm frequency = 10 yrs Time to peak = 11.98 hrs Time interval = 1 min Hyd. volume = 118,122 cuft Inflow hyds.= 9, 10, 11 Contrib. drain. area = 1.050 ac 42 0 3 6 9 12 15 18 21 24 27 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 Q (cfs) Time (hrs) Post Development Total Hyd. No. 12 -- 10 Year Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Summary Report 43 Hyd. Hydrograph Peak Time Time to Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strge used Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 SCS Runoff 21.19 1 723 60,673 ------------------Pre-Development => DA#1 2 SCS Runoff 3.472 1 723 9,941 ------------------Pre-Development => DA#2 3 SCS Runoff 13.22 1 724 39,271 ------------------Pre-Development => DA#3 4 Combine 37.80 1 724 109,885 1, 2, 3 ------------Pre-Development Total 6 SCS Runoff 71.75 1 717 153,532 ------------------Post Development => DA#1 To SCM 7 Reservoir 34.90 1 723 140,794 6 311.84 70,453 SCM Routing 8 SCS Runoff 1.738 1 718 3,495 ------------------Post Development => DA#1 By-Pass 9 Combine 35.79 1 723 144,288 7, 8 ------------Post Development => DA#1 Total 10 SCS Runoff 1.938 1 718 3,972 ------------------Post Development => DA#2 11 SCS Runoff 4.090 1 718 8,212 ------------------Post Development => DA#3 12 Combine 38.78 1 723 156,472 9, 10, 11 ------------Post Development Total Medlin Self Storage Routing.gpw Return Period: 25 Year Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 1 Pre-Development => DA#1 Hydrograph type = SCS Runoff Peak discharge = 21.19 cfs Storm frequency = 25 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 60,673 cuft Drainage area = 5.310 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.50 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 44 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Pre-Development => DA#1 Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 2 Pre-Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 3.472 cfs Storm frequency = 25 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 9,941 cuft Drainage area = 0.870 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.90 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 45 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (hrs) Pre-Development => DA#2 Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 3 Pre-Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 13.22 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 39,271 cuft Drainage area = 3.410 ac Curve number = 68 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 17.70 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 46 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) Pre-Development => DA#3 Hyd. No. 3 -- 25 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 4 Pre-Development Total Hydrograph type = Combine Peak discharge = 37.80 cfs Storm frequency = 25 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 109,885 cuft Inflow hyds.= 1, 2, 3 Contrib. drain. area = 9.590 ac 47 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Pre-Development Total Hyd. No. 4 -- 25 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 6 Post Development => DA#1 To SCM Hydrograph type = SCS Runoff Peak discharge = 71.75 cfs Storm frequency = 25 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 153,532 cuft Drainage area = 8.180 ac Curve number = 85 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 48 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) Post Development => DA#1 To SCM Hyd. No. 6 -- 25 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 7 SCM Routing Hydrograph type = Reservoir Peak discharge = 34.90 cfs Storm frequency = 25 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 140,794 cuft Inflow hyd. No.= 6 - Post Development => DA#1 To SCMMax. Elevation = 311.84 ft Reservoir name = Wet Pond #1 Max. Storage = 70,453 cuft Storage Indication method used. 49 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 Q (cfs) Time (hrs) SCM Routing Hyd. No. 7 -- 25 Year Hyd No. 7 Hyd No. 6 Total storage used = 70,453 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 8 Post Development => DA#1 By-Pass SCM Hydrograph type = SCS Runoff Peak discharge = 1.738 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,495 cuft Drainage area = 0.370 ac Curve number = 61 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 50 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#1 By-Pass SCM Hyd. No. 8 -- 25 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 9 Post Development => DA#1 Total Hydrograph type = Combine Peak discharge = 35.79 cfs Storm frequency = 25 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 144,288 cuft Inflow hyds.= 7, 8 Contrib. drain. area = 0.370 ac 51 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Post Development => DA#1 Total Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 7 Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 10 Post Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 1.938 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 3,972 cuft Drainage area = 0.270 ac Curve number = 75 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 52 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (hrs) Post Development => DA#2 Hyd. No. 10 -- 25 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 11 Post Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 4.090 cfs Storm frequency = 25 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 8,212 cuft Drainage area = 0.780 ac Curve number = 64 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 6.75 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 53 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Post Development => DA#3 Hyd. No. 11 -- 25 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 12 Post Development Total Hydrograph type = Combine Peak discharge = 38.78 cfs Storm frequency = 25 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 156,472 cuft Inflow hyds.= 9, 10, 11 Contrib. drain. area = 1.050 ac 54 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Post Development Total Hyd. No. 12 -- 25 Year Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydrograph Summary Report 55 Hyd. Hydrograph Peak Time Time to Hyd.Inflow Maximum Total Hydrograph No.type flow interval Peak volume hyd(s)elevation strge used Description (origin)(cfs)(min)(min)(cuft)(ft)(cuft) 1 SCS Runoff 32.41 1 723 92,394 ------------------Pre-Development => DA#1 2 SCS Runoff 5.310 1 723 15,138 ------------------Pre-Development => DA#2 3 SCS Runoff 20.06 1 724 59,418 ------------------Pre-Development => DA#3 4 Combine 57.65 1 723 166,950 1, 2, 3 ------------Pre-Development Total 6 SCS Runoff 97.02 1 717 211,882 ------------------Post Development => DA#1 To SCM 7 Reservoir 79.31 1 720 199,029 6 312.18 78,233 SCM Routing 8 SCS Runoff 2.761 1 718 5,555 ------------------Post Development => DA#1 By-Pass 9 Combine 81.71 1 720 204,583 7, 8 ------------Post Development => DA#1 Total 10 SCS Runoff 2.770 1 717 5,766 ------------------Post Development => DA#2 11 SCS Runoff 6.318 1 718 12,764 ------------------Post Development => DA#3 12 Combine 89.55 1 720 223,114 9, 10, 11 ------------Post Development Total Medlin Self Storage Routing.gpw Return Period: 100 Year Friday, 04 / 24 / 2020 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 1 Pre-Development => DA#1 Hydrograph type = SCS Runoff Peak discharge = 32.41 cfs Storm frequency = 100 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 92,394 cuft Drainage area = 5.310 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.50 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 56 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Pre-Development => DA#1 Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 2 Pre-Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 5.310 cfs Storm frequency = 100 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 15,138 cuft Drainage area = 0.870 ac Curve number = 67 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 15.90 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 57 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (hrs) Pre-Development => DA#2 Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 3 Pre-Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 20.06 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 1 min Hyd. volume = 59,418 cuft Drainage area = 3.410 ac Curve number = 68 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc)= 17.70 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 58 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 21.00 21.00 Q (cfs) Time (hrs) Pre-Development => DA#3 Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 4 Pre-Development Total Hydrograph type = Combine Peak discharge = 57.65 cfs Storm frequency = 100 yrs Time to peak = 12.05 hrs Time interval = 1 min Hyd. volume = 166,950 cuft Inflow hyds.= 1, 2, 3 Contrib. drain. area = 9.590 ac 59 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 Q (cfs) Time (hrs) Pre-Development Total Hyd. No. 4 -- 100 Year Hyd No. 4 Hyd No. 1 Hyd No. 2 Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 6 Post Development => DA#1 To SCM Hydrograph type = SCS Runoff Peak discharge = 97.02 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 211,882 cuft Drainage area = 8.180 ac Curve number = 85 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 60 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) Post Development => DA#1 To SCM Hyd. No. 6 -- 100 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 7 SCM Routing Hydrograph type = Reservoir Peak discharge = 79.31 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 199,029 cuft Inflow hyd. No.= 6 - Post Development => DA#1 To SCMMax. Elevation = 312.18 ft Reservoir name = Wet Pond #1 Max. Storage = 78,233 cuft Storage Indication method used. 61 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 100.00 100.00 Q (cfs) Time (hrs) SCM Routing Hyd. No. 7 -- 100 Year Hyd No. 7 Hyd No. 6 Total storage used = 78,233 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 8 Post Development => DA#1 By-Pass SCM Hydrograph type = SCS Runoff Peak discharge = 2.761 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 5,555 cuft Drainage area = 0.370 ac Curve number = 61 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 62 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Post Development => DA#1 By-Pass SCM Hyd. No. 8 -- 100 Year Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 9 Post Development => DA#1 Total Hydrograph type = Combine Peak discharge = 81.71 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 204,583 cuft Inflow hyds.= 7, 8 Contrib. drain. area = 0.370 ac 63 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) Post Development => DA#1 Total Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 7 Hyd No. 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 10 Post Development => DA#2 Hydrograph type = SCS Runoff Peak discharge = 2.770 cfs Storm frequency = 100 yrs Time to peak = 11.95 hrs Time interval = 1 min Hyd. volume = 5,766 cuft Drainage area = 0.270 ac Curve number = 75 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 64 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Post Development => DA#2 Hyd. No. 10 -- 100 Year Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 11 Post Development => DA#3 Hydrograph type = SCS Runoff Peak discharge = 6.318 cfs Storm frequency = 100 yrs Time to peak = 11.97 hrs Time interval = 1 min Hyd. volume = 12,764 cuft Drainage area = 0.780 ac Curve number = 64 Basin Slope = 0.0 %Hydraulic length = 0 ft Tc method = User Time of conc. (Tc)= 5.00 min Total precip.= 8.73 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 65 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (hrs) Post Development => DA#3 Hyd. No. 11 -- 100 Year Hyd No. 11 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Hyd. No. 12 Post Development Total Hydrograph type = Combine Peak discharge = 89.55 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 1 min Hyd. volume = 223,114 cuft Inflow hyds.= 9, 10, 11 Contrib. drain. area = 1.050 ac 66 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 50.00 50.00 60.00 60.00 70.00 70.00 80.00 80.00 90.00 90.00 Q (cfs) Time (hrs) Post Development Total Hyd. No. 12 -- 100 Year Hyd No. 12 Hyd No. 9 Hyd No. 10 Hyd No. 11 Hydraflow Rainfall Report 67 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Return Intensity-Duration-Frequency Equation Coefficients (FHA) Period (Yrs)B D E (N/A) 1 57.0356 11.9000 0.8655 -------- 2 69.0307 12.5000 0.8674 -------- 3 0.0000 0.0000 0.0000 -------- 5 69.4522 12.4000 0.8238 -------- 10 68.8066 11.9000 0.7899 -------- 25 64.1391 11.1000 0.7420 -------- 50 58.2337 10.1000 0.6979 -------- 100 53.8523 9.3000 0.6602 -------- File name: Raleigh.IDF Intensity = B / (Tc + D)^E Return Intensity Values (in/hr) Period (Yrs)5 min 10 15 20 25 30 35 40 45 50 55 60 1 4.94 3.94 3.30 2.85 2.51 2.25 2.04 1.87 1.73 1.61 1.50 1.41 2 5.76 4.64 3.89 3.37 2.98 2.67 2.42 2.22 2.05 1.91 1.79 1.68 3 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5 6.60 5.36 4.54 3.96 3.52 3.17 2.89 2.66 2.47 2.31 2.16 2.04 10 7.38 6.01 5.11 4.47 3.98 3.60 3.29 3.04 2.83 2.65 2.49 2.35 25 8.16 6.68 5.70 5.01 4.48 4.07 3.74 3.46 3.23 3.03 2.86 2.71 50 8.76 7.17 6.14 5.41 4.86 4.43 4.08 3.79 3.55 3.34 3.16 3.00 100 9.30 7.63 6.55 5.79 5.22 4.77 4.41 4.11 3.85 3.64 3.45 3.28 Tc = time in minutes. Values may exceed 60. Rainfall Precipitation Table (in) Precip. file name: Z:\AutoCAD\Hydraflow\PCP\Angier.pcp Storm Distribution 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr SCS 24-hour 3.05 3.70 1.00 4.80 5.58 6.75 7.30 8.73 SCS 6-Hr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-1st 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-2nd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-3rd 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-4th 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Huff-Indy 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Custom 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Hydraflow Table of Contents Medlin Self Storage Routing.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2020 Friday, 04 / 24 / 2020 Watershed Model Schematic ...................................................................................... 1 Hydrograph Return Period Recap ............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre-Development => DA#1................................................... 4 TR-55 Tc Worksheet............................................................................................................ 5 Hydrograph No. 2, SCS Runoff, Pre-Development => DA#2................................................... 6 TR-55 Tc Worksheet............................................................................................................ 7 Hydrograph No. 3, SCS Runoff, Pre-Development => DA#3................................................... 8 TR-55 Tc Worksheet............................................................................................................ 9 Hydrograph No. 4, Combine, Pre-Development Total............................................................10 Hydrograph No. 6, SCS Runoff, Post Development => DA#1 To SCM..................................11 Hydrograph No. 7, Reservoir, SCM Routing..........................................................................12 Pond Report - Wet Pond #1...............................................................................................13 Hydrograph No. 8, SCS Runoff, Post Development => DA#1 By-Pass SCM........................14 Hydrograph No. 9, Combine, Post Development => DA#1 Total...........................................15 Hydrograph No. 10, SCS Runoff, Post Development => DA#2.............................................16 Hydrograph No. 11, SCS Runoff, Post Development => DA#3..............................................17 Hydrograph No. 12, Combine, Post Development Total.........................................................18 2 - Year Summary Report.......................................................................................................................19 Hydrograph Reports.................................................................................................................20 Hydrograph No. 1, SCS Runoff, Pre-Development => DA#1.................................................20 Hydrograph No. 2, SCS Runoff, Pre-Development => DA#2.................................................21 Hydrograph No. 3, SCS Runoff, Pre-Development => DA#3.................................................22 Hydrograph No. 4, Combine, Pre-Development Total............................................................23 Hydrograph No. 6, SCS Runoff, Post Development => DA#1 To SCM..................................24 Hydrograph No. 7, Reservoir, SCM Routing..........................................................................25 Hydrograph No. 8, SCS Runoff, Post Development => DA#1 By-Pass SCM........................26 Hydrograph No. 9, Combine, Post Development => DA#1 Total...........................................27 Hydrograph No. 10, SCS Runoff, Post Development => DA#2.............................................28 Hydrograph No. 11, SCS Runoff, Post Development => DA#3..............................................29 Hydrograph No. 12, Combine, Post Development Total.........................................................30 10 - Year Summary Report .......................................................................................................................31 Hydrograph Reports.................................................................................................................32 Hydrograph No. 1, SCS Runoff, Pre-Development => DA#1.................................................32 Hydrograph No. 2, SCS Runoff, Pre-Development => DA#2.................................................33 Hydrograph No. 3, SCS Runoff, Pre-Development => DA#3.................................................34 Hydrograph No. 4, Combine, Pre-Development Total............................................................35 Hydrograph No. 6, SCS Runoff, Post Development => DA#1 To SCM..................................36 Hydrograph No. 7, Reservoir, SCM Routing..........................................................................37 Hydrograph No. 8, SCS Runoff, Post Development => DA#1 By-Pass SCM........................38 Contents continued...Medlin Self Storage Routing.gpw Hydrograph No. 9, Combine, Post Development => DA#1 Total...........................................39 Hydrograph No. 10, SCS Runoff, Post Development => DA#2.............................................40 Hydrograph No. 11, SCS Runoff, Post Development => DA#3..............................................41 Hydrograph No. 12, Combine, Post Development Total.........................................................42 25 - Year Summary Report.......................................................................................................................43 Hydrograph Reports.................................................................................................................44 Hydrograph No. 1, SCS Runoff, Pre-Development => DA#1.................................................44 Hydrograph No. 2, SCS Runoff, Pre-Development => DA#2.................................................45 Hydrograph No. 3, SCS Runoff, Pre-Development => DA#3.................................................46 Hydrograph No. 4, Combine, Pre-Development Total............................................................47 Hydrograph No. 6, SCS Runoff, Post Development => DA#1 To SCM..................................48 Hydrograph No. 7, Reservoir, SCM Routing..........................................................................49 Hydrograph No. 8, SCS Runoff, Post Development => DA#1 By-Pass SCM........................50 Hydrograph No. 9, Combine, Post Development => DA#1 Total...........................................51 Hydrograph No. 10, SCS Runoff, Post Development => DA#2.............................................52 Hydrograph No. 11, SCS Runoff, Post Development => DA#3..............................................53 Hydrograph No. 12, Combine, Post Development Total.........................................................54 100 - Year Summary Report .......................................................................................................................55 Hydrograph Reports.................................................................................................................56 Hydrograph No. 1, SCS Runoff, Pre-Development => DA#1.................................................56 Hydrograph No. 2, SCS Runoff, Pre-Development => DA#2.................................................57 Hydrograph No. 3, SCS Runoff, Pre-Development => DA#3.................................................58 Hydrograph No. 4, Combine, Pre-Development Total............................................................59 Hydrograph No. 6, SCS Runoff, Post Development => DA#1 To SCM..................................60 Hydrograph No. 7, Reservoir, SCM Routing..........................................................................61 Hydrograph No. 8, SCS Runoff, Post Development => DA#1 By-Pass SCM........................62 Hydrograph No. 9, Combine, Post Development => DA#1 Total...........................................63 Hydrograph No. 10, SCS Runoff, Post Development => DA#2.............................................64 Hydrograph No. 11, SCS Runoff, Post Development => DA#3..............................................65 Hydrograph No. 12, Combine, Post Development Total.........................................................66 IDF Report ..................................................................................................................67 CALCULATIONS Ditch Calculations Project #No Date Project Name Date Peak Discharge Calculation (10 Year Design) Drainage Area =1.26 ac C =0.50 Bare Earth I10 =7.22 in/hr Assume Tc =5 min A =1.26 ac Q10 =4.56 cfs Determine Ditch Flow Depth (d) and Velocity (v) - Check for Temporary Conditions Apply Manning's Equation: V=1.49/n * R2/3*S1/2 , Q=A/V Ditch Characteristics: 0.02 Bare Earth 2.00 ft 2 1.00% 2.00 fps Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.45 ft Area (A) =B*d + M*d2 =1.30 Perimeter (P) =b + 2d*(M2+1).5 =4.01 R =A/P =0.32 VpR =V Permiss * R =0.65 V =Flow Velocity =3.51 fps Q =design flow =4.56 cfs check Q:OK Check Ditch Velocity for Lining: 2.00 fps 3.51 fps Determine Temporary Liner Recalculate with Liner: Liner Material =Tshear stress =Shear stress =g*d*s n =0.033 Table 8.05e NCESCPDM g =density of water =62.4 lb/ft3 Base Width (B) =2.00 ft d =flow depth =0.59 ft M =2 S =channel slope =1.00% Ditch Slope (S) =1.00%Tshear stress = Shear Stress =0.37 T allow (Td) =1.45 psf Apply the Following Analysis to Determine Actual "d" and "V"T allow (Td)1.45 d =flow depth =0.59 ft Tshear stress =0.37 Area (A) =B*d + M*d2 =1.86 Perimeter (P) =b + 2d*(M2+1).5 =4.62 R =A/P =0.40 V = Flow Velocity = 2.45 fps Q =design flow =4.56 cfs check Q:OK Project Data Revisions Description TEMPORARY DIVERSION DITCH CALCULATION TDD A 2020-010 Medlin Self-Storage 4/24/2020 Vp = Vactual = Vactual>Vallow, Find Temp Lining n = Base Width (B) = M = Ditch Slope (S) = Permissible Max Velocity (Vp) = Straw with Net Compare Tshear stress to Td: Tshear stress < Td => OK Summary Straw with NetTemporary Ditch Liner = dM:1 B Project #No Date Project Name Date Peak Discharge Calculation (10 Year Design) Drainage Area =3.54 ac C =0.50 Bare Earth I10 =7.22 in/hr Assume Tc =5 min A =3.54 ac Q10 =12.77 cfs Determine Ditch Flow Depth (d) and Velocity (v) - Check for Temporary Conditions Apply Manning's Equation: V=1.49/n * R2/3*S1/2 , Q=A/V Ditch Characteristics: 0.02 Bare Earth 2.00 ft 2 2.50% 2.00 fps Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.61 ft Area (A) =B*d + M*d2 =1.96 Perimeter (P) =b + 2d*(M2+1).5 =4.72 R =A/P =0.41 VpR =V Permiss * R =0.83 V =Flow Velocity =6.53 fps Q =design flow =12.77 cfs check Q:OK Check Ditch Velocity for Lining: 2.00 fps 6.53 fps Determine Temporary Liner Recalculate with Liner: Liner Material =Tshear stress =Shear stress =g*d*s n =0.033 Table 8.05e NCESCPDM g =density of water =62.4 lb/ft3 Base Width (B) =2.00 ft d =flow depth =0.79 ft M =2 S =channel slope =2.50% Ditch Slope (S) =2.50%Tshear stress = Shear Stress =1.23 T allow (Td) =1.45 psf Apply the Following Analysis to Determine Actual "d" and "V"T allow (Td)1.45 d =flow depth =0.79 ft Tshear stress =1.23 Area (A) =B*d + M*d2 =2.81 Perimeter (P) =b + 2d*(M2+1).5 =5.52 R =A/P =0.51 V = Flow Velocity = 4.54 fps Q =design flow =12.77 cfs check Q:OK Project Data Revisions 2020-010 Description Medlin Self-Storage Vactual = 4/24/2020 TEMPORARY DIVERSION DITCH CALCULATION TDD B n = Base Width (B) = M = Ditch Slope (S) = Permissible Max Velocity (Vp) = Vp =Vactual>Vallow, Find Temp Lining Straw with Net Compare Tshear stress to Td: Tshear stress < Td => OK Summary Temporary Ditch Liner =Straw with Net dM:1 B Project Name:Medlin Self-Storage Ditch # :1 Station Range:N/A Peak Discharge Calculation: Drainage Area =47131 sf 1.08 acres Q10 = C x I x A C =0.90 I10 =7.22 in/hr A =1.08 acres Q10 =7.03 cfs Determine Ditch Flow Depth (d) and Velocity (v) Check for Permanent Condition: Apply Manning's Equation: V=1.49/n * R2/3*S1/2 , Q=A/V Ditch Characteristics: n =0.03 grass Base Width (B) =2 ft M =5 Ditch Slope (S) =1.00% Permissible Max Velocity (Vp)4.00 fps Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.58 ft Area (A) =B*d + M*d2 =2.82 Perimeter (P) =b + 2d*(M2+1).5 =7.89 R =A/P =0.36 VpR =V Permiss * R =1.43 V =Flow Velocity =2.49 fps Q =design flow =7.03 cfs check Q:OK Check Ditch Velocity for Lining: Vp =4.00 fps Vactual =2.49 fps Vactual<Vallow, No Perm. Lining Needed Determine Ditch Flow Depth (d) and Velocity (v) Check for Temporary Condition: Q2 = C x I x A C =0.25 I2 =4.52 in/hr A =1.08 acres Q2 =1.22 cfs Ditch "Q" and "V" Calculation Worksheet dM:1 DITCH 1 Ditch Characteristics: n =0.02 bare earth Base Width (B) =2 ft M =5 Ditch Slope (S) =1.00% Permissible Max Velocity (Vp)2.00 fps (bare earth) Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.20 Area (A) =B*d + M*d2 =0.59 Perimeter (P) =b + 2d*(M2+1).5 =4.02 R =A/P =0.15 VpR =V Permiss * R =0.29 V =Flow Velocity =2.06 fps Q =design flow =1.22 cfs check Q:OK Check Ditch Velocity for Lining: Vp =2.00 fps Vactual =2.06 fps Vactual>Vallow, Find Temp. Lining Recalculate with Temp Liner: Liner Material =Straw with Net n =0.065 Straw with Net Base Width (B) =2 ft M =5 Ditch Slope (S) =1.00% T allow (Tp)1.45 Straw with Net Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.36 Area (A) =B*d + M*d2 =1.38 Perimeter (P) =b + 2d*(M2+1).5 =5.69 R =A/P =0.24 V =Flow Velocity =0.89 fps Q =design flow =1.22 cfs Tshear stress =g*d*s g= 62.4 lb/ft3 d =0.36 ft S =1.00% Tshear stress =0.23 Compare Tshear stress to Td: T allow (Td)1.45 Tshear stress =0.23 Tshear stress < Td => OK DITCH 1 Project Name:Medlin Self-Storage Ditch # :2 Station Range:N/A Peak Discharge Calculation: Drainage Area =146000 sf 3.35 acres Q10 = C x I x A C =0.90 I10 =7.22 in/hr A =3.35 acres Q10 =21.78 cfs Determine Ditch Flow Depth (d) and Velocity (v) Check for Permanent Condition: Apply Manning's Equation: V=1.49/n * R2/3*S1/2 , Q=A/V Ditch Characteristics: n =0.03 grass Base Width (B) =3 ft M =5 Ditch Slope (S) =0.75% Permissible Max Velocity (Vp)4.00 fps Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.95 ft Area (A) =B*d + M*d2 =7.31 Perimeter (P) =b + 2d*(M2+1).5 =12.65 R =A/P =0.58 VpR =V Permiss * R =2.31 V =Flow Velocity =2.98 fps Q =design flow =21.78 cfs check Q:OK Check Ditch Velocity for Lining: Vp =4.00 fps Vactual =2.98 fps Vactual<Vallow, No Perm. Lining Needed Determine Ditch Flow Depth (d) and Velocity (v) Check for Temporary Condition: Q2 = C x I x A C =0.25 I2 =4.52 in/hr A =3.35 acres Q2 =3.79 cfs Ditch "Q" and "V" Calculation Worksheet dM:1 DITCH 2 Ditch Characteristics: n =0.02 bare earth Base Width (B) =3 ft M =5 Ditch Slope (S) =0.75% Permissible Max Velocity (Vp)2.00 fps (bare earth) Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.33 Area (A) =B*d + M*d2 =1.53 Perimeter (P) =b + 2d*(M2+1).5 =6.35 R =A/P =0.24 VpR =V Permiss * R =0.48 V =Flow Velocity =2.48 fps Q =design flow =3.79 cfs check Q:OK Check Ditch Velocity for Lining: Vp =2.00 fps Vactual =2.48 fps Vactual>Vallow, Find Temp. Lining Recalculate with Temp Liner: Liner Material =Straw with Net n =0.065 Straw with Net Base Width (B) =3 ft M =5 Ditch Slope (S) =0.75% T allow (Tp)1.45 Straw with Net Apply the Following Analysis to Determine Actual "d" and "V" d =flow depth =0.60 Area (A) =B*d + M*d2 =3.57 Perimeter (P) =b + 2d*(M2+1).5 =9.08 R =A/P =0.39 V =Flow Velocity =1.06 fps Q =design flow =3.79 cfs Tshear stress =g*d*s g= 62.4 lb/ft3 d =0.60 ft S =0.75% Tshear stress =0.28 Compare Tshear stress to Td: T allow (Td)1.45 Tshear stress =0.28 Tshear stress < Td => OK DITCH 2 CALCULATIONS Outlet Protection Project #No Date Project Name Date Input Values Defined Channel (Y/N)N Diameter (in)24 Flow Rate (cfs)28.81 Slope (%)7.93 Manning Coef.0.013 Iteration Variable 1 Angle of Sump,a 3.025 Calculated Data Normal Depth (ft)0.94 Outlet Velocity (fps)19.81 Classification Average Diameter (in)Stone Class Minimum Thickness (in) Fine 3 A 12 Light 6 B 18 Zone =6 Medium 13 1 24 Heavy 23 2 36 20 ft 6 ft N/A ft 8 ft HEAVY 2 36 inMin. Thickness = W2 = Diameter + 0.4*L Width at end of Apron, W2 = (defined channel) W2 = 1.25 X W1 Width at end of Apron, W2 = (undefined channel) Classification = NCDOT Stone Class = Equations Summary L = See Table Length of Apron = W1 = 3 x Diameter Width at Pipe, W1 = Diagram of Outlet Appron Project Data Revisions 2020-010 Description Medlin Self-Storage 4/24/2020 Outlet Protection - NYDOT Dissipator Methodology FES#101 CALCULATIONS Sediment Basin Calculations Project #No Date Project Name Date Sediment Basin #1 Area Disturbed =246322 sf 5.65 acres Peak Discharge Calculation: Drainage Area =246322 sf 5.65 acres Q10 = C x I x A C =0.50 I10 =7.22 in/hr A =5.65 acres Q10 =20.41 cfs Minimum Surface Area Calculation: Surface Area (SF)= Q10 x 435 sf/ac = 20.41 cfs x 435 sf/ac Surface Area Req =8880 sf Basin Volume Calculation: Volume of Sediment = (Drainage Ac.) x (1800 cf sed./year) x (1 year) = 5.65 ac x 1800 x 1 yr Min Vol =10179 cf Assumed basin depth =2 ft min D = 2' for "Temp Sediment Trap" Resultant Basin Area Req =5089 sf Check Surface Area Criteria Surface Area Requirement =8880 sf Basin Volume Calc Area =5089 sf Therefore: Surface Area Governs Min Volume Req =10179 cf Min Area Req =8880 sf L:W Ratio =2.0 Use L =2xW, calculate basin dimensions Actual W =67 ft Min W =67 ft L =134 ft D =2 ft Actual Vol =17956 cf Vol Check:OK Actual Area =8978 sf Area Check:OK Actual Basin Dimensions =67 ft W x 134 ft L x 2 ft D Weir Design and Velocity Check: Calculate Flow Depth H = [Q/CL]2/3 Q10 =20.41 cfs C =2.68 constant L =25 ft min L = 10' H =0.45 ft max H = 0.5' Calculate Velocity Over Weir V = Q/A V =20.41 cfs / 25 ft x 0.45 ft V =1.80 ft/sec OK Skimmer Sizing: 2.5 Skimmer Size (inches)Skimmer Size 0.208 Head on Skimmer (feet)(Inches) 2 Orifice Size (1/4 inch increments)1.5 4.26 Dewatering Time (days)2 2.5 3 4 5 6 8 Project Data Revisions 2010-010 Description Medlin Self-Storage 4/24/2020 SEDIMENT SKIMMER BASIN Skimmer Basin #1 CALCULATIONS SHWT