Loading...
HomeMy WebLinkAboutSW6200102_Supplement-EZ Form_20200716SUPPLEMENT-EZ COVER PAGE FORMS LOADED 1 !Project Nam 2 Proiec Ae rea ( Area h or Low Density? use an off -site SCM? HPTC 4.76 0 0 High No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 10 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 (c-d) out of the setback? Yes 10 Is streambank stabilization proposed on this project? No TYPE OF SCMs: Cell Filter Dry Pond StormFi@er 25 'Bayfilter 26 Filterra El FORMS LOADED gNMEARNMCATION 27 Name and Title: F. Michael Mayer, PE Civil Engineer 28 Organization: Mason & Hanger 29 Street address: 300 W Vine St Suite 1300 30 City, State, Zip: Lean ton, KY 40507 31 Phone number(s): 859-280-3557 32 Email: __. mike. ma e y r@masonandhanger.com Certification Statement I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifcetions, operation and maintenance agreements and other supporting information are consistent with the information provided here. ``;`Urrrrllll �' -�'N CAIRp' . =�Q SEAL - - 039 8 A fit lrnIN�I Low Signatu t of Designer �I �I zo2o Dat�� DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 2 3 Is all/ of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Bioretention Bioretention Bioretention 5 Total BUA in project (sq ft) 113581 sf 67546 sf 46035 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft) sf sf sf 7 New BUA outside of subdivided lots (subject to permitting) (sf) 113581 sf 67546 sf 46035 sf 8 Offsite - total area (sq ft) sf sf sf 9 Offsite BUA (sq ft) sf sf sf 10 Breakdown of new BUA outside subdivided lots sf sf sf Parking (sq ft) 15350 sf 8500 sf 6850 sf Sidewalk (sq ft) 6442 sf 2042 sf 4400 sf Roof (sq ft) 46014 sf 30894 sf 15120 sf Roadway (sq ft) 25827 sf 6162 sf 19665 sf Future (sq ft) sf sf sf Other, please specify in the comment box below (sq ft) 19948 sf 19948 sf sf 11 New infiltrating permeable pavement on subdivided lots (sq ft) sf sf sf 12 New infiltrating permeable pavement outside of Isubdivided lots (sq ft) sf sf sf 13 Exisitng BUA that will remain (not subject to permitting) (sq ft) sf sf sf 14 Existing BUA that is already permitted (sq ft) sf sf sf 15 Existing BUA that will be removed (sq ft) 4782 sf 2570 sf 2212 sf 16 Percent BUA 55% 60% 76% 17 Design storm (inches) 1 in 1 in 1 in 18 Design volume of SCM (cu ft) 7170 cf 4282 cf 2888 cf 19 Calculation method for design volume SCS SCS SCS ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): Drainage Area 1 includes area of outdoor astroturf area. Underdrains from turf area lead to Bioretention Area 1. BIORETENTION CELL 1 1 Drainage area number 1 qcf 2 Design volume of SCM (cu ft) 4282 cf 288 GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design Ivolume. Yes Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice Drawdown Orifice 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with JGeneral MDC (10)? Yes Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designedy an NC licensedprofessional? Yes Yes BIORETENTION CELL MDC FROM 02H .1052 18 SHWT elevation (fmsl) 245.08 248.87 19 Bottom of the bioretention cell (fmsl) 252.50 254.50 20 Ponding depth of the design storm (inches) 9 in 9 in 21 Surface area of the bioretention cell (square feet) 8400 sf 4500 sf 22 Design volume of the bioretention cell (cubic feet) 6225 cf 3788 cf 23 Is the bioretention cell used for peak attenuation? Yes Yes 24 Depth of peak attenuation over planting surface (in) 24 in 24 in 25 Height of peak attenuation outlet above the planting surface (in) 18 in 18 in 26 Infiltration rate of the in situ soil (inch/hour) 1 in/hr 1 in/hr 27 Diameter of the underdrain pipes (if applicable) 6 in 6 in 28 Does the design include Internal Water Storage (IWS)? Yes Yes 29 if so, elevation of the top of the IWS (fmsl) 254.5 256.5 30 Elevation of the planting surface (fmsl) 256 258 31 What type of vegetation will be planted? (grass, trees/shrubs, other)? Grass Grass 32 Media depth (inches) 30 in 30 in 33 Percentage of medium to coarse washed sand by volume 85% 85% 34 Percentage of fines (silt and clay) by volume 10% 10% 35 Percentage of organic matter by volume 5% 5% 36 IType of organic material Engineered Fill Engineere d Fill 37 Phosphorus Index (P-Index) of media (unitless) 10 10 38 Will compaction be avoided during construction? Yes Yes 39 Will cell be maintained to a one inch/hour standard? Yes Yes 40 Depth of mulch, if applicable (inches) n/a n/a 41 Type of mulch, if applicable n/a n/a 42 How many clean out pipes are being installed? 10 6 43 Type of pretreatment that will be used: Vegetative Filter/Rip Rap Vegetativ e Filter/Rip Rap ADDITIONAL INFORMATION Please use this space to provide any additional information about the 44 bioretention cell(s): The engineered fill will infiltrate at approximately 2in/hr (maintained at a min 1 in/hr), which will eliminate the surfae ponded volume within 24 hours, to the storage within the IWS for ultimate infiltration. Peak attenuation volumes provided in order to comply with EISA 438. Project based entirely within Fort Bragg (US Gov't property).