Loading...
HomeMy WebLinkAboutSW7111007_CURRENT PERMIT_20200330STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW 7z�z -% DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE[? (� YYYYMMDD ROY. COOPER Go v ern or MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality March 30, 2020 Chowan University Attention: Danny R. Davis, VP for Business Affairs One University Place Murfreesboro, NC 27855 Subject: Stormwater Permit No. SW7111007 Renewal Chowan University Student Housing High Density Stormwater Project Hertford County Dear Danny R. Davis: The Washington Regional Office received a Stormwater Management Permit Application for renewal of the subject permit on February 24, 2020. Staff review of the application has determined that the permit can be reissued. We are forwarding Permit No. SW7111007 dated March 30, 2020, for the continued operation of the subject project. This permit, upon its effective date, will replace all previous State Stormwater permits for this project. This permit shall be effective from September 11, 2020 until September 10, 2028 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer E *rk — North Carolina Department of £nvirax,merttai Quality � Division of "Energy. Mineral and Land Resmll'Ce5 �� `%Ia;hingtan Regional Office ' IM3'Nashington Square MaE ; Washington. North Carolina 27 SBn osa�.va�m.muow� /"� 2SZ.)klih4S1 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Chowan University Chowan University Student Housing Located on Union Street in Murfreesboro, NC, Hertford County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from September 11, 2020 until September 10, 2028, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from total of 269,469 square feet of impervious area for Phase I and Phase II of the project. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this permit, and per approved plans. Plans for any future built -upon area not currently shown on the approved plans must be submitted and approved by the Division prior to the start of construction. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, ft2: 539,840 b. Total Impervious Surfaces, ft2: 269,469 C. Design Storm, inches: 1.5 d. Pond Depth - average, feet: 4.50 e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 65.00 g. Permanent Pool Surface Area required, ft2: 21018 h. Permanent Pool Surface Area, ft2: 22,216 i. Min. Volume required, ft3: 33,689 j. Permitted Storage Volume, ft3: 38,044 k. Temporary Storage Elevation, FMSL: 66.60 I. Controlling Orifice: 2.50"0 pipe M. Permitted Forebay Volume, ft3: 20,659 n. Receiving Stream/River Basin: Hares Branch o. Stream Index Number: 25-4-6 P. Classification of Water Body: "C;NSW" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from September 11, 2020 until September 10, 2028. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 30 th day of March 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Brian Wrenn, Acting Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Stormwater Permit No. SW7111007 a �DEMLR USE ONLY:. Date Received Fee Paid Permit Number ZP' '!'GS r or/ I c0% NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: 4. L441h PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3). the current permit holder shall renow their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. Stale Stormwater Permit Number: SW71 11007 2. Project name: Cowan University Student Housing I-1i h Density Stormwater Project 3. Project street address: Union Street 400 feet South of 1-lassel Drive City: Murfreesboro County: Hertford ZIP: 1 27855 4. What, if any, changes have been made to the project as permitted? No If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: htts:llde .nc. oviabout/divisions/ener -mineral-land-resourceslener -mineral-land-ruleststormwater- r ogra mlpost-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: htt sjlde .nc. ov/about/divisio s/ener -mineral-land-resourceslener-minera€-land-rulesistormwater- ro ra m/post-construction. State Storm water Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Chowan University. _. 2. Signing Official's Name: R1%r` 2^Dabi ' 3. Signing Official's Title: v C-v •� �� S' 4. Mailing Address: One University Place City: Murfreesboro State: NC ZIP: 27855 5. Street Address: One University PI, cc City: Murfreesboro State: NC ZIP : 27855 6. Phone: (. 252) 398-6250 Email: _ drdavis(a�chowan.edu Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQ W/ORM. Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: X 1. A permit application processing fee of $505.00 payable to NCDEQ. X 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. X 4. O&M Agreements, Please select one: have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certifications) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc,govlon line serviceslsearch/b title/ Business Re istration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION a the person legally responsible for the permit, certify that I have a copy of thel Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, c and complete. j 7� Signature: Date: —/ f 4,'h�c'� RIZATION: a Notary Public for the State of 710"JIRE u „� �> _ County o do hereby certify that D�1 N!J y', ��1Y I s personally appeared before me this the ) S `l day of execution of the forgoing instrument. Witness my hand and official seal, (Notary Sea!) Notary Signature: My commission expires a.� Brenda N Baisey �•?t'rifOrti w�itnty. i�IG n� My Commission Expires J. -...1 L1�,.. 20 ZO , and acknowledge the due Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 WET DETENTION POND ANALYSIS - ALL RULES FILE NAME: S:IWQSISTORMWATERIEXCELSPREADSHEETSIPOND1717007MOD PROJECT #: SW7 111007MOD REVIEWER: Samir Initial Run Date 0.00 PROJECT NAME: Chowan University 5udent Housing Last modified 04-Sep-12 Receiving Stream: Hares Branch Drainage Basin: Chowan Class: c, NSW Within 112 mile sFN- Y or N Index No. 15.00 Site Area 1 12.39 jacres ODrainage Area 1 539840.00 square feet DA Area 12.39 lacres Rules- "2008" or "Ph2" 1 2008 Buildings square feet 1 Street square feet 0.98 SW square feet 0.95 Future square feet offsite square feet 1 Other 269469.00 square feet 1 BUA at dill. DSm square feet TOTAL 269469.00 square feet SURFACE AREA CALCULATION (with added DA and BUA at different design storm) Overall % Impervious 49.92% SA/DA Ratio 3.89% Average Design Depth 4.5 feet Req. SA 21018 Isf TSS, 85 or 90: 90 % Prov. SA 22216 Isf TEMPORARY POOL. AND FOREBAY VOLUME CALCULATIONS Drainage AreaO BUA Post development Rv= Old BUA Design Storm Old BUA Design Volume 1.5" New BUA Design Storm Volume 1 yr. 24 hour precipitation depth (inches) Predevelopment Rv value 1 yr. 24 hr. Pre -development volume 1 yr. 24 hr. Post -development volume 539840.00 sf 0.00 sf #DIV10! unitless inches 0 from NOAA chart use 0,0e if no existing BUA cubic feet cubic feet 269469.00 0.499 33689 2.90 0.05 6523 65133 2008 Design Volume 1 33689 cubic feet Phase 2 Design Volume 33689 Icubic feet Required Volume 33689 cf Area, sf Inc. volume Acc. volume Top of Sediment 58.00Imsi msl ........ 10005.00 0.00 0.00 Bottom of Shelf 64.50msl......... 19863.00 11640.00 11640,00 Permanent Pool 65.00msl......... 22216.00 25741.00 37381.00 Top of Shelf 65.50......... 25600.00 27962.00 65343.00 Temporary Pool 66.60 msl......... 27563.00 30241.00 95584.00 Volume met at elev 66.78 msl FOREBAY Vol. Prov. at TP 128160.00 cf Perm. Pool Volume= 72876 Req. Forebay Volume= 14575 Provided Volume= 20659.00 Percent= 28.3% Calculated Average D@Dth. feet 15.36 Max PUmD HP r 114 user input rec formula ORIFICE CALCULATION Average Head Flow Q2, cfs Flow Q5, cis No. of Orifices Diameter, inches Drawdown = 1 yr 24 hr intensity, in/hr Runoff Coefficient 1 yr 24 hr peak 0 Orifice flow<1yr24hr 1 feet ds cfs or weir H x W days NOAA chart & unitless cfs Q2 Area = 8.23 05 Area = 3.29 Orifice Area = 3.98 Av . Flow Q= 0.094 in x '# of end contractions, N = discharge coefficient, C Effective weir length, L sq. inches sq. inches sq. inches ds in 0.50 0.195 0.078 1 2.25 4.1 0.62 0.00 NO w-::IlU51 tali- VIV UAVAaIlDq iSVV 00Mi i0t I Cit�C��;�:' r3�120M=}x;9�_E � /fi.,TAi•"li„Si i '2 'Nl'' :SMAA-3.,P T!-{1W-i`A to, :;c n._c- y, J, ,:;.. P irr:. 11:1-i 7 1� tf.1 `(� �� _.-..'..{j1G .1t:n :'I ;,rrfJl?. 'IL.'.:•Ii_.` '7r1 li :,'�iry.[tl� LYA r _3 �=,ti.: � '�•C 4� 'ai (7t�r_ rtt,t 1 ' .- _ ,,iE1Ju��D'! _ .".sit .o: Jam~: tit N(.!':'i' Yi�1 BAA � E IDVE AIMMII 2v Tbhua i '.J IMP UQQ IE -i 4li1Jr-,; '`J t.'yi'��.'..�.. jAl' - (n;3fl1. � nn{ar.AMOMb 0 .Afl ] .7I Ar,: now ii,i10 W f A iLt`?JlMIT sW ?S:t1C Q. r{ . a W qg& C1-- 0 Go�M.JtJ.YAS 3i,:U.;5. Yf r=)tc'y a147 ii7o4i'r:,1•''r!�•- ;.;11 le ' ,..N efro -t: r7.iQ, n!1 -id ALI' ' 4 i Wo r i:�'.it .v J. II V l' s. i! t T I:.ii.l� - 'wo"v" %I jeo ndJ t;itr•!L 0v&. so at" !oc E . 3 !..,; it ^ _ I IrTlolo + it .7r , ra:.s iti i 1 CIA, t ' CS{I nE="•t i � L'rto';.3r_d 11L fig y.,1� � i-r�r �'v ••'JY.'1'� _ ir'�r?: it Sri !�i^:'r:•r, .�i _Earnl� i «;Jn ; Vol j _"=Z'�fr ; !.+} _l�:ra,� _ ...iafilii _4 �! L __ _ Oi: i'i 19 t,ti'. i M� irrr:I _ - T Gi21N, !=:ifT'li[ 4FCi.31G�i P&'! _ me > '_ih ' Vi ... ' ll''"�i1Z�+ I:rl ,�,+r E � �'•J% L�� ` II:rJUwr�C� --- - -- •!'�_ti�I - � 11 .:It+^C:1 �+s�;.Ft:J '117 11'�i) Sit,.1� r�-L3 i�� _ YF I:"i�1ti v1 art Lr 1� r y .111r'11, - !:: l llj. �i, j d' ' Amu _ _ � _ ri,k' t7t tf1.71JS.1:.':..} j+C. ^ilJ:'� T _. _... i _-rf) - 0 A ;S , F w 4s ROY COOPER Governor MICHAEL S. REGAN Se -my BRIAN WR£NN Acting Atrector Dr. Kirk E. Peterson, President Chowan University One University Place Murfreesboro, NC 27855 NORTH CAROLINA EnvLnamentd Quality February 10, 2020 Subject: Stormwater Permit No. SW7111007 Renewal Chowan University Student Housing High Density Stormwater Project Hertford County Dear Dr. Peterson: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7111007 for a stormwater treatment system consisting of a wet detention pond to serve Chowan University Student Housing located on Union Street in Murfreesboro, NC expires on September 10, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. To keep this permit active please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: hups: 1,/deq.nc.gavJ�bout/ "visio ,/energy-mineral-land-resources/energgy-mineral-lance rules/stormwater-prQgram,Lpost-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can a -mail you a copy of the application forms. You can request a copy by e-mailing me at rogpr.thorpe@ncdenr gu. Sincerely, Rog r K. Thorpe Environmental Engineer /�pp�{ �D+ �� orth Carolina Department of Environmental Quality I Division of Energy, Mineral And Land Resources }p�{yyr Washington Regional Office 1 943 Washington Square Mall 1 Washington, North Carolina 27869 Wz9ow"a.ft 25Z946.6481 EXPRESS Permit Number: J W -7 I j t{ UL7 O C T 24 2011 (to be p•oi4ded Pis b,1'Q) Drainage Area Number: NC DEW& Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMI' elements noted in the inspection will be corrected, repaired or replaced immediately. "These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check once): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check once): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on tile - vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — if the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potential roblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximatelyapploximately six inches. Form SW401-Wet Detention Basin O&M-Rev-4 Page 1 of 4 BMP element: The inlet device: pipe or Swale The forebay The vegetated shelf The main treatment area Permit Number: (to he prof ded hr Dt11Q) Drainage Area Number: Potential problem: The pipe is clogged The pipe is cracked or otherwise damaged. Erosion is occurring in the sti+ale. Sediment has accumulated to a depth greater than the original design depth for sediment storage. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Weeds are present. Sediment has accumulated to a depth greater than the original design sediment storage depth. Algal growth covers over 50% of the area. Cattails, phragmites or other invasive plants cover 50% of the basin surface. How I will remediate the problem: Unclog the pipe. Dispose of the sediment off -site. Replace the pipe. Regrade the Swale if necessary to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future Eroblerns with erosion. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13MP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . Prune according to best professional practices Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Consult a professional to remove and control the algal growth. Remove the plants by Wiping them with pesticide (do not spray). Form SW401-Wct Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be provided bY 1)6fQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem-. The embankment Shrubs have started to grow Remove shrubs immediately, on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair, if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is darna ed Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth readhig and not readily penetrate into accumulated sediments. When the permanett pool depth reads 7 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 7 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom Clevat BASIN DIAGRAM (Jill in the blank ) p Permanent Pool Elevation 65 f 58 Pe maven Pool • - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 58 � Volume 57 -ft Min. ---------------------------- ----- ------ --- --- Sediment Bottom Elevation 57 � t-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by D WQ) i acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Chowan University Student Housing BMP drainage area number: 10.0 12 Acres Print name:M. Christopher White Title:President of Chowan University Addr Phon Sigm Date: Note: The legally responsihle party should not he it homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of ounty of 4 do hereby certify that Ct' RI JgER � "tTE p rsonally appeared before me this 7 d day of p--(icn� p r , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL 1 LL� My commission expiresVO-,,-A Form SW401-Wet Detention Basin 0&,M-Rev.4 Page 4 of 4 ae<--C) l . 'bwQ tisri ONLY Date Received Fee Paid Permit Number q -- i -r --a- S Q Applicable Rules: {select (I!l that ripply) ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 11 - Post Construction ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management flan ❑ Other WQ M rmt Plan: S'< ;4Ci` $ State of North Carolina Department of Environment and Natural ResourceREC E I' E n Division of Water Quality Y V STORMWATER MANAGEMENT PERMIT APPLICATION FOM 14 2012 This forrrr gray be photocopied for rise as an original I. GENERAL INFORMATION D =�,-.W, O 1. Project Name (subdivision, facility, or establishment name - should be consistent,a specifications, letters, operation and maintenance agreements, etc.): Chowan University Student Housing 2. Location of Project (street address): Union Street (400 ft south of Hassell Drive City: Murfreesboro County: Hertford %ip:27855 3. Directions to project (from nearest major intersection): north from US 158 onto Union Street fSR 11 Site Is anoroximately 0.6 miles on the left. 4. Latitude:360 25' 50.71" N Longitude:-77° 05' 51.14" W of the main entrance to the project. II. PERMIT INFORMATION: 'I. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number SW7111007 , its issue date (if known)Nov. 17, 201E , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ❑I-ligh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/} rosion Control: 11.39 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.lf any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2Ol0 Page 1 of 6 Sol A f R& III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Chowan University/ M. Christopher White Signing Official & Title: President of Chowan University b.Contact information for person listed in item 1a above: Street Address:One University Place City: Murfreesboro State:NC Zip:27855 Mailing Address (if 1apl7ficab1e):One University Place City: Murfreesboro State:NC/_ip:27855 Phone: (252 ) 398-6250 Fax: ( } Email:whitecOchowan.edu c. Please check the appropriate box. The applicant listed above is: ®'The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below-, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official &'Title: b.Contact information for person listed in item 2a above: Street Add City: Mailing Address (if applicable): Citv: Phone: Email: State: Zip: State: Lip: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( } Email: State: Zip: Fax: l ) 4. Local jurisdiction for building permits: Hertford County Point of Contact: William Early Phone #: (252 ) 358-7801 Form SWU-101 Version 07Jun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. All stormwater runoff on -site will be gathered via drainage structures and directed into a_piping system. The system will convey the stormwater to the site 13MP wet and and be treated before being discharged to the Hare Branch Waterway. 2. a, If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph I I - Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4. Total Property Area: 12.393 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area`:12.393 acres Total project area shall he calculated to exclude thefollowing: the nornxrl pool of btr orn ded structures, the area behVCen the bunks of streams and rivers, the area belrno the Norwal Higglr Water (NM line or Mean High Water (MHW) line, and coastal uaellands lanrhoard from tiro NHW (or MHW) line. The resrillant project area is used to calculate ozpertrll pen:er7t built upon area (B UA). Norr-coastal nlethands landznard of the NHW (or MFlM line may he included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 49.9 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered storrwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information ., Drainage Area T Drainage Area _ Draina' e Area ' Draina `e Area Receiving Stream Name Hares Branch Stream Class * C-NSW Stream Index Number * 25-4-6 Total Drainage Area (so 539,840 Iz , 3,1 ae On -site Drainage Area (so 539,840 Off -site Drainage Area (sf) - Pro osed Impervious Area'(so 269,469 tb� % Impervious Area** total 49.9 clin pervious..,_ Surface Area s i Draina e Area1 ' Drainage Area Draina e°Area,_ Drainage •Area'' On -site Buildings/ Lots (so 35,349 On -site Streets (sf) 37,760 On -site Parkin (so 136,011 On -site Sidewalks (so 35,725 Other on -site (so - Future (sf) 24,624 O.y"� o►o Off -site (so - Existin BUA*** (so - Total (so: 269,469 6. A- * Sireaar Class and lodes Number ran be deterntiued at: Jrtt�*;//piirlrrl.mxla�rtr.or rccs:b/mrl[hs/carr/c°lrrssilir:rrti��ats Norm SWU-101 Version 07Jun2010 Page 3 of 6 * 1na xrnrious area is defined as the built rrpon area including, but not lintited to, buildings, roasts, parking arears, siatavalks, gravel areas, etc. ***Report only that franount of existing BUA that will renwin after developrnent. Do riot report ally existing BLIA that is to be rranoved and 717hiCh will be replaced by Hem BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. N/ A Proiects in Union County: Contact DiVC) Central Office sluff to sleek if the project is located tvithin a 77rreatenesl & Endangered Species watershed that naayy he subject to nror•e stringent alorinivater reguirenrents as per NCAC 0211.0600. 0�11910Ua1101ZIONlMt•I19X01-4-3 C0][M►ifI The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BM P specified for this project. The latest versions of the forms can be downloaded from http://portil.ncdenr.org/web/wq/ivs/su/btiip-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://�)orfial.nccienr.org/tiveb/wq/ws/su/statesw/for•r»s does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at httr�://t?ortal.ncilenr.orwet?f wqf wsf suf ma�?s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from htt ): ?ortal.ncdenr.or gweb w w^s su statesw forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form, 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part V11 below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreements) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'/z mile of the site boundary, include the'/i mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/ Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f, Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the batiks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MI-IW or NI-IW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. Fonn SWU-101 Version 07Jun2O10 I'age 4 of 6 o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SFIWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x 11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration 13MPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedide a silt. visit for DWQ to 74e7fil the 514Wl' prior to subnntillal, (910) 796-7378) 10. A copy of the most current property deed. Deed book: 337 Page No: 214 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item In, 2a, and/or 3a per NCAC 21-1.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: // www.secretary,state.nc.us/Corporations/CSearcli,asi2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed 13UA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org,/web/wq/ws/su/statesw/forms docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:David Castel Consulting Firm: LandDesi n Inc. Mailing Address:19 W Hargett Str�Suite 602 City:Raleigh State:NC Zip:27601 Phone: (919 ) 838-9331 Fax: (919 ) 800-3583 1?maiLd ;astel@landdesign.com IX. PROPERTY OWNER AUTHORIZATION (if Conlract Innfornnrationn, ilew 2 has been filed oast, c'otuylete this secl ion) 1, (print or type mane of person listed in Contact lufornrtatioa, item 21a) , certify that I own the property identified in this permit application, and thus give permission to (print or type, nnmut of person listed in Contact Inafornuatioa, item 1aa) with (print or type nuaine of organizatiort listed in Contact Inforntratiot, ilenu la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner l acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. 1 understand that the operation of a stormwater treatment facility 4vithout a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of , County of . do hereby certify that before me this _ day of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type naive of person listed in Contact [nforniation, itenr Ia) M. Christopher Mite certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that th4 proposed project complies with the requirements of the applicable stormwater rules under �5A NCAC 2H .1 SL 2006-246 (Ph. 11 - Post Construction) or S1. 2008-211. personally appeared �n of the application for Fonn SWU-101 Version 07Jun2010 Page 6 of 6 C A Ryp�i-nit No. fro be provided by DINO) �2�� 16�i L SEAL T EXPRESS 032429 ; ATA Nov 14 201 , �-• F �:,-�; _C3 oG NCDENR `i. G�ra�� NCNC DE��,�I�MWATER MANAGEMENT PERMIT APPLICATION FIIH(K 401 CERTIFICATION APPLICATION FORM r WET DETENTION BASIN SUPPLEMENT 11r�fl I This form must be filled out, printed and submitted. The Required Items Checklist (Part (11) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Chowan University Student Housing Contact person David Gastel Phone number 704-333-0325 Date 111912011 Drainage area number 10.60 Acres II. DESIGN INFORMATION Site Characteristics Drainage area 461,736 it' Impervious area, post -development 277,042 g2 V . % Impervious 60.00 % Design rainfall depth 1.5 in 1/ Storage Volume: Non -SA Waters Minimum volume required 34,053 rya OK Volume provided 38,044 It' OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-developmenl 1-yr, 24-hr runoff Post -development 1-yr, 24-hr €uncfl Minimum volume required Volume provided Peale Flow Calculations Is the prelpost control of the tyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development I y, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10f1 vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanoul, bottom elevation Sediment storage provided Is there additional volume stored above fhe state -required temp. pool? Elevalion of the top of the additional volume it3 ft3 ll3 it ft3 Y (Y or N) 2.9 in 0.25 (unitless) 0.70 (unitless) 0.12 inlhr OK 7.69 ft3fsec 21.52 it/sec 13.84 ft3lsec 66.60 fmsl 65,00 fmsl 65.40 fmsl 65.50 fmsl 64.50 imsl Data not needed for calculation option 41, but OK if provided. 58,00 fmsl 57.001msl Data not needed for calculation option k 1, but 4K if provided. 1.00 1t N (Y or N) fmsl Form SW401-Wet Detention Basin-Rov.8,e117W Parts I. S It. Design Summary, Page 1 of 2 Permit No. (10 be provided by DWO) II, DESIGN INFORMATION Surface Areas Area, temporary pool 27,563 ftz Area REQUIRED, permanent pool 22,163 it' SAIDA ratio 4.80 (unitless) Area PROVIDED, permanent pool, Am„ yD, 22,216 it OK Area, bottom of 10ft vegetated shelf, Aba ,hw 19,863 it' Area, sediment cleanoul, top elevation (bottom of pond), Abd �Or,a 10,005 fl2 Volumes Volume, temporary pool 38,044 f13 OK Volume, permanent pool, VP*- 105,208 10 Wume, forebay (sum of lorebays if more than one forebay) 20,659 h3 Forebay % of permanent pool volume 19.6% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? Y (Y or N) Mountain/Piedmont SA)DA Table Used? N (Y or N) SAIDA ratio 4.80 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Votume, permanent pool, Vim„-, , 105,208 if Area provided, permanent pool, Ap,„ pw 22,216 h2 Average depth calculated 4.74 it OK Average depth used in SAIDA, d,,, (Round 10 nearest 0.511) 4.5 h OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ap,, ad 22,216 ft2 Area, bottom of 10it vegelaled shelf, At,, w, 19,863 h2 Area, sediment cleanoul, top elevation (bottom of pond), Aba,_P W 10,005 ft2 'Depth' (distance blw bottom of 1 Oft shelf and top of sediment) 6.50 it Average depth calculated it Average depth used in SAIDA, d. (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50 in Area of orifice (if -non -circular) in, Coefficient of discharge (Cu) 0.60 (unitless) Driving head (Hp) 1.50 h Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (C,Y) (unitless) Length of weir (L) it Driving head (H) it Pre -development 1-yr, 24-hr peak flow 7.69 ft3lseC Post-developmem 1-yr, 24-hr peak flow 21.52 ft3lsec Storage volume discharge rate (through discharge orifice or weir) 0.12 ft3lsec Storage volume drawdown time 4,13 days CK, draws down in 2.5 days. Additional Information Vegelaled side slopes 3 :1 OK Vegetated shell slope €0 :1 OK Vegetated shelf width 10,0 it OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 2.4 A OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 h OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Hydraulic Pump/Emergency valve Farm SW401-Wet Detention Basin-Rev.6-8117/09 Parts I. & 11. Design Summary, Pago 2 o12 Permit (to be provided by DWO) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 4r— e' 6. n 1. Plans (1" 50' or larger) of the entire site showing: CA[ CS - Design at ultimate build -out, Ba o K Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. C 0 2 Partial plan (1" = 30' or larger) and details for the wet detention basin showing: G 6 • I Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with Hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. CG . 0 3. Section view of the wet detention basin (1' = 29 or larger) showing: C • G• 2 Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. �t w 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 4 4 C S 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for Forebay, C 6.0 to verify volume provided. C. 3. J &. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. r1l Cr 7. The supporting calculations. 2� r04 g. A copy of the signed and notarized operation and maintenance (O&M) agreement. afv �t rr.s 9. A copy of the deed restrictions (it required). Fa a Al 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County C'J 1. C f soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin- Rev.8-9117109 Part III. Required Items Checklist, Page 1 of 1