Loading...
HomeMy WebLinkAboutSW7080213_HISTORICAL FILE_20120710STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE C DOC DATE 2a20Z/,(i YYYYMMDD �A-7A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Charles Wakild, PE Director July 10, 2012 Mr. Johnie D. Harvey, III, Chairperson of Building Committee Grace and Truth Community Church' 1300 Walker Avenue Elizabeth City, NC 27909 Dear Mr. Harvey: Dee Freeman Secretary Subject: Stormwater Permit No. SW7080213 Modification Grace and Truth Community Church High Density Project Pasquotank County The Washington Regional Office issued the permit modification for Grace and Truth Community Church on June 29, 2012 with an incorrect date located in the middle of page 2 of 7 of the permit, which read: "This permit shall be effective from the date of issuance until June 29, 2012, and shall be subject to the following specified conditions and limitations:". The renewal date of the permit is actually June 29, 2020 and should read: "This permit shall be effective from the date of issuance until June 29, 2020, and shall be subject to the following specified conditions and limitations:" Please replace page 2 of the permit with the attached corrected version. If you have any questions, or need additional Information concerning this matter, please contact me at (252) 946-6481. Sincerely, Scott Vinson Environmental Engineer Surface Water Protection Section AHlsv: S:IWQSISTORMWATERILET7-ERSISW7080213 cc: Caroline Copeland, AR Chesson Co. ,,,,WaRO SW File North Carolina Division of Water Quality Internet: www.ncwaterqualitv.or¢ 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer— 50% Recyded110% Post Consumer Paper None Carolina �tura!ly _.. 1 State Stormwater Management Systems Permit No. SW7080213MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Grace and Truth Community Church Grace and Truth Community Church Pasquotank County FOR THE construction, operation and maintenance of three grassed bioretention areas in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting, data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 29, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been -designed to handle the runoff from 66,928 square feet of impervious area. Basins 1 and,1A are connected to Basin 2-3 by an underground connection to act as one basin to achieve volume capacity for Drainage Areas 1, 1A, 2 and 3. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans and specifications. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems h- Permit No. SW7080213MOD \ 6. The following design criteria have been provided in the bioretention areas and must be maintained at design condition: Area 1-1 A Area 2-3 Area 4 a. Drainage Area, ft2: 9-- b, 7-4— 46- 43 b. Total Impervious Surfaces, ft2: 18,284 31,534 17,110 C. Design Storm, inches: 1.0"&1.5" 1.0" 1.011. d. Bioretention Ponding Depth, inches: 9.0 9.0 9.0 e. Temporary Ponded Depth Elevations, FMSL: 8.20 8.20 8.20 f. Bioretention Planting Elevation, FMSL: 7.45 7.45 7.45 g. Bioretention Surface Area, ft2: 1,500 5,735 8,600 h. Permitted Storage Volume, ft3: 998 3,718 5,910 i. Type of Planting Media Soil: 85% Sand, 12% Fines, 3% Organic j. Type of In -situ Soils: Arapahoe, fine sandy loam with clayey pockets j. Expected Infiltration Rate, inlhr: 2.0 2.0 2.0 k. Seasonal High Water Table, FMSL: 5.45 5.45 5.45 1. Receiving Stream/River Basin: Knobbs Creek 1 Pasuotank m. Stream Index Number. 30 — 3 — 8 n. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction' of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 clf Tru C0 (h f.ch - Pa�)cinq Lod A, cl d'+i cq ; , 5-10 r 61.walf co lwobbL -,a�a-v-d �!94 r m -�Ojtu-1 Cl-h �cnS! 2 1 -,Z 00 0 At -d. --p (3 V), 5 ZCI)08. - 1. 4- E>6. 4 J' C REEIVED. -.D A I 11-1 ce JUN - 5 2012 PAL ii Z = e-, -,-,)s> -5 L-r RO DWQ-WA X- x 5to(A,qe- Prov.1 cl cd Ob 0 -t 0 Q (Z 08 S. C,5 Ix3,DsCF u lb bK SEAL I -6242 a AOU olll! , f i R cacti Tu. h .&CAM.ur7d: - Chu Iuh -Pa(b,0y._�-bt Add► 0—) S�urMt,sc�kl Calculn�c�s - N,_GW _ 1 _. - . Drainage Arec, I.A . _P0e.7%tlopmen .. Cx•i Si�`�.q � � IYl ��� V i OUs - O- dQ �A �-:. � � .. . _. - - jlfr ,cc. 0-3-1AAG KPcc,_ I,.o.U(U.!5) _ -Y'n o� .T'ia.vc. i - 55 _ Chun .c i'.n 9 o5.5' Y .0.50' . TG. . C _H_ J �O _ p'M iMin eaooc 2 - 2,01a min j,10 -_10H� `7 S {`' h(- i ' DIaunG9c- A-rca ]A Post- [)evcto lYKil� A r to = 0K Yost = .U, $ S. . UP& I = .I 15 Gha e in rc ltve, ic/ = 9, (o o' 8.9;0' =_G T= Li US SDyr-_2-ilhr -7c5 inJhr . 1S0 `s`Y'e.'.��- 1.,,3� t 30� P.tc vs ('c*r_ ?,egv;rcd S--o(o9c-='Cd�ast: p«)(TSP)-- (2_.30 yz Cf 'orainp�e .!'eta IA [ '�z" CoaSta.l-S-tbcr�_ ,a.kr �Cu.4�sT -1-771 ouS..SUIFace- - IZ s l2, 408 Kf x O•IZS = _l_,_A ?TAL'. OC t?uLE - u i d d ' Z'oE 2 , I i - S9-of m Wow Calw Ictii pA 1''. 3_ DA Z t DA3t DP.+ 1A = 25, L) C(-- -F_ 138 $o CF t_ 31;0'�;3 65_ CF. To7AL. _12 e .0 i.(-Cd f=v r _Prc, v s: Po-S (DA ► -f DA 2 t DA3) t DA JA = 3,085 [ F . i C - (a 3(o C 8 32. CF equ' ��,r Coomo),eule s� I `1 13 1.32..CF 7bTAL Vi u:ired_ for Coastal'_ Punts.. DPA1.t DA I = 999.CF 5.55 Cf, PA Tovo 4 = 9 , -t 1 .CF G Provl It cl, - r A.R,CHESSON C( �: CONSTRUCTION CO., INC. 315 West Alain Street 138 Rich Boulevard 3200 Maritime Woods Park Drive Post Offiec Box 1147 Elizabeth City, NC 27909 Mantco, NC 27954 Willinmston, NC 27892 PHONE (252)792-4486 11110NE (252)338-9171 P110,VP (252)473-2726 FAX 252 792.9090 FAX (252) 338-9172 FAX (252) 473-2726 To: NCDENR — Division of Water Quality Date: 5/1/12 RE: Grace and Truth CornMUnity Church WE ARE SENDING YOU Attached Under separate cover via JUN 2012 the following items: Shop drawings Prints X Plans Samples DVVeQrVtVARO Copy of letter Change order COPIES DESCRIPTION 2 Revised Plans for Graee &'Frulh Corninuifily Church 2 Stormwater Mama Bement Permit Al2plic,,ktion Form Pa es 2 and 3 2 Revised Bioreteniion Cell Su >>lemenis 2 Revised Stornmiicr Calculations THESE ARE TRANSMITTED as checked below: X For approval Approved as submitted For your use Approved as doted As requested Returned for corrections For review and comment FOR BIDS DUE REMARKS: Resubmit copies for approval Submit copies for distribution Return corrected prints PRINTS RETURNED AFTER LOAN TO US Per comments from Cit of Elizabeth City we had to install an extra sidewalk connection to the bottom right parking lot from the buildings and increase the size of the parking stalls. This increased our im ervious surface. We were able to stay within the amount of CF ca acit originally pro osed. Ifyou have any questions please let me know. Thank you, Caroline 02I4Ajv-r,jw(-,] RECEIVED JUN - 5 2012 DWQ-WARO STORMWATER MANAGEMENT NARRATIVE Grace and Truth Community Church Elizabeth City Pasquotank County, North Carolina By , yyyyylrsrllll/i,, CAR0 �. Ralph S. Jarvis, PE, PLS ��; •pF� ��Dij�'•+9 •Q SEAL • • 6242 • JARVIS CONSULTANTS, INC. CONSULTING ENGINEERS -PLANNERS -SURVEYORS 212 South Main Street, Bath, North Carolina 27808 Telephone (252) 923-0302 / Fax (252) 923-0306 f ��-.. ` i�,� L rll; :1 � , 5� �.1 t �. ` l } . '' STORMWATER MANAGEMENT NARRATIVE A. DESCRIPTION OF PROJECT Location of Project The project is located at 1300 Walker Avenue, Elizabeth City, North Carolina. It is in the southwest portion of the city in predominately residential zoning. Type of Development The parking lot addition project consists of grading, placing stone, and modifying the stormwater management system adjacent to Walker Avenue. There are existing improvements covered by permit number SW7080213 issued March 5, 2008. The permitted area is identified as area 1. The area to be expanded is area 1 A. Earth Disturbing Activities The site presently has had stone placed on it in anticipation of grading and drainage. Earth disturbances will consist of 0.64 acres for the construction of the new parking area, erosion control measures, and stormwater detention features. The City of Elizabeth City has the construction plans under review. Existing Drainage Patterns The site has the stormwater collection and treatment systems along both the eastern and western property lines. All the construction permitted under the existing permit has been completed. Both systems drain southward toward Walker Avenue. Proposed Drainage Patterns The existing Drainage Area 4 will not be impacted by the new proposed construction. Drainage Area 1, 2, and 3 are all interconnected hydrostatically and share storage volume. They were designed with storage from a one inch rainfall event. Future parking areas were anticipated and reserve capacity provided in the permit and construction of the existing system. The location of the future parking lot was not decided upon until recently. Since the original permit was issued, the Coastal Stormwater Rules has changed to require storage from one and one half inches of rainfall. There was a deficit in the storage volume and a modification for additional storage was necessary. The new parking lot required storage has been computed under the newest rules while the existing permit covers the one inch volume. The new volume under the rules requires 4,713.32 CF of storage and 4,716 CF of storage will be provided. The bioretention cell supplement enclosed is the same as the date of the original permit and has Areas 1 and 1 A combined and a rainfall event of one and one half inches. The provided storage is sufficient to handle the rainfall even in Areas 1 and 1 A without having to show the one inch area as a separate item. The older version of the supplement allowed for SHWT separation from the bottom of the storage volume whereas the current addition shows an insufficiency with the required separation. Construction Sequence Currently installed grave] will be removed and re -used within the new parking area. Containment devices will be installed for construction discharge. Stormwater management devices will not be completed until site stabilization has been completed. K Permit Number SW7080213 Central Files: APS _ SWP 11/13/2014 Permit Tracking Slip Program Category Status Project Type State SW Active Major modification Permit Type Version Permit Classification State Stormwater 1.10 Individual Primary Reviewer scott.vinson Coastal SWRute Permitted Flow Facility Permit Contact Affiliation Facility Name Major/Minor Region Grace and Truth Community Church - Express Minor Washington Location Address // O�►� L f County 1300 Walker Ave f Jv��" �jZ�c,�_ F�_l L Pasquotank Facility Contact Affiliation Elizabeth City NC 27909 Owner Owner Name Owner Type Grace and Truth Community Church Non -Government Owner Affiliation Johnie D. Harvey III Chairperson Dates/Events Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 3/5/2008 5/9/2012 6/29/2012 6/29/2012 6/29/2020 Regulated Activities Requested !Received Events State Stormwater - HD - Bioretention Deed restriction requested Deed restriction received Additional information received 615112 Outfall Walerbody Name Streamindex Number Current Class Subbasin State Stormwater Management Systems Permit No. SW7080213MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Grace and Truth Community Church Grace and Truth Community Church Pasquotank County FOR THE construction, operation and maintenance of three grassed bioretention areas in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211(hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 29, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 66,928 square feet of impervious area. Basins 1 and 1A are connected to Basin 2-3 by an under round connection to act as one basin to achieve volume capacity for Drainage Areas 1, 1A, 2 and 3. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans and specifications. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW7080213MOD 6. The following design criteria have been provided in the bioretention areas and must be maintained at design condition: Area 1-1 A Area 2-3 Area 4 a. Drainage Area, ft2: 25,356 46,174 46,645 b. Total Impervious Surfaces, ft2: 18,284 31,534 17,110 C. Design Storm, inches: 1.0"&1.5" 1.0" 1.01, d. Bioretention Ponding Depth, inches: 9.0 9.0 9.0 e. Temporary Ponded Depth Elevations, FMSL: 8.20 8.20 8.20 f. Bioretention Planting Elevation, FMSL: 7.45 7.45 7.45 g. Bioretention Surface Area, ft2: 1,500 5,735 8,600 h. Permitted Storage Volume, W: 998 3,718 5,910 i. Type of Planting Media Soil: 85% Sand, 12% Fines, 3% Organic j. Type of In -situ Soils: Arapahoe, fine sandy loam with clayey pockets j. Expected Infiltration Rate, inlhr: 2.0 2.0 2.0 k. Seasonal High Water Table, FMSL: 5.45 5.45 5.45 I. Receiving Stream/River Basin: Knobbs Creek 1 Pasuotank M. Stream Index Number: 30 — 3 — 8 n. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 l ..,jA wayo NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, PE Dee Freeman Governor Director Secretary June 29, 2012 Mr. Johnie D. Harvey, III, Chairperson of Building Committee Grace and Truth Community Church 1300 Walker Avenue Elizabeth City, INC 27909 Subject: Stormwater Permit No. SW7080213 Modification Grace and Truth Community Church High Density Project Pasquotank County Dear Mr. Harvey: The Washington Regional Office received a complete Stormwater Management Permit Application for the modification of Grace and Truth Community Church on June 5, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2008-211. We are forwarding Permit No. SW7080213MOD dated June 29, 2012, for the construction of three grassed bioretention cells to treat the existing and proposed new impervious area at the subject project located at 1300 Walker Avenue, Elizabeth City, North Carolina. By issuance of this permit, the previous permit for this project, issued on March 5, 2008, is hereby rescinded. This permit shall be effective from the date of issuance until June 29, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such -demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481, S'�lcerely, . / _ . Al Hodge Regional Supervisor Surface Water Protection Section AHlsv: S:1WQSISTORMWATERIPERMITS1SW7080213 cc: Sam Jarvis, PE Pasquotank County Building Inspections ,,/*ashington Regional Office North Carolina Division of Water Quality Internet: www.ncwaterqualin�.ore Ong 943 Washington Square Mall Phone! 252-946-6481 Washington, NC 27889 FAX 252-946-9215 NNatuilally orthCarofina An Equal opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper i State Stormwater Management Systems Permit No. SW7080213MOD STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Grace and Truth Community Church Grace and Truth Community Church Pasquotank County FOR THE construction, operation and maintenance of three grassed bioretention areas in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 29, 2012, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Pro1'ect Data Sheet. The stormwater control has been designed to handle the runoff from 66,928 square feet of impervious area. Basins 1 and 1A are connected to Basin 2-3 by an underground connection to act as one basin to achieve volume capacity for Drainage Areas 1, 1A, 2 and 3. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans and specifications. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW7080213MOD 6. The following design criteria have been provided in the bioretention areas and must be maintained at design condition: Area 1-1 A Area 2-3 Area 4 a. Drainage Area, ft2: 25,356 46,17T_ 46, 445 b. Total Impervious Surfaces, ft2: 18,284 31,534 17,110 C. Design Storm, inches: 1.0"&1.5" 1.0" - 1.01, d. Bioretention Ponding Depth, inches: 9.0 9.0 9.0 e. Temporary Ponded Depth Elevations, FMSL: 8.20 8.20 8.20 f. Bioretention Planting Elevation, FMSL: 7.45 7.45 7.45 g. Bioretention Surface Area, ft2: 1,500 5,735 8,600 h. Permitted Storage Volume, ft3: 998 3,718 5,910 i. Type of Planting Media Soil: 85% Sand, 12% Fines, 3% Organic j. Type of In -situ Soils: Arapahoe, fine sandy loam with clayey pockets j. Expected Infiltration Rate, inlhr: 2.0 2.0 2.0 k.. Seasonal High Water Table, FMSL: 5.45 5.45 5.45 I. Receiving Stream/River Basin: Knobbs Creek I Pasuotank M. Stream Index Number: 30 - 3 — 8 n. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3 of 7 t State Stormwater Management Systems Permit No. SW7080213MOD 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SW7080213MOD III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division; such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination} does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts'of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 10. This permit shall be effective from the date of issuance until June 29, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 291h day of June, 2012. N RTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Charles Wakild, PE, Director Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7080213 Modification Page 5 of 7 State Stormwater Management Systems Permit No. SW7080213MOD Grace and Truth Community Church Stormwater Permit No. SW7080213MOD Pasquotank County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater Management Systems Permit No. SW7080213MOD , Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Pasquotank County Building Inspections Page 7 of 7 A DWQ USE ONLY Date Received Fee Paid Permit Number State of North Carolina 0A Department of Environment and Natural Resources ����� D Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORIJAy 1 1 2012 This farm may he photos-opied for use try an original I. GENERAIANFORMA'rION DW4WAR0 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 00,P Grace and Truth Connmunily Church' 2. Print Owner/ Signing Official's name and title (person legally responsible for facility and compliance): .lohnie D. Harvcy,-lll--.BUi1di11,2, and Grounds Manager 3. Mailing Address for person listed in item 2 above: 1300 Walker Avenue City:Elizabeth City _ State:NC Zip:27909 Phone: (252 ) 338-7705 Fax: (252 ) 338-7708 Email:iohriie.d.harvey(!-�tiscg.mail 4. Project Name (subdivision, facility, or establishment name - should he consistent with project name on plans, specifications.. letters, operation and maintenance agreements. etc.): Grace and Truth Community Church 5. Location of Project (street address): 1300 Walker Avenue City:Elizabetli City County:Pasguotank 6. Directions to project (from nearest major intersection): From the intersection of Halstead Blvd and Walker Avenue turn east onto Walker Avenue. Church is located aooroximately 11 4 mile down Walker Avenue. 7. Lalitude:36.28796 Longitude:76.23717 of project 8. Contact person who can answer questions about the project: Nanic:Caroline Copeland _ Telephone Number: (252 ) 792-4486 Eri3ail:caroline@archesson.com H. PERMIT INFORMATION: 1. Specify whether project is (check one): ❑New ❑Renewal ®Modification Form SWU-101 Version 8.07 Page l of 4 i 5 i YAM op r mow, r Q 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number. SW7080213 and its issue date (if known) 3/5/08� 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop []General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit �iEW�+D Information on required state permits can be obtained by contacting the Customer Service Center at ir+ 1-877-623-6748. JUN - 5 2012 III. PROJECT INFORMATION DWQ-WARO 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. All stormwater runoff will be treated on site in three separate grassed bio-retention cells. There is a cell locted on the east side of the project that handles the stormwater from a portion of the existing buildings and a portion of the parking area. Another cell is located on the west side of the property to handle the stormwater from a portion of the new building and a large portion of the parking area and drive. The final cell is located on the west and, south side of the property to handle the remaining portion of the, building, the remaining portion of the 12a1king lot and the remajp ortion of the existing buildings. The expanded treatments stem will impact this area adjacent to Walker Avenue. 2. Stormwater runoff from this project drains to the Pasquotank River basil. 3. Total Site Area: 6.21 acres 4. Total Wetlands Area: 0.00 acres 5. 100' Wide Strip of Wetland Area: 0.00 acres (not applicable if no wetlands exist m site) 6. Total Project Area**:6,21 acres 7. Project Built Upon Area:24 8. How many drainage areas does the project have?3 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information ea e Area 1 10 A Drains >e A rea Receiving Stream Name Knobbs Creek Knobbs Creek Stream Class & Index No. C Sw 30-3-8 C Sw 30-3-8 Drainage Area (sf) 25356 46174 Existing Impervious* Area (sf) 5256 13418 Proposed Impervious*Area (sf) 18284 31534 Impervious* Area (total) 72% 68% Impervious* Surfacc•Ar6a , laiaii _ ' Area'1 0A Drainiige,Area 2 3 On -site Buildings (sf) 1235 3975 On -site Streets (sf) 0 0 On -site Parking (sf) 15852 25745 On -site Sidewalks (sf) 1197 1814 Other on -site (sf) 0 0 Off -site (sf) 0 0 Form SWU-101 Versioii 8.07 1la-e.2 ol"4 `7 I I,; J v 16 t A Total (sf): I 18284 l 31534 Impervious area is defined as the built upon area including, but not lindted to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above derived,. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each 13MP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-1-evel Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Fornt S W U- l 0l Version 8.07 1 Page 3 of 4 Basin Information Drainage Area 4 Receiving Stream Name Knobbs Creek Stream Class & Index No. C Sw 30-3-8 Drainage Area sf 46645 Existinci Impervious* Area (sf) 2613 Proposed Impervious* Area (sf 17110 % Impervious* Area total 37% Impervious* Surface Area Drainage Area 4 On -Site Building sf) 6184 On -Site Streets (sf) 0 On -Site Parkin sf) 9765 On -Site Sidewalks (sf) 1161 Other On -Site (sf) 0 Off -Site (sf) 0 Total sf): 17110 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of WaterQualit.y (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appn)priate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htty:Hh2o,eiir.state.nc.its/su/msi maps.htm) Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original curd onecopy of the Storrnwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Fortn(s) and O&M agreetnent(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) pernahleloNCDEWR • Calculations & detailed narrative description of storrnwater treatment/ management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/ Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/ project boundary - Location snap with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and storrnwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firni so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Jarvis Consultants, Inc. Mailing Address:212 South Main Street City:Bath Phone: (252 ) 923-0302 Email:sam,jarvispaCurnhargmaiLcon Vlll. APPLICANT'S CERTIFICATION State:NC 7ip:27808 Fax: (252 ) 923-0306 1, (print nr type ncnrtecf'persnrr listed in General Irtfnrmation, item 2) Johnie D. Harvey, III certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance wilh the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .109O Signature: 0 Date: S q l7i Form SWU-101 Version 8.07 Page 4 of 4 Vinson, Scott From: Dumpor, Samir Sent: Wednesday, May 23. 2012 US AM To: Vinson, Scott Subject: FW: Grace & Truth Stormwater Calculations Attachments: Grace&Truth Calcs REV 5-22-12,PDF A From: Copeland; Caroline [mail :caroline archesson.com] Sent: Wednesday, May 23, 2012 7:56 AM To: Dumpor, Samir Cc: Sam Jarvis Subject: Grace & Truth Stormwater Calculations Samir, we submitted to Elizabeth City Planning Dept. at the same time we submitted to you for stormwater. We met with Elizabeth City yesterday to review the comment changes to the plans. The City is requiring we adjust the proposed parking stalls to 9'x19' instead of the 9'x18' as originally proposed. They also requested we install a sidewalk to access the lower parking area. Doing these two changes increased the impervious area for our proposed site. To accommodate the additional impervious, I reduced the traffic isle in the upper parking area thus offsetting some of the new impervious required. By making all the changes we were able to stay within our designed 'provided' storage as originally submitted. The only thing that did change was the amount of storage required. I have attached the scanned revised calculations. I would like to hold off on sending you the drawings until Friday. Elizabeth City wanted to make a few changes to shrub types and I would like one set of plans to be the same for everyone if you can wait a few more days. If you have any questions please give me a call or Sam. Thank you, Caroline O. Copeland, LEED AP BD+C A.R. Chesson Construction Co., Inc. P.O. Box 1147 -' 315 West Main Street WiIliamston, NC 27892 Phone: (252) 792-4486 Fax: (252) 792-9090 www.archesson.com Interact with A.R. Chesson: Facebook: www.facebook,comlchessonconstruction 14 r _..__.......(race. .._.Tf�� h_ (Annm.mda-.,Churt,h.-..PacYs'ny..Lot _. SttirM.t,>►cehl Ccilcu�aticns-..Nt.w.............._ .......... _..._. .Drai(pgc . A(cc, _.I.A_- .Pfe- -Deg tlo . en . pe{_v ous_ - o- oo A c-.... . oF.._Travc..I.__=... .... -. � cgs....... ---...... .._._. ,... ._ o z Z.0.8_.rmin .'_ . L� K z-A Co.:15)-(. J •S1 r`0, 34,). = 0 y..L _CFs _ *-D ctinoge. Area ..I'A Post �ev�10 ..(ho1�. .. :. .. _. Area = 0:i.F1� .... K ?st Char)qc. i`o FIeuG 'rfr = `3 (a 0.'- S •9 D' =.0 -70.Tc-� 3 f 3 . '... .6}0 P, .=..tO._es).(.�.si-(.v. �). 2�� o GAS........: CCNyso.= --Tc C.o• y ��> a•o 3 Ito.. AC-) 3Ub r� .:..)(A - TIC .:Y5-Fast. _ I?e ui rcd. 5�nra s✓ = _C.c�. asp. - G? +ciCTT�i.= (2.30 -¢u. Q g. P 1 `1) qz3.: Cf- .......'uired :�. D�a,n�e . �'+ctca.:._1/.��—I '1z'� Coalfia.j_S•f-as_�_W�...1�,r_.�-u.lGs... ..:.. .: 5�.2 1 r�'rous °SurF� 17, 42to �S .. •� ,rye ems. �. ! 2 s , .. ..... - - - ti(egWr .. .. :. :.. ..�z`)..L109 SF.x 0!1zs--= 1 55 F *COASTAL- AQCA..KVLEa- - - _.:. _....... 2 oF. A.R.CHESSON C( �.' CONSTRUCTION CO., INC. 315 West Main Street 138 Rich 1loulevard 3200 Maritime Woods Park Drive Post Office Box 1147 Elizabeth City, NC 27909 Manlco, NC 27954 Will ianvaon, NC 27892 PHONE (252)792.4486 PHONE (252)338-9171 PHONE (252)473-2726 FAX (252)792-9090 FA (252) 338-9172 FAX (252) 473.2726 To: NCDENR — Division of Water Quality Date: 5/9/12 RE: Grace and Truth Community Church WE ARE SENDING YOU Attached Under separate cover via the following items: Shop drawings Prints X Plans Copy of letter Change order Samples Specifications COPIES DESCRIPTION 3 Plans for Crace &'truth Communlity Church 2 Stormwater Mana gc nierd Permit Application Form 2 Deed I Bioretention CCI1 Su i Slemen1S 1 O & M Agreement I Su}rmwatar Calculations I Narrative I Soil Report Prepared h MSA. PC I Check THESE ARE TRANSMITTED as checked below: X For approval Approved as submitted For your use Approved as noted As requested Returned for corrections For review and comment FOR BIDS DUE REMARKS: Resubmit copies for approval Submit copies for distribution Return corrected prints PRINTS RETURNED AFTER LOAN TO US c6mf � n.i Eta_ _GNrc,h '�ar_lr�'�� _Lit O�.di;fi cn { ' Wok _.Cal�v}'Qfi. as -For de.td, �cd _ex�.lana i G d__Calwla ids! of__ehc+sh'oc�.+dr.gt`na.�e_a{gas__ nder_.S. �mwa r. ' ' I 1 [ fYm; _ lni4'•_ 51Ni1.0_S.O{�Z 13 .___ 'Ck wr o,4t_4 _Mw:r- h!_s _ zoo$..- 1 ' ,n i Drain e Arto��'Calc�u.l'G( ISumma( IIA .._ {SSA, 2 ! 2,533J�F , A� I- � - ---i — -I � - -` - ! -' I - - � -! - - ' - ' � !.IVED . -MAY 9 2012 D WO RO, -WA , E � Lo , y ,9315 .C� frov:l.ded. —' 3. D_S.S.CF.fr�q�i.i`Cdf, = . )1;3_ 0 Cf # ex-ku st-or.io ., I f I k ' •�` i CA�CjfJ��� ; 3 -_ -•-- I . _- - � __ ,. _ ray --SEAL 2A 2 o i tl ' � ' I +� '7 •°°.. •.•°°� ,� `ice • k G-Mace. Drain Arec, .1.A .-De�clo C-x:, sfi`�9 I tV1 per-0ous �� G�,y h ok- _7 Pico( I__ 55' . _ . _,_ C.�iu y c !n _ Ie v.a-h en_ _ 9 %o' - B-S, _0 Tc- E tFa:cto'c 2 Z,p.B KiA' (Q 15i.Cj},Si k DIal'nG4c- IIA ._. Post- I�evr✓Io _ 1. ! ??. i A-rca C?_3 !1c _ K Post - 0, 5's Leo Oe TravCl ��.�C4ic� jc_io. Flew TC L 9.k'.h 77. _Q.equ;rcd St�ragC- F ;Dmi.Nc PCtc, .I/_a i2',.Ll08-sc x.o'fzs y s5�;�'�.. j GpAs-rA (—JMMvn,i� C,hv(CV) - PaOkrn�.Lo _A-ddiViCO, E TA _i'_ -t_ DA _z t_._pA 3 t. UH _ 1 R 5 , `r`- 13 6, �'a _CFq',s.s!_B iz3 Gr '= -(2. 2-ur:rid DA 2 4 DA3) t DA IA_= 3.,,0$S G� L, 5.5..,1 G . _ . y.y io.3(a �t,-e TOTA r_ -.��Cqumfoostc } :eu c S# 1 I i -2,533 GF . _ , .To}o 4 - H , -7=C,& 55!' XO i PcouideC� r r I ' �7 OCMWQ Ck C-u L0,' enS. ...... PCe - Oeve.1 grn6--)t _ rcl I nctJ L Ace ci T o-�o1 A-rca 0. 22 Acres <pre ..__-. (Ex..crdve-1 Par�.�r9 , Conc S�d�walks�_S�.,ld'►-,r� s� ... Len55 h oe Travel =. I U.\ ,.C,' .. . Chana�e.. tin Elt,va�icr� = °�lo'-.9•.0�}' = O.s(�_' , �3 o.38S 1Ccl:o� 0:385 O.5CO.). = 3.5- ,"C'. factor ~ l•-2 2 min ('lz. 9ra.sscd 5urFciu = 1� lz con cf Gcsphc k SuffaLt 0.2) .A = 0- 22. A crc.s = 10 y e of- - 2L1 H e .= •.S ► ") hr 010 �i l� - (0, S L,) 7' S� (L�, 22) = O . g 3 CF 5 v��Ge�a�eaoarP�► CcA qp� . D; ai r)Q c Are a 2 SQL 6242 m� C" CxisNnr� Im erv�`ous = U• 3d Ae � `Fo FG�4 Area 0_ L1 2 AG �'-A,, °`V",*4 l�prY = o.7i �• �s) fi 0.29 (0,15) = o• (a�l o. ©Li = (�,�► G CE->e G-ravt,t etwi o5) C-It-Q 5� Un.51-h C,F Trove l = Ica-' Chpnr).c lo. ClegcL o-). �ltoz-�r D.s8s l�a gassed su r ca - 0 (71 % Gck) c cv GsPhcl� su rfa cr = 0; 2 8) AreQ = O.Li2 Ar-as L,o = I0 /car - 2L1 HQ = 7.5 r �0.71D.14 2) 2 2�4 CF ru ON) m Uc> > ii L_.�) U; ca,-, Sj-ormU6aA-er CCL Wlc,�innS . 1)raunaj( Ace,ck x,si,,,5. Rc Total re- n = G^ . &2, A c �Cprc = U.Q2 C0,95) e p.,9B.(0.1S) trGrc,Ss SmaO Ayv�ounV o(z' Gravel PcUr1G+'n - Arr-ca) LeOc�i h o� Trgv G� _ 3S` Chong c. i'n EIe VUiicn = `)-37' - �%• 5G' = U. 8'� " 2.-38 .Arca = o 63 Acres Fc�ct�r = 2 Lto = 1v ycckr - Zq i-tP- =..75_ '")hr.. . Nc0000 c A(ca y'. _ Ex��9in� I�peruFr�US = 0•oCa Total A r cct = iC�rC = L�.C3(�i6.�is) r p,��lCO•ISi = blo '� ILq 0.2b CG-«sscd St��Fr�c� � �xsii�r� t3ulcl;,x�s� or I rave 1 = 261' Ghor,c�c.n rlc.vc�or} gl3 O.385 Tc,,2B rn;n Area 1•.awl �1� l2$ Fn&-or = Z = 8 •Sin m,n C ja = i0yeac - 2q 14 p w %•.6_1n)hr �10 1,04) CFS f, • �—ru c� 4 ru- h (_ammon=+j C_.hurCV) . S f r7Yl c ) cc�cr Ccut [ -i 4 OJT on S14 Cl� n �+ toSEA C) 2-2. Ac len��h u� 'TravcI = Ilp.l'... C;>1a ngc .ila.Elwcdk on m 8 0 a 0 385 Tc Fc�(-*or = 1. 2 3, 80 . (Y) ,.o = 14 dear 24 HP- = 7..S.'"�hc. A = .t`p.8S) (7'S)C0', 2z) = I�y,.O GFS. - — Rai nfei 11 D(.p-k k Cr-n1.1S) LTTP) Tirne jo Peak = olume (0,-13)(.0•0833_,-rn),(0.22.Ac)(.L43 SUO. /AC) �. 54•11 �e4ucrc.d s}orae = Co s�-.o�fe�(r�-�� = �I,�ao-o'Q���sy.►a� = 25.4.3 c . Provided S+ fa e = -11-7 CF 5E- lDraina5e Area. 2:... Arta =...O :�f2 A.c Kpos� F G. 85 Uoan k 6F -('ravel Icls` Change 'n tevati'en = 1C).1z`- e.9s` = 1. 1,7 /1 y5� o.3as 1•z8 Fac%r = 1).14 = . i�.92 min irp = 10 scar 24 1+Q = 7,..S nrhr C,Q 14'A (0.8S)(7,S)(o.42) = 2,�g C,�S ` Ro in(ai1 De-o-h CC nI -7S) = 0:7 u, "n . TT P = 1 e _ CC?.�itoi(0.0833 Ay;�, (0.42A-c)-(.-43,Sua srfac) 315, yC. Se c X- �equ,rc-d sfv(-Oqe 6SoS� - Ca re)CTTF_ (Z &S - 2.2Y)(3)5,LlLa) = I3 g . Ro CF 4E Prov i d e.d St-o f c+ e= z.S 3 S CF JTUC-r')WL1-ver LaICOlC,,t-)( )-s Drounage Arcct 3 A(cp = U io3,Acr ICpast v c>.,9s Leng�H OF Iravc4= 310' Chgnrge n EIevofcn= lo.r-.g,zo' 94? ']O' 3U.385 T C = ` ► 92 _ S Co Z tYi i r) Fa 1, 3 _.._ - = 7. �1. rn!'rt- - pro = lc� .jca�- 29 r►2 = 7,,0. hr .. ©!p- �L�R,= �n.8S>i-7.D)Co,�o3� = 3•�S CFS r �ainfal! peps (CN -75} = k-lq-Jrh TT? - O'Li V0.c)z33)(O,co3) 43,5(p_d) C�Ca2.91 Sec � Rec�uircd s�ra[�.G � (apo5�- oprc�CT'i`P�=..(3•�s-a8a)C Co[��•9�i) = lgss•82 c� I�ruv�.ded Sirorage v 11f?,5 CF 1Prc -,}S , P05t DAf DA2- t IDAS = 2S,43. OF 1r 138,So CF v f955.82 CF = iN ZC),OS CF- Ylli cd TV Pro is C, Storage- Prov�de_d QQ -r Q -r- 3Q � 1-7 C-F f- 11 65 U 1 2 S 3' 3 c F = LIJ 5 CF Prov ; decl vsk 00 ! 0 CoG.sta1 Storm"Jaicr Rules IMPeNIovS Suf&-US OA 1 4- DA Z-t OAa tz 7-Z sf3.`J' 2O.5f 4 f78S9. (oOsF - 12 3D85 C� stow e Re u i rcr� uneLe_r ccxxs�-�1...r�1 e 5 Dicon&9c Ar-c.a U l cnc�t 1� O� Tra\iG = 30y 0' Gha�c� c E.� G-lc �� i c = 9. s' 8.� 8 ' = o. -7 z ° TG =. LO '2- - -7, 4 rn n 12e . 1~acr-br - l,y c. ic, loved( Z4 0Z = Cv �n1hr a,a = V-�A = (0.8S)1,aY) = 5,H 8_ CFS - RaIn Fct Dcp�Ah (C.n1 -� 5) M. Zen Tl-P = �OlumE rrZ,BioiCU 083 � �n)(Io�lAc (43,SC�p�{rA[a ILi 5eG (s.4 8) Pre vs Pos i- Requi(Ca sfvfa)e=CQ(-nF);(S,Lt8 - I'Il)3.8; = 5853 CF CL uiCtd '� 1 Cc�c�}cat �rrnu.�aier �'.�iP 1rYlee.ry�OVS .5ur( ce _ 16,Ras, u10 = 1,L4jc. GF fequircd 12 )7 y 5t0(- QrUv t d ca = 29 CO Z c F t 29 LI 8 C F= AEG L ra ce Tru+h Ccamt trlunf� GhUQA,) Over{lo Devf C.0 - GrcjsSCd l.-WW-crwa� fr2r-' L= 30. {mow fa, Q2 0.3 D = 0.3 5 ` .. G T� 13' Ar to H L W . 8' a ' - 9'' (3)63--�'5 0.(p2 Ry4��3�4 yL t1 --jc. ' r;d X r_ �.?. BOOK 962 PAGE 71 FILED in Pa•qquotank County. NC an Mar 20 2007 at 02:28:10 PM by: Dollio J. Summorour REGISTER OF DEEDS PASQUOTANK COUNTY Deed number % r , -5,A 3 Transfer tax $ Pasquotank County Assessor's Office liNCISE TAX: so LAN l7'r RANs FF: R'rAX: 50 PARCEI.IDENTIFWRNo.: 891 tf3 1) 91 MAIL A171 FR RECVRDINO 10; Erich Y, James,James Luw Associates, 732 Peanree Rd, EI'iz City, NC 27907 TIIIS rNSTRUWNT WAS PREPARFF) RV: Ericka Y. Jamey, Janscs Lauv Associates, 732 Peanree Rd, Eliz City, NC 27909 BRIEF DESCRIPTION FOR THE tNlliX 1300 Walker Avenue This deed nas pre)xrred br Ericko Y. Jarj,—. a North C'ura!lera twensed allorne, , ahvist alfe .tunrch, cfming, or mA advice. NORTH CAROLINA GENERAL WARRANTY DEED THIS IS A DEED OF GIFT TNIS DEED made this _L7 day of _ AtJ-,� , 2007, by and between GRANTOR-. George Powell, Thomas Sawyer, Kenneth Coleman, Connie A. Mercer, Jr., and Kermit I. Gallop, Trustees of the Grace & 'Truth Communih' Church GRANTEE - Grace & Truth Community Church, Inc., a North Carolina nonprofit corporation 1300 Walker Avenue Elizabeth City,.NC 27909 This designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNCSSETH, that the Grantor, in consideration ofthe mutual regard and respect given by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of Elizabeth City, Elizabeth City Township, Pasquotank County, North Carolina and more particularly described is follows: See Attached Exhibit A. The property hereinabove described was acquired by Grantor by instrument recorded in Book 606, Page R 17. A map showing the above described property is recorded in Map/Plat Book 16 at Page 42. "f0 HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple, And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and delend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions; (1) restrictions, covenants, easements of record and governmental RECEIVED MAY -92012 DWQ-WARO r BOOK 962 PAGE 72 ordinances or coning regulations affecting same, and (2) Ad valorem taxes for year 2007 prorated herein and assumed by purchaser. 1N WITNESS WI-IEREOF, the Grantor has hereunto set his hand and seal, or if' corporate, has caused this instrument to be signed in its corporate narnc by its duly authorized officers and its seal to be hereunto affixed by authority of' its Board of Directors, the day and year first above written. {SEAL) Georg Dwell, Trustee of the Grace & "Truth Community Church Lud— .�(S17AI ) Kenneth Colman, `trustee of the Grace & Truth Community Church (SEAL) Kermit"Gallop, Gallop, Trustee o the Grace & 'Truth Community Church NORTIf CAROLINA COUNTY OF PASQUOTANK m�SGAhe Thoas Sa4�rycr, ustee of the Grace & Truth Community Church ,z (SEAL) Connie A. Mercer, Jr., Trustee of the Grace & 'Truth Community Church 1, Ericka Y. James, a Notary Public of the County and State aforesaid, certify that George Powell, Trustce of the Grace & Truth Community Church, personally appeared before me this day and acknowledged the due execution of the foregoing instrumem. Witness my hand and official stanip or seal, this _imay of Ajaojr� _ , 2067. My commission expires: `" E-IZNotary rblie 0,,T<':: l ,CKAYOUNGJAMES + NOTARY PUBLIC q'n PASMOTANKCOUNTY:NC NORTH CAROLINA COUNTY OF PASQUOTANK 1, Lricka Y. James, a Notary Public of the County and State aforesaid, certify that Thomas Sawyer, Trustee of (lie Grace & Truth Community Church, personally appeared before me this day and acknowledged the due executionofthe foregoing instrument. Witness my hand and official stamp or seal, this _401f20 MycommissioncZ`'rEtZICKAYOtiIJGJAMES NOTARYPOSLIC �.; PASOUOTANK COUNTY, NC BOOK 962 PAGE 73 NORTH CAROLINA COUNTY OF PASQUOTANK. 1, Ericka Y. James, a Notary Public of the County and State aforesaid, certify that Kenneth Coleman, "Trustee of the Grace & "Truth Community Church, personally appeared before me this day and acknowledged the due execution of the foregoing instrument, c4 Wihiess my hand and official stamp or seal, this My commission expires: ERICKA YOUNG JAMES (;•r� NOTARY PUBLIC PASQUOTANK COUNTY, NC NORTH CAROL.INA COUNTY OF PASQUOTANK 1, Ericka Y. Jarnes, a Notary Public of'the County and State aforesaid, certify that Connie A. Merecr, Jr., Trustee of the Grace &. Truth Community Church, personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official stamp or seal, this _/34ay of _,(, A1yk_ 2047 My commission expires: t ERICI(A YOUNG JAMES NOTARYPUSLIC PASCIUOTANKCOUNTY, NC NORTH CAROL INA COUNTY OF PASQIJOTANK Notary Public 1, l--ricka Y. James, a Notary Public of the Countyand State aforesaid, certify that Kermit ..Gallop, Trustee of the Grace & 'Truth Community Church, personally appeared before me this day and acknowledged the due execution of theforegoinginstrument. Witness my hand and official stamp or seal, this 13 itay of , 20Q_7 My commission expires: � '' f A__ — — Notary Public w >, ERICKA YOUNG JAMES fr;OTARY PUBLIC PASQUOTANK COUNTY. NC BOOK 962 PAGE 71 BEGINNING al a point marked by an iron pipe set in I lie northern margin of the right of way line of WaikerAvenue fpresett light of way width 60 feet), said point of beginning being the southwestern corthei of the property shown and delineated as Moore l leights, on Map recorded in Rook 417. Page 202, Paaquolank County Pt6lic Registry; said point of beginning is further situate a distance of 1 1 1,2 feel in a westerly dirmlioa along and wit lh the northern right of way litre of Walker Avenue liom Ilse centerline ofCardweli Drive; thence from said point ofbeginning pruceed'ulg South 73 deg, 14 mirh. 00 sec. West along and Willi the northern margin of [be right of way line of Walker Avenue, a distance of 274.51 fuel to a point marked by an iron pipe in the centerline of a ditch, a corner, (hence leaving lire northern margin of the right of way line of Walker Avenue and proceeding North I deg. 39 min. 37 sec. West, a distance of 1000.1 a feet to u point mat ked by an iron pipe, a corner; thence Not 77 deg. I I min. 30 sec. East , a distance of 273,42 feel to a point, a corner; thence South 13 deg. I I Olin. 06 Sue. Emu, along and with a shallow Swale, a distance of 981.24 feel to a point narked by an iron pipe set in the northern margin ofthe right of way line of Walkcr Avenue, [his being lire point and place of beginning AN �OF 1N A TF�Q Michael F, Easley, Governor t William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Q Coleen H. Sullins, Director Division of Water Quality March 5, 2008 rrid Mr. Johnie D. Harvey, III, Chairperson of Building Committee `t Grace and Truth Community Church 1300 Walker Avenue Y - Elizabeth City, NC 27909�- Subject: Stormwater Permit No. SW7080213 Grace and Truth Community Church High Density Project Pasquotankc County Dear Mr. Harvey: The Washington Regional Office received a complete Stormwater Management Permit Application for Grace and Truth Community Church on March 3, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7080213 dated March 5, 2008, for the construction of three grassed bioretention cells to treat the existing and proposed new impervious area at the subject project located at 1300 Walker Avenue, Elizabeth City, North Carolina. This permit shall be effective from the date of issuance until March 5, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. incerel , r Al Hodge Regional Supervisor Surface Water Protection Section AHlsv: S:1WQSISTORMWATERIPERMITS1SW7080213 cc: Sam Jarvis, PE Pasquotank County Building Inspections ;Washington Regional Office Central Files NRmhCarolina ,Alatura!!y North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6491 FAX (252) 946-9215 Customer Service Internet: www.nQwaterqualitN,.org 943 Washington Square Mall, Washington, NC 27899 1-877-623-6748 An Equal OpporiunitylAffirmative Action Employer — 50°% Recycled110% Post Consumer Paper State Stormwater Management Systems Permit No. SW7080213 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Grace and Truth Community Church Grace and Truth Community Church Pasquotank County FOR THE construction, operation and maintenance of three grassed bioretention areas in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 5, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. The stormwater control has been designed to handle the runoff from 5�,900 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 2 of 7 State Stormwater Management Systems Permit No. SW7080213 6. The following design criteria have been provided in the bioretention areas and must be maintained at design condition: Area 1 Area 2-3 Area 4 a. Drainage Area, ft2: 9,542 6,14 46,645 b. Total Impervious Surfaces, ft2: 5,256 31,534 17,110 C. Design Storm, inches: 1.01, 1.011 1.01, d. Bioretention Ponding Depth, inches: 9.0 9.0 9.0. e. Temporary Ponded Depth Elevations, FMSL: 8.20 8.20 8.20 f. Bioretention Planting Elevation, FMSL: 7.45 7.45 7.45 g. Bioretention Surface Area, ft2: 1,125 5,735 8,600 h. Permitted Storage Volume, ft3: 717 3,718 5,910 i. Type of Planting Media Soil: 85% Sand, 12% Fines, 3% Organic j. Type of In -situ Soils: Arapahoe, fine sandy loam with clayey pockets j. Expected Infiltration Rate, in/hr: 2.0 2.0 2.0 k. Seasonal High Water Table, FMSL: 5.45 5.45 5.45 I. Receiving Stream/River Basin: Knobbs Creek / Pasuotank M. Stream Index Number: 30 — 3 — 8 n. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications, f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. Page 3of7 State Stormwater Management Systems Permit No. SV 7080213 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10, The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 7 State Stormwater Management Systems Permit No. SV 7080213 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a formal permit transfer request to the Division of Water Quality, accompanied by a completed name/ownership change form, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. ' 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division any name, ownership or mailing address changes within 30 days. 10. This permit shall be effective from the date of issuance until March 5, 2018. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 5th day of March, 2008. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SV 7080213 Page 5 of 7 State Stormwater Management Systems Permit No. SVV7080213 Grace and Truth Community Church Stormwater Permit No. SW7080213 Pasguotank County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL_ Page 6 of 7 State Stormwater Management Systems Permit No. SW7080213 0 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. $. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Pasquotank County Building Inspections Page 7 of 7 .. 'DWQ USE ONLY Date Received Fee Paid Permit Number T State of North Carolina sWA K a/j3�e8 Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM` This forni may be photocopied for use as an original kAY 1. GENERAL INFORMATION 1. , Applicants name (specify the name of the corporation, individual, etc. who owns the project): Grace and Truth Communiy Church 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): ohnie D. Harvey, III - Chairperson of Building Committee 3. Mailing Address for person listed in item 2 above: r 1300 Walker Avenue y zo �'t`-E-' CT City. -Elizabeth Ci State:NC Zip:27909 Phone: 252 338-7705 Fax:.(Z52 } 338-770 Email: johnie.d.harvey®useg.mail 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Grace and Truth Community Church 5. Location of Project (street address): 1300 Walker Avenue City:Elizabeth City County:Pasauotank 6. Directions to project (from nearest major intersection): From the intersection of Halstead Blvd and Walker Avenue turn east onto Walker Avenue. Church is located approximately 1 4 mile down Walker Avenue. 7. Latitude:36.28796 Longitude:76.23717 of project 8. Contact person who can answer questions about the project: Name:Caroline Copeland Telephone Number: (252 _ } 792-4486 Email:caroline@archesson.com IL PERMIT INFORMATION: 1. Specify whether project is (check one): ®New Form SWU-101 Version 8.07 Page 1. of 4 a ❑Renewal -1q.0o9v ❑Modification wer ME 2. If this application is being submitted as the result of a renewal or modification to an existing permit, Iist the existing permit number and its issue date (if known) 3. Specify. the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other . 4. Additional Project Requirements (check applicable blanks): ❑CAMA Major ®Sedimentation/Erosion Control ❑404/401 Permit ❑NPOES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project, All Stormwater runoff will be treated on site in three separate grassed bio-retention cells. There is a cell locted on the south side of the project to handle the stormwater from abortion of the existing buildings and a portion of the larking area. Another cell is located on the west side of the prolerty to handle the stormwater from a portion of the proposed building and a large portion of the parking area and drive. The final cell is located on the west side of the propertyto handle the remaining_ portion of the proposed building, the remaining portion of the12roposed parking lot, and the remaining portion of the existing buildings. 2. Stormwater runoff from this project drains to the Pasquotank River basin. 3. Total Site Area: 6.21 acres 4. Total Wetlands Area: 0.00 acres 5. 100' Wide Strip of Wetland Area: 0.00 acres (not applicable if no wetlands exist on site) 6. Total Project Area'.6.21 acres 7. Project Built Upon Area:19 8. How many drainage areas does the project have?3 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information ' . , .. },' Drainage Area.1 n Drainage Area 2, Receiving Stream Name Knobbs Creek Knobbs Creek Stream Class & Index No. C Sw 30-3-8 C Sw 30-3-8 Drainage Area (so 9542 46174 Existing Impervious* Area (sf) 4792 13418 Proposed Impervious*Area (sf) 5256 31534 % Impervious* Area (total) 55% 68% lmpervious* Surface Area ° '.=Drainage Areal ; , Drainage Area 2 - 3 On -site Buildings (sf) 1235 3975 On -site Streets (so 0 0 On -site Parking (so 3135 25745 On -site Sidewalks (so 886 1814 Other on -site (so 0 0 Off -site (so 0 0 Total (so: 5256 31534 Form SWU-101 Version 8.07 Page 2 of Basinlnforrnation=al ,"Drain`a' a Area Receiving Stream Name Knobbs Creek Stream Class & Index No. C Sw 30-3-8 Drainage Area (so 46645 Existinq Impervious* Area 2613 Proposed Impervious* AreEsf 17110 % Impervious* Area(total)___37% Im erGious*°Surface°Area `Drama' e Area 4''''' On -Site Buildin sf 6184 On -Site Streets sf 0 On -Site Parkin s 9765 On -Site Sidewalks sf 1161 Other On -Site sf 0 Off -Site sf 0 Total sf : 17110 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. 10. How was the off -site impervious area listed above derived?N/A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed. Swale Supplement Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form • Original of the applicable Supplement Form(s) and O&M agreement(s) for each 6MP • Permit application processing fee of $505 (54,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: Y- Development/Project name Engineer and firm �- Legend v- North arrow Y - Scale L-- - Revision number & date Mean high water line 4-- Dimensioned property/project boundary *-- Location map with named streets or NCSR numbers a-- Original contours, proposed contours, spot elevations, finished floor elevations '-- Details of roads, drainage features, collection systems, and stormwater control measures 11� - Wetlands delineated, or a note on plans that none exist Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations Drainage areas delineated Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): CARduA) E Copst_ u n _ Mailing Address: Q• O- 6wc 41�i'-1 City: W %u�IAMS'T ON State: tic Zip: 2'189 Z Phone: ( 2S2 ) '792-.448(e Fax: ( ZS2 -712 -g090 Email: CGtfoline- a Ckc6 5aa.Com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) lohnie D. Harvey, III , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .19Q0. n n ! Signature: Date: &k Form SWU-101 Version 8.07 Page 4 of 4 set Az - doi aim M L OV. S y0: w. MA NCDEHRRECEIVED Permit Number: (to be provided by DWO) `o2oF w a rFR�c fa Y FEB 1 3 2008 ST0RMW40ECERTIIFICATION APPLICATION PERMIT FORM APPLICATION FORM BI0RETENTION CELL SUPPLEMENT ®WQ-WARQ This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I: PROJECT INFORMATION'' s .: `.; :.. a�;>, �m �..; s ''rr�,.:�� , r =f: ` k. - �• �;.y Project name Grace and Truth Community Church Contact name Sam'Jarvis Phone number (252).974-7794 Date February 12, 2008 Drainage area number, II. DESIGN'INF0RMATION ' Site Characteristics Drainage area 9,542 ft2 Impervious area 5,256 ft2 Percent impervious 55.1% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr peak flow ft 3Isec Post -development 1-yr, 24-hr peak flow ft3lsec Pre/Post 1-yr, 24-hr peak control ft3lsec Storage Volume: Non -SR Waters Design volume 717:0 ft Storage Volume: SR Waters Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 9 inches OK Ponding depth of water 0.75 ft Surface area of the top of the bioretention cell 1,125:0 ft2 OK Length, 75 ft OK Width: 15 ft OK -or- Radius ft Soils Report Summary Drawdown time, ponded volume 4:5 hr OK Drawdown time, to 24 inches below surface 12 hr OK Drawdown time, total: 16.5 hr In -situ soil: Soil permeability 2.00 inlhr OK Planting media soil: Sail permeability 2.00 inlhr OK Soil composition % Sand (by weight) 85% OK % Fines (by weight) 12% OK % Organic (by weight) 3% OK Form SW401-Bioretention-Rev.2 Parts I and II. Design Summary, Page 1 of 2 MI J i Permit Number: (to be provided by D WQ) Phosphorus Index (P-Index) Basin Elevations Temporary pool elevation Planting elevation (top of the mulch) Bottom of the cell Planting depth Depth of mulch SHWT elevation Total: 100% 20 (unitless) OK 8 fmsl 7.45 fmsl OK 7.45 fmsl 0 ft 4 inches OK 5.45 fmsl OK Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 7.45 fmsl Distance from bottom to SHWT 2 ft OK Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Y (Y or N) Insufficient media depth Is this a cell with treestshrubs? N . (Y or N) Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Centipede Sod OK Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed Y (Y or N) OK through a vegetated filter? What is the length of the vegetated filter? 30. ft Does the design use a level spreader to evenly distribute flow? Y (Y or N) Submit a level spreader supplement. Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP located at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than V? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way. (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (indicate Type Used with an "X" in the shaded cell) Gravel and grass (flinches gravel followed by 3-5 ft of grass) Grassed swale Forebay Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK N (Y or N) Insufficient ROW location. 1 ft/sec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK OK v Form SW401-Bioretention- ev.2 Parts I and 11. design Summary, Page 2 of 2 Permit No: (to be assfgned by D INS]) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan I tials ! Sh t No. 1, Plans (1' - 50' or larger) of the entire site showing: ✓- Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, vHigh flow bypass system, Maintenance access, — - Recorded drainage easement and public right of way (ROW), -- Clean out pipe locations, Overflow device, and Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the bioretention cell showing: well dimensions —Pretreatment system, High flow bypass system, v- Maintenance access, Recorded drainage easement and public right of way (ROW), av Design at ultimate build -out, 'Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and - Boundaries of drainage easement. 3. Section view of the bioretention cell (1' = 20' or larger) showing: `"^Side slopes, 3:1 or lower -- • Underdrain system (if applicable), and YBioretention cell layers (ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), #57 stone, underdrains (if applicable), HWT level(s), and overflow structure] 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (imsl). Results of soils tests of both the planting soil and the in situ soil must include: 'Soil permeability, Soil composition (% sand, % fines, % organic), and .--13 index, 5. A detailed planting plan (1' = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, - The source nursery for the plants, and _;.Eartilizer and watering requirements to establish vegetation. ��� 1 `-E�An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the bioretention cell will be protected from sediment until the _ entire drainage area is stabilized. Qchc B. The supporting calculations (including underdrain calculations, if applicable). -Ac Ctfi1Gd 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 0 , 10. A copy of the deed restriction. Form SW401-Bioretention-Rev.2 Part 111, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: i Sioretention Inspection and Maintenance Agreement FEB 8ail� tnl �ilIVeep a maintenance record on this BMP. This maintenance record will be kept in a lo,in�a k�town set location. Any deficient BMP elements noted in the inspection will be QclOr�:�Wrepaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How 1 will remediate theproblem: The entire BMP Trash/debris is plesent. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed, remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention I&M-Rev.2 Page 1 of 4 BMP element: The pretreatment area The bioretention cell: vegetation The bioretention cell: soils and mulch Potential problems: Flow is bypassing pretreatment area and/or gullies have formed. Sediment has accumulated to a depth greater than three inches. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Tree stakes/wires are present six month_ s after planting. Mulch is breaking down or has floated away. Soils and/or mulch are clogged with sediment. An annual soil test shows that pH has dropped or heavy metals have accumulated in the soil media. How I will remediate the problem: Regrade if necessary to route all flow to the pretreatment area. Restabilize the area after grading Search for the source of the sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. Prune according to best professional practices. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground.cover if a soil test indicates it is necessary. Remove tree stake/wires (which can kill the tree if not removed). Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Determine the extent of the clogging - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. Dolomitic lime shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. Form SW401-Bioretention I&M-Rev.2 Page 2 of 4 BMP element: Potential roblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the dro inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-13ioretcntion I&M-Rev.2 Page 3 of 4 Permit Number: (to he Provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Grace and Truth Community Church BMP drainage area number: Print name: Johnie D. Harvey III Title: Chnigc(sct—, of F3[rlct (unn,',k-+e(? Address: 1300 Walker Avenue Elizabeth -City, NC 27909 Phony Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, , a Notary Public for the State of ` , County of F%irf6e� , do hereby certify that �Inhnk- i?._ )Aar�� L personally appeared before me this day of Fr.kru 2oO8 , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, 4•••.•`�p1.IRdE 06'•.�p� a` Cj �e°s a r q o ti• o CQU SEAL My commission expires_ [t� USi- III zoil Form SW401-Bioretention I&M-Rev. 2 Page 4 of 4 q Permit Number: (to be provided by DWQ) � y-o�OF WAT�RQG NMENRIECEI E STORMWATER MANAGEMENT PERMIT APPLICATION FORM FEB 13 2008 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT MaNy a RThis form must be filled out, printed and submitted. terns eckfist (Part 111) must be printed, filled out and submitted along with all of the required information. I. :PROJECT INFORMATION _ Project name Grace and Truth Community Church Contact name Sam Jarvis Phone number (252) 974; 7794 Date February 12,,2008 Drainage area number 2 - 3. IL'ESIGN INFORMATION �� r ee Site Characteristics Drainage area 46,174 ft2 Impervious area 31534. ft2 Percent impervious 68.3% % Design rainfall depth 1.0 inch Peak Flow Calculations Is pre/post control of the 1-yr, 24-hr peak flow required? (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hr peak flow ft3lsec Post -development 1-yr, 24-hr peak flow ft3lsec Pre/Post 1-yr, 24-hr peak control ft3lsec Storage Volume: Non -SR Waters Design volume 3,718.0 ft3 Storage Volume: SR Waters Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft, Volume provided ft, Cell Dimensions Ponding depth of water 9 inches OK Ponding depth of water 0.75 ft Surface area of the top of the bioretention cell 5,735.0 ft2 OK Length: 345 ft OK Width: 17 ft OK -or- Radius ft Soils Report Summary Drawdown time, ponded volume 4.5 hr OK Drawdown time, to 24 inches below surface 12 hr OK Drawdown time, total: 16.5 hr In -situ soil: Soil permeability 2.00 in/hr OK Planting media soil: Soil permeability 2.00 in/hr OK Soil composition % Sand (by weight) 85% OK % Fines (by weight) 12% OK % Organic (by weight) 3% OK Form 5W401-Bioretention-Rev.2 Parts I and it. Design Summary, Page 1 of 2 e Permit Number: (to be provided by DWQ) Phosphorus index (P-Index) Basin Elevations Temporary pool elevation Planting elevation (top of the mulch) Bottom of the cell Planting depth Depth of mulch SHWT elevation Total: 100% 20 (unitless) OK 8 ff sl 7.45 fmsl OK , 7.45 fmsl Oft 4 inches OK 5.45 fmsl OK Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 7.45 fmsl Distance from bottom to SHWT 2 ft OK Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Y (Y or N) Insufficient media depth Is this a cell with treeslshrubs? N (Y or N) Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Centipede Sod OK Additional Information Does volume in excess of the design volume bypass the y' (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed ;'! . Y . ! (Y or N) OK through a vegetated filter? What is the length of the vegetated filter? 30 ft Does the design use a level spreader to evenly distribute flow? Y (Y or N) Submit a level spreader supplement. Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a N (Y or N) Insufficient ROW location. recorded access easement to a public Right of Way (ROW)? Inlet velocity (from treatment system) 1 ft/sec OK Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3-5 ft of grass) OK Grassed swale X Forebay Form SW401-6ioretention-Rev. 2 Parts I and II. Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result in a request for additional Information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may initial below, If a requirement has not been met, attach justification. Page! P n I 1 No.117 Plans (1' - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), -Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. 2. Plan details (1' = 30' or larger) for the bioretention cell showing: Cell dimensions Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, Overflow device, and Boundaries of drainage easement. Section view of the bioretention cell (1` = 20' or larger) showing: - Side slopes, 3:1 or lower 1lnderdrain system (if applicable), and Bioretention cell layers (ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choking stone if applicable), 957 stone, underdrains (if applicable), SHWT level(s), and overflow structure] A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (fmsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, %, fines, % organic), and P-index, 5. A detailed planting plan (1' = 20' or larger) prepared.by a qualified individual showing: - A varlety of suitable species, Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and F. 5 ateringg requirements to establish vegetation. An assurance that the installed system will meet design specitications upon initial operation once the project is complete and the entire drainage area is stabilized. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. The supporting calculations (including underdrain calculations, it applicable). A copy o1 the signed and notarized inspection and maintenance (I&M) agreement. Form SW401-13ioretention-Rev.2 A copy of the deed restriction. Part III, Page 1 of 1 Permit Number: (to be proWded by DWQ) @3Y tk� Drainage Area Number: 2-3 Bioretention Inspection and Maintenance Agreement FEB 13 2008 I will keep a maintenance record on this BMP. This maintenance record will be kept in a DWOVAP known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention I&M-Rev.2 Page I of 4 BMP element: The pretreatment area The bioretention cell: vegetation The bioretention cell: soils and mulch Potential problems: Flow is bypassing pretreatment area and/or gullies have formed. Sediment has accumulated to a depth greater than three inches. Erosion has occurred. Weeds are present Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Tree stakes/wires are present six months after planting. Mulch is breaking down or has floated away. Soils and/or mulch are clogged with sediment. An annual soil test shows that pH has dropped or heavy metals have accumulated in the soil media. How l will remediate the problem: Regrade if necessary to route all flow to the pretreatment area. Restabilize the area after grading. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Provide additional erosion T~ protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. Prune according to best professional practices. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove tree stake/wires (which can kill the tree if not removed). Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Determine the extent of the clogging - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. _ Dolomitic lime shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. Form SW40I-Bioreienlion I&M-Rev.2 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The droE inlet is damaged Repair or re lace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioreteii1ion I&M-Rev.2 Pagc 3 of 4 Permit Number: {to be provi(led by DtwQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Grace and Truth Community Church BMP drainage area number: 2 -3 Print name: Johnie D. Harvey, III Title: Address: 1300 Walker Avenue Elizabeth City, -NC 27909 Phone Sign Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Carolt'nt E. OdtA a Notary Public for the State of March Carolina , County of Bea"fUri- , do hereby certify that �:Yonnic- 0. tkaryLq , ALL personally appeared before me this Stl day of Fc-6rucana ZcoB , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, `�'rtfz'^ s: E` West t�O SEAL My cotnmissioil expires_A,}gk)S� I3� ZDI t Form SW401-Biorelention I&M-Rev. 2 Page 4 of 4 I NCDENRRECEI ED STORMWATER MANAGEMENT PERMIT APPLICATION FORM FEB 13 2008 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT Permit Number: (to be provided by DWQ) O`,OF W A T �9QG � r (] Y 9,9yiThis form must be tilled out, printed and submitted. qutre ems hecklist (Part Ill) must be printed, filled out and submitted along with all of the required information. 1. 'PRWECTAN FORMATION x Project name Grace and Truth Community Church Contact name Sam Jarvis Phone number (252)'974-7794 Date February 12''2008 Drainage area number 4 ! N INFORMATION �+ f� II: gIlES V 9i , Site Characteristics Drainage area 46,65.4 ft2 Impervious area 17;110 ftz Percent impervious 36.7% % Design rainfall depth 1.0 inch Peak Flow Calculations Is prelpost control of the 1-yr, 24-hr peak Flow required? (Y or N) 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity in./hr Pre -development 1-yr, 24-hr peak flow ft/sec Post -development 1-yr, 24-hr peak flow ft'/sec PrelPost 1-yr, 24-hr peak control ft'/sec Storage Volume: Non -SR Waters Design volume 5,910.0 ft' Storage Volume: SR Waters Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required 0 ft3 Volume provided ft3 Cell Dimensions Ponding depth of water 9 inches OK Ponding depth of water 0.75 ft Surface area of the top of the bioretention cell '8;600A ft' OK Length: 200 ft7pr OK Width: 22 ft 135' OK -or- Radius ft Soils Report Summary Drawdown time, ponded volume 4.5 hr OK Drawdown time, to 24 inches below surface 12 hr OK Drawdown time, total: 16.5 hr 10-situ soil. Soil permeability .2.00 in/hr OK Planting media soil. Soil permeability 2.00 inihr OK Soil composition % Sand (by weight) 85% OK % Fines (by weight) 12% OK % Organic (by weight) 3% OK Form SW401-Bioretention-Rev.2 Parts I and II. Design Summary, Page 1 of 2 Permit Number: (to be provided by D WO) Total: 100% Phosphorus Index (P-Index) 20 (unitless) OK Basin Elevations Temporary pool elevation 8 fmsl �. Planting elevation (top of the mulch) 7.45 fmsl OK Bottom of the cell 7.45 fmsl Planting depth 0 ft Depth of mulch 4 inches OK SHWT elevation 5.45 fmsl OK Are underdrains being installed? N (Y or N) How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 0 ft the bottom of the cell to account for underdrains Bottom of the cell required 7,45 fmsl Distance from bottom to SHWT 2 ft OK Type of bioretention cell (answer "Y" to only one of the two following questions): Is this a grassed cell? Y (Y or N) Insufficient media depth Is this a cell with trees/shrubs? N (Y or N) Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Centipede Sod OK Additional Information Does volume in excess of the design volume bypass the Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed Y (Y or N) OK through a vegetated filter? What is the length of the vegetated filter? 30 ft Does the design use a level spreader to evenly distribute flow? Y (Y or N) Submit a level spreader supplement. Is the BMP located at least 30 feet from surface waters (50 feet if Y (Y or N) OK SA waters)? Is the BMP located at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a recorded drainage easement with a N (Y or N) Insufficient ROW location. recorded access easement to a public Right of Way (ROW)? Inlet velocity (from treatment system) 1 fUsec OK Is the area surrounding the cell likely to undergo development in N (Y or N) OK the future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an "X" in the shaded cell) Gravel and grass (8inches gravel followed by 3-5 ft of grass) OK Grassed Swale X Forebay Form SW401-Bioretention-Rev.2 Parts I and 11. Design Summary, Page 2 of 2 Permit No: (to be assigned by DKIQ) tIi REQWRE ITEINSb iIEULIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An Incomplete submittal package will result In a request for additional Information. This will delay Mal review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel PI�V I , Shee�.l?o t. Plans (1' - 50' or larger) of the entire site showing: /j Design at ultimate build -out, G Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Cell dimensions, Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Clean out pipe locations, I Overflow device, and - Boundaries of drainage easement. r,- —L� 2. Plan details (1' = 30' or larger) for the bioretention cell showing: Cell dimensions (/ Pretreatment system, High flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Design at ultimate build -out, Off -site drainage (if applicable), Clean out pipe locations, �1 Overflow device, and Boundaries of drainage easement. 3. Section view of the bioretention cell (1" = 20' or larger) showing: Side slopes, 3:1 or lower Underdrain system (if applicable), and Bioretention cell layers (ground level and slope, pre-treatment, ponding depth, mulch depth, fill media depth, washed sand, filter fabric (or choHng stone if applicable), 957 stone, underdrains (if applicable), SHWT level(s), and overflow structure] f� 4. A sails report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source at soils information. All elevations shall be in feet mean sea level (imsl). Results of soils tests of both the planting soil and the in situ soil must include: Soil permeability, Soil composition (% sand, % fines, % organic), and P-indPedplamfing 5. A deta plan (1' = 20' or larger) prepared by a qualified individual showing: A variety of suitable species, -Sizes, spacing and locations of plantings, Total quantity of each type of plant specified, A planting detail, The source nursery for the plants, and Fertili Wncet atering requirements to establish vegetation. Aes e installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. A construction sequence that shows how the bioretention cell will be protected from sediment until the entire drainage area is stabilized. The supporting calculations (including underdrain calculations, if applicable). f9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. Form SVV401-131oretenflon-Rev.2 IPart III, Page 1 of 1 Permit Number: (to be provided by DWQ) Drainage Area Number: 4 Bioretention Inspection and Maintenance Agreement FEB 13 Mill keep a maintenance record on this BMP. This maintenance record will be kept in a log, in a known set location. Any deficient BMP elements noted in the inspection will be lJYIQ- a RQ'ted, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important inspection and maintenance procedures: - Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). - Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. - Heavy equipment will NEVER be driven over the bioretention cell. - Special care will be taken to prevent sediment from entering the bioretention cell. - Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of inspection and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How 1 wiIl remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW40 I -Bioretention I&M-Rev,2 Page I of 4 BMP element: The pretreatment area The bioretention cell: vegetation The bioretention cell: soils and mulch Potential rroblems: Flow is bypassing pretreatment area and/or gullies have formed. Sediment has accumulated to a depth greater than three inches. Erosion has occurred Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Tree stakes/wires are present six months after planting. Mulch is breaking down or has floated away. Soils and/or mulch are clogged with sediment. An annual soil test shows that pH has dropped or heavy metals have accumulated in the soil media. How I will remediate the problem:_ Regrade if necessary to route all flow to the pretreatment area. Restabilize the area after rradun. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. Prune according to best professional practices. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. _ Remove tree stake/wires (which can kill the tree if not removed). Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Determine the extent of the clogging - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. Dolomitic lime shall be applied as recommended per the soil test and toxic soils shall be rernoved, disposed of properly and replaced with new planting media. Farm SW401-Biore►cntion I&M-Rev2 Pugc 2 of 4 BMP element: Potentialproblems: How I will remediate the roblem: The underdrain system Clogging has occurred. Wash out the underdrain system. (if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The droe inlet is damaged Repair or re lace the drop inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW40 I -Bioretentioii I&M-Rev.2 Page 3 of 4 Permit Number: (to be provided by UWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Grace and. Truth Community Church BMP dreiinage area member: Print name: Johnie D. HarveV, III Title:. c;cr�crL }31c� - l nmmL Address-. 1300 Walker Avenue Elizabeth City, NC 27909 Phoni Signa Date: Note: The legally responsible party should not be a homeowners association unless more than So% of the lots have been sold and a resident ol'the subdivision has been named the president. I, Lrnlinc t OCILn _ , a Notary Public for the State of t�or CgrnItna , County of [�MdMri ,.do hereby certify that personally appeared before me this day of Fehr► nn,l ZOOS , and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, d� a . R f sdd 6.�y ry' Po���Of j 5 4 7 SZ •y .L ag' U':OOE � SEAL My commission expires Auq a IA 2-pit Fornn SW401-13ioretention ]&M-Rev. 2 Page 4 of 4 F WAr�c �� 9p Michael r. Easley, Governor �Q William G. Ross Jr., Secretary North Carolina Department Environment Natural Resources j? -=� of and Alan W. Klimek, P.E. Director Division of Water Quality February 26, 2008 Mr. Johnie D. Harvey, Iil, Chairperson of Building Committee Grace and Truth Community Church 1300 Walker Avenue Elizabeth City, NC 27909 Subject: Stormwater Review SW7080213 Grace and Truth Community Church Pasquotaak County Dear Mr. Harvey: This office received a Coastal Stormwater permit application and plans for the subject project on February 13, 2008, A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. A site visit was conducted on February 26, 2008 to verify soil and water table conditions. Borings were, conducted at each of the Stormwater treatment systems. As reported in the submitted soils report, theso borings concluded that there were inappropriate soils in each of the basins. The pockets of sandy/silty clays are inadequate planting media for bioretention cells. A possible solution would be to replace the in - situ material in those areas with more suitable fill that does not contain clay. The excavation of the inappropriate soils should extend downward to appropriate soils. The appropriate soils and planting medial for bioretention areas are loams, sandy loams, or loamy sands. A field note on the plans would help address this issue further for construction phases with planned site visits by the consultant(s) (professional hydrogeologist, prof. soil scientist, or PE) during these phases. The consultant should field verify thu elevations and soil conditions of the fill/planting media prior to sodding the bioretention areas. These visits need to be logged and submitted with the final PE certification after construction, as required in high density stormwater permits. Please add explicit construction notes and sequencing on the Grading- Stormwater plan sheets if this is proposed and submit 2 sealed copies of the revised plan sheets. 2. Please provide either a wetland delineation or if there are no wetlands, a note on the plans stating there are none. 3. Please provide a cross sectional detail of the overflow structures with dimensions, elevations, rip -rap, liners, etc.. Please note that the storage elevations should not be located at the top of any rip -rap elevation but at the bottom or lower, The above requested information must be received in this office prior to March 5, 2008 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. ne No{thCarolino ,1 atrrra!!y North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: h2o.enr.state.nc.us 943 Washington Souare Mall. Washingtnn. NC 27R89 1-877-623-6749 Please reference the Stormwater Project Number above on all correspondence. if you have questions, please feel free to contact me at (252) 948-3848. Sincerely, Scott Vinson Environmental Engineer Washington Regional Office cc: Sam Jarvis, PE Caroline Copeland, AR Chesson ,Xashington Regional Office Walker Avenue, Elizabeth City, NC - Google Maps htip:Hmaps.google.com/maps?f--q&hl=en&geoco-de=&q=Walkcr+A%, Address Walker Ave Get Google Maps an your phone GOO. Elizabeth City, NC 27909 rexttheword"GMaps"to466453 MVap ... - f :air:•°�'d��a � ? l , X�CF� � ��� jji 7a 5t c3 0r �i3a�tar SL �L l� r 1 J 7 '7cgr_-V1 Chi. rl�r 5t_t J'� J IN Church St � to ����� t• i 7Y / • Kam/ /��j(�f//�J��f�V/�• I or 1 2/26/2008 9:48 AM North Carolina Department of Environment and AF-r*'A'Natural Resources — NCDEPlR Request for Express Permit Review For DENR Use ONLY Reviewer. Submit: Time', Confirm: LA3 FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson828-296-4698;alison.davidson(a).ncmaiLnet • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.lee(CDncmail.net • Mooresville & -Patrick Grogan 704-663-3772 or patrick._qro.Qan(@,ncmaiI.ne EXPRESS • Washington Region -Lyn Hardison 252-946-9215 or I n.hardison ncmail.net • Wilmington Region -Janet Russell 910-350-2004 or janet.russel!@ncmail.net FEB 13 2008 NOTE: Project application received after 12 noon will be stamped in the following work day. NC DOMA Project Name: GRACE AND TRUTH COMMUNITY CHURCH County: PASQUOTANK Applicant: GRACE AND TRUTH COMMUNITY CHURCH Company: Address: 1300 WALKER AVENUE City: ELIZABETH CITY, State: NC Zip: 27909 Phone:252-338-7705 Fax:252-338-7708 Email: NIA Project Drains into water classified C SW (for classification see - httpalh2o.enr.stat_e_.nc.us/bimslreportslreportsWB.htmi) Project Located in PASQUOTANK River Basin. Is project draining to class ORW waters? N , within'/2 mile and draining to class SA waters N, or within 1 mile and draining to class HOW waters? N Engineer/Consultant: SAM JARVIS Company: JARVIS CONSULTANTS Address: 223 N. RESPESS STREET City: WASHINGTON, State: NC Zip: 27889 Phone: 252-794-7794 Fax::252-794-7795 Email: sam jarvispaRembargmail.com (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, []OTHER: ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ❑ State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter — # Curb Outlet Swales ❑ Off -site [SW (Provide permit #)] ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration — #Treatment Systems ® High Density -Bio-Retention 3 # Treatment Systems ❑ High Density—Stormwater Wetlands — # Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with acres to be disturbed .(CK # (for DENR use)) WETLANDS QUESTIONS MUST BEADDRESSED BELOW ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ® No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: (Check# ?tr Isolated wetland on Property ❑ Yes ® No Buffer Impacts: ❑ No ❑ YES: acre(s) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perenniai, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ 24C�-10 SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ❑ Ma'; ❑ Min $ SW D, ❑ LD, ❑ Gen - - 1 $ 4o r_ c .� 401: 1 $ LQS $ Stream Deter,_ $ PlIf n1:g1D cvoQGcc 1..­­ Irmo A R CHESSON CONSTRUCTION CO. INC. P O Box 1147 Williamston, NC 27892 Ph. 252-792-4486 PAY TO THE C ORDER OF I FOR BBU DRANCH SANKING AND TRUST COMPANY 7drW6AAWK ART BBT com 150806 88-112/531 I � 9:thNCH 9MS DATE C-'~/(J1 s4rWCO DOLLARS PRESS FEB 13 2008 NC ®ERR A.R.CHESSON CONSTRUCTION CO., INC. 315 West Main Street 1774 Ocean Highway 105A Byron Court 3200 Maritime Woods Park Drive 3737F 1lolland Boulevard Post Officc Box 1147 Post Office Box 46 Elizabeth City, NC 27909 Mantco, NC 27954 Chesapeake, VA 23323 Williamston, NC 27892 Edenton, NC 27932 PHONE (252)792-4486 PHONE (252)482-5966 PHONE (252)338-9171 P110NF. (252)473-2726 PHONE (757)485-939.7 FAX (252)792-9090 FAX 252 482-1996 FAX (252) 338-9172 FAX (252) 473-2726 FAX (757)485.9338 To: NCDENR — Division of Water Quality Date: 0 1 -06-08 RE: Grace and Truth Communit Church WE ARE SENDING YOU Attached Under separate cover via the following items: Shop drawings Prints X Plans Copy of letter Change order Samples Milic'fnu COPIES DESCRIPTION 3 Revised Plans for Grace & Truth Community Church 2 StormwaterManagement Permit Application form (I Original & I Copy) 2 Bioretention Cell SLI221MCIIIS for Each Drainage Arca 2 Bioretention Maintenance Agreement for Each Drainage Arca 2 Stormwater Calculations 2 Narrative 2 Soil Report Prepared by MSA. PC I Chcck THESE ARE TRANSMITTED as checked below: X For approval Approved as submitted For your use Approved as noted As requested Returned for corrections For review and continent FOR BIDS DUE REMARKS: Resubmit copies for approval Submit copies for distribution Return corrected prints PRINTS RETURNED AFTER LOAN TO US