Loading...
HomeMy WebLinkAboutSW7050117_APPROVED PLANS_20050726STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. DOC TYPE ❑CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE o 7o2& YYYYMMDD 3oX r g Lf SW 7DS©117 N/F CAMILLA MCPHERSON HULL PI N #: 8913-07- 58-3443 MAP/BLOCK/LOT: 78-E-1 D ZONED: GB n 7__ J 86 4.87 1.85 t 1 OFFTCE/WAREHOUSE UNIT 5 OFFICE/WAREHOUSE / UNIT 6 / 5.3 1.59 ¢ 48 OFFICE/ W UNi 0 HOUSE 50, (TYP) 1 �/ 6 lw OFFICE/WARE OUSE UNIT 8 6.42 1-6" HYDRANT TEE 7.45 1-6" GATE VALVE 1-HYDRANT 1-6"x2" TAPPED PLUG 1-2" TEE 1-2• GATE VALVE 51.fi7' EACH UNIT I 2,583 SF (TYP) OFFICE/WAREHOUSE - 5.75 z 0' WIDE 4.28 [ROLL-UP 853 5F 1,730 SF WAREHOUSE F.F. CE 50 6.48 UNIT 9 79-1.s7 XISTING OOR (TYP) I o BUILDING TO BE DEMOLISHED • 6 29 7.45 L_ f s. as s. Ss OFFICE/WAREHOUSE OFFICE/W EHOUSE F F� OFFICE/ OFFiC /WAREHOUSE UNIT 1 UNIT 2 IAREHOUSE NIT 3 IT 4 51.67' 6.85 EACH UNIT IS 583 SF (�) 853 SF 0 CE 1,730 SF WA F.F. 7. OUSE CONCRETE SIDEWALK - 6.46 6,7 0Q OVERHEAD DOORS (TYP) PARKING BUMPERS SHALL BE 5" THICK (SEE DETAILS) 50' (TYP) 7.45 0 4 7,45 ExI�TING I i euILDINc Nf THE MCNEE CORPORAION X D.B. 492, PG. 396 I ZONED: GB w 27 11� � EX WM -�+► I - 9s1 1l ui %' TER. s, fo s4 z 0 IF� UJ I� 5.74 5 6,60 61S x w 6- 59 ' ,'DAP S W TIC 6.69* 6 6g s.3s 43 w{ ui I L-37 --- - - - - --- - - - - ---- - - - -- _-- - - - - I 6.71 125 =XIST. DI 21M = 5.89 NV 1.70 6.71 IIM = 5.89 NV = 2.22 6.64 MOM w � Mo � M��Q SITE DATA 1. OWNER: = s 2s THE SEWELL CORPORATION C/O CHRIS SEWELL P.O. Box 15159 CHESAPEAKE, V.A. 23328-5159 (757) 546--0720 2. LOT COVERAGE: BUILDING •-33,749.93 SF 20.37% PAVEMENT=65,333.04 SF 39.44% SIDEWALK-6,863.15 SF 4.14% OPEN W _aE _-59,702.56 3s.0ax TOTAL AREA-165,643.71 SF 100% 3. THIS SITE IS LOCATED AT 900 EHRINCHAUS STREET IN EUZABETH CITY. D.B. 719, PG. 299 4. PARKING: RETAIL SPACE 10,500 SF BUILDING 1 SPACE PER 200 SP = 53 SPACES OFFI 7,677 SF BUILDING 1 SPACE PER 250 SF - 138 SPACES PARKING SPACES PROVIDED = 31 WAREHOUSE 1 SPACE PER 2/3 EMPLOYEES (9 UMTS ® 2 EMPLOYEES EACH-12) PARKING SPACES PROVIDED - 12 PARKING SPACES REQUIRED = 96 PARKING SPACES PROVIDED = 113 (INCLUDES 8 HANDICAP SPACES) 5. SITE IS ZONED: GB 6, SITE IS LOCATED IN FLOOD ZONE X ACCORDING TO FIRM MAP NUMBER 3720891300 J. DATED 10/05/04. 7. SETBACKS: FRONT = 20' REAR = 15' 50E - 20' 8 DISTURBED AREA = 3.8 AC 9. LANDSCAPING MUST BE INSTALLED AS SHOWN ON THIS PLAN. CHANGES MUST BE APPROVED BY THE ELIZABETH CITY PLANNING DEPARTMENT. 10. ALL SIGNS MUST BE APPROVED BY THE CITY OF ELIZABETH CITY PRIOR TO INSTALLATION. 11, DURING CONSTRUCTION AND SITE WORK THE SITE SHALL BE SURROUNDED WITH SILT FENCE (SEE DETAILS) EXCEPT AS NECESSARY FOR INGRESS/EGRESS OF CONSTRUCTION TRAFFIC, CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN EVENT OR WEEKLY. 12, OWNER SHALL PERFORM WATER AND SEWER TAPS WITH CITY STAFF PRESENT. 13. THERE ARE NO WETLANDS ON THIS SITE LEGEND 7 EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING POWER POLE O SCO PROPOSED SEWER CLEANOUT BENCHMARK DRAINAGE FLOW DIRECTION RIP -RAP EXISTING ASPHALT PROPOSED ASPHALT PROPOSED CONCRETE PAVEMENT PATCH CA (42) PROPOSED CHINESE PISTACHE (Pistarla drinensis) (173) PROPOSED JAPANESE HOLLY 'HELLERI' (,/Ox Bata w1oril (44) PROPOSED NANDINA 'GULF STREAM' (Nandfna damestka) Gldf $tream' ( j PROPOSED MULCH GROUND COVER (31) PROPOSED BLUE CARPET JUNIPER (Ainparus squamata) 14iue Carpet' x fo sa EXISTING GRADES ,/-3.00 PROPOSED GRADES - EXISTING DITCH TOP OF BANK (TOO) - - - - - BUILDING SETBACK (MBL) SILT FENCE GRAPHIC SCALE 2S 0 13 23 30 IN FEET ) RhUhlvb'J 1 inch = 25 fiw MAY 17 2005 DWQ PROD #'- d 5V ! f fq� T:,4 CAR r! ;NA n1 -jut_ f � N a V M R g o ♦ � ��� it : oa� JO Lj ., -• �. \ Ypp U � 0 r_ ¢ OD � N 0 0 Q A 0 0 n t*S o� a4Q� V [yam Y Y >4 i w 0 � Ld a R LLI w m NPAJ Zi w .aa •� IY w 3 4so o LLI 5 S 5 � a U 5 CK \ , \ � \ � _ \ \ N s - L NN My In it - -, -� i-a-•_ E 7 I r --•--'-r 11 r - 'e t ��� r: i. I d i 1- Ij �� E r L) !� I •�f i i' l 1 ;i rl may z `� SW 7Dre /�� EROSION CONTROL MEASURES THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REQUIRMENTS OF THE EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS OF THE DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE PROVIDED ON ALL AREAS OF THE SITE WHICH ARE DISTURBER OR GRADED. CONTRACTOR SHALL PROVIDE GROUND COVERS (SEE SCHEDULE BELOW) WITHIN 30 CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION WITHIN THE SPECIFIC AREAS. THE CONTROL MEASURES MALL BEGIN PRIOR TO ANY LAND DISTURBING ACTIVITY INCLUDING CLEARING; SHALL CONTINUE DURING THE CONSTRUCTION AND SHALL CONTINUE NTH THE NECESSARY MAINTENANCE UNTIL THE DISTURBED LAND IS STABILIZED. COMPLIANCE WITH LOCAL AND/OR STATE SOIL EROSION AND SEDIMENTATION CONTROL LAWS SHALL BE THE ENTIRE RESPONSIBILITY OF THE CONTRACTOR. THIS PARAGRAPH IS INTENDED TO SERVE ONLY AS A GUIDE TO THE CONTRACTOR FOR COMPLIANCE WITH SUCH LAWS. ORDERS, RULES AND REGULATIONS CONCERNING EROSION AND SEDIMENTATION CONTROL PROTECTION OF EXISTING STRUCTURES AND FACILITIES FROM SEDIMENTATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ITEMS TO BE PROTECTED SHALL INCLUDE, BUT ARE NOT LIMITED TO CATCH BASINS, NATURAL WATERWAYS, DRAINAGE DITCHES, WALKS, DRIVES, ROADS, LAWNS, AND STREAMS. SEEDING SCHEDULE SEED MIXTURE RATE OPTIMUM PLANTING DATES 1. KENTUCKY 31 FESCUE 5 #/1000 SF MAR. 15 - MAY 1 AUG. 15 -- OCT. 15 2. COMMON BERMUDAGRASS 2 �I/1000 SF MAY 1 - JUNE 30 (HULLED) 3. PEARL MILLET 2 #/1000 SF MAY 1 - OCT. 1 4. FESCUE 5 #/1000 SF OCT. 15 - MAR. 15 TYPICAL DITCH OR SWALE NTS �? 10 YR = 4.29___ INLET ELEV. - 2.00 CLASS B STONE COMPLETELY 6" SCH 40 PVC PIPE, SURROUNDS RISER - FEMALE ADAPTER & PERMANENT THREADED PLUG WATER SURFACE ELEV. = 3.00 6" SCH 40 PVC TEE 6" SCH 40 PVC TEE --� THREADED PLUG WITH - 1-1/2" DIA. HOLE DRILLED THROUGH • \6" SCH 40 PVC (LENGTH AS REQUIRED) 20"X20'X3' THICK CONCRETE PAD TOP OF RISER ELEV. 3.85 SEEDBED PREPARATION THE CONTRACTOR SHALL CUT AND DISPOSE OF WEEDS OR OTHER UNACCEPTABLE GROWTH ON THE AREAS TO BE SEEDED. UNEVEN OR ROUGH AREAS SHALL, BE SHAPED AND SMOOTHED TO PROVIDE FOR EFFECTIVE SEEDING AND EASE OF MOWING. THE SOIL SHALL BE SCARIFIED TO A DEPTH OF NOT LESS THAN 5 INCHES. CLODS SHALL BE BROKEN AND THE TOP 3--4 INCHES OF THE SOIL SHALL BE WORKED INTO A SEEDBED BY THE USE OF PULVERIZERS, DRAGS, OR HARROWS. THE PREPARATION OF SEEDBEDS SHALL NOT BE DONE WHEN THE SOIL IS FROZEN OR EXTREMELY WET. LIMESTONE. FERTILIZER, AND SEED LIMESTONE, FERTILIZER, AND SEED SHALL BE APPLIED WITHIN 24 HOURS AFTER COMPLETION OF SEEDBED PREPARATION. LIMESTONE AND FERTILIZER MAY BE APPLIED AS PART OF THE SEEDBED PREPARATION, PROVIDED IT 1S WORKED INTO THE SOIL. IF NOT SO APPLIED, LIMESTONE AND FERTILIZER SHALL BE DISTRIBUTED UNIFORMLY OVER THE PREPARED SEEDBED AT THE SPECIFIED RATE OF APPLICATION AND THEN HARROWED, RAKED, OR OTHERWISE THOROUGHLY WORKED INTO THE SEEDBED. SEED SHALL BE DISTRIBUTED UNIFORMLY OVER THE SEEDBED AT THE RATE OF APPLICATION SPECIFIED, AND IMMEDIATELY HARROWED, RAKED, OR DRAGGED AS TO COVER THE SEED WITH A LAYER OF SOIL MULCHING ALL SEEDED AREAS SHALL BE MULCHED. GRAIN STRAW MAY BE USED AS MULCH AT ANY TIME OF THE YEAR. MULCH SHALL BE APPLIED WITHIN 24 HOURS AFTER THE COMPLETION OF SEEDING. CARE SHALL BE TAKEN AS TO PREVENT DISPLACEMENT OF SOIL OR SEED FROM THE SEEDBED AREA DURING MULCHING OPERATIONS. MULCH SHALL BE UNIFORMLY SPREAD BY HAND OR MECHANICAL SPREADER. AN ACCEPTABLE APPLICATION WILL BE THAT WHICH WILL ALLOW SOME SUNLIGHT TO PENETRATE AND AIR TO CIRCULATE BUT ALSO PARTIALLY SHADE THE GROUND, REDUCE EROSION AND CONSERVE SOIL MOISTURE. MAINTENANCE AREAS WHERE SEEDING AND MULCHING HAVE BEEN PERFORMED SHALL BE MAINTAINED IN SATISFACTORY CONDITION UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. AREA OF DAMAGE OR FAILURE DUE TO ANY CAUSE SHALL BE REPAIRED OR REDONE AS NECESSARY. DETENTION POND DIMENSIONS NTS 12" CMP RISER W/ ANTI -VORTEX PLATES do TRASH RACK. SEE TRASH RACK DETAIL. WELD 1/4" STEEL PLATE ON BOTTOM. BARREL 8" CMP INVERT = 3.00 1 444 iv a4a" CI 4 4 4 4 i\\�f\\��♦�\\ #57 WASHED STONE ANTI -SEEP COLLARS AT OF DAM 4 DRAWDOWN DEVICE- 6" GALV. STEEL PIPE do FITTINGS, ATTACH TO RISER OUTFLOW STRUCTURE NTS 1. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PADS. (SEE DETAIL) 2. INSTALL EROSION CONTROL DEVICES AT SITE DISCHARGE POINTS TO PREVENT OFF SITE SEDIMENTATION. 3. CUT NEW SWALES AND DITCHES AND CONSTRUCTION DETENTION POND. 4. INSTALL THE REMAINING SEDIMENT AND EROSION CONTROL PROTECTION. 5. INSTALL THE STONE BASE AND ASPHALT FOR THE PROPOSED PARKING. 6. PROVIDE A GROUNDCOVER ON EXPOSED SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS (WHICH EVER IS SHORTER), THE FOLLOWING COMPLETION OF ANY PHASE OF GRADING; AND, A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT 7. REMOVE SEDIMENT FROM DETENTION POND AND RESTORE TO DESIGN DEPTHS. S. MONITOR AND MAINTAIN THE INSTALLED EROSION CONTROL MEASURES AND REPAIR AS NECESSARY. 9. ONCE VEGETATION IS ESTABLISHED, REMOVE THE CONTROL DEVICES. CONSTRUCTION SEQUENCING RIP RAP PAD TOP ELEV. = 3.20 PERMANENT GRADE 20WATER SURFACE �ELEV, = 3.00 I EARTH WEIR ACROSS MUM l END OF FOREBAY AREA 3' Q MARSH VEGETATION LOOTTOM ELEV.- 0.0 \1 71 BOTTOM ELEV. FOREBAY AREA CROSS SECTION NTS 2" X 4" WOOD FRAME iI II II II 2" X 4" STAKES STAKE FABRIC - FABRIC BURIED FABRIC' i' MIN. ATE 1. SPACE STAKES EVENLY AROUND THE PERIMETER OF THE INLET A MAXIMUM OF 3' APART AND DRIVE THEM SECURELY INTO THE GROUND. 2. PLACE THE BOTTOM 12 INCHES OF THE FABRIC IN A TRENCH AND BACKFILL THE TRENCH WITH AT LEAST 4 INCHES OF CRUSHED STONE OR 12 INCHES OF COMPACTED SOIL. 3. THE TOP OF THE FRAME AND FABRIC MUST BE WELL BELOW THE GROUND ELEVATION DOWNSLOPE FROM THE DROP INLET TO KEEP RUNOFF FROM BYPASSING THE INLET. IT MAY BE NECESSARY TO BUILD A TEMPORARY DIKE ON THE DOWN SLOPE SIDE OF THE STRUCTURE TO PREVENT BYPASS FLOW, MATERIAL FROM WITHIN THE SEDIMENT POOL MAY BE USED FOR DIKING, FABRIC DROP INLET PROTECTION NTS A. NCDOT #5 OR #57 WASHED STONE SHALL BE USED. PAD TO BE 50' X 20' X 6" DEPTH MIN. B. TURNING RADIUS SUFFICIENT TO ACCOMODATE LARGE TRUCKS TO BE PROVIDED. C. ENTRANCE(S) SHALL BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. D. PAD MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. E. ANY MATERIAL WHICH IS TRACKED ONTO ADJACENT ROAD SHALL BE REMOVED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PLANTING NOTES 1. VEGETATED SHELF SHALL BE PLANTED WITH PLANTS SELECTED FROM THE TABLE PROVIDED. 2 OR 3 PLANTS SHALL BE CHOSEN FROM THE TABLE. 2. PLANT MATERIAL MAY BE AVAILABLE FROM LOCAL WETLAND AREAS AND DITCHES. THE CONTRACTOR SHALL VERIFY WITH THE LOCAL OFFICE OF COASTAL AREA MANAGEMENT WHETHER OR NOT A PERMIT IS REQUIRED TO TAKE PLANTS FROM THESE AREAS. 3. APPROPRIATE TRANSPLANTING OR PLANTING METHODS SHALL BE DETERMINED ACCORDING TO PLANTS CHOSEN. (PRIOR TO DIGGING, THE TOPS OF THE PLANTS SHOULD BE CUT OFF TO A HEIGHT OF 4--6 INCHES. CUT OR DIG PLUGS APPROX, 4 INCHES SQUARE MAKING SURE TO GET FULL ROOT DEPTH. THIS PROCESS SHOULD IMPROVE THE SURVIVAL RATE OF MOST OF THE PLANTS.) EX. GRADE NTS COMMON NAME SCIENTIFIC NAME PICKEREL WEED PONTEDERIA CORDATA BLUE FLAG IRIS VIRGINICA " PERMANENT POOL ELEVATION 3.0 OIo� 6. ? S%L IW VEGETATED SHELF 3 _ POND BOTTOM ELEV. _ -1.0 WET BASIN CROSS SECTION NTS MAX. HEIGHT 18" LENGTH AS NECESSARY TO INSURE STABLE INSTALLATION FILTER F BACKFILL MINIMUM 8' GRAVEL OR COMPACTED SOIL 1. FILTER FABRIC SHALL BE EXTRA STRENGTH FABRIC CAPABLE OF MEETING 50LB/LIN. INCH, 2. FABRIC SHALL iAVE A SLURRY FLOW RATE OF 0.3 GAL/SOFT141N. 3. STAPLE OR WIIFE THE FABRIC DIRECTLY TO THE POSTS. 4. EXCAVATE A TRENCH APPROX. 6" WIDE AND 8" DEEP ALONG THE PFOPOSED LINE OF POSTS UPSLOPE OF THE SILT FENCE AND BURY THE BOTTOM EDGE OF THE FILTER FABRIC BACKFILL THE TRENCH WITH COMPACTED EARTH OR GR)VEL. 5. INSPECT SEDI#ENT FENCES WEEKLY AND AFTER EACH RAINFALL REMOVE SEDIkENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE FOR THE NEXT RAIN. 6, REMOVE FENCIIG AS THE DRAINAGE AREA IS STABILIZED_ 8" "V" TRENCH -� UNDISTURBED SOIL SILT FENCE DETAIL NTS � bpi a � U N � t g � o Q� Io 00 - ....•' • +. Y Ln nD o In � N m U qp94, o O N �A _04 Q Q x4 z A X I Y 3`