State Stormwater Permit
Permit No. SVV6120703
Highland Middle School Page 1 of 2
Stormwater Permit No. SW6120703
Harnett County
Designer's Certification
I, ��CT� 8C4KF 14-tt as a duly registered tNGA'EX-,K in
the State of North Carolina, having been authorized to observe (periodically/weekly/full
time) the construction of the project,
14.7-69LAArp MLOACI, .5e-HOC C __
(Project)
for iAXII/Orr eoum77' .sertpcc (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in'the observation of the -project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
SEAL
Signature
Registration Number
Date % Z
RECEIVED
DEC 1 2014
L> ALI °irr, , PH
FAYFT JFLV![.Lc F;Ef CIaAL �FrIC£
Page 6 of 7
DEC
i
State Stormwater Permit
Permit No. SVV6120703
Certification Requirements:
Page 2 of 2
J� 1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
%C 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
_K`4. All roof drains are located such that the runoff is directed into the system.
5. The outlet/bypass structure elevations are per the approved plan.
C 6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
�8. All slopes are grassed with permanent vegetation.
X 9. Vegetated slopes are no steeper than 3:1.
7C 10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. Required drawdown devices are correctly sized per the approved plans.
X 13. All required design depths are provided.
x 14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
X 15. The required dimensions of the system are provided, per the approved
plan.
Please submit this Designer's Certification to: Fayetteville Regional Office
Surface Water Protection
225 Green Street
Systel Building Suite 714
Fayetteville, NC 28301
Page 7 of 7
DWQ USE ONLY
Date Received
Fee Paid
Permit Number
+.SibS -a a t,3 3 t J
Sw Le 1 D' o
Applicable Rules: ❑ Coastal SW — 1995 ❑ Coastal SW — 2008 ❑ Ph it - Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters . ❑ Universal Storm water Management Plan
❑ Other WQ M =mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This farm may be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Highland Middle School
2. Location of Project (street address):
SE of intersection of Buffalo Lake Road and Roberts Road
City:Sanford County:Harnett Zip:27332
3. Directions to project (from nearest major intersection):
Heading south on Buffalo Lake Road from the US Hwy 27/Buffalo Lake Road intersection Highland
Elementary School will be approximatley 1.8 miles on the left. Site is approximatley 1,000 feet east of existing
Highland Elementary School.
4. Latitude:35° 18' 19" N Longitude:790 02' 21" W of the main entrance to the project.
IL PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) , and the status of
construction: ❑Not Started ❑Partially Completed* ❑ Completed* "provide a designer's certification
Specify the type of project (check one):
®Low Density ❑High Density []Drains to an Offsite Stormwater System ❑Other
3. If this application is being submitted as the result of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the stormwater project number, if
assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑LAMA Major ®Sedimentation/Erosion Control: ac of Disturbed Area
❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:
tld
DENR
Wetlands- P a..,,..
Form SWU-l01 Version 07.Iun2010 Page] oF6
11L CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the rp oject):
Applicant/Organization:Harnett County Schools
Signing Official & Titlejohn Birath - Director of Facilities,_ Planning, and Construction
b.Contact information for person listed in item 1a above:
Street Address:1500 South Main Street
City:Lillin ton State:NC Zip:27546
Mailing Address (if applicable): P.O. Box 1029
City:Lillington
Phone: (910 } 893-4808 x 25
Email:jbirath@harnett.kl2.nc.us
State:NC Zip:27546
Fax: (910 ) 893-1100
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/Organiza
Signing Official & Title:
b.Contact information for person listed in item 2a above:
Street Address:
City:
Mailing Address (if applicable):
City:
Phone: ( )
Email:
State: Zip
State: Zip:
Fax: ( )
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organ ization:Timmons Group
Signing Official & Title:Dayid Arnold, PE - Project Engineer
b.Contact information for person listed in item 3a above:
Mailing Address:5410 Trinity Road, Suite 112
City:Raleigh State:NC Zip:27607
Phone: (919 ) 866-4938
Email:david.ar-nold@timmoiis.com
timmons.com
Fax: (919� ) 859-5663
4. Local jurisdiction for building permits: Harnett County
Point of Contact:Amanda Bader Phone #: (910 ) 893-7555
Form SWU-101 Version 07Jun2010 Page 2 o1`6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
On -site stormwater runoff in locations with new built upon area will be collected into a storm drainage
network and routed to three proposed infiltration basins These infiltration basins have been sized to treat 2.5
times the required treatement volume, thus eliminating the need for an offline bypass or vegetative filter strip.
On -site stormwater runoff in locations with no build upon area will be routed through grassed swales and
discharged offsite.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW —1995 ❑ Ph II — Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 170.81 acres 5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: acres
7. Total Property Area (4) — Total Coastal Wetlands Area (5) —Total Surface Water Area (6) = Total Project Area':
170.81 acres
Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area
between the barks of streams and rivers, the area below the !Normal High Water (NHW) line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area i`.s used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may be
included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 6 %
9. How many drainage areas does the project have?1 (For high density, count I for each proposed engineered
stor►rrzoater BMP. For low density and other projects, use I for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. I€ there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area 2
Drainage Area 3
Drainage Area 4
Receiving Stream Name
McLeod Creek
McLeod Creek
McLeod Creek
McLeod Creek
Stream Class *
C
C
C
C
Stream Index Number *
18-23-29-1
18-23-29-1
18-23-29-1
18-23-19-1
Total Drainage Area (sf)
296,076
79,330
262,220
6,802,858
On -site Drainage Area (sf)
296,076
79,330
262,220
6,802,858
Off -site Drainage Area (sf)
0
0
0
0
Proposed Impervious Area** (sf)
134,802
51,338
155,177
103,499
% Impervious Area** (total)
46 ` ,
65 ` ,
59 `%
11.51%
Im ervious" Surface Area
Drainage Area 1
Drainage Area 2
Drainage Area 3
Drainage Area 4
On -site Buildings Lots (sf)
106,828
0
40,853
0
On -site Streets (sf)
15,080
1,067
75,555
103,499
On -site Parking (so
0
47,938
14,764
0
On -site Sidewalks (sf)
12,894
2,333
24,005
0
Other on -site (sf)
0
0
0
0
Future (sf)
0
0
0
0
Off -site (sf)
0
0
0
0
Existing BUA*** (sf)
0
0
0
0
Total (sf):
134,802
51,338
1155,177
103,499
Stream Class and Index Number can be determined at: http://portal.ncdenno? L b wq[p1esu classi nations
** Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
*** Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is
to be removed and which will be replaced by new BUA.
Form SWU-101 Version 07Jun2010 Page 3 of 6
11. How was the off -site impervious area listed above determined? Provide documentation. See Stormwater
Compliance Plan Sheet
Projects in Union County: Contact DTVQ Central Office staff to check if'the project is located ti thin a Threatened &
F.ndangered Species ivatershed that may he subject to more stringent stornmti ater requirements as per NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org web wq/ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from httptLportal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from http://portal,ncdenr.or . web wq/ws/su/statesw/forms_docs.
Initials
1. Origina[ and one copy of the Stormwater Management Permit Application Form. aA
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants fJJA
Form. (if required as per ['art VIl below)
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
http://www.envlielp.org/pages/onestopexi2ress.litml for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management for
the project. This is required in addition to the brief summary provided in the Project
Information, item 1.
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within'/2 mile of the site boundary, include the'h
mile radius on the map.
7. Sealed, signed and dated calculations.
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and' Firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BOA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished floor elevations.
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
Form SWU-101 Version 07Jun2010 Page 4 of 6
OA
DA
'D A
VP
9. Copy of any applicable soils report with the associated SHWT elevations (Please identify A
elevations in addition to depths) as well as a map of the boring locations with the existing 4
elevations and boring logs. Include an 8.5"xlI" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(infiltration Devices submitted to WiRO: Schedale a site visitfir it DWQ to verify flit, SH WT prior
to submittal, (910) 796-7378.)
10. A copy of the most current property deed. Deed book: 2939 Page No: 341 -DA
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC fi A
Secretary of State or other official documentation, which supports the tildes and positions held
by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The
corporation or LLC must be listed as in active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
11ttp:/ /www.secretary.state.nc.us/Corporations/CSearch.aspx
VI1. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot sire, and the allowable built -upon area must be provided
as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and
protective covenants forms can be downloaded from
http:/ / portal.ncdenr.org/webLwqLwsZsuZstatesw/ forms does. Download the latest versions for each submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot.
VIII. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:David Arnold PE
Consulting Firm: Timmons Croup
Mailing Add ress:5410 Trinit.yRoad, Suite 112
City:Ralei h State:NC Zip:27607
Phone: ,(919 ) 866-4938
Email:david.arnold@timnions.com
Fax: (919_ ) 859-5663
IX. PROPERTY OWNER AUTHORIZATION (if Contact Infornrrrtion, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) certify that
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact lirf irmation, item W . with (print or type name of organization listed in
Contact Information, item 1a) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-101 Version Mun2010 Page 5 of'6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to
me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a
completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. 1 understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature: Da
a Notary Public for the State of . County of
do hereby certify that
personally appeared
before me this _ day of . and acknowledge the due execution of the application for a
stormwater permit. Witness my hand and official seal,
SEAL
My commission expires
X. APPLICANT'S CERTIFICATION
I, (print or type name of person fisted in Contact Information, item W Iohn Birath ,
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covrr nts will be recorded, and that the proposed project complies with the requirements of the
applicable stormwbt rules Ln 15 H .1000, SL 2006-246 (Ph. II —Post Construction �Vz
2008-211.
Signature: Da11-11 te: 11 Z
I,4lh, a Notary Public for the State of A) County of
�Cru!l . do he eby certify that 'SoFF,-� / 11 f personally appeared
before me this A day of u 101 rand ac cnowl ge the due execution of the application for a
stormwater permit. Witness my hail and official seal,
MATTHEW BEASLEY
Notary Polk
Hamett County
North Carollne
FIMY Commission Expires May 18, 2013
SEAL
My commission expires An t o-OL3
Form SWU-101 Version 07Jun2010 Page 6 of6
;NX Caiuurazjou Exb:M
N�i1;i Caw�aa
How4gs COAUZA
y�410 bnD]IC
VVIVIiNEM 9EMUS3
Permit Number:
(to be provided by DIVQ)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted'in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
.six weeks).
No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
Swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swaie (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Farm SW401-Infiltration 13asin O&M-Rcv.3 ['age 1 oi'3
BMP element:
The forebay
The main treatment area
The embankment
The outlet device
The receiving water
Potential problem:
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
Erosion has occurred or
riprap is displaced.
Weeds are present
A visible layer of sediment
has accumulated.
Water is standing more than
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to grow on the embankment.
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Clogging has occurred.
The outlet device is damaged
Erosion or other signs of
damage have occurred at the
outlet.
How I will remediate the problem:
Search for the source of the
sedimentand remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
►wiping there with pesticide (do not
spray).
Remove shrubs or trees
immediately.
Make all needed repairs,
Clean out the outlet device. Dispose
of the sediment off -site.
Repair or replace the outlet device.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
Form SW401-InfEltra(ion Basin O&M-Rev.3 Page 2 of
Permit Number:
(to be provided by DfVQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Highland Middle School
BMP drainage area number: I
Print name:Mr. John Birath
Title:Director of Facilities, Planning, and Construction
Addre
Phone:
Signat
ss:1500 S uth Main Street - Lill in gton NC 27546
910-89318 8 x 25
Are:
Date: -7�!/G� t�
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
1, Xw 1 40 , a Notary Public for the State of
County of ,Cher , do hereby certify that
personally appeared before me this _6
day of and acknowledge the due execution of the
forgoing infiltr ion basin maintenance requirements. Witness my hand and official seal,
MATTHEW BEASLEY
Notary Publlo
Harnett County
North Carolina
MY Commission Expires May 18, 2013
SEAL
My commission expires
1
Form SW401-Infiltration Basin O&M-ltev.3 Page 3 of 3
Date: -7�!/G� t�
Note: The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
1, Xw 1 40 , a Notary Public for the State of
County of ,Cher , do hereby certify that
personally appeared before me this _6
day of and acknowledge the due execution of the
forgoing infiltr ion basin maintenance requirements. Witness my hand and official seal,
MATTHEW BEASLEY
Notary Publlo
Harnett County
North Carolina
MY Commission Expires May 18, 2013
SEAL
My commission expires
1
Form SW401-Infiltration Basin O&M-ltev.3 Page 3 of 3
-gbpp%.,
Y33ZA38 W3mTTAh
ai1CDq ViGM14
60110143 �IION
Eros At IBM aaliciO aoizaimmao Im
VP
c
Permit Number:
(io he provided by DJVQ)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance -will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable),
Erosion is occurring in the
Regrade the Swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
futureproblems with erosion.
Form SW40I-Infiltration Basin O&M-Rev.3 Page l of 3
BMP element:
Potentialproblem:
How I will remediate the roblem:
The forebay
Sediment has accumulated
Search for the source of the
and reduced the depth to 75%
sediment and remedy the problem if
of the original design depth.
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Erosion has occurred or
Provide additional erosion
riprap is displaced.
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by
hand, if pesticides are used, wipe
them on the plants rather than
spraying.
The main treatment area
A visible layer of sediment i
Search for the source of the
has accumulated.
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately.
Water is standing more than
Replace the top few inches of filter
5 days after a storm event.
media and see if this corrects the
standing water problem. If so,
revegetate immediately. If not,
consult an appropriate professional
for a more extensive repair.
Weeds and noxious plants are
Remove the plant-, by hand or by
growing in the main
wiping them with pesticide (do not
treatment area.
spray).
The embankment
Shrubs or trees have started
Remove shrubs or trees
to grow on the embankment.
immediately.
An annual inspection by an
Make all needed repairs.
appropriate professional
shows that the embankment
needs repair, "
The outlet device
Clogging has occurred.
Clean out the outlet device. Dispose
of the sediment off -site.
The outlet device is damaged
Repair or replace the outlet device.
The receiving water
Erosion or other signs of
Contact the NC Division of Water
damage have occurred at the
Quality 401 Oversight Unit at 919-
ou tlet.
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3
Permit Number:
(to he provided by DfFQ)
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Highland_Middle School
BAIP drainage area number:2
Print name:Mr. John Birath
Titic:Director of Facilities, Planning, and Construction
Address:1500 South Main Street - Lillinaton. NC 2
Phone: 910-893-4808 x
Signature:
Date: 7
Note. The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, iYoe,' a Notary Public for the State of
County of , do hereby certify that
�ntdy��ry�fl} j!i personally appeared before me this {�
day of j l� , and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
MATTHEW BEASLEY
Notary Public
Harnett County
North Caroilrta
Commission Expires May 18, 2013
SEAL
My commission expires ?An 4 )A I �)_
Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3
YUMO Y13HTTAM
zildu9 Testo%
XMU03 lten'SH
600153 d17, :l
EIOS ,et XGM zsiigx3 izzimmoO IM
Permit Number:
(to he provided by Ui1'Q)
Drainage Area Number:
Infiltration Basin Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a
log in a known set location. Any deficient BMP elements noted in the inspection will be
corrected, repaired or replaced immediately. These deficiencies can affect the integrity
of structures, safety of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— The drainage area will be carefully managed to reduce the sediment load to the
infiltration basin.
— Immediately after the infiltration basin is established, the vegetation will be
watered twice weekly if needed until the plants become established (commonly
six weeks).
— No portion of the infiltration basin will be fertilized after the initial fertilization
that is required to establish the vegetation.
— The vegetation in and around the basin will be maintained at a height of
approximately six inches.
After the infiltration basin is established, it will be inspected once a quarter and within
24 hours after every stofm event greater than 1.0 inches (or 1.5 inches if in a Coastal
County). Records of operation and maintenance will be kept in a known set location
and will be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall
be repaired immediately.
BMP element:
Potentialproblem:
How I will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or
Regrade the soil if necessary to
infiltration basin
erosive gullies have formed.
remove the gully, and then plant a
ground cover and water until it is
established. Provide lime and a
one-time fertilizer application.
The inlet device: pipe or
The pipe is clogged (if
Unclog the pipe. Dispose of the
Swale
applicable).
sediment off -site.
The pipe is cracked or
Replace the pipe.
otherwise damaged (if
applicable).
Erosion is occurring in the
Regrade the swale if necessary to
swale (if applicable).
smooth it over and provide erosion
control devices such as reinforced
turf matting or riprap to avoid
future problems with erosion.
Form SW401-Infiltration Basin O&M-Rev.3 Page I of 3
BMP element:
The forebay
The main treatment area
The embankment
The outlet device
The receiving water
Potential problem:
Sediment has accumulated
and reduced the depth to 75%
of the original design depth.
Erosion has occurred or
riprap is displaced.
Weeds are present.
A visible layer of sediment
has accumulated.
Water is standing more than
5 days after a storm event.
Weeds and noxious plants are
growing in the main
treatment area.
Shrubs or trees have started
to grow on the embankment.
An annual inspection by an
appropriate professional
shows that the embankment
needs repair.
Clogging has occurred.
The outlet device is damaged
Erosion or other signs of
damage have occurred at the
outlet.
How I will remediate the problem:
Search for the source of the
sediment and remedy the problem if
possible. Remove the sedirent and
dispose of it in a location where it
will not cause impacts to streams or
the BMP.
Provide additional erosion
protection such as reinforced turf
matting or riprap if needed to
prevent future erosion problems. .
Remove the weeds, preferably by
hand. If pesticides are used, wipe
them on the plants rather than
spraying.
Search for the source of the
sediment and remedy the problem if
possible. Remove the sediment and
dispose of it in a location where it
will not cause impacts to streams or
the BMP. Replace any media that
was removed in the process.
Revegetate disturbed areas
immediately. _
Replace the top few inches of filter
media and see if this corrects the
standing water problem. If so,
revegetate immediately, If not,
consult an appropriate professional
for a more extensive repair.
Remove the plants by hand or by
wiping them with pesticide (do not
spray.
Remove shrubs or trees
immediately.
Make all needed repairs.
Clean out the outlet device. Dispose
of the sediment off -site.
Repair or replace the outlet device.
Contact the NC Division of Water
Quality 401 Oversight Unit at 919-
733-1786.
Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3
Permit Number:
(to he provided by DOT)
acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify DWQ of any
problems with the system or prior to any changes to the system or responsible party.
Project name:Highland Middle School
BMP (frainage area number:3
Print name:Mr. John Birath
Title:Director of Facilities, Planning, and Construction
Address:1500 South Main Street - Lillintton, NC 27546
Phone: 910-893-4
Signature:
Date: 7 //' / lvlz
Note. The legally responsible party should not be a homeowners association unless more than 50% of
the lots have been sold and a resident of the subdivision has been named the president.
I, 'T , a Notary Public for the State of
Col ty of , do hereby certify that
personally appeared before me this /P
day of %l� , and acknowledge the due execution of the
forgoing infiltration basin maintenance requirements. Witness my hand and official seal,
MATTHEW BEASLEY
Notary Public
Harnett County
North Carolina
My Committloo Expires May IS. 2013
SEAL
My commission expiresZ�iAn
Form SW401-infiltration Basin O&NI-Rev.3 Page 3 of 3
E38 W3HTTAM
au9 jisfaM
uoO ltsmsH
lois;l MOM
2!lliQA3 0*11r mod ym
Permit No
(to be provided by DWQ)
STORMWATER MANAGEMENT PERMIT APPLICATION FORM 4G
NCDEW 401 CERTIFICATION APPLICATION FORM Y
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required items Checklist (Part fit) must be printed, filled out and submitted along with all of the required information.
!. PROJECTINFORMATION
Project Name Highland Middle School
Contact Person David Arnold, PE
Phone Number 919-866-4938
Date 711212012
Drainage Area Number 1
II. DEStGNIINFORMATION'
Site Characteristics
Drainage area 6.80 ft
imperious area 3.09 ft7
Percent impervious 0.45 %
Design rainfall depth 2.50 _ in ')Ff1 L Ai S &t.^'
Peak Plow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hrdischarge
Post -development 1-yr, 24•hr discharge
Pre/Post 1-yr, 24-hr peak Flow control
Storage Volume: Non -SA Waters
Minimum design volume required
Design volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Minimum required volume
Volume provided
Soils Report Summary
Soif type
Infiltration rate
SHVVT elevation
Basin Design Parameters
in
Whr
folsec /VoT 129-Q'.' Zrc,
elsec
ft'lsec
28,323.00 ft'
74,426.00 ft' OK for non -SA waters
f1'
ft'
ft' A/ 1 FI
ft'
to
LaB
2400 inihr
416.00 frost -_1 S,4kzT vs.ci 9eLa+tx=� iuG su �n,,IT+t�C7o-�
Drawdown time
1.00
days OK
Basin side slopes
3.00
:1 OK
Basin bottom elevation
418,00
fmsl OK
Storage elevation
423,00
Imsl
Storage Surface Area
21241,00
f'
Top elevation
424.00
fmsl
Basin Bottom Dimensions
Basin length
214.00
It
Basin width
52.00
it
Bottom Surface Area
10,512.00
fC
Additional Information
Maximum runoff toeach inlet tothe basin?
ac-in - N'A F 3AcaMec`
Length of vegetative filter for overflow
ft - NIA 3 ,i.Z eb F,a 2-S' n Afsr Li S ti 2n1
Distance to structure
ft
Distance from surface waters
ft - /4"
Distance from water supply well(s)
ft - Ncd
Separation from impervious soil layer
ft - All f'4. x
Naturafly occuring soil above shwt
fl - aJW , c: s ie
Bottom covered with 4-in of clean sand?
Y
(Y or N) OK
Proposed drainage easement provided?
Y
(Y or N) OK
Capures all runoff at ultimate build -out?
Y
(Y or N) OK
Bypass provided for larger storms?
N
(Y or N) Must provide bypass for larger flows - S xe b Fo+t t. r iiEf+fir) S7Aa.r.
Pretreatment device provided
Forebay
Form SW401-infiltration Basin-Rev.4 Parts 1. & it. Design Summary, Page 1 of 1
Permit
(to be provided by DWQ)
04 W A rER
A GG
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Pan 111) must be printed, filled out and submitted along with alf of the required information.
INPRO:IECTilNF.ORMATION
Project Name
Highland Middle School
Contact Person
David Arnold, P.E.
Phone Number
919-866-4938
Date
711212012
Drainage Area Number
2
Site Characteristics
Drainage area
1.82 it,
Impervious area
1.18 fh
Percent impervious
065 %
Design rainfall depth
2.50 in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
1-yr, 24-hr intensity
Pre -development 1-yr, 24-hr discharge
Post -development 1-yr, 24-hr discharge
PrelPosl 1-yr, 24-hr peak flow control
Storage Volume: Non -SA Waters
Minimum design volume required
Design volume provided
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Minimum required volume
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SFi4YT elevation
Basin Design Parameters
Drawdown time
Basin side scopes
Basin bottom elevation
Storage elevation
Storage Surface Area
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom Surface Area
Additional Information
Maximum runoff to each inlet to the basin?
Length of vegetative filter for overflow
Distance to structure
Distance from surface waters
Distance from water supply well(s)
Separation from impervious sal layer
Naturally occuring soil above shwl
Bottom covered with 4-in of clean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Pretreatmenl device provided
(21S11 34f1,).. 5P.Z—)
in
inmr
ft3isec Tf oT
ft'Isec
fl'fsec
10,463.00 ft'
15,334.00 ft' OK for non -SA waters
ft3
fl3
e ) NlH
ft3
LaB
24,00 infhr
415.00 fmsl
1.00 days OK
3.00 :1 OK
41T00 find OK
422.00 fmsl
7,844.00 ft'
422.00 fmsl
92.00 ft
47.00 ft
3,414.00 e
GAR o���
SEAL 9r : _
036865
G
A
�•• 'VG INE .• p`'��•
/���ics DAVIDSr Nl\\\
ac-in ` Nla -S c4,5TN e,m rf.0 70rc4 rt,97Atr4` cF- g,+.,crrroE'
ft - :mz.'
ft
ft
it r r✓M��
ft
ft - ��r.. ea,f.la
Y (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
N (Y or N) Must provide bypass for larger flows 1. S' Y, 1Dcrv4„1 5F,, _
Form SVV401-Inf4ua6on Basin-Rev.4 Parts I. & 11. Design Summary, Page 1 of 1
Permit
(to be provided by Dw0)
04 wa rF9
�� OG
STORMWATER MANAGEMENT PERMIT APPLICATION FORM o Y
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part 111) must be printed, filled out and submitted along with off of the required information,
19PROJECT61KIF,ORMATION
Project Name
Highland Middle School
Contact Person
David Arnold, PE
Phone Number
919.866.4938
Date
7112r2012
Drainage Area Number
3
ADESIGNIINEORMATION
Site Characteristics
Drainage area
6,02
if
Impervious area
3.56
ft
Percent impervious
0.59
%
Design rainfall depth
2.50
in
Peak Flow Calculations
1-yr, 24-hr rainfall depth
in
1-yr, 24-hr intensify
h/hr
Pre -development 1-yr, 24-hr discharge
ft3lsec Il aC (pa t a E
Post -development 1-yr, 24-hr discharge
fi lsec
PrelPost 1-yr, 24-hr peak flow control
ft'/sec
Storage Volume: Nol waters
Minimum design volume required 31,808.00 tt'
Design volume provided 42,956.00 ft' OK for non -SA waters
Storage Volume: SA Waters
1.5" runoff volume ft'
Pre -development 1-yr, 24-hr runoff volume ft'
Post -development 1-yr, 24-hr runoff volume ,,�
Minimum required volume ft3 �� `H (; A ci
Volume provided ft3 'o'
Soils Report Summary _� y
Soil type LaB SEAL
Infiltration rate 24.00 h/hr 038865
SHWTelevation 411,00 fmsl
Basin Design Parameters
Drawdown time 1,00 days OK �/j Faj'+ • . • ' ��\�
Basin side slopes 3,00 :1 OK //� aA VI1D A��\\�
Basin bottom elevation 414.00 fmsl OK
Storage elevation 416.50 fmsl
Storage Surface Area 21,293.00 ftz
Top elevation 416.50 fmsl
Basin Bottom Dimensions
Basin length 275.00 ft
Basin width 50,00 ft
Bottom Surface Area 13,214,00 ft
Additional Information
Maximum runoff to each inlet to the basin? ac-in N�t3 01�� �,. "�Y'A ru -ri �rct r'.4,x a f $At✓N��
Length of vegetative filter for overflow ft — NIA j S,ZEI 1 7, f 4rrc) S7b-f�^
Distance to structure ft
Distance from surface waters ft — Alva
Distance from water supply well(s) ft A.),,,r`
Separation from impervious soil layer ft - /{ I4 5,a s,z
Naturally occudng soil above shwt ft
Bottom covered with 4-in of dean sand? Y (Y or N) OK
Proposed drainage easement provided? Y (Y or N) OK
Capures all runoff at ultimate build -out? Y (Y or N) OK
Bypass provided for larger storms? N (Y or N) Must provide bypass for larger flows - 5,2-c7? F e4 z .s €1 rG r� 5 fps Yr1
Pretreatment device provided Forebay
Form SW401-Infiltration Basin-Rev_4 Parts i, 6 11. Design Summary, Page 1 of 1
A'i; Ll"*-..
KDENR su-) i q -4u.)
North Carolina Department of Environment and Natural Resources
Division of Water Quality D()
Beverly Eaves Perdue Charles Wakild, PE Dee Freeman
Governor Director Secretary
August 20, 2012
Mr. John Birath
Harnett County Schools
1500 South Main Street
Lillington, NC 27546
Subject: Stormwater Permit No. SW6120703
Highland Middle School
Overall Low Density Residential Subdivision with Infiltration Basins
Harnett County
Dear Mr. Birath:
The Stormwater Permitting Unit received a -complete Stormwater Management Permit Application for
Highland Middle School on August 18, 2012 after requesting additional information on July 25, 2012. Staff
review of the plans and specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are
forwarding Permit No. SW6120703, dated August 20, 2012, for the construction, operation and
maintenance of the subject project and the stormwater BMPs.
This permit shall be effective from the date of issuance until August 19, 2020 and shall be subject to the
conditions and limitations as specified therein, and does not supersede any other agency permit that may
be required. Please pay special attention to the conditions listed in this permit regarding the Operation and
Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership,
transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and
maintenance of the stormwater management system, to record deed restrictions, to follow the procedures
for transfer of the permit, or to renew the permit, will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit.
This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina
General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC
27611-7447. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Brian
Lowther at (919) 807-6368, or brian.lowther@ncdenr.gov.
Sincerely,
%
Jbi- Charles Wakild, PE
cc: Fayetteville Regional Office
SW6120703 File
ec: David Arnold — Timmons Group
Wetlands and Si Branch One
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NorthCarolina
Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919-B07-63001 FAX'. 919-807-64941 Customer Service: 1-877-623-6748 Aatura//
L %/
Internet: www.ncwalerquality.org */
An Equal Opportunity 4 Aff;rmative Action Employer
State Stormwater Permit
Permit No. SW6120703
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
OVERALL LOW DENSITY SUBDIVISION DEVELOPMENT
WITH POCKETS OF HIGH DENSITY
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Harnett County Schools
Highland Middle School
SE of intersection of Buffalo Lake Road and Roberts Road, Sanford
Harnett County
FOR THE
construction, operation and maintenance of three (3) Infiltration basins(s) in compliance
with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter
referred to as the "stormwater rules') and the approved stormwater management plans
and specifications and other supporting data as attached and on file with and approved
by the Division of Water Quality and considered a part of this permit.
This permit shall be effective from the date of issuance until August 16, 2020 and shall
be subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. The overall tract built -upon area percentage for the project must be maintained at
24% per the requirements of Session Law 2006-246 of the stormwater rules.
This project is permitted for a maximum of 444,816 square feet of BUA.
3. The stormwater systems proposed to treat the runoff generated by the
designated high density areas have been approved for the management of
stormwater runoff as described in Section 1.6 of this permit.
4. The low density portions of this project will maintain a minimum 30 foot wide
vegetated buffer between all impervious areas and surface waters.
5. Within the low density portions of the permitted project, the only runoff
conveyance systems allowed will be vegetated conveyances such as swales with
minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and as
shown on the approved plan.
Page 1 of 7
State Stormwater Permit
Permit No. SW6120703 `
6. The following design elements have been permitted for this infiltration basin
stormwater facility, and must be provided in the system at all times.
a. Drainage Area, acres:
Onsite, ft :
Offsite, ft2:
b. Total Impervious Surfaces, ft2:
Lot BUA, ft
Roads/Parking, ft2:
Other, ft2:
Offsite, ft2:
c. Design Storm, inches:
d. TSS removal efficiency:
e. Basin Design Depth:
f. Bottom Elevation, FMSL:
g. Surface Area, ft2:
h. Bypass Weir Elevation, fmsl:
i. Permitted Storage Volume, ft3:
j. Type of Soil:
k. Expected Infiltration Rate, in/hr
I. Seasonal High Water Table, fmsl:
m. Time to Draw Down, hrs:
n. Receiving Stream / River Basin:
o. Stream Index Number:
p. Classification of Water Body:
II. SCHEDULE OF COMPLIANCE
6.8
1.8
6.0
296,076
79,330
262,220
0
0
0
134,802
51,338
155,177
106,828
0
40,853
15,080
49,005
90,319
12,894
2,333
24,005
.0
0
0
11 (designed for 2.5 inches)
85%
5'
4'
2.5'
418'
419'
414'
21,241
7,844
416.5'
no bypass
74,426
15,334
42,956
LaB
24
416'
415'
411'
24
24
24
McLeod / Cape Fear
18-23-29-1
„C11
No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature
(such as swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving
approval from the Division. .
2. The permittee is responsible for verifying that the proposed built -upon area for
the entire lot does not exceed the maximum allowed by this permit. Once the lot
transfer is complete, the built -upon area may not be revised without approval
from the Division of Water Quality, and responsibility for meeting the built -upon
area limit is transferred to the individual property owner.
3. If an Architectural Review Board or Committee is required to review plans for
compliance with the BUA limit, the plans reviewed must include all proposed
built -upon area. Any approvals given by the Board do not relieve the homeowner
of the responsibility to maintain compliance with the permitted BUA limit.
4. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
5. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface.
6. The runoff from all built -upon area within the drainage area of the pocket of high
density permitted stormwater system must be directed into the permitted
stormwater control system.
Page 2of7
State Stormwater Permit
Permit No. SW6120703
7. Within the low density portions of the permitted project, all roof drains shall
terminate at least 30 feet from the mean high water mark of surface waters.
8. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area.
e. Further subdivision, acquisition, or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for
which Sedimentation and Erosion Control Plan approval or a CAMA Major
permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
9. The Director may determine that other revisions to the project should require a
modification to the permit.
10. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of completion of
construction.
11. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
must be recorded showing all such required easements, in accordance with the
approved plans.
12. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
13. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification.
14. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
15. Permanent seeding requirements for the stormwater control must follow the
guidelines established in the North Carolina Erosion and Sediment Control
Planning and Design Manual.
16. The stormwater treatment system shall be constructed in accordance with the
approved plans and specifications, the conditions of this permit, and with other
supporting data.
17. The permittee shall at all times provide the operation and maintenance
necessary to assure that all components of the permitted stormwater system
function at optimum efficiency. The approved Operation and Maintenance Plan
must be followed in its entirety and maintenance must occur at the scheduled
intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
Page 3 of 7
State Stormwater Permit
Permit No. SW6120703 t
b. Sediment removal.
C. Mowing and re -vegetation of side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of structures, orifice, catch basins and
piping.
g. Access to all components of the system must be available at all times.
18. Records of maintenance activities must be kept by the permittee. The records will
indicate the date, activity, name of person performing the work and what actions
were taken.
19. The permittee shall submit to the Division of Water Quality an annual summary
report of the maintenance and inspection records for each BMP. The report shall
summarize the inspection dates, results of the inspections, and the maintenance
work performed at each inspection.
20. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ
personnel. The facility must be in compliance with all permit conditions. Any
items not in compliance must be repaired or replaced to design condition prior to
the transfer. Records of maintenance activities performed to date will be
required.
III. GENERAL CONDITIONS '
1. This permit is not transferable to any person or entity except after notice to and
approval by the Director. In the event there is either a desire for the facilities to
change ownership, or there is a•name change of the Permittee, a completed
"Name/Ownership Change Form" must be submitted to the Division of Water
Quality, signed by the parties involved, along with the applicable documents as
listed on page 2 of the form. The project must be in good standing with DWQ.
The approval of this request will be considered on its merits and may or may not
be approved.
2. The permittee is responsible for compliance with all of the terms and conditions
of this permit until such time as the Director approves the transfer request.
3. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances, which may be imposed by
other government agencies (local, state, and federal), which have jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action,
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
6. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and re -issuance or
termination does not stay any permit condition.
7. Permittee grants permission to staff of the DWQ to access the property for the
purposes of inspecting the stormwater facilities during normal business hours.
Page 4of7
State Stormwater Permit
Permit No. SW6120703
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9.. The permittee shall notify the Division in writing of any name, ownership or
mailing address changes within 30 days.
10. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
11. The permittee shall submit a renewal request with all required forms and
documentation at least 180 days prior to the expiration date of this permit.
Permit issued this the 20th day of August 2012.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for Charles Wakild, PE, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Permit
Permit No. SW6120703
Highland Middle School
Stormwater Permit No. SW6120703
Harnett County
Designer's Certification
Page 1 of 2
I, , as a duly registered in
the State of North Carolina, having been authorized to observe (periodically/weekly/full
time) the construction of the project,
(Project)
for (Project Owner.) hereby state that, to the
best of my abilities, due care and diligence was used in the obser�ation'of the`project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is a part of this Certification.
Noted deviations from approved plans and specifications:
Signature
Registration Number
Date
SEAL
Page 6of7
State Stormwater Permit
Permit No. SW6120703
Certification Requirements:
Page 2 of 2
.1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
.3. All the built -upon area associated With the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
.5. The outlet/bypass structure elevations are per the approved plan.
6. The outlet structure is located per the approved plans.
7. Trash rack is provided on the outlet/bypass structure.
.8. All slopes are grassed with permanent vegetation.
.9. Vegetated slopes are no steeper than 11.
.10. The inlets -are located per the approved plans and do not cause short-
circuiting of the system.
.11. The permitted amounts of surface area and/or volume have been
provided.
_12. Required drawdown devices are correctly sized per the approved plans.
_13. All required design depths are provided.
_14. All required parts of the system are provided, such as a vegetated shelf, a
forebay, and the vegetated filter.
.15. The required dimensions of the system are provided, per the approved
plan.
Please submit this Designer's Certification to: Fayetteville Regional Office
Surface Water Protection
225 Green Street
Systei Building Suite 714
Fayetteville, NC 28301
Page 7of7
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
August 13, 2012
NCDENR-DWQ
Stormwater Permitting Unit
512 N. Salisbury St. (91h Floor)
Raleigh, NC 27604
Attn: Mr. Brian Lowther
Re: Highland Middle School
Dear Mr. Lowther,
Thank you for your review of the referenced project. Please accept our revisions from comments issued on
July 25'h, 2012. Comments to the items in question are as follows:
I. While the project built upon area is less than 24%, vegetated conveyances must be used to the
maximum extent practicable. In areas where the stormwater does not flow to a BMP (85% TSS
removal), vegetative conveyances or sheet flow must be used. The only piping allowed in these
areas is for under a road or at a curb outlet to a curb outlet swale.
Timmons Response: Storm piping has been removed, except for road culverts, in areas not
draining to a BMP. This was primarily shown previously around the athletic fields. Swales have
now been proposed to route runoff to areas where it can be infiltrated back into the ground.
2. Please include the I11. Required Items Checklist for each Supplement form. It can be found as one
of the tabs in the excel tile.
Timmons Response: The I11. Required Items Checklists have been provided for each
Supplement form.
3. Please provide a Low Density Supplement form.
Timmons Response: Low Density Supplement form has been provided.
4. Please provide Swale details on the plans.
Timmons Response: A typical Swale detail has been provided on sheet G408. A table has been
provided to illustrate the dimensions for each swale. Drainage areas have been included for
reference.
5. Please include a plan sheet ofthe overall project area and make sure to include any wetlands or
surface waters. If no wetlands are on the site, please include a note saying none exist on site
and/or adjacent property.
I
Timmons Response: A note has been added on the overall plan sheet C-001 indicating that no
wetlands or surface waters exist onsite. This information has also been added to the general
notes on the Cover Sheet
6. The plans show curb around the parking lots but there are no curb cuts or drop inlets. Please
provide more information on how stormwatcr will get to the infiltration basins.
Timmons Response: Concrete flumes have been added to allow runoff from the parking lot into
Infiltration Basin 2. Runoff for Infiltration Basins 1 and 3 will enter through storm drainage
pipes as previously shown.
7. Please show proposed drainage easements and public right of way on the plans.
Timmons Response: Proposed drainage easements have now been shown and labeled around
swales and infiltration basins on sheets C400-402. A proposed right of way has also been shown
and labeled.
We hope this will satisfy any of your concerns far this and will lead to the issuance ol' your approval. If I
can be of further assistance, or if you have additional concerns, please don't hesitate to give me a call at
919-866-4938.
Best Regards,
David Arnold, PE
Timmons Group
A
Permit
kv
�aOF W A H
�,,�,, �„„� STORMWATER MANAGEMENT PERMIT APPLICATION FORM
6 OG
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part [if) must be printed, filled out and submitted along with all of the required information.
!. PROJECT,INFORMATION,' _
Project Name Highland Middle School
Contact Person David Arnold, PE
Phone Number 919-6664938
Date 71i 212012
Drainage Area Number 1
(to be provided by DWQ)
II, DESIGN! INFORMATION
'
Site Characteristics
Drainage area
6.80 f?
Impervious area
3.09 ft
Percent impervious
0.45 %
Design rainfall depth
2.50 in
(s.i w ?t-fr6A) 5Ayt
Peak Flow Calculations
1-yr, 24-hr rainfall depth
in
1-yr 24-hr intensity
inlhr
Pre- development 1-yr, 24-hrdischarge 0sec /4,r [z E", eeb \\\V\\ j i I i ! I" ,
Post -development 1-yr, 24-hr discharge a/sec \��\ C'AL
Pre/Post 1-yr, 24-hr peak flow control fl3/sec ` • / • �ry��
Storage Volume: Non -SA Waters 9
-�.
Minimum design volume required 28,323.00 ft' �E,
f .
Design volume provided 74,426.00 tt' OK for non -SA waters 036865
Storage Volume: SA Waters v'� (�` 1 13_t �- •�
t5• runoff volume h� NG 1 N
Pre -development 1-yr, 24-hr runoff volume ft /� s A
Post -development 1-yr, 24-hr runoff volume ft' vll fl
Minimum required volume ft'
Volume provided ft'
Soils Report Summary
Soil type LaB
Infiltration rate 24.00 inlhr
SNWTeievation 416.DO fmSI -0,0 .SNwT 0,C �> )ut TV C,^TTI-c7'O
Basin Design Parameters
Drawdown time
1,00
days OK
Basin side slopes
3,00
:1 OK
Basin bottom elevation
418,00
Imsl OK
Storage elevation
423.00
fmsl
Storage Surface Area
21,241.00
fe
Top elevation
424.00
fmsl
Basin Bottom Dimensions
Basin length
214.00
ft
Basin width
52.00
fl
Bottom Surface Area
10,512.00
ft
Additional Information
Maximum runoff to each inlet to the basin?
ac-in - NIA V, W ,;5)W Z jr ' r£+\ 7n 7w'tt I EAR . W a F $ f1Clr lieC-
Length of vegetative finer for overflow
ft - NIA 4 s,20t, r= 7•S x Di'Sri_) s'n
Distance to structure
H
Distance from surface waters
Distance from water supply well(s)
ff - Nr J c
Separation from impervious soil layer'
ft -- A n SA,J 7
Naturally eccuring soil above shwt
tt - A4 r fC�r, �s : 4e
Bottom covered with 4-in of clean sand?
Y
(Y or N) OK
Proposed drainage easement provided?
Y
(Y or N) OK
Capures all runoff at ultimate build -out?
Y
(Y or N) OK
Bypass provided for larger storms?
N
(Y or N) Must provide bypass for larger flows - i , zC h�Oa 2 • ' aE f� f STD¢.r,
Pretreatment device provided
Forebay
Form SW401-101tramv Basin-Rev.4 Parts i. $ II. Oesign Summary. Page t of 1
I
Permit No.
(to be provided by DWQ)
III: REQUIRECOTEMS CHECKLIST a
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to'
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
A C400-C402 1. Plans (1" 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
C-406 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Bypass structure,
Maintenance access,
Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
Flow distribution detail for inflow,
Vegetated filter, and
Pretreatment device.
9�
C406
3. Section view of the infiltration basin 0" = 20' or larger) showing:
- Pretreatment and treatment areas, and
Inlet and outlet structures"
CALCS
4" A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
CALCS
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
PA
C406
6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
7A
INCLUDED
7. The supporting calculations.
r
INCLUDED
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
D,4
INCLUDED
9. A copy of the deed restrictions (if required).
Form 5W401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1
Permit No.
(to be provided byDWO)
of "' a reR
A��
_ _ STORMWATER MANAGEMENT PERMIT APPLICATION FORM
NCDENR 401 CERTIFICATION APPLICATION FORM
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist {Part 111) must be printed, filled out and submitted along with all of the required information.
PROJECT INFORMATION-
_._,.
Project Name
Highland Middle School
Contact Person
David Arnold, P.E.
Phone Number
919.866.A938
Date
V1212012
Drainage Area Number
2
II. DESIGN INFORMATION'.
Site Characteristics
Drainage area
1.82
ft2
Impervious area
1.113
If
Percent impervious
0.65
%
Design rainfall depth
2.50
in (3 , fit• y� S p i.+ )
Peak Flow Calculations
J
1-yr, 24-hr rainfall depth
in
1-yr, 24-hr intensity
infhr
Pre -development 1-yr, 24-hr discharge
ft3lsec pl oT ��4 u „2L717
Post -development 1-yr, 24-hr discharge
ft3lsec
Pre/Post 1-yr, 24-hr peak flow control
ft3lsec
Storage Volume: Non -SA Waters
Minimum design volume required
10,463.D0
ft3
Design volume provided
15,334 00
ft3 OK for non -SA waters 1 t I I + 1
Storage Volume: SA Waters
1.5' runoff volume
Pre -development 1-yr, 24-hr runoff volume
Post -development 1-yr, 24-hr runoff volume
Minimum required volume
Volume provided
Soils Report Summary
Soil type
Infiltration rate
SHWT elevation
Basin Design Parameters
Drawdown time
Basin side slopes
Basin bottom elevation
Storage elevation
Storage Surface Area
Top elevation
Basin Bottom Dimensions
Basin length
Basin width
Bottom Surface Area
Additional Information
Maximum runoff to each inlet to the basin?
Length of vegetative filter for overflow
Distance to structure
Distance from surface waters
Distance from water supply well(s)
Separation from impervious sail layer
Naturally occuring soil above shwi
Bottom covered with 4-in of clean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Pretreatment device provided
ft3
ft3
h' NIA
83
LaB
24.00 inihr
415.00 Ernst
1.00
days OK
3.00
:1 OK
419.00
fins) OK
422.00
fmsl
7,644.00
ft2
422,DO
fmsl
/,/
Q,
YA C �`/�
_ SEAL
036865 -
QAVID
92.00 ft
47.00 ft
3,414.00 it'
ac-in -NIA '? W,aw z,,- JLO -71:- r4,9rAc,+ ot` lj,4crrrnt`
ft - N%A 7 S2z,-D Fr G 2. S X f,t- SibYr
ft
ft - nl«,vc
it - All 5*.P71
it 41f .fre nrf:la
Y (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
N (Y or N) Must provide bypass for larger flows - Si2C rcR 1 f I)L r,L• ! iinr ,
Form SW401-Infiltration Basin-Rev_4 Paris I. & II. Design Summary, Page I of 1
Permit No
(to be provided by DWQ)
Ill. REQUIRED ITEMS CHECKLIST. y,
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page/ Plan
Initials Sheet No.
C400-C402 1. Plans (1" - 50' or larger) of the entire site showing. -
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
Basin dimensions,
- Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
- Overflow device, and
Boundaries of drainage easement.
C406 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing:
Bypass structure,
- Maintenance access,
Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
- Flow distribution detail for inflow,
Vegetated filter, and
Pretreatment device.
0A C406 3. Section view of the infiltration basin (1" = 20' or larger) showing:
Pretreatment and treatment areas, and
Inlet and outlet structures.
DA CALCS 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
_iA CALCS 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWQ, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
1)A C406 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the
entire drainage area is stabilized.
DA INCLUDED 7, The supporting calculations.
INCLUDED 8. A copy of the signed and notarized operation and maintenance (O&M) agreement.
INCLUDED 9. A copy of the deed restrictions (if required).
Form SW441-Infiltration Basin-Rev.4
Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1
s
Permit No.
(to be provided by DWQ)
m fop w A rE9
ATA STORMWATER MANAGEMENT PERMIT APPLICATION FORM
NCDENR 401 CERTIFICATION APPLICATION FORM Q
INFILTRATION BASIN SUPPLEMENT
This form must be filled out, printed and submitted.
The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information.
PROJECT INFORMATION'
Project Name Highland Middle School _
Contact Person David Arnold, PE
Phone Number 919-8664930
Dale 7112I2012
Drainage Area Number 3
II. DESIGN. NFORMAT IONL _
Site Characteristics
Drainage area
6 C2 flz
Impervious area
3 56 e
Percent impervious
0.59 °%
Design rainfall depth
2.50 in
Peak Flow Calculations
1-yr, 24-hr rainiall depth
in
1-yr, 24-hr intensity
inihr
Pre -development 1-yr. 24-hr discharge
elsec i3K Qt 1Su a 11 E 1)
Post -development 1-yr, 24-hr discharge
ft'Isec
Pre/Post 1-yr, 24•hr peak Flow control
fOlsec
Storage Volume; Non -SA Waters
Minimum design volume required
31,808 00
ft'
Design volume provided
42,956.00
f?
OK fa non -SA waters
Storage Volume: SA Waters
1.5" runoff volume
ft'
Pre -development 1-yr, 24-hr runoff volume
ft3
Post -development 1-yr, 24-hr runoff volume
ft
Jrj
i / i
Minimum required volume
ft;O
Volume provided
ft;
�Ey i
Soils Report Summary
Q SEAL
Soil type
Lab
036865
Infiltration rate
2400
inlhr
SHWT elevation
411.00
fmsl
7'*`NGINS�Q;� 4`
Basin Design Parameters
//�F • . • �1� �-\
DAVI)D�
days
OK
i/S N�\O
BasDrain side slopes
3.00
Basin bottom elevation
414,00
fmsl
OK
Storage elevation
41650
fmsl
Storage Surface Area
21,293.00
ft
Top elevation
416.50
imsl
Basin Bottom Dimensions
Basin length
275,00
ft
Basin width
50.00
ft
Bottom Surface Area
13,214.00
f?
Additional Information
Maximum runoff to each inlet to the basin?
Length of vegetative filler for overflow
Distance to structure
Distance from surface waters
Distance from water supply well(s)
Separation from impervious soil layer
Naturally occuring soil above shwt
Bottom covered with 4-in at dean sand?
Proposed drainage easement provided?
Capures all runoff at ultimate build -out?
Bypass provided for larger storms?
Pretreatment device provided
aCin — 'VIA� 0�OTH 4Jnr.-W, Tu TL�rcc Ear* of �{r#e�k■�
I — #IA F-4 7, f
ft
It — Aln..¢
It - ,A)Cmt
ft 411 SA -so
ft - /4 it f�f 1)
Y (Y or N) OK
Y (Y or N) OK
Y (Y or N) OK
N (Y or N) Must provide bypass for larger flows
DClrr.) 57bz^
- 5'zc-T)Fnc zsS }'.1,5r6d ,,
Form SW401-infltraaon Basin-Rev.4 Pans I. & 11, Design Summary, Page 1 of 1
f . .
Permit
Ill. REQUIRED ITEMS'CHECKLIST
(to be provided by DWQ)
Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will
result in a request for additional information. This will delay final review and approval of the project. initial in the space provided to
indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a
requirement has not been met, attach justification.
Page! Plan
Initials Sheet No.
DA C-400-C402
1. Plans (1" - 50' or larger) of the entire site showing:
Design at ultimate build -out,
Off -site drainage (if applicable),
Delineated drainage basins (include Rational C coefficient per basin),
- Basin dimensions,
Pretreatment system,
High flow bypass system,
Maintenance access,
Proposed drainage easement and public right of way (ROW),
Overflow device, and
Boundaries of drainage easement.
t C406
2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing. -
Bypass structure,
Maintenance access,
- Basin bottom dimensions,
Basin cross-section with benchmark for sediment cleanout,
Flow distribution detail for inflow,
Vegetated filter, and
Pretreatment device.
t-D.44 C-406
3. Section view of the infiltration basin (1" = 20' or larger) showing:
Pretreatment and treatment areas, and
- Inlet and outlet structures.
UA CALCS
4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided.
CALCS
5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The
results of the soils report must be verified in the field by DWO, by completing & submitting the soils
investigation request form. County soil maps are not an acceptable source of soils information.
-PA C-406
6. A construction sequence that shows how the infiltration basin will be protected from sediment until the
entire drainage area is stabilized.
INCLUDED
7. The supporting calculations.
-7A INCLUDED
8. A copy of the signed and notarized operation and maintenance (0&M) agreement.
IM INCLUDED
9. A copy of the deed restrictions (if required).
Form SW401-Infiltration Basin-Rev.4
Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1