Loading...
HomeMy WebLinkAboutSW6060601_HISTORICAL FILE_20090106STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW IOB�O�Q�JL DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD Re: Ruby "Tuesday -Lumberton Subject: Re: Ruby Tuesday -Lumberton From: Mike Lawyer <Mike.Lawyer@ncmail.net> Date: Tue, 06 Jan 2009 10:58:40 -0500 To: Jeremy Pettit <Jeremy@ingeniumdg.com> Jeremy, Based on observations made during the most recent site visit at Ruby Tuesday -Lumberton along with conversations held between ourselves, I feel that the issues presented in the inspection report dated July 22, 2008 have been addressed. The storm water collection system will serve as a pseudo-forebay, requiring maintenance as needed to remove trash, debris and any collected solids. The large concrete block that is present within the basin may remain due to its location of not blocking flow from the outlet structure as well as being anchored into the ground. The outlet of the perforated pipe into the outlet structure has been effectively plugged with cement, which will now allow for the required minimum three feet depth of permanent pool. As with the drainage and collection system, the basin must be operated and maintained per the requirements of the permit to include mowing, re -vegetation as necessary, removal of trash and debris, etc. in order for the basin to function properly for the life of the basin and the permit. Please be reminded that the permit has an expiration date and must be renewed prior to such. If you or the Ruby Tuesday staff has any.questions or need assistance with any aspect of the permit, please contact me by telephone or e-mail. Thank you for your continued assistance regarding this project. Sincerely, Michael Lawyer Jeremy Pettit wrote: Jeremy M. Pettit, P.E. Ingenium Design Group, Inc. 1339 Canton Road, Suite D2 Marietta, GA 30066 770--437-8850 x202 404-745-0238 (Fax) Michael Lawyer Environmental Specialist NCDENR-Division of Water Quality Surface Water Protection Section Fayetteville Regional. Office Direct: (910)433-3329 Main: (910)433-3300 Fax: (910)486-0707 I of' t 1 / 12/2009 2:16 NNI CNo�-WAr�9Q Michael F. Easley, Governor ` G William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Qk ` r Coleen H. Sullins, Director w• Division of Water Quality July 22, 2008 CERTIFIED MAIL: 7001 2510 0006 9498 7735 RETURN RECEIPT REQUESTED Dan Bettis Ruby Tuesday, Inc. 150 West Church Street Maryville, TN 37801 Subject: Compliance Evaluation Inspection -Non Compliance Status State Stormwater Management Permit SW6060601 Ruby Tuesday Restaurant -Lumberton Robeson County .Dear Mr. Bettis: On July 16, 2008, I, Michael Lawyer from the Fayetteville Regional Office of the Division of Water Quality, conducted a Compliance Evaluation Inspection at the Ruby Tuesday Restaurant - Lumberton facility located on West 5" Street in Robeson County, North Carolina. The purpose of the inspection was to ensure compliance with State Stormwater Management Permit SW6060601 that was issued on August 2, 2006. A copy of the Compliance Inspection Report is enclosed for your review. As a result of the inspection and subsequent file review, it has been determined that the facility is Not Compliant. The required actions that are necessary to bring this site into compliance are noted under the Inspection Summary and Comments sections of the report. You are asked to provide this office a written/typed response within 30 calendar days from receipt of this letter. Your response should specify actions that will be undertaken and the time frame that will be required to correct the deficiencies. Failure to provide the requested information may constitute the issuance of a Notice of Violation, which is subject to the assessment of a civil penalty of up to $25,000 per day, per violation. 1f you have any questions concerning this matter or if this office can be of any assistance, please contact me at (910) 433-3329. Sincerely, Michael Lawyer Environmental Specialist cc: Jeremy Pettit-Ingenium, Inc. (via fax # 404-745-0238) Robeson County Planning Department FRO -Surface Water Protection DWQ Central Files North Carolina Division of Water Quality 225 Green Street -Suite 714 Fayetteville, NC 28301 Phone (910) 433-3300 Internet: www.ncwater uali .or Fax (910) 496-0707 An Equal Opportunity/Affirmative Action Employer - 50% Recycledl10% Post Consumer Paper One N"p�hCarolina )naturally Customer Service 1-877.623.6748 Cc Postage $ c— Certified Fee Retum Receipt Fee Postmark (Endorsement Required) Here 0 Restricted 00very Fee O (Endorsement Required) d Total Postage Dan Bettis in Sent To ru Ruby 'I,uesday, Inc. ,a Sfreef, Apt. No.; 0 orpoeoxNo. 150 West Ch1,n-ch Street 17�ciry',srare,zrP; Mal-yville, TN 37801 I q ■ Complete items 1, 2, and 3. Also complete A. Signature item 4 if Restricted Delivery is desired. ❑ Agent ■ Print your name and address on the reverse X © Addressee so that we can return the card to you. B. Received by (Printed Name) C. Date of Delivery ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: D. Is defvery addre ? ❑ Yes If YES, enter address be w ❑ No Dan Bettis Ruby, 'I'I,lesday, Inc. 15 0 W c s t C h u l-C h S 0 3. service Type M a I' v i 1 l e, ' i 'N '3 7 01 ❑ Certified Mall ❑ Express Mau I y ❑ Registered ❑ Return Receipt for Merchandise ❑ insured Mail ❑ C.O.D. 4. Restricted Delivery? (Extra Fee) ❑ Yes 2. Article Number ; p 1 ; i {Transfer from service label) o b 1� 12 5 A� D ©Q 6: 9 4 98 7 7 �3 5 _ PS Form 3811, February 2004 Domestic Return Receipt 102595-o2-fit-1540: Compliance Inspection Report Permit: SW6060601 Effective: 08/02/06 Expiration: 08/02/16 Owner: Ruby Tuesday Inc Project: Ruby Tuesday Restaurant -Lumberton County: Robeson W 5th St €-95 Region: Fayetteville Lumberton NC 28358 Contact Person: Dan Bettis Title: Phone: 865-379-5778 Directions to Project: 1-95 South to Exit 17, go east on West 5th Street, go approximately 0,3 miles, property is on the left Type of Project: State Stormwater- HD - Detention Pond Drain Areas: 1 - (LUMBER RIVER) (03-07-51 ) (WS-IV,B;Sw,HOW) On -Site Representative(s): Related Permits: Inspection Date: 0711612008 Entry Time: 02:15 PM Exit Time: 03:10 PM Primary Inspector: Mike Lawyer Phone: 910 433 3300 O ExL p� 33 — ? Belinda S Henson "" ' Phone: 910-433-3300 41 2 Reason for Inspection: Routine Inspection Type: Compliance Evaluation 33zYi Permit Inspection Type: State Stormwater Facility Status: Q Compliant ® Not Compliant Question Areas: ® State Stormwater (See attachment summary) Page: 1 Permit: SW6060601 Owner - Project: Ruby Tuesday Inc Inspection Date: 07/16/2008 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted to ensure compliance with conditions of the State Stormwater Management Permit as well as observe that the BMP was installed per the approved plans and specifications. Project was approved as High Density with a permanent wet detention basin for stormwater treatment, Upon review of the site along with the approved plans, it was noticed that an additional storm drain has been installed in the parking area near the entrance. Also, it was noted that there has been 'a slight reconfiguration of the storm sewer system that conveys flow into the BMP. These.types of changes should have been addressed with the Designer's Certification as minor deviations from the approved plans, however a certification could not be found during the file review. A request has been made of the engineer. to provide such documentation. The wet detention basin is lacking a defined forebay as required and is in need of vegetation maintenance. At the time of inspection; there was a large concrete block present in the basin near the outlet structure that should be removed. Also, the side slopes appeared to be steeper than the required minimum of 3:1. Based on the approved plans, a perforated pipe enters the outlet structure near the bottom, which would not allow for a permanent pool of at ieast,three feet. This item was an oversight during the application review and may be addressed with the submittal of revised plans and specifications along with the Designer's Certification,' Page: 2 Permit: SW6060601 Owner - Project: Ruby Tuesday Inc Inspection Date: 07/16/2008 Inspection Type: Compliance Evaluation Reason for Visit: Routine r:i_ n_..c_— YP< Nn NA NF Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: A request has been made to receive the Designer's Certification, Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Are the outlet structures located per the approved plans? Comment: An additional storm drain has been installed that was not on the approved plans and the stormwater piping system has been slightly reconfigured. At the time of inspection, there was no defined forebay within the basin and the side slopes appeared to be steeper than 3:1. The outlet structure was inadvertently approved with a perforated pipe that enters at the bottom that would not allow for a minimum 3 feet of permanent pool. Yes No NA NE ■ n n n ©nnp ■nnn Op ration and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? Q ■ 0 n Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ n ❑ n ■ upon request? Comment: Thick vegetation observed in the basin near the outlet structure. A large concrete block was observed inside the basin near the outlet structure. Other Permit Conditions Is the site compliant with other conditions of the permit? Comment: Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE annn ■nnn Page: 3 LISPS - Track & Confirm Page 1 of 1 UNITFDSTI.ITF.S POST/1L SERVICE., Home I Hetp I Sign.in Track B Confirm FAOs Track & Confirm Search Results Label/Receipt Number: 7001 2510 0006 9498 7735 Status: Delivered Track & Contirin Your item was delivered at 8:03 AM an July 28, 2008 in MARYVILLE, TN Enter Label/Receipt Number. 37801. Go Notilication Options Track & Confirm by email Get current event information or updates for your item sent to you or others by email. Go Site fillip contaol US Forms Gnv'I Servires jobs Privacy Policy Twins of Use Nalfonal 9 hrmmfer AcrOLIn IS Copyright© 1999.2007 LISPS. All Rights Reserved, No FEAR Aci EEO Data FOIA http:/Arkcnfrm l.snii.usps.com/PTSIntemetWeb/InterLabellnquiry.do 8/4/2008 TRANSMISSION VERIFICATION REPORT TIME 07/17/200B 17:51 NAME NC DENR FAX 9104B60707 TEL 9104333300 SEP.# 000L7N272292 DATE,TIME 07/17 17:50 FAX NO./NAME 14047450238 DURATION 00: 00: 37 PAGE(S) 03 RESULT OK MODE STANDARD ECM 3, � e�� NCDENR FAX TRANSMISSION DENR FAYETTEVILLE REGIONAL OFFICE FAYETTEVILLE, NORTH CAROLINA 28301-5043 VOICE: 910.433.3300 Fax: 910-486-0707 To: fel-�Y Fax #: yd 7 � 7V5-023 Date, 7 /? J 4 T EC4'" r1 Pages (including cover): From: /� Alit z4 4f- T� Q I Subject: 'btS/ ew"s C� r% Arn NCDENR FAX TRANSMISSION DENR FAYETTEVILLE REGIONAL OFFICE FAYETTEVILLE, NORTH CAROLINA 28301-5043 VOICE: 910-433-3300 Fax: 910-486-0707 To: �YfW7<Y Fax #: �Q 7 7VY- QZ 3 Y Date: % 17 d 0 Pages (including cover): 3 From: / ih zoc�e-r— ze Subject: bes COMMENTS: Ruby Tuesday Restaurant -Lumberton Stormwater Permit No. SW6060601 Robeson County Designer's Certification Form I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodicallylweekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Certification Requirements: i. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the.project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevation is per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. to. The inlet is located per the approved plans and does not cause short-circuiting of the system. 11. The permitted amount of surface area and/or volume has been provided. 12. Required drawdown device is correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. -2- ryP0 ` �Otv p � August 2, 2006 Dan Bettis Ruby Tuesday, Inc. 150 West Church Street Maryville, TN 3780t William G. Ross Jr., secretary North Carolina Depanment of Environment and Natural Resources SUBJECT: Stormwater Management Permit No. SW6060601 Ruby Tuesday Restaurant -Lumberton High Density Development Project Robeson County Dear Mr. Bettis: Alan W. Klimek, P.E. Director Division of Water Quaiity The Fayetteville Regional Office received a Stormwater Management Permit Application for the Ruby Tuesday Restaurant -Lumberton project on June 7, 2006. Staff review of the plans and specifications and the additional information received June 23, 2006, July 19, 2006 and July 25, 2006 has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H .1000. We are forwarding herewith Permit No. SW6060601 dated August 2, 2006, for the construction, operation and maintenance of stormwater treatment facilities associated with the Ruby Tuesday Restaurant -Lumberton project. This permit shall be effective from the date of issuance until August 2, 2016, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made, this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Mr. Mike Lawyer at (910) 433-3329. Sincerely, Belinda S. Henson Regional Supervisor Surface Water Protection Section BSH: MLlml cc: Jeremy Pettit, Edwards & Neff Engineering Robeson County Planning Department FRO -Surface Water Protection No°`t,C:trolitt:I Water Quality Central Files ��nlura!!y North Carolina Division of Water Quality 225 Green Street. Suite 7l4 Fayetteville, INC 29301-5043 Phone (910) 433-3300 Customer Service lntetnet Fax 1910) 486-0707 . 1-i 77-623-6748 An Equal OpportunirjlAffirmative Action Employer - 50% Recycledl10% Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Dan Bettis -Ruby Tuesday, Inc. Ruby Tuesday Restaurant -Lumberton Robeson County FOR THE construction, operation and maintenance of a wet detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until August 2, 2016 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 3 of this permit, the Project Data Sheet. Stor3nwater will be conveyed through a set of storm drains around the perimeter of the parking lot and piped into a wet detention basin designed for 85% TSS removal efficiency and with a 30' vegetated filter. The stormwater controls have been designed to handle the runoff from 2.23 acres with approximately 65,776 square feet, or 67.71 %, of impervious surface. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. The detention basin must be operated with a 30' vegetated filter. 5. The runoff from all built -upon areas,within the permitted drainage areas of this project must be directed into the permitted stormwater control systems. A permit modification must be submitted and approved prior to the construction of additional built -upon areas. 6. The built -upon area for any future development is not included in this permit. A permit modification must be submitted and approved prior .to the construction'of additional built -upon areas. -2- S DIVISION OF WATER QUALITY PROJECT DESIGN DATA SHEET -WET DETENTION BASIN Project Name: Ruby Tuesday Restaurant -Lumberton Permit Number: SW6060601 Location: Robeson County Applicant: Dan Bettis Ruby Tuesday, Inc. Mailing Address: 150 West Church Street Maryville, TN 37801 Application Date: June 7, 2006 Receiving Stream/index 0: Lumber River/14-(7) Stream Classification: WS-IV, B; Sw, HQW Wet Pond Depth, feet: 3 feet (permanent pool) Permanent Pool Elevation, FMSL: 117,90 feet Drainage Area, acres: 2.23 Total impervious Surfaces, sq ft: 6 '77(o Off -site Area Entering Pond, sq ft: None, per engineer Required Surface Area, sq ft: 2,691 Provided Surface Area, sq ft: 2,779 Required Storage Volume, cu ft: 5,338 Provided Storage Volume, cu ft: 5,884 Temporary Storage Elevation, FMSL: 117.95 feet Controlling Orifice: 1-3116" pipe Required 85% TSS Filter: 30' vegetated filter -3- II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shad be kept to a minimum and any eroded areas of the system wilt be repaired 'immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. . Mowing and revegetating of side slopes. d. Immediate repair of eroded areas. C. Maintenance of side slopes in accordance with approved plans and specifications. f. -Debris removal and unclogging of outlet structure, orifice device, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. ' The facilities shall be constructed as shown on the approved plans.. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications and other supporting data. 6. Upon completion ofconstruction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility, 8. Any modifications must be permitted prior to construction. The following items will require a modification to the permit. The Director may determine that other revisions to the project should require a modification to the permit. a.. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of the project area. The project area is defined as all property owned by the permittee, for which Erosion and Sedimentation Control Plan approval was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 9. A copy of the approved plans and specifications shall be maintained on file by the permittee for a minimum of ten years from the date of completion of construction. -4- "10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. If the proposed built -upon area exceeds the permitted amount, a modification to the permit must be submitted and approved prior to construction. It. Prior to the sale of any portion of the property, an access/maintenance easement to the stormwater facilities shall be granted in favor of the permittee if access to the stormwater facilities will be restricted by the sale of any portion of the property. 12. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. 13. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director of modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 14. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. I[I. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a "Name/Ownership Change Form" must be submitted to the Division of Water Quality accompanied by appropriate documentation from the parties involved. This may include, but is not limited to, a deed of trust, recorded deed restrictions, Designer's Certification and a signed Operation and Maintenance plan. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local,. state, and federal) that have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. - 5 - Permit issued this the second day of August 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION (� Alan W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW6060601 0 1 -6- ,f , Project No. DWQ SW6060601 Project Name: Ruby Tuesday -Lumberton DESIGN PARAMETERS: ELEVATIONS Bottom of Basin (ft) Permanent Pool (ft) Temporary Pool (ft) AREAS Permanent Pool SA (sq ft) 2779 Temporary Pool Depth: 0.05 ft. - Drainage Area (ac) 2.23 Impervious Area (ac) 1.51 Required Surface Area: 2691 sq. ft. ok VOLUMES Permanent Pool (cu ft) 5884 Required Permanent Pool: 5338 cu. ft. ok Temporary Pool (cu ft) 2279 Forebay (cu ft) 1177 Drawdown Rate: 0.01 cfs - OTHER PARAMETERS SA/DA 2.77 Draw -Down Time: 4.5 days ok Orifice Diameter (in) 1.1875 NOTES: *This spreadsheet is designed to perform a quick preliminary check of design requirements and should not be considered a complete evaluation of any project. *All design parameters entered into this spreadsheet should be verified to be accurate based upon submitted plans and specs. CALCULATION OF DESIGN REQUIREMENTS: 114.9 % Impervious: 67.71 % - 117.9 117.95 Permanent Pool Depth: 3.0 ft. ok Forebay: 20.003399 % ok *This spreadsheet is designed to calculate the draw -down time using the average temporary pool depth and the orifice equation to estimate the change in driving head over time. *The correct, not the reported, SAIDA value should be entered into the SAIDA block above. *For impervious areas that do not fall neatly into the categories provided in table 1.1 of the BMP Manual, a linear interpolation subroutine is provided below. The SAIDA value it computes must be physically entered in the SAIDA space above. Linear Interpolation of SAIDA: Impervious % SAIDA (from Table 1.1) Target 67.71 - Next Highest 70 2.88 Next Lowest 60 2.40 Interpolated SAIDA= 2.77 Fdwards & Neff Atlanta ,YDalton Birmingham Date: July 24, 2006 Please Deliver To: Mike Lawyer NCDENR Stormwater Division 225 Green Street, Suite 714 Fayetteville, NC 28301 Phone: (910) 433-3329 Fax: From: Shelby Rogers Project Number: 058646 Ruby Tuesday Lumberton, NC Sent Via: FedEx We are sending you the following: 237 North Hamilton Street Dalton, GA 30720 Phone: 706-529-5000 Fax: 706-529-5011 REFIVi n J U L t 5 2006 DENR - FAVETfE)ALLE REGIONAL OFRCE Date No. Description 07/24/06 1 2 sets of Civil Plans 07/24/06 2 Updated Wet Detention Basin Supplement 07/24/06 3 2 Hydrology and Water Quality Studies Remarks: Mike, Please contact me if you have any questions or comments. Thank you, Shelby Rogers y Permit No. SW666(�60 1 (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANACEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may bephorocopied for use as in original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications slowing alI basin and outlet stricture details. I. PROJECT INTO RMATI Project Name: 05864 - Ruby Tuesday - Lumberton, NC Contact Person: Mr. Jeremy Pettit Phone Number: (706 ) 529-5000 x 201 For projects with multiple basins, specify %which basin this worksheet applies to: NIA elevations Basin Bottoin Elevation 114,90 R. (floor of the basin) Permanent Pool Elevation 117.90 ft. (elevation of the orifice) Temporary Pool Elevation 117.95 ft. (elevation of the discharge structure over flow) areas Pci-manent Pool Surface Area 2779 sq. ft. (waterstaface area at the orifice elevation) Drainage Area ac. (on -.rite and off -site drainage to the basin) Impervious Area I -51 JX3 ac. (on -site and off -site drainage to the basin) i,olunres Pe,-inanent Pool Volume Temporary Pool Volume forebay Volurne Dtber parameter S SAJDAi Diameter of Orifice Design Rainfall Design TSS RCn1oval 2 5884 cu, ft. (combined volume of main basin and forebay) 2279 cu. ft. (volume detained above the permanent pool) 54 cu. ft. (approximately 20% of total volume) 2.77 (surface area to draincrbe al -ea ratio front DT110 table) 1 - 306" in. (2 to 5 day temporary pool draw -down required) 1 in 85 % (minimum 85% required) Fnnn SVdiJ-102 Rev 3,99 Page k of 4 Footnotes: When using the Division SAIDA tables, the correct SA/DA ratio for permanent pool sizing should be. computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to detemtine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. 11. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Flealth and Natural Resources, February 1999) and Adminisirative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Storinwater Management Permit Application Fonn, the agent may initial below. If a requirement has not been met, attach justification. The permanent pool depth is betweeai 3 and 6 feet (required n>inirnuin of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls ninoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative Filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3.1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right- of-way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specificd prior to use as a wet detention basin, A mechanism is specified which will drain the basin for maintenance or an emergency, 1] 1. WET DETENTION' BASIN OPERATION AND AL%.INT NANCE AGPEk:i111 NT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This systcnl (check one) 0 does ltY foes riot incorporate a vegetated filter at the otrtlet. This system (check one) 0 does does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches; and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch. basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-armually or when depth is .reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that �vill not adversely impact water quality (i.e. stockpiling near a vet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 115.65 feet in the main pond, the sediment shall be removed. 1I5.8q ��Then the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blmiks) 1�5�Sq Permanent Pool Elevation 117.90 7 Sediment Ren oval El 75 ___________........_ 115.65 Sediment ttemovai Elevation 75% BDtto[n)le'3tmn. , o �o -------------------------------------------------------- Bottom) levation 114M 25% II5.50 FOREBAY MAIN POIND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm, b. If the basin must be drained for an emergency or to parfortn maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3,99 Page 3 of,', 7. All components of the wet detention basin system shall be maintained in good working order. I. acknowledge and agree by my signature below that I atn responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Dan Bettis Title: —Re ional Construction Director Address: 150 West _Church _Avenue_, Maryville, TN 37801 Phone: 965 — 179-57Q0 RUBY TUESDAY, INC. Signature: B-,, Date: July 17, 2006 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I Sue B. Coley , a Notary Public for the State of Tennessee County of Blount , do hereby certify that Dan Bettis, Regional Construction Director of Ruby Tuesday, Inc., personally appeared before me this 17th day of July ?Dn6, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Wit less my hand acid official seal, SEAL My corrunission expires 11 /04 /08 t=orin SWLJ-102 Rev 3.99 Page 4 of4 Letter of Transmittal Ruby Tuesday, IuC. 150 W. ( lll.11'Ch Sll-cl't N,Urvville. 'fN ;7801 { 865 ) ; 79-5 700 h): 1-'JN�urds &` Ncll 7 North I Linillion Si I)allon. (J 1 )f)7-'() Atill: Ii]'l,lll (IiIhCrt 1),Itc: 7/17/00 110LI',c COLIC 2� Roby C '+tall,: ❑ "vulched ❑ scpar.Itc VI'l: ❑ 1 I-s- N1,61 ❑f )thcr I"(,r YOM': X l t,c• ❑ f nli,rnr,uic�n ❑ I:c� ic�� �L (_ �,nlnlcnl ❑ ❑ \pprov d ❑ Rccorc! ❑ I)istrihLlti��n The Follm\ ii-it: ❑ PI-O UCt 1_itct'alul'c ❑ )'hoi) 1.) -,m i�1 s ❑ tipcciliC'.Ilil,lls ❑ s,u11plc, ❑ C'll,ln`c t \redo C epics Dowd I)c,crillti��n 11'c1 lhtcnliurl liasirl Sunnlcnlcnt (.'epics to1-licllcllc I CIII.y. I),IIl lictti, 1i\: ]M,Iurcl li�cr, F51wards & Neff Birmingham Date: July 18, 2006 Please Deliver To: Mike Lawyer NCDENR Stormwater Division 225 Green Street, Suite 714 Fayetteville, NC 28301 Phone: (910) 433-3329 Fax: From: Brian Gilbert Project Number: 05864 - Ruby Tuesday - Lumberton, NC Sent Via: Fed Ex We are sending you the following: 237 North Hamilton Street oatton, GA 30720 Phone: 706-5 29-5000 Fax: 706-529-5011 RECEIVED JUL 19 2006 DENR - FAYETTEViLLE REGIONAL OFFICE Date No. Description 07/18/06 1 4 pgs I Wet Detention Basin Supplement Signed and Sealed Remarks: For Stormwater Submittal Mike, Please contact me if you have any questions or comments. Thank you, Brian Gilbert Permit No, (to be provided by D1f�Q State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be phatocapied Ibr use as art original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. L PROXECT INFORMATION Project Name: 05864 - Ruby Tuesday - Lumberton, NC Contact Person: Mr, Jeremy Pettit P11onc Number: 706 529-5000 x 201 For projects with multiple basins, specify which basin this worksheet applies to- NIA elevations Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation areas Permanent Pool Surface Area Drainage Area Impervious Area volurrres Permanent Pool Volume Temporary Pool Volume Forebay Volume Other parameters SA/DA 1 Diameter of Orifice Design Rainfall Design TSS Removal 2 114.90 fl (floor of the basin) I17.90 fl. (elevation of the orifice) 117.95 ft. (elevation of the discharge structure overflow) 2779 sq. ft. (water st.aface area at the orifice elevation) 1.85 ac. (on -site and ofj-site drainage to the basin) 1.63 ac. (on -site and off site drainage to the basin) 5884 cu. ft. (combined volume ofmain basin and forebay) 2279 cu. ft. (volume detained above the permanent pool) 616 ) cu. ft. (aap�proxiimately[ 20% of total volume) y.e zv Go d 1� 7 (z+-i' 2.77 (stu face area to drainage area ratio fr unt DT'VQ table) 1 - 3/16" in. (2 to 5 day tenzporar y pool draw -down required) 1 in. 85 % (minimum 85% required) Forin SIYU-102 Rev 3.99 Page I of 4 Footnotes: When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should he computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 851Y) TSS removal and 90°/n TSS removal. II. REQUIRED ITEMS CRECKLiS r The following checklist outlines design requirements per the Stormwater .Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February I999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. 1f required, a 30-foot vegetative Filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A. trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for each basin including access to nearest right - of way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. i. A mechanism is specified which will drain the basin for maintennlice or an emergency. 11.1. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. ']'his system (check ogre) 0 does �� 'oes not incorporate a vegetated filter at the outlet. This system (check one) 0 does >7 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: I . After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. lnspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper fitnctioning. =1. Remove accumulated sediment from the wet detention basin system semi-atuivally or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water duality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 115.65 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 116.20 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) D Permanent Pool Elevation 117.90 Sediment Ren oval El. 116.20 r,\ 115.65 _____________.._ Sediment Removal Elevation 75% BottomEle atian 115.70 ---------------------------------------------- -- o--- Bottom Elevation 114.90 25 % FOREBAY MAIN POND a. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berth. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. FoiTn SwiJ-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. i agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title:_ Regional_ Construction Director Address: 150 West Church Avenue,._Maryville-, TN_37801 Phone: -.865 — 379-5700 _ RUBY TUESDAY, INC. Signature: B_v_. Date: July 17, 2006 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I Sue B. Coley , allotary Public for the State of Tennessee County of Blount , do hereby certify that Dan Bettis, Regional Construction Director of Ruby Tuesday, Inc., personally appeared before me this 17th day of Jul} 2006 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, i +tin..ryJJ of t * lifANESSEE co: pUBLIC SEAL My commission expires 11/04/08 Form SWU-i62 Rev 3.99 Page 4 oF4 it f U I arils & Neff Birmingham Date: June 30, 2006 Please Deliver To: Mike Lawyer NCDENR Stormwater Division 225 Green Street, Suite 714 Fayetteville, NC 28301 Phone: (910) 433-3329 Fax: From: Brian Gilbert Project Number: 05864 - Ruby Tuesday - Lumberton, NC Sent Via: FedEx We are sending you the following: 237 North Hamilton Street Dalton, GA 30720 Phone: 706-529-5000 Fax: 706-5 29-5011 RECEIVED JUL 0 3 2006 DENR - EAYETIENLLE REGIONAL OFRCE Date No. Description 06/30/06 2 sets Civil Plans 06/30/06 1 Wet Detention Basin Supplement Remarks: Signed and Sealed Wet Detention Basin Supplement Application will follow. Mike, Please contact me if you have any questions or comments. Thank you, Brian Gilbert 1 , 5 r Permit No. (to be provided by DJYQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stortnwater Management Plan Review; A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: 05864 - Ruby Tuesday - Lumberton, NC Contact Person: Mr. Jeremy Pettit Phone Number: (706 ) 529-5000 x 201 For projects with multiple basins, specify which basin this worksheet applies to: NIA elevations Basin Bottom Elevation 114.90 ft. (floor of the basin) Permanent Pool Elevation 117.90 ft. (elevation of the orifice) Temporary Pool Elevation 117.95 ft. (elevation of the discharge structt.tre overflow) areas Permanent Pool Surface Area 2779 sq. ft. (water surface area at the orifice elevation) Drainage Area 1.85 ac. (on -site and off -site drainage to the basin) Impervious Area 1.63 ac. (on -.site and off -site drainage to the basin) volumes Permanent Pool Volume 5884 cu. ft. (combined volume of main basin crud forebay) Temporary Pool Volume 2279 cu. ft. (volume detained above the pernionent pool) Forebay Volume 616 cu. ft. (approximately 20% of total volume) Other parameters SA/DAt 2.77 (surface area to drainage area ratiof'om DIVQ table) Diameter of Orifice 1 : 3116" in. (2 to 5 day temporary pool draw-dmm required) Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 85% required) Forin SWU-102 Rev 3.99 Page 1 of 4 Footnotes: When using the Division SA/DA tables, the correct SAIDA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. ]n the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. It. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008, Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. The pen-nanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. if required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. The basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage casement is provided for each basin including access to nearest right- of-way. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. A mechanism is specified which will drain the basin for maintenance or an emergency, III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does WIdlibes not This system (check ogre) 0 does does not incorporate a vegetated filter at the outlet, incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of t Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water duality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 115.65 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 116.20 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (till in the blanks) 0 Permanent Pool Elevation 117.90 Sediment Ren oval 1 3. 116.20 75 is 115.65 ------m ---------- Sediment Removal Elevation 75% Bottorn Ele ,ation 115.70 -------------------------------------- ----------------- Bottom I levation 114.90 125% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berin. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 1 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures fisted above. f agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature: Date: Note: The legally responsible party should not he a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this day of , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form 54A'lvl-102 Rev 3.99 Page 4 of 4 rds & Neff 237 North Hamilton Street Dalton. GA 30720 Phone: 706-529-5000 Fax: 706-529-5011 �ENR-FRO JUN Z 3 2006 Date: June 22, 2006 D d V Q Please Deliver To: Mike Lawyer NCDENR Stormwater Division 225 Green Street, Suite 714 Fayetteville, NC 28301 Phone: (910) 433-3329 Fax: From: Brian Gilbert Project Number: 05864 - Ruby Tuesday - Lumberton, NC Sent Via: FedEx We are sending you the following: Date No. Description 06/09/06 1 Check for Review Fee 06/19/06 1 Wet Detention Basin Supplement Application Remarks: Submittal for Stormwater Permit Mike, Please contact me if you have any questions or comments. Thank you, Brian Gilbert et1 Permit No. Oo be provided by DWQ) State of North Carol.l.na Department of Envlron..meut and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form may he phnmropted for use as an original DWO Stonnwater Management Ping Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and spcci5cations showing all basin and outlet stricture details. I. PROTECT 1N1F01;4V1A'T'10N Project Name: 058i34 - Ruby Tuesday - Lumberton_ NG Contact Person: Mr. Jeremy Pettit Phone Ntunbcr: { 706 ) 529-5000 M 201 For projects with multiple basins, specify wbhich basin this workshect applics to- N/A elevation.t Basin Bottom Elevation 115,00 ft. (floor of the basin) Permanent Pool Elevation 117.21 ft. (elevation of the orifice) Temponary Pool Elevation 11 B.35 ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area3050 sq. ft. (wator swface area at the orifice elevation) Drainage urea 2.52 ac. (on -site and gfflsite drainage to the basin) Junpervious Area 1.78 ac. (on -site and off -site drainage to the basin) volennes Minanent Pool Volurne 4434 cu. ft. (combinEd vollrme of main basin and forebay) Temporary Pool Volume 3951 cu. fit_ (volume detained above the permanent pool) Forebay Volume 1781 cu. ft. (approximately 20% of total volume) Other parameters S NDA1 2.77 (surface area to drainage area ratio from DWP table) Diamcrcr of Ori'flce t - 118 ir1; (2 to 1 day temporary pool draw -down regvirer> Design Rainfall 1 in. Design TSS Removal 2 85 % (minimum 8.5119 required) Form SWU-102 Rev 3.99 Pagr 1 of 4 FoQknotes.1 When using tl)e Division SAID.1 tables, the correct SA1DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine tho correct value for non- standard tabie entrios. 2 At the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR RMP manual pmvidr4 dc.sigrr tables fnr h❑th 851,1- 79S removal and 90% TSS rern.aval. M REQUTIMM 1T1EMS CHECKLIST The following checklist outlines design requirements per thu St0M1Water Rest Management Practices Manual (N.C. Departinent of Enviranm.e.nt, Health and. Natural Resources. Fcbruary 1999) and A.dininistrative Code Section: 15 A NCAC 214 .100R. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Per -mil Application Form, the agent may initial below. If a requirement has not been met, s "ste a ,j ustffleadon. "AA Z- I - a. The permanent pool depth is between/and 6 feet (required minimum of-4 feet). b. The forebay volume is approximateiy equal to 20% of the basin volume. c. The temporary pool controls rvnoff.ftom the design storm event_ d, The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the otttlt t (incittdc non -erosive flow calculations) The basin lengtl7 to width. ratio is greater than 3: l.. Z.1 The basin side slopes above the pem)anerlt pool are no steeper than-^}. A -submerged and vegetated perimeter shelf with a slope of 6-1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. A trash rack or similar device is provided for both the overflow and orifice. A recorded drainage easement is provided for eac€i basin including access to nearest right- of-way. 1. If tie basin is used for sedinrent and erosion control during, construction, clean out of the basin is specified prior to use as a wet detention basin. rri. A mechanism is specified which will drain the basin. for maintenance or an enjergcncy. III. NNIET DETENTION 13ASIN OPERATION AND MAINTENANCE AGRI?,'FME T The wet detention. basin system is defined as the wet detention basin, prctreatrstent including forebays and the vegetatod filter if one: is provided, This system (check are) 0 does Rocs not incorporate a vegetated filter stt the outlet. This system (check ane) 0 does ' ocs not incorporate pretreatincnt other than A forehay. Form SWU-102 Rev 1.99 Page 2 of 4 Maintenance activities shall be performed as follows: 1. After everysignificant runoff producing rainfall event and at least nionthly: a. Inspect the wet detention basin system for sediment accum.tilation, erosion, trash sceumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that dt-awdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximiun height of six inclres, and remove trash as needed. 3. Inspect and repair the collection systr_m (i.e- catch basins, piping, swales, riprap, etc,) quarterly to maintain proper functioning. 4. Rernove accumulated sediment from the wet detention basin system, semi-annually or when depth is reduced to 75% of the original design. depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (Le. stockpiling near a wet detention basin or stream, etc-). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments, When the permanent pool depth reads 115.55 feet in the main pond, the sediment shall be removed, When. the permalient pool depth reads 115.98 Feet in the forebay, the sediment shall be ,moved. BASIN DTAGRAM (fill fn the hlanta) iI Permancnt Pool Elevation 111.21 5editntra Rc "al El. { 5.98 75 u r --------------- -- Sediment Rcmoval Elevation 115'a5 75% T3crctnrnF.lc atian_115.57 % ---------- I --------------------------------- ---- ------ Bottom Elevation 115At) 25% / FOREBAY MAIN POND 5, Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forcbay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Farm 5WU-102 ftcv 3,99 Page 3 of4 7. All components of the wet detention basin system shall be maintained in good working order, I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. gate: swm.lm 1UW Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, � , a Notary Public for the State of Coun4 of do hereby certify that c--741A o a eL)'- , 1-96 personally appeared before me this day of ;G„ 0-1 and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, 00 STATE 0-r OF _ TENNESSEE # NOTARY ` PUBLIC SEAL My commission expires_„( Forni SWU-102 Rev 3.99 Page 4 of 4 Birmingham Date: Edwards & Neff Engineering June 6, 2006 Please Deliver To: Ricky Revels NCDNER - Storm Water Division 225 Green Street, Suite 714 Fayetteville, NC 28301 Phone: (910) 486-1541 x 720 Fax: From: Brian Gilbert Project Number: 05864 - Ruby Tuesday - Lumberton, NC Sent Via: FedEx We are sending you the following: 237 North Hamilton Street Dalton, GA 30720 Phone: 70&529-5000 Fax: 706-529-5011 RECEIVED JUN 0 7 2006 DENR-FAYErTMLLE REGONALOFRCE Date No. Description 06/01/06 2 sets Civil Plans 06/01/06 2 copies Hydraulic Calculations 06/05/06 1 Narrative of Stormwater Treatment with Existing Drainage Area Map 06/06/06 1 Stormwater Management Permit Application Form 06/06/06 1 Wet Detention Basin Supplement Remarks: Letter from the City of Lumberton noting the permissible impervious coverage for the site and Plan Review Fee will follow. Ricky, The attached information is being submitted to obtain a Stromwater Permit for the proposed Ruby Tuesday in Lumberton, NC. Please contact me if you have any questions or comments. Thank you, Brian Gilbert '�ffp1 State of North Carolina Department of Environment and Natural Resources Dg.EI EI) Division of Water Quality nL G 11 STORMWATER MANAGEMENT PERAITT APPLICATIOs FOP'no 2006 This form mRsl be photocopied for arse as an Original aREGOWOM � " I. GENERAL INFORMATION 1. Applicants narne (specify the name of the corparadon. individual, etc. who Owns the projerrj , Dan Bettis, Ruby Tuesday, Inc. 2, Print Owner/Signing Ofrlcial's narne and title (person legally rrsponslble for racility rind compilance): Dan Bettis, Ruby Tuesday, Inc._- 3. Mailing Address For parenrr listed in item 2 above: 150 West Church Street City: Maryville State;. TN ^ ,,_, Zip: 37801 _ ,�. Telephone Number_ LM�aS 379-577$ 4, Pro)ect Name (subdivision, facility, or establishment name - should bP consistent. wl•th prOject name on plans, specifications. letters, operauon and maintenance agreements, etc.): Ruby Tuesday. Inc. - Lumberton, NC I*DWARDS NEFF INC surrrRusT snhK ` 1-748 3980 FLOWERS.ROAD STE. 550 ACH RT0061OD0104 DORAVILLE,-GA 30360 64-10/610 . ' (678) 805-5000 j1 f PAY TO THE / v ORDER OF I ;o ` F0.u1 swu-101 V Crainn 3'99 Pace l of 4