Loading...
HomeMy WebLinkAboutSW5111201_HISTORICAL FILE_20120213STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�z DOC TYPE El CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE �1�an z ?2 YYYYMMDD POND WA TER SOL UTIONS, INC. CIVIL & ENVIRONMENTAL ENGINEERS Saturday, January 7, 2012 Mr. Robert Patterson NCDENR -- Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 Re: FVW Opportunities, Inc., Head Start Program Stormwater Project No SW5111201 Comments Response Letter Dear Mr. Patterson: J A N 1 0 2012 DENR-WATER QUALITY WMNOSAND STORMWATER BRAKH This letter is in response to the comments letter provided for this project, dated December 12, 2011: 1. The drainage area (DA) and impervious area is not consistently shown on SWU-101 and the supplement form. Please revise to make all consistent with these forms, and the calculation and plans. A: Understood. The SWU-101 form, the supplement form and the calculations were all updated and checked for consistency. 2. On SWU-101, IVA, through IV.10. should be based on the FVW property only. The adjacent church property is considered as off -site area in IV.10. A: Understood. All flows were adjusted to show the FVW Opportunities site only. 3. The supplement form is merely a tool for summarizing final design results. Please provide your supporting calculations for the minimum required treatment volume (using the simple method), drawdown calculations, and underdrain sizing. A: Understood. Calculations for the volume, drawdown and underdrain sizing are included in the modified calculations sheets. 4. The percent sand on the supplement form needs to be corrected to show a number value. A: Understood. The cell has been corrected to show 85%. S. The pretreatment part at the end of the supplement form is blank. Some form of pretreatment must be provided and indicated on this form, A: Understood. The pretreatment utilizing gravel and grass was marked. 1025 South Church Street ♦ P.O. Box 8342 • Rocky Mount, NC 27803 ♦ (252) 904-8078 Email peter@pondwatersolutions.com Mr. Robert Patterson 5W5111201- FVW Opportunities, Inc. Page 2 6. The supplement form states the SHWT is 429', but the soils report states no SHWT down to 60" (5') below existing ground. Based on the soils report the SHWT at or below —433' at B3 and—430.5' at B4. Please verify and revise as necessary. A: Understood. Additional bore was completed specifically for the location of the Bioretention cell. The testing including going to 9 feet of total bore to test for the high water table. 7. Please provide a detail and calculations for the energy dissipater(s). A: Understood. The calculations and details are provided. 8. Underdrains must be provided unless the assumed infiltration rate stated on the supplement form (1.59"/hr) can be verified by an infiltration test within the footprint of the proposed bioretention cell at the bottom elevation of the media. That said, underdrains are recommended unless the infiltration rate is above 2"/hr. Note that the SHWT must be 2' below the bottom of any underdrains. A: Understood. Underdrains along with the calculations were added. 9. Please show the 4" sand layer (and any underdrains added) on the bioretention cross - sections on sheet SW--2. A: Understood. The 4" sand layer has been added. 10. Since the bioretention cell is proposed to be located on the adjacent property not owned by FVW Opportunities, Inc., an agreement stating this must be provided that is signed by the adjacent property owner. A: Understood. Per this comment, the bioretention cell was moved to the front of the property to segregate the overall flow between the church property and the FVW project. 11. Nearly half of all proposed impervious area is not being captured and treated as required. All proposed impervious area must be captured and treated to remove 85% TSS. In addition, the rules require that the system be sized to account for the ultimate build -out potential of the site. A: Understood. Per our discussion, the plans were modified to the front of the property to capture only the FVW Opportunities project. With the shift, the BMP captures approximately 81% of the total impervious generated from the project alone. The church property will have an impervious area close to 16% of the total property area due to the new driveway. In order to expedite this project, it is understood that another permit application for the church portion of the project will be submitted in the near future (within 30 days) to DENR. This permit will be for low density, specifically for the church property and will be signed by both FVW Opportunities, Inc. and the church as applicant and property owner respectively. Ce-444rT - 1 /1 all Z t P Mr. Robert Patterson SW5111201- FVW Opportunities, Inc. Page 2 If you should have any questions, please do not hesitate to call or email me at your convenience to discuss the project and what changes may be necessary. Thank you for taking the time to review this project. If you need any additional information, please do not hesitate to contact me. Sincerely, Peter Soka Pond Water Solutions, Inc. Attachments CC: File JQ-)E_ (u(Lkf -T,) P-a; 3V_P- i Application.. Completeness Review N First Submittal ❑ Re -submittal Date Received: I ii Date Reviewed Development/Project Name: PJU Y Z LVA"" 'f&i �l Receiving stream name ` ! ,I r Classif River Basin: TkQ- ?AM, ,'c. n _-d, High Density Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Si)(MALbreek Water Sheds): II/IA Latitude and Longitude: 3(� 05 ��/� , i ,,�� ` 2,'7 ` 9Z Jurisdre itit on -ry cJA ) Project Address: !Z!C2s I Engineer name and firm: P rE� SakA) 4<j.: P4 Phone: 75'z- 9oq�- So;7 E Email: a c aAv Is the project confirmed to be in the State MSI Stormwater Permil jurisdiction? es or ❑ No ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets ❑ High Density ❑ Other ❑ 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or add info letter) �K_BUA Z,3• iS' � [Check for $505.00 included ❑ Original signature (not photocopy) on application ❑ Legal signature (Corporation-VP/higher' Parth&ship=General Partner/higher, LLC-memberlmanager, Agent). Check spelling, capitalization, punctuation: http://www.secretary.state.ne.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement V ealed, signed & dated calculations rs�4orrect supplement and O&M provided for each BMP on site (check all that were provided & number of each) u $ioretention ❑ Rooftop Runoff MananP P f ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer '�.:'`:�'?';:' , ❑ .Sand Filter ..❑.Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Roac DER 73 2012 &"' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details ~�J [� Narrative Description of stormwater managemeht:'Oro vided [Soils report provided B c/z„?gs t,/odr� a ❑ Wetlands delineated or a not&on the plans or.in the accompanying documents that none exist on site and/or hpp-&L;.u; adjacent property V etails for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; 00 Dimensions & slopes provided fD 'tJA ar' Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density aoT"� MP operation and maintenance agreements provided rL,.t1J Application complete ❑ Application Incomplete, Returned: (Date) da"q ommen#s A[(`� 5_ i,t <— f O �i4'/C � � /1-r►? L / GO A/SW %ZG�G�.S p*t ; It/&A' - r-Z.J trF �/ D_ Td P/1.4A Goa tf"I_'0 nr_c May 8, 2011 Revision, Bill Diuguid POND WATER SOLUTIONS, INC. CIVIL & ENVIRONMENTAL ENGINEERS Thursday, December 8, 2011 Mr. Bradley Bennett NCDENR — Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 Re: FVW Opportunities, Inc., Head Start Program Stormwater Management Plans and Calculations Dear Mr. Bennett: Q FEB 13 2012 1 NG [)[NR RaWOI Rr2!053a �'"'Ce Attached are the plans and calculations for the FVW Opportunities, Inc. project in Franklinton, NC. The project is currently being developed for the Head Start Progam in Franklinton, NC. If you should have any questions, please do not hesitate to call or email me at your convenience to discuss the project and what changes may be necessary. Thank you for taking the time to review this project. If you need any additional information, please do not hesitate to contact me. Sincerely, Peter Soka 5�� Pond Water Solutions, Inc. Attachments CC: File rFiL&4/,-)7'� 1-/ ��7- .- 1025 South Church Street ♦ P.O. Box 8342 ♦ Rocky Mount, NC 27803 ♦ (252) 904-8078 Email: peter@pondwatersolutions.com LETTER OF TRANSMITTAL Pond Water Solutions, Inc. 1025 South Church Street Rocky Mount, NC 27803 (252) 904-8078 (c ) pondwatersolutions a embargmail.com DATE: December 8, 2011 PWS JOB NO TO: Mr. Bradley Bennett NCDENR Stormwater Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 PROJECT: FVW Opportunities, Inc Project 11-201 GENTLEMEN: We are sending you ® herewith or ❑ under separate cover: SUBMITTAL FOR: CODE FOR YOUR USEIINFORMATION 1 ❑ AS REQUESTED 2 ❑ FOR YOUR APPROVAL 3 F F B 1 3 2012 ACTION CODE PLEASE SUBMIT A ❑ PLEASE REVISE AND RETURN B ❑ PLEASE SIGN AND RETURN C PRINT COPIES DRAWING NUMBER (REVISION NO. OR DATE) DESCRIPTION CODE 2 Plans and Calcs 2 Executed Stormwater Permit Application vy 2 Executed Stormwater Agreement O 110� d d�10�,r 1 Check for $505 stormwater fee 0 REMARKS: Mr. Bennett, Attached is the project with attachments for your review. Thank you! Sent by: First Class Mail ❑ UPS Next Day 1 AM ❑ UPS Next 2nd Day ❑ Federal Express ❑ Faxed ❑ Hand Delivered Pick Up ❑ If enclosures received are not as listed above, kindly notify at once. Thank you. Received By Date cc North Carolina Elaine F. Marshall DEPARTMENT OF THE Secretary SECRETARYOF TATE PO Box 29622 Raleigh, NC 27626-0622 (9191807-2000 Date: 10/27/2011 Click here to: View Document Filings I Sign Up for E-Notifications I PC, PLLC, LP and Non -Profit entities are not required to file annual reports. Corporation Names Name Name Type NC FRANKLIN-VANCE- WARREN OPPORTUNITY, LEGAL INC. Non -Profit Corporation Information SOSID: 0055447 Status: Current -Active C Effective Date: 3/25/1966 ] 3 ZO,Z Dissolution Date: Annual Report Due Date: Citizenship: DOMESTIC Palo.i�h State of Inc.: NC ° Ana!/five Duration: PERPETUAL Registered Agent Agent Name: OWENS, WILLIAM S Office Address: 116 YOUNG ST, HENDERSON NC 27536 Mailing Address: 116 YOUNG ST. HENDERSON NC 27536 Principal Office Office Address: 180 S. BECKFORD DRIVE HENDERSON NC 27536 Mailing Address: PO BOX 1453 HENDERSON NC 27536 Officers This website is provided to the public as a part of the Secretary of State Knowledge Base (SOSKB) system. Version: 1351 IV. PROJECT INFORMATION '// SyLj�, 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be routed via ditches, roofdrains and culverts into a bioretention cell that will treat the first flush (1=in) runoff. Due to sufficient storage capacity in the cell, the bioretention will also serve as detention for the 1-yr, 24 hr storm. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Tar -Pamlico River basin. 4. Total Property Area: 9.17 acres 5. 'Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': ?" t`7 acres Total project area shall he calculated to exclude the following the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) lure or Mean High Water• (MHW) line, and coastal wetlands landward from the NHW (or MHM lure, Tire resultant rroject area is used to calculate overall percent built upon area (BUA). Non -coastal zrretlarrds landward of fire NH (or MHW) line may be included in tire total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = Z3.75 % 9. How many drainage areas does the project have?2 (For high density, taunt 1 for each proposed engineered storruwater BMP. For low density and other projects, rise I for tire whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 'Drainage Area 2 Drainage Area _ Drainage Area Receiving Stream Name Franklinton Branch Franklinton Branch Stream Class * C; NSW C; NSW Stream Index Number * 28-29-4 28-29-4 Total Drainage Area (sf) 17,977 76,718 On -site Drainage Area (so 17977 76718 Off -site Drainage Area (so 0 0 Proposed Impervious Area**(so 10603 11885 % Impervious Area** total 58.99 15.49 Impervious** Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ On -site Buildings/Lots (so 4269 On -site Streets (so 11885 On -site Parking (so 6334 On -site Sidewalks (so Other on -site (so Future (so Off -site (sf) Existing BUA*** (so Total (so: 10026 f g�rj Stream Class and Index Number can be determined at: irtfp://)ortal.rrcderu•.oiZ nel)Ailq ps/csrr/classi icatioirs imppervious area is defrued as tire built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. form SWU-101 Version 07Jun2010 Page 3 of Patterson, Robert From: Diuguid, Bill Sent: Tuesday, December 13, 2011 8:27 AM To: Patterson, Robert Subject: FW: FVW Opportunities Inc Head Start Bldg Project FVW Opportunities, Inc. site plan. BD From: Tammy Ray [mailto;tray_@franklintonnc.us] Sent: Monday, December 12, 2011 7:12 PM To: Diuguid, Bill Subject: RE: FVW Opportunities Inc Head Start Bldg Project Hello, Yes sir, the Board of Commissioners approved annexation of the aforementioned property into the city limits on March 15, 2011. Please feel free to contact me if you have any questions or concerns regarding this matter. Have a great day. Tammy Mason Ray Town Manager JL1,,t N�'�� St4ktJ.1X%'-4 110 W IT"O, V011R TCYAN, PO Box 309 7 West Mason Street Franklinton, NC 27S2S (919) 494-2S20 ext. 23 (919)426-8710 From: Diuguid, Bill[mailto:bill.diuquid@ncdenr.pov] Sent: Friday, December 09, 2011 10:55 AM To: tray@franklintonnc.us Subject: FVW Opportunities Inc Head Start Bldg Project Tammy Ray: Re my Friday, Dec 9th phone call to you. I did confirm with Sarah Rudolph of FVW Opportunities that Franklinton has annexed their site at S. Main and College Streets. So I don't need any additional info from you. Thanks. Bill Diuguid, AICP Staff Planner, Stormwater Permitting Wetlands and Stormwater Branch Division of Water Quality I NCDENR 1617 Mail Service Center (Mail) 512 N. Salisbury St, Raleigh, NC 27604 j 91h Floor (Location & Parcels) Raleigh North Carolina 27699-1617 Phone: 919-807-6369 1 Fax: 919-807-6494 Website: httR://portal.ncdenr.org/web/wq/ws/su E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. A14 ,!,a NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Peter Sokalski, PE Pond Water Solutions, Inc. P.O. Box 8342 Rocky Mount, NC 27803 Dear Mr. Sokalski: Division of Water Quality Coleen H. Sullins Director December 12, 2011 Dee Freeman Secretary Subject: Request for Additional Information Stormwater Project No. SW5111201 Franklin -Vance -Warren Opportunities, Inc. Franklin County The Division of Water Quality Central Office received a Stormwater Management Permit Application for the subject project on December 9, 2011. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the Stormwater review: The drainage area (DA) and impervious area is not consistently shown on SWU-101 and the supplement form. Please revise to make all consistent with these forms, and the calculation and plans. 2. On SWU-101, 1V.4. through IV.10. should be based on the FVW property only. The adjacent church property is considered as off -site area in IV.10. 3. The supplement form is merely a tool for summarizing final design results. Please provide your supporting calculations for the minimum required treatment volume (using the simple method), drawdown calculations, and underdrain sizing. 4. The percent sand on the supplement form needs to be corrected to show a number value. 5. The pretreatment part at the end of the supplement form is blank. Some form of pretreatment must be provided and indicated on this form. 6. The supplement form states the SHWT is 429', but the soils report states no SHWT down to 60" (5') below existing ground. Based on the soils report the SHWT at or below —433' at B3 and--430.5' at B4. Please verify and revise as necessary. 7. Please provide a detail and calculations for the energy dissipater(s), 8. Underdrains must be provided unless the assumed infiltration rate stated on the supplement form (1.59" Ihr) can be verified by an infiltration test within the footprint of the proposed bioretention cell at the bottom elevation of the media. That said, underdrains are recommended unless the infiltration rate is above 2"/hr. Note that the SHWT must be 2' below the bottom of any underdrains. Wetlands and Stormwater Branch „1 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 One �� Li1C O11I1� Location 512 N. Salisbury St. Ralegh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Naturally Internet: www.ncwaterquality.org An Equal Opportunily 1 Affirmative Acton Employer Mr. Peter Sokalski, PE SW5111201 - FVW Opportunities, Inc. December 12, 2011 9. Please show the 4" sand layer (and any underdrains added) on the bioretention cross - sections on sheet SW-2. 10. Since the bioretention cell is proposed to be located on the adjacent property not owned by FVW Opportunities, Inc., an agreement stating this must be provided that is signed by the adjacent property owner. 11. Nearly half of all proposed impervious area is not being captured and treated as required. All proposed impervious area must be captured and treated to remove 85% TSS. In addition, the rules require that the system be sized to account for the ultimate build -out potential of the site. Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to January 12, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. All revised original signed documents must be returned or new originals must be provided. Copies are not acceptable. Any revised calculations or plans must be sealed, signed, and dated; and have a revision date shown. Please reference the State assigned project number SW5111�01 on all correspondence. If you have any questions concerning this matter please feel free to call me at (919) 807-6375, or at robert.patterson@ncdenr.gov. Sincerely, Robert D. Patterson, PE Environmental Engineer Stormwater Permitting Unit cc: SW5111201 File ec: Sara Rudolph - Franklin -Vance -Warren Opportunities, Inc. Danny Smith - Raleigh Regional Office Page 2 of 2 ,5-Ve; 1! 12-0/ STORMWATER MANAGEMENT CALCULATIONS FOR FVW OPPORTUNITIES, INCw Franklinton Franklin County October 18, 2011 JN: 1 201 Pond Water Solutions, Inc. PO Box 8342 CPw Rocky Mount, NC 27804 (252) 904-8078 (252) 822-0207 (Fax) IIt rrrfrr N CAR4 O .•'�F E.551Q� •. y 9 = 9 . �Of 9 8 'rrrN rririr�tist�� 10/18/11 FVW OPPORTUNITIES, INC. STORMWATER MANAGEMENT CALCULATIONS T A B L E O F C O N T E N T S Description • Site Summary/Narrative Runoff Calculations a Storm Sewer Pipe Calculations • Stormwater Management Calculations Appendix • Soils Boring Letter USGS Map of Site Soils Map of Site • NCDENR Environ. Sensitivity Map APPENDICES Soil Horizons, Inc. R'y PO Box 1063 ,,f Youngsville, North Carolina 27596 August 19, 2011 Mr. Pete Sokalski, PE Pondwater Solutions, Inc. 1025 South Church Street Rocky Mount, NC 27803 Dear Pete, On August 19, 2011, 1 made a site visit to the proposed FVW Opportunities site in Franklinton, NC for the purpose of making an assessment of the soil conditions for proposed stormwater BMP devices. The assessment included hand auger borings conducted at four selected locations shown on attached Figure 1. The soil characteristics were observed and described to a depth of 60 inches below the ground surface. See the attached soil profile descriptions. In general, these soils contain 4 to 20 inches of sandy loam surface materials over layers of red clay material. This soil is classified as well drained. No indicators of a seasonally high water table were observed within 60 inches from the surface of any of the four soil borings. These soil borings were marked in the field with red flagging tape. If you have any Questions about this report, please give me a call at 919-818-5087. Sincerely, SOIL SC�F Uwe � IL DAV,s y� w � � �t Y , a c John R. Davis, Jr. Licensed Soil Scientist Encl. Figure 1 Soil profiles Soil Evaluations For On -Site Wastewater Systems Wastewater System Design And Permitting Stream and Wetland Delineations and Permitting Subsurface Wastewater System Operation �_ t.rt,rw pr.q U�+aS wYl. s� v • _"___ —' r � Isf n sw7s +o nmcs . tmr SOUTH MA[N STREET- US # 1 BUSINESS PUBLIC STREIrI rw•r t.�....b M F~ `,-r .r d.. nw, �• r. ri...""r'Jg jrra�syV<—'i� i �;f ql�p ert. ..°}'1 f 0 low, w, x rcrs Iwr'r�a_irsxit ..� 1 Win. �• _ f y r _ .. _ . .r �+. e.eer .iLKWST.i f �� �' �-�y,,.,�� � ! on. ru, s,. 1.• Lznr,wa sra r-.Ir ; •� `f"" �'--1'J=. Fes, r , • _:, ` ,` ® hJtw rmr tW,p► + 'VIM; rl` : .. .` �• 1 k1 .KaI.tM r .rr�'.'t�i � , IY _�'� r^y I, / w m•�. ra srws E rr.rrc srx 1r r•w... T 1p+t. sr.[ ro- �n• m q Itl PARCEL.A -0' ''RI 3� I�_rre�a wwor �.ti�a F�,,1: �,; — — .y +'n � ;S% a)` i+1YS ' �• . w+ i.h � l• _ a7 c N[1 • IN 11[11u R,rIM l!O f1V}r[S N1 {{41RlFi tlrLL Q NM41 Ftl. r wir6r *4 tM 11�1fy 1 �`0 Yrl rirO r'�`i14 11Mw •FrN6 ,M 1 CSX TRANSPORTATION eo, a:OHT IN WAY is -� o Soil Borings depicted with red dots and numbers. Site Plan with Boring Locations Aug 19, 2011 SOIL HORIZONS, Inc. FVW Opportunities PO Box 1063 r ' Youngsville, NC 27596 Franklin County, NC Not To Scale FIGURE 1 SITE/SOIL EVALUATION FOR SUBSURFACE WASTEWATER DISPOSAL SYSTEMS Ref. # / ° � 2 Owner W CI n j �i Phone Fax Date of Application Date(s) Evaluated -1 -1 Owner's Address Property ID # Township County "v n +-► Property Size acresjsquarefeQt Fa ility ay Gast. Locationa;v, -�vuT At ' _ Water Supply: Private Well; Community/Non-community, Public Well; Other (see remarks) Evaluation Method By: -�Z_ Auger Boring; Pit SOIL Lando Posit] Slope Horizi Depth Color Textu Consi Strut Miner Horizi Deptt Color Textu Cons Strut Miner Horiz Depti Color Textu Cons Strut Minei Horiz, Deptt Color Textu Cons Struc Minei Soil % Restr Pm/S Class LTAF FACTORS PROFILE NUMBERS ]cape on/Shape (Direction Al 6 •6 Dn F re L 6 r, V c, istence et is i v lure a wl r a Lr O.Y Du alogy I - i Dn — DIj 1 r 6-1%,, yR . 5 re G a istence a i lure 0 c- 'C .j v d o -alogY Dn 6] z i 14 _ S, ye 1 oR'+S re a istence yw` lure ,alogy : d Dn BAG Q/C v ., �.S 797 a mica o ire Lo4 »� S 04 ' K L Istence ; u / r; S G ture S u ar, u o w a v oc, c -alogy r . vetness 0 .Horizons " do' aplRock Acation (ConvlSap) (LpP) Soil Moisture Status at Time of Evaluation: �' - o;J� Site LTAR: gpdsf) Site Classification: Parent Material : t w\ ___ Evaluated By: 1 Others Present: Available Space: Remarks: SITE/SOIL EVALUATION FOR SUBSURFACE WASTEWATER DISPOSAL SYSTEMS Ref. # Owner Phone Fax Date of Application Date(s) Evaluated Owner's Address Property ID # Township County Property Size acr�es1square feet Fa ility 10a Location V CI f lj:�Q_kl `►� � a n ry ' Water Supply: Private Well; Community/Non-community, Public Well; Other (see remarks) Evaluation Method By: _.,,/ Auger Boring; Pit SOIL Land Horiz Dept Color Textu Cans Stru Mine Horiz Dept Color Textu Cons Struc Mine Horiz Dept Horiz Dept Cola Text Cons Struc Mine Soil Rest s Positi Slope Horiz Dept Color Textu Cans Stru Mine Horiz Dept Color Textu Cons Struc Mine Horiz Dept h Colo Text Cons Struc Mine Horiz Dept Cola Text Cons Struc Mine Soil Rest r Pm/S Class LTA FACTORS PROFILE N17!�, & MBERSA ; cape - on/Shape r e (Direction o on A i h - T, a ' S . re C, a C.o istence , i h Clure C,r%tA ow rr+( V ralogy ' on S . HA re 4 M istence ture a ,� ay a c �, n ati a raiogy on G r o - ' r R 104 + ure istence ' ry lure S►� o r, Qv a c «.. V &V 0( ralogy onLL h - r o `4/ ure istence ture ,,- h - r ralogy = 7 fi Wetness IJ 610 .Horizons > O ap/Rock ification R (Conv/Sap) (Lpp) Soil Moisture Status at Time of Evaluation: ' rnd Td Site LTAR: Site Classification: Parent Material : k-P Evaluated By: Others Present: Available Space:_ (Lpp) Soil Moisture Status at Time of Evaluation: ' rnd Td Site LTAR: Site Classification: Parent Material : k-P Evaluated By: Others Present: Available Space:_ USGS MAP OF FVW Opportunities, Inc. Latitude: 36"5'56.223"N Longitude:-78027'31.6218"W Saturated Hydraulic Conductivity (Ksat), Standard Classes —Franklin County, North Carolina (FVW Opportunities, Inc. Project) 36° 5' 53" ., 4 I�� -ti11nn { ru M Map Scale: 1:940 if printed on A size (85" x 11") sheet. t` N N Meters n / 0 5 10 20 30 N Feet 0 35 70 140 210 USA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 1� N N m 36° 5' 59' 36' 5' 53" r_ N W 10/1812011 Page 1 of 4 Saturated Hydraulic Conductivity (Ksat), Standard Classes —Franklin County, North Carolina (FVW Opportunities, Inc, Project) MAP LEGEND MAP INFORMATION Area of Interest (A01) Map Scale: 1:940 if printed on A size (8.5" x 11") sheet. 0 Area of Interest (A01) The soil surveys that comprise your AOi were mapped at 1:24,000. Soils Soil Map Units Warning: Soil Map may not be valid at this scale. Soil Ratings Enlargement of maps beyond the scale of mapping can cause 0 Very Low (0.0 - 0.01) misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting 0 Low (0.01 - 0 1) soils that could have been shown at a more detailed scale. 0 Moderately Low (0.1 - 1) Please rely on the bar scale on each map sheet for accurate map Q Moderately High (1 - 10) measurements. 0 High (10 - 100) Source of Map: Natural Resources Conservation Service 0 Very High (100 - 705) Web Soil Survey URL: hftp:ltwebsoilsurvey.nres.usda.gov Coordinate System: UTM Zone 17N NAD83 Not rated or not available This product is generated from the USDA-NRCS certified data as of Political Features the version date(s) listed below. p Cities Soil Survey Area: Franklin County, North Carolina Water Features Survey Area Data: Version 10, Feb 12, 2010 Streams and Canals Date(s) aerial images were photographed: 7/1/2006 Transportation The orthophoto or other base map on which the soil lines were Rails compiled and digitized probably differs from the background iv Interstate Highways imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. N US Routes Major Roads Local Roads USDA Natural Resources Web Soil Survey 10118/2011 2im Conservation Service National Cooperative Soil Survey Page 2 of 4 Saturated Hydraulic Conductivity (Ksat), Standard Classes —Franklin County, North Carolina FVW Opportunities, Inc. Project Saturated Hydraulic Conductivity (Ksat), Standard Classes Saturated Hydraulic Conductivity (Ksat), Standard Classes —Summary by Map Unit —Franklin County, North Carolina (NC069) Map unit symbol Map unit name Rating (micrometers per second) Acres in AOI Percent of AOi Puc Pacolet-Urban land 11.2368 2.1 100.0% complex, 2 to 10 percent slopes Totals for Area of Interest 2.1 100.0% Description Saturated hydraulic conductivity (Ksat) refers to the ease with which pores in a saturated soil transmit water. The estimates are expressed in terms of micrometers per second. They are based on soil characteristics observed in the field, particularly structure, porosity, and texture. Saturated hydraulic conductivity is considered in the design of soil drainage systems and septic tank absorption fields. For each soil layer, this attribute is actually recorded as three separate values in the database. A low value and a high value indicate the range of this attribute for the soil component. A "representative" value indicates the expected value of this attribute for the component. For this soil property, only the representative value is used. The numeric Ksat values have been grouped according to standard Ksat class limits. The classes are; Very low: 0.00 to 0.01 Low: 0.01 to 0.1 Moderately low: 0.1 to 1.0 Moderately high: 1 to 10 High: 10 to 100 Very high: 100 to 705 Rating Options Units of Measure: micrometers per second Aggregation Method. Dominant Component Component Percent Cutoff. None Specified Tie -break Rule: Fastest Interpret Nulls as Zero: No Layer Options: Depth Range Top Depth: 0 USDA Natural Resources Web Soil Survey r" Conservation Service National Cooperative Soil Survey 10/18/2011 Page 3 of 4 JZ 0 - bill s CraeK14 & '7 `§ 'ijlfyv K'amey e a 7 0* � f . A I 4 Sally ree a UWS - WAPPROXIMATE 2 SITE LOCATION F U KLIN CO ON Ce&ir_M-11Creek)W& 4f" "AN'- pch% 'XV ! 6n-ter, j • Franklinton Qua'd 2, 4 7", k oungsville