Loading...
HomeMy WebLinkAboutSW5100101_HISTORICAL FILE_20100223STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW5I(y��/iy/ DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Mr. Matt Lowder, PE Triangle Site Design, PLLC 165 Trantham Trail Clayton, North Carolina 27527 Dear Mr. Lowder: Director February 22, 2010 Dee Freeman Secretary FEB 2 3f`( Subject: Request for Additional Information (2"1) Stormwater Project No. SW5100101 Dollar General - Princeville Edgecombe County The D;visi::,i of Water Quality (DWQ) Stormwater Permitting Unit received your revised Stormwater Management Permit application for the subject project on February 19, 2010. A preliminary review of that information has determined that the application is not yet complete. The following information is needed to continue the Stormwater review: 1. Calculations using the Simple Method to find the required water quality treatment volume were not submitted or incorrect. The required volume is 3,630 CF, not 2,846 CF. Please revise the supplement. 2. The 1-yr, 24-hr intensity is 0.236 inlhr, not 4.92 in/hr. Please revise this number on the supplement and corresponding pre- and post -development peak flows. 3, The temporary pool elevation (TPE), according to the required volume and the pond contours, should be just over 36 feet. The drawings show intermediate weirs on the riser structure at an undeterminable elevation (no detail was found to refer to). Please note that the TPE must be below this weir outlet elevation. The top of the baffles should be set near the TPE. Please revise the supplement and drawings accordingly. 4. The forebay weir elevation is incorrectly listed at 68,0 ft on the basin detail. Please correct. 5. Please revise the elevations contained in the Wet Detention O&M Agreement to match those listed on the supplement. 6. Six or more inches of topsoil to be placed on top of the clay liner along the vegetated shelf for plantings should be specified and shown on the basin detail. The requested information should be received by this Office prior to March 15, 2010, or the application will be returned as incomplete. One NorthCarolina ��atura!!J North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 807-6300 Customer Service Internet: www.ncwaleruualitV.org Location: 512 N. Salisbury St. Raleigh, NC 27604 Fax (919) 807-6494 1-877-623-6748 An Equal Opportunity/Affirmalive Action Employer — 100% Recycled130% Post Consumer Paper Mr. Matt Lowder, PE SW5100 101 - Dollar General - Prinole February 22, 2010 0 Construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW5100101 on all correspondence. If you have any questions concerning this matter please feel free to contact me at (919) 807-6365 or cory.larsen@ncdenr.gov. Sincerely4se C Environmental Engineer Stormwater Permitting Unit cc: Raleigh Regional Office DWQ Central Files SPU Files FEB 10 2010CIDENR .f North Carolina Department of Environment and Natural RdWfcesJ LL El� Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary February 8, 2010 Mr. Matt Lowder, PE Triangle site Design, PLLC 165 'frantham Trail Clayton, North Carolina 27527 Subject: Request for Additional Inf'onnation Stormwater Project No. SW5100101 Dollar General - Princeville Edgccombe. County Dear Mr. Lowder: The Division o.f Water Quality (DWQ) Stormwater Permitting Unit received a Stonmwater Management Permit Application for the subject project on December 30, 2009. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Dorm SWU-101 states a total project area of 1.325 acres but the stornwater calculations/narrative lists the project as 1.85 ac. Please revise for consistency and confirm project BUA of'73.6%. 2. Please submit calculations using the Simple Method to find the required water quality treatment volume per Chapter 3 of the BMP Manual. The SCS Method is only allowed for LID designs. 3. Please revise the following errors located on the wet detention basin suppleinent: l . 1-yr, 24-lir rainfall depth should equal 2.83 inches; 2. Rational C, predevelopment value is too high. Most of the site is wooded, lawn or unimproved areas (C = 0.15-0.35); 3. Minimum volunte required is underestimated; and 4. Pre -development peak flow is incorrect. 4. The basin must have a minimum length -to -width ratio of 1.5:1 and flowpath-to-width ratio of at least 3:1. Currently, the basin has a L:W ratio of -approximately 1:1. Please revise appropriately. 5. Please include a landscaping plan for the detention basin meeting the requirements of section 6.4.1 of the BMI' Manual, Rcgiiirecl ltenrs ofcr Lcrrrclseape Plcrri. Note that seeding is not an acceptable source of vegetated shelf plantings. 6. Please set the forebay weir elevation at or near the permanent pool elevation (PPE). 7. Since the site is located in well -drained sandy soils, please indicate how the PPE will be maintained at design elevation. Ifa clay or synthetic liner is to be utilized, it must be specified on the drawings. one NorthCarolina �1 �rrlrrrrr!!� Mr. Matt Lowder, PIS SW5100101 —Dollar General - Princ February 8, 2010 0 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to i larch 10, 2010, or the application will he returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please send your request for a time extension to the Division at the address and fax number on page one of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number SW5100101 on all correspondence. If you have any questions concealing this matter please Feel free to contact me at (919) 807-6365 or cory.larsen a ncdenr.gov. Sincerely, Cory rs Environmental Engineer Stormwater Permitting Unit cc: Raleigh Regional Office DWQ Central Files SPU Files