Loading...
HomeMy WebLinkAboutSW4110702_CURRENT PERMIT_20110721STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW /,/// 6 7001 DOC TYPE Q5- CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE ALLZD YYYYMMDD FOX MC®ENR North Carolina Department of Environment and Natural Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director July 18, 2011 Ms. Mary Joan Pugh, Deputy Director North Carolina Zoological Authority 4401 Zoo Parkway Asheboro, NC 27205 Subject: Stormwater Permit No. SW4110702 NC Zoo Polar Bear Exhibit Randolph County Dear Ms. Pugh: nacalVED N.C. Genf, of Efj4 JUL 2 1 `201i W nS(6nSalem RYgional office Dee Freeman Secretary The Storlwater Permitting Unit received a complete Stormwater Management Permit Application for the NC Zoo Polar Bear Exhibit on July 11, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding Permit No. SW4110702, dated July 18, 2011, for the construction, operation and maintenance of the subject project and the stormwater BMPs. This permit shall be effective from the date of issuance until July 17, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Mike Randall at (919) 807-6374; or mike.randall@ncdenr.gov. Sincerely, for Coleen H. Suliins cc: Winston-Salem Regional Office SPU Files Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 L FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org Nne orthCarolina )Vatumlly An Equal Opportunity 4 Affirmative Action Employer _1i State Stormwater Permit Permit No. SW4110702 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO NC Zoo Polar Bear Exhibit 4401 Zoo Parkway, Asheboro North Carolina Randolph County FOR THE construction, operation and maintenance of two bioretention cell(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until juiy 17, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in this permit. The stormwater control has been designed to handle the runoff from 29,650 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area as indicated in this permit, and per the application documents and as shown on the approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 4 State Stormwater Permit ;i Permit No. SW4110702 7. The following design criteria have been provided in the bioretention cell and must be maintained at design condition: Drainage Area 1 Drainage Area 2 a. Drainage Area, acres: 17,950 54,970 b. Total Impervious Surfaces, ftz: 9,590 20,040 c. Design Storm, inches: 1.0 1.0 d. Max. Ponded Depth, feet: 12 12 e. Seasonal High Water Table, fmsl: 730 730 f. Planting Media Depth, feet: 3.33 3.33 g. Cell Dimensions, feet: 14 45 x 35 h. Bottom Elevatiop, fmsl: 732 732 i. Surface Area, ft : 1,170 2,300 j. Permitted Storage Volume, ft3: 990 1,770 k. Bypass 1 Storage Elevation, fmsl: 738 738 I. Predevelopment 1 year 24 hour: 0.520 1.460 m. Post development 1 year 24 hour: 0.970 2.730 n. Drawdown Time, hours: 48 48 o. Underdrain Diameter, inches: 4 & 6 4 & 6 p. Total number of plants provided: 17 18 q. Receiving Stream/River Basin: Panther Creek 1 Cape Fear r. Stream Index Number: 17-22-5 s. Classification of Water Body: "C" II. SCHEDULE OF COMPLIANCE 1. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans. f. Debris removal and unclogging of all drainage structures, level spreader, filter media, planting media, underdrains, catch basins and piping. g. Access to the cell and outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall prepare and have available for review an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Page 2 of 4 ir State Stormwater Permit Permit No. SW41.10702 6. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 7. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification mav_ be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. Page 3 of 4 State Stormwater Permit ✓ Permit No. SW4110702 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting ail components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 18th day of July, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Co1een H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 4 Stormwater Permit No. SVV4110702 NC Zoo Polar Bear Exhibit Randolph County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, NC Zoo Polar Bear Exhibit (Project Name) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 1 of 2 Stormwater Permit No. SW4110702 NC Zoo Polar Bear Exhibit Randolph County Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4, All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. S. All slopes are grassed with permanent vegetation, per the vegetation plan. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 2of2 DWQ USE ONLY Date Received Fee Paid (express only) Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT PLAN REVISION APPLICATION FORM This farm may be photocopied for use as an original I. GENERAL INFORMATION 1. Stormwater Management Permit Number: SW4110702 2. Project Name: North Carolina Zoological Park - Polar Bear Exhibit Expansion 3. Permit Holder's name (specify the name of the corporation, individual, etc.): North Carolina Zoological Park 4. Print Owner/Signing Official's name and title (person legally responsible for permit): MaEy loan Pugh - Deputy Director _ 5. Mailing Address for person listed in item 2 above: 4401 Zoo Parkway City:Asheboro StateNC Zip:27205 Phone: 336 879-7110 Fax: (336 879-2891 Email: maryjoan&nczoo.org I1. PLAN REVISION INFORMATION 1. Summarize the plan revision proposed (attach additional pages if needed): Relocate BioCell #1 from the Polar Bear Exhibit to the Africa Bus Parking Lot. The two biocells (A and B) in the Africa Bus Parking Lot will treat the same amount of volume as planned for BioCell #1. 111. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ), A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Office that issued the permit. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. I' • Original & I copy of the Plan Revision Application Form 0" • Two (2) copies of revised plans (must be revisions of original approved plan sheet(s)) If ap1lying for Express review (only available in 20 coastal counties): • Application fee of $500.00 (made payable to NCDENR) VI. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 3) Jfa1-v Joan Pugh - Deputy Director certify that I have authorized these plan revisions and that the information included on this plan revision application is, to the best of my owledge, 507ect and complete. Signature: Date: Plan Revision Form Rev 13July2010 Page 1 of Permit Number: (to he provided by DWQ) Drainage Area Number: 1 Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will betaken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal! County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired 'immediately. BMP element: Potentialproblems; How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. applicable). Form SW401-Bioretention O&M-Rev.3 Page I of 4 BMP element: The pretreatment area The bioretention cell: vegetation The bioretention cell: soils and mulch Potential problems: Plow is bypassing pretreatment area and/or gullies have formed. Sediment has accumulated to a depth greater than three inches. Erosion has occurred. Weeds are present. Best professional practices show that pruning is needed to maintain optimal plant health. Plants are dead, diseased or dying. Tree stakes/wires are present six months after planting. Mulch is breaking down or has floated away. Soils and/or mulch are clogged with sediment. An annual soil test shows that pH has dropped or heavy metals have accumulated in the soil media. _How I will remediate the problem: Regrade if necessary to route all flow to the pretreatment area. Restabilize the area after grading. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Provide additional erosion protection such as reinforced turf matting or riprap if needed to _prevent future erosion problems. Remove the weeds, preferably by hand. Prune according to best professional practices. Determine the source of the problem; soils, hydrology, disease, etc. Remedy the problem and replace plants, Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Remove tree stake/wires (which can kill the tree if not removed). Spot mulch if there are only random void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Determine the extent of the clogging - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if Dolomitic lime shall be applied as recommended per the soil test and toxic soils shall be removed, disposed of properly and replaced with new planting media. Form SW40 I -Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate the roblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if a licable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or re lace the dro2 inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Bioretention O&M-Rev.3 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:NC 'Zoo Polar Bear Exhibit Expansion/Renovation BMP drainage area number:I Print name:Mary„ Joan Pugh Title: Deputy Director Address:4401 Zoo Parkway _ Phone Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, a `1'� , a Notary Public for the State of �a rA 6, County of Rdnolo% � _ , do hereby certify that r�- /Y) �, �ja�.r p„�bs personally appeared before me this t 7 - day of and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, NOTARY K" COlrmiioP S, 2Of7 SEAL My commission expires Form SW401-Bioretention l&M-Rev. 2 Page 4 of 4 Permit Number: (to be provided by UWQ) Drainage Area Number: 1 Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. — Heavy equipment will NEVER be driven over the bioretention cell. — Special care will be taken to prevent sediment from entering the bioretention cell. — Once a year, a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How I will remediate theproblem: The entire BMP 'Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to bioretention cell erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged (if applicable). Erosion is occurring in the Regrade'the swale if necessary to Swale (if applicable), smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future eroblems with erosion. Stone verge is clogged or Remove sediment and clogged covered in sediment (if stone and replace with clean stone. a licable . Form SW401-Bioretention O&M-Rev.3 Page I of 4 (�. BMP element: Potentialproblems; How I will remediate theproblem: The pretreatment area Flow is bypassing Regrade if necessary to route all pretreatment area and/or flow to the pretreatment area. gullies have formed. Restabilize the area after grading. Sediment has accumulated to Search for the source of the a depth greater than three sediment and remedy the problem if inches. possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems, Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices Prune according to best professional vegetation show that pruning is needed practices. to maintain optimal plant health, Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. `free stakes/wires are present Remove tree stake/wires (which six months after planting, can kill the tree if not removed). The bioretention cell: Mulch is breaking down or Spot mulch if there are only random soils and mulch has floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are Determine the extent of the clogging clogged with sediment. - remove and replace either just the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic lime shall be applied as pH has dropped or heavy recommended per the soil test and metals have accumulated in toxic soils shall be removed, the soil media. disposed of properly and replaced with new planting media. Form SW401-Bioretention O&M-Rev.3 Page 2 of 4 BMP element: Potentialproblems: How I will remediate theproblem: The underdrain system Clogging has occurred. Wash out the underdrain system. if applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the dro2 inlet. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786, Form SW401-Bioretention O&M-Rev.3 Page 3 o l' 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:NC Zoo Polar Bear Exhibit Ex pansion/Renovation BMP drainage area number:2 Print name:Mary Joar Title:Deouty Director Address:4401 Zoo Parkway Phone Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of D�-t� ateol ne,- , County ofRl�d ila , do hereby certify that ,/144e,, "Tam personally appeared before me this P day of �Ix- 7 e- , �, and acknowledge the due execution of the forgoing bioretention maintenance requirements. Witness my hand and official seal, Lsi P Sm a MOTAM PUBLIC %ow ca. [y NC S, M13 r SEAL My commission expires L5� adl Form SW401-Bioretention [&M-Rev. 2 Page 4 of North Carolina Zoological Park. David M. Junes, DVM, Zoo Director ' February8, 2012 Mr. Mike Randall Environmental Engineer NCDENR DWQ Stormwater Permitting Unit D@��j-' 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FEB - 9 2012 Subject: Revision to SW4110702 DENR- WATER QUALITY Polar Bear Exhibit Expansion WE WosANDST4RMWATERFMCH Relocation of BioCell #1 to Africa Bus Parking Lot Dear Mr. Randall, Kindly find attached the following documents for your consideration. 1. Stormwater Management Permit Plan Revision Application Form (signed and dated) 2. Two (2) copies of construction plans (24"x36") The purpose of this revision is to relocate BioCell #1 from the Polar Bear Exhibit Expansion to the Africa Bus Parking Lot. Two (2) new cells will be built to treat the same amount of stormwater runoff volume that was planned for BioCell #1. The new cells (A and B) will capture runoff from a portion of a bus parking lot instead of pedestrian walkways. We would like to complete this project by April before visitor attendance increases dramatically. If delays occur the project will be completed before the Polar Bear Exhibit Expansion goes to State Construction for final closeout - November 2012. Please let us know if you have any questions or need additional information. Best Regards, jGerryy1rkerA,PE Phone: 336-879-7515 Email: gerry.parker@nczoo.org c: Mary Joan Pugh - Deputy Director Attachments Deportment of Environment ACCREDITED BY TILE North Carolina Zoo coarrect your life to wil(Ili fe and Novel Resources ASSOCIATION Beverly Eaves Perdue, Governor OF ZOOS 4401 Zoo Parkway • Asheboro, N.C. 27205 • 336.879.7000 • nezoo.org Dee Freeman, secretary AQUARIUMS DWQ USE ONLY Date Received Fee Paid Permit Number - II —11 r1 6W 110D'-L' Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph 1I - Post Co struction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This farm may be photocopied for use as an original GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): NC Zoo Polar Bear Exhibit Expansion/Renovation 2. Location of Project (street address): 4401 Zoo Parkway City:Asheboro County:Randolph Zip:27205 3. Directions to project (from nearest major intersection): From Downtown Asheboro, NC 42 East, Turn Right onto Old Humble Mill Road, Turn left onto Old Cox Road, Turn Left on Zoo Parkwa 4. Latitude:35° 37' 45.72" N Longitude:79° 45' 47.08" W of the ain enJt0bc4tcJtF Wioj ct. 11. PERMIT INFORMATION: DENR - WA R IN!rmde a qbwwaw Bra 1.a.Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numbern/a , its issue date (if known)n/a , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density ❑High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, n/a and the previous name of the project, if different than currently proposed, n/a ^ 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748); ❑CAMA Major ®Sedimentation/Erosion Control: 2 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts 220LF-Stream & 1,075SF-Wetlands b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:Other Permits are Currently in Review Fonn S W U- l 01 Version 07Jun2010 Page 1 of 6 Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: North Carolina Zoological Authority Signing Official & Title:Mary loan Pugh, Deputy Director b.Contact information for person listed in item la above: Street Address:4401 Zoo Parkway City:Asheboro State:NC Zip:27205 Mailing Address (if applicable):4401 Zoo Parkway City:Asheboro Phone: (336 )_ 879-7110 _ Email mar 'oan. u h®nczoo.or State:NC Zip:27205 Fax: 336 879-2891 Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2:'a. Print Property Owners name and title below, if you are the lessee, purchaser or developer. (This is the person who ownsalie property that the project is located on): Property Owner/ Organization: n/a Signing Official & Title:n/a b.Contact information for person listed in item 2a above: Street Address:n/a City:n/a T Mailing Address (if applicable):n a City:n a Phone: (n/a ) Email:n/a Staten/a Zip:n/a Staten/a Zip:n Fax: (n/a 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization: n/a Signing Official & TitIe:n/a _ b.Contact information for person listed in item 3a above: Mailing Address:n/a City:n/a Staten/ a Zip:n/a Form SWU-101 Version 07Jun2010 Page 2 of 7 Phone: (n Fax: Email:n/a 4. Local jurisdiction for building permits: n/a Point of Contact:n/a IV. PROJECT INFORMATION Phone #: (n/a ) n/a_ 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Two bioretention areas are being installed to treat an equivalent impervious area that is located upstream on site just above the project site area. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the Cape Near River basin. 4. Total Property Area: 879.5 acres 5. Total Coastal Wetlands Area: n/a acres 6. Total Surface Water Area: n/a Do not have any information on the total surface water area for the entire zoo acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area,:879.5 acres + Total project area shall be calculated to exclude the followinbb the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal HigI Water (NHW) line or Mean High Water (MH1M line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BiIA). Non -coastal wetlands landward of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = n/a 9. How many drainage areas does the project have?2 (For high density, count 7 for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Form SWU-101 Version 073un2010 Page 3 of 7 Basin Information - Drainage Area 1 Drainage Area 2 Drainage Area Drainage Area Receiving Stream Name Panther Creek Panther Creek Stream Class * C C Stream Index Number * 17-22-5 17-22-5 Total Drainage Area (sf) 17,950 sf 54,970 sf On -site Drainage Area (sf) 17,950 sf 54,970 sf Off -site Drainage Area (so 0 0 Proposed Impervious Area** (so 0 0 Impervious Area** total 0 0 Impervious Surface Area Draina a Area 1 Draina a Area 2 Draina a Area Draina a Area _ On -site Buildings/Lots (so 0 0 On -site Streets (so 0 0 On -site Parking (so 0 0 On -site Sidewalks (so 0 0 Other on -site (so 7,410 sf 14,380 sf Future (so 2,180 sf 5,660 sf Off -site (sf) 0 0 Existing BUA*** (sf) 7,410 sf 14,380 sf Total (so: 9,590 20,040 sf Stream Class and Index Number can be determined at: http//portal.ncdenr.orgfwebAv qZPs/csu�classihcations "* Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 'Report only that amount of existing B UA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new B UA. 11. How was the off -site impervious area listed above determined? Provide documentation. n/a-no offsite Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http//_portal.ncdenr.orLweb/wq/ws/su/bmp-manual. VI. SUBMITTAL. REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available fromhttp;//12ortal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map athttp-./Iportal.ncdenr.org/­web/`wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portalncdenr.org/web/wq/ws/su/statesw/forms_. docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form.�,.n 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed signed and dated) and O&M� agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to 3rn http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) Form SWU-101 Version 07Jun2010 Page 4 of 7 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor :!2[yr� the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the _ h� receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: . yr a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify�� elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (970) 796-7378.) 10. A copy of the most current property deed. Deed book: 1064 Page No: 259 *?%Vv%- 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC� Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:ZZwww.secretary.state.nc.us/Corporations/­CSearch.aspx V1I. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http:ZZRortal.ncdenr.org/webjwq/"ws/su/stateswZforms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. Form SWU-101 Version 07Jun2010 Page 5 of 7 VTII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Steven Miller, PE Consulting Firm: CLH Design P.A. _ Mailing Address:400 Regency Forest Drive, Suite 120 City:Cary Phone: (919 ) 319-6716 Email:smiller®clhdesignpa.com State:NC Zip:27518 Fax: (919 ) 319-7516 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name of person fisted in Contact Information, item 2a) , certify that 1 own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item Ia) with (print or type 'name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: a Notary Public for the State of , County of do hereby certify that personally appeared before me this _ day of I , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, iteru T a) Mary Joan_ Pugh certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15 " NCAC 2H .1000, SL 2006-246 (Ph. II -Post Construction) or SL 2008-211. Signature: ,Date: i7 1, (� l , a Notary Public far the State of �U"f '/.,." -County of do hereby certify that personally appeared before me this day of 01 + , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, . M NWARY PUBLIC RaWDV Canny NC *C&W=WE0M$AuquS152Q13 SEAL My commission expires�[�7 Form SWU-101 Version 07Jun2010 Page 7 of 7 SEDIMENTATION POLLUTION CONTROL ACT EXPRESS PERMITTING OPITION-08012007 VV No person may initiate any land -disturbing activity on one or more acres as covered by the Act bef&e`�ttils'"V� form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the question is not applicable or the e-mail and/or fax information unavailable, place NIA in the blank.) Part A. 1. Project Name NC Zoo Polar Bear Exhibit Expansion/Renovation 2. Location of land -disturbing activity, County Randolph City or Township Asheboro Highway/Street 4401 _Zoo Parkway Latitude 35.630221 Longitude-79.762199 3. Approximate date land -disturbing activity will commence: August 2011 4. Purpose of development (residential, commercial, industrial, institutional, etc.):Rec./Educational (Zoo) 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 2 acres 6. Amount of fee enclosed: $ 630 The Express Permitting application fee is a dual charge. The normal fee of $65.00 per acre is assessed without a ceiling amount. In addition, the Express Permitting supplement is $250.00 per acre up to eight acres, after which the Express Permitting supplemental fee is a fixed $2,000.00 (Example: 9 acres total is $2,585). NOTE: Both fees are rounded up to the next whole acre and need to be paid by separate checks to NCDENR. 7. Has an erosion and sediment control plan been filed? Yes No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name_ Bobby Smith _ _ E-mail Address bobby.smith@nczoo.or4 Telephone 336-879-7514 Cell # n/a Fax # 336-879-2891 9. Landowner(s) of Record (attach accompanied page to list additional owners): North Carolina Zoological Authority _ 336-879-7514 336-879-2891 Name Telephone Fax Number 4401 Zoo Parkway — _ _ _ _ 4401 Zoo Parkway_ . Current Mailing Address Current Street Address Asheboro NC 27205 Asheboro NC 27205 City State Zip City State Zip 10. Deed Book No. 1064 Page No, 259 Provide a copy of the most current deed. Part B. 1. Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a comprehensive list of all responsible parties an an attached sheet): North Carolina Zoological Park - NCDENR maryjoan,pu-"h-nczoo.org Name E-mail Address 4401 Zoo Parkway 4401 Zoo Parkway Current Mailing Address Current Street Address Asheboro NC 27205 Asheboro NC 27205 City State Zip City State Zip Telephone 336.879-7110 Fax Number 336-879-2891 (a) It the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name E-mail Address Current Mailing Address Current Street Address City State Zip City State Telephone Fax Number Zip (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: nla Name of Registered Agent Current Mailing Address City Telephone E-mail Address Current Street Address State Zip City Fax Number State Zip (c) In order to facilitate Express Permitting, it is necessary to be able to contact the Engineer or other consultant who can assist in providing any necessary information regarding the plan and its preparation: Engineering Firm or other consultant E-mail Address Individual contact person (type or print) Telephone Fax Number The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in - fact, or if not an individual, by an officer, director, partner, or registered agent with. the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there be any change in the information provided herein. Type RI pri narrA � Title dr Aut ority &Sao E [_ Date I ?7 f► C'�- `f 1 "! J'i' a Notary Public oft County of nad oL State of North Carolina, hereby certify that"Iedg -� �. appeared personally before me this day and being duly swornlaccthatthe above for as executed by him. Witness my hand and notarial seal, this day ofqf 20� t 1U_�Zj Notary L ALESI MILLER NOTARY PUBLIC My commission expires RANDOLPH COUNTY, NC _�My Commission Exo_Ka_�1_2��•- . N.C. Uofll. of f,fJ R tJl JUN 2 V 2011 r V�inStUn$BCf77 n SOA __0ional OffiCe� Y NCDENDU% North Carolina Department of Environment and Natural Resources Division of Land Resources Land Quality Section James D. Simons, PG, PE Beverly Eaves Perdue, Governor Director and State Geologist Dee Freeman, Secretary ,tune 27, 2011 LETTER OF APPROVAL NC Zoological Association ATTN :- Maryjoan Pugh 4401 Zoo Parkway Asheboro, NC 27205 RE: Project Name: NC Zoo Polar Bear Exhibit Project ID: RANDO-2011-029 County: Randolph, Zoo Pkwy, Asheboro River Basin: Cape Fear Submitted By: CLH Date Received by LQS: June 22, 2011 Plan Type: Express New Dear Sir or Madam: JUN 3 p 2011 PfHR - ebenfta cr..._ _--- Acres Approved: 2.00 Stream Classification: Other This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at -the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61,1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, North Carolina 27107 Phone: (336) 771-5000 / Fax: (336) Letter of Approval Project :- NC Zoo Polar Bear Exhibit June 27, 2011 Page 2 of 2 water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please be aware that your project will be covcred by the enclosed NPDES General Stormwater Permit NCGOI OOOO (Construction Activities). You should first become familiar with all of the requirements for compliance with the enclosed general permit. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this'office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. . " .Your cooperation is appreciated. Sincerely r. r Scott Sink Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES Permit cc: CLH Design 400 Regency Forest Dr., Suite 120 Cary, NC 27518 W SRO-D W Q CERTIFICATE. OF PLAN'APPROVAL --that:qn....erosi The posting :of this •certificate..,certifies : on and sedimentation control plan has been sedi I appTqyed,for this project by..tlieNorth :Carolina ,-Department of Environment and Natural Resources in . accordance with. North , Ca'r'.olina-,-;L Ge'neraf-Statut,eL 113A — 57 (4) and 113A — 54 (d) (4) and North -Carolina Administrative. Co'de-1.-Title. 15A Chapter, 4B.0107 (c). This certificate must be posted- at the primary -entrance of thej6b,.,"siie'.b6foi,'ec',onstruction begins and until establishment of permanent grounde over.: as: required -by:' 'i-th.-Caro'liha i Administrative Code, Title 15A, Chapter I IV 41B..0127 (b). -AM VOM Date of Plan Approval M 'Locaiion- - - A-' T. r-4 A-:, '.-'NCDENR Engineer Permit Number: (to be provided by DWO) of warFq ALT o� aq r � y NCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. i. PROJECT INFORMATION Project name NO Zoological Park Polar Bear Exhibit Expansion/Renovation Contact name Steve Miller, PE Phone number 919-319-6716 Date June t, 2011 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 17,950f12 ,Itkl Milt,, Impervious area 9,590 tiZ CAR0-,, Percent impervious 53.4% % ,,.`� D��N Design rainfall depth 1.0 inch Peak Flow Calculations — E L — e Mc•,r � Is prelpost control of the 1-yr, 24-hr peak flow required? 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In -situ soil.• Soil permeability Planting media soil: Soil permeability Soil composition • Sand (by volume) • Fines (by volume) �1tm►1) 1 in 4.6 in/hr 0.520 ft'/sec 0.970 ft sec 0.450 ft3lsec 559.0 ft3 990.0It3 OK ft' ft3 ft3 0 ft3 k3 12 inches OK 1.00 ft 1,170.0 ftz OK ft It 14 ft OK 12 hr OK 36 hr OK 48 hr 0.10 in/hr 1.00 irdhr 85% 10% Insufficient. Increase infiltration rate or include underdrains. OK OK OK Form SW401-Bioretention-Rev.8 June 25, 2010 Parts I and 11. Design Summary, Page 1 of 3 % Organic (by volume) 5% OK Total: 100% Permit Number: (to be provided by OWO) Phosphorus Index (P-Index) of media 20 (unitless) OK Form SW401.Bioretention-Rev.8 June 25, 2010 Parts I and it. Design Summary, Page 2 of 3 Permit Number: (to be provided by DWO) Basin Elevations Temporary pool elevation Type of bioretention cell (answer 'Y" to only one of the two following questions): Is this a grassed cell? Is this a cell with trees/shrubs? Planting elevation (top of the mulch or grass sod layer) Depth of mulch Bottom of the planting media soil Planting media depth Depth of washed sand below planting media soil Are underdrains being installed? How many clean out pipes are being installed? What factor of safety is used for sizing the underdrains? (See BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and the bottom of the cell to account for underdrains Bottom of the cell required SHWT elevation Distance from bottom to SHWT Internal Water Storage Zone (IWS) Does the design include IWS Elevation of the top of the upturned elbow Separation of IWS and Surface Planting Plan Number of tree species Number of shrub species Number of herbaceous groundcover species Additional Information Does volume in excess of the design volume bypass the bioretention cell? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30 feet from surface waters (50 feet if SA waters)? Is the BMP localed at least 100 feet from water supply wells? Are the vegetated side slopes equal to or less than 3:1? Is the BMP located in a proposed drainage easement with access to a public Right of Way (ROW)? Inlet velocity (from treatment system) Is the area surrounding the cell likely to undergo development in the future? Are the slopes draining to the bioretention cell greater than 20%? Is the drainage area permanently stabilized? Pretreatment Used (Indicate Type Used with an 'X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3-5 it of grass) Grassed swale Forebay Other 738.00 fmsl N (Y or N) Y (Y or N) OK media depth 737 fmsl 4 inches OK 733.67 fmsl 3.33 it Y (Y or N) 4 OK 10 OK 1 It 732.34 fmsl 730 fmsl 2.34 it OK N (Y or N) fmsl 737 it 2 5 10 OK Y (Y or N) OK N (Y or N) Excess volume must pass through filter. (Y or N) Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 0.5 ftlsec OK N (Y or N) OK N (Y or N) OK Y (Y or N) OK x OK Form SW401-Bioretentior-Rev.8 June 25, 2010 Parts I and II. Design Summary, Page 3 of 3 Permit Number; (to be provided by DWO) Q�OF W A 1'FRQG r -y NCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM BIORETENTION CELL SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name NC Zoological Park Polar Bear Exhibit ExpansiorVRenovation Contact name Steve Miller, PE Phone number 919.319-6716 Date June 1, 2011 Drainage area number 2 ll. DESIGN INFORMATION Site Characteristics Drainage area 54,970 h2 Impervious area 20,040 rye %.1�++�Hr AR!!t��� Percent impervious 36.5°/° °/° ��� Ctl Design rainfall depth 1.0 inch C�� •• F •• •• / Peak Flow Calculations Is prelpost control of the 1-yr, 24-hr peak flow required? 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak control Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Cell Dimensions Ponding depth of water Ponding depth of water Surface area of the top of the bioretention cell Length: Width: -or- Radius Media and Soils Summary Drawdown time, ponded volume Drawdown time, to 24 inches below surface Drawdown time, total: In -situ soil: Soil permeability Planting media soil; Soil permeability Soil composition • Sand (by volume) % Fines (by volume) % Organic (by volume) Phosphorus Index (P-Index) of media N (Y or NJ S A� _ 1 in U?�625 4.6 inlhr ( ' rn `ttGQz: !L 1.460 ft3 Isec 2.730 w �i •+••••'• ��.�� ft3/sec 1.270 ft Isec 1,597.0 f13 1,770.0 f13 OK _ ft3 _ ft3 _ ft3 0 ft3 ft3 12 inches OK 1.00 ft 2,300.0 to OK 45 ft OK 35 ft OK ft 12 hr OK 36 hr OK 48 hr 0.10 in/hr Insufficient. Increase infiltration rate or include underdrains. 1.00 in/hr OK 85% OK 10% OK 5% OK Total: 100% 20 (unitless) OK Form SW401-Bioretention-Rev.8 June 25, 2010 Parts I and II. Design Summary, Page 1 o1 2 Permit Number: (to be provided by D WQ) Basin Elevations Temporary pool elevation 738.00 fmsl Type of bioretention cell (answer "Y" to only one of the two following questions); Is this a grassed cell? N (Y or N) Is this a cell with trees/shrubs? Y (Y or N) OK media depth Planting elevation (top of the mulch or grass sod layer) 737 fmsl Depth of mulch 4 inches OK Bottom of the planting media soil 733.67 fmsl Planting media depth 3.33 It Depth of washed sand below planting media soil 0.33 ft Are underdrains being installed? Y (Y or N) How many clean out pipes are being installed? 7 OK What factor of safety is used for sizing the underdrains? (See 10 OK BMP Manual Section 12.3.6) Additional distance between the bottom of the planting media and 1 It the bottom of the cell to account for underdrains Bottom of the cell required 732.34 fmsl SHWT elevation 730 fmsl Distance from bottom to SHWT 2.34 ft OK Internal Water Storage Zone (IWS) Does the design include IWS N (Y or N) Elevation of the top of the upturned elbow fmsi Separation of IWS and Surface 737 ft Planting Plan Number of tree species 3 Number of shrub species 5 Number of herbaceous groundcover species 10 OK Additional Information Does volume in excess of the design volume bypass the - Y (Y or N) OK bioretention cell? Does volume in excess of the design volume flow evenly distributed N {Y or N} Excess volume must pass through filter, through a vegetated filter? What is the length of the vegetated filter? It Does the design use a level spreader to evenly distribute flow? (Y or N) Is the BMP located at least 30 feet from surface waters (50 feet it Y (Y or N) OK SA waters)? Is the BMP Iocaled at least 100 feet from water supply wells? Y (Y or N) OK Are the vegetated side slopes equal to or less than 3:1? Y (Y or N) OK Is the BMP located in a proposed drainage easement with access to Y (Y or N) OK a public Right of Way (ROW)? Inlet velocity (from treatment system) 0.5 ft/sec OK Is the area surrounding the celE likely to undergo development in the N (Y or N) OK future? Are the slopes draining to the bioretention cell greater than 20%? N (Y or N) OK Is the drainage area permanently stabilized? Y (Y or N) OK Pretreatment Used (Indicate Type Used with an' X" in the shaded cell) Gravel and grass (8'inches gravel followed by 3.5 It of grass) X Grassed swale OK Forebay Other Form SW401-Dioretention-Rev.8 June 25, 2010 Parts I and H. Design Summary, Page 2 of 2 w �j�r�rrr NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis. PE, CPM Director September 3, 2013 CERTIFIED MAIL #7012 2920 0000 3656 1493 RETURN RECEIPT REQUESTED Ms. Mary Joan Pugh North Carolina Zoological Park 4401 Zoo Parkway Asheboro, NC 27205 Pat McCrory, Governor John E. Skvarla, ill, Secretary Subject: NOTICE OF INSPECTIONS NC Zoo African Plains Barns and Polar Bear Exhibit Expansion Permit Nos. SW4100801 and SW4110702 Randolph County Dear Ms. Pugh: On August 29, 2013, Aana Taylor -Smith and Sue White of the Winston-Salem Regional Office of the Division of Energy, Mineral, and Land Resources {DEMLR} inspected the African Plains Barns and Polar Bear Exhibit Expansion at the NC Zoo in Randolph County. These inspections were conducted. to determine compliance with Stormwater Management Permit Numbers SW4100801 issued on October 20, 2010, and SW4110702 issued on July 18, 2011. DEMLR file review and site inspection revealed that both sites are compliant with the terms and conditions of the permits. Please find copies of the completed form entitled "Stormwater Inspection Report" for each site attached to this letter. In 2011, House Bill 492 was signed into law, which determined that Randolph County is not subject to the requirements for development covered by the State Stormwater permits described above. Therefore, you may request to have Stormwater Management Permit Numbers SW4100901 and SW4110702 rescinded. If you wish to rescind those permits, please send a written rescission request for each permit to the following address: Wetlands and Stormwater Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Please be advised that you are required to comply with the terms, conditions and limitations of your Stormwater Management Permits under Title 15A North Carolina Administrative Code 21-1 .1003 and North Carolina General Statute 143-214.7, including operation and maintenance of your permitted stormwater systems, for as long as the permits are in effect. If the projects have changed name, ownership or mailing address, a fonnal change of name/ownership form must be submitted to DEMLR within 30 calendar days detailing the change. Please provide the name, mailing address and phone number of the person or entity that is now responsible for these permits. Winston-Salem Regional Office 585 Waughtown Street, Winston-Salem, NC 27101 . Phone: 336-771-50001 FAX: 336-771-4631 North Carolina Zoological Park 09/03/2013 Page 2 of 2 Thank you for your assistance and cooperation during acivil assessment this inspection.tof up to $25,000.00 per day Stormwater Management Permit may be subject t penalty for each violation. if you have any questions, comments, or nee a sistancWhitee with or a (33ta ding nyOaspect of your permit, please do not hesitate to contact Ms. Tay lor-Smith, Ms. ■ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ■ Print your name and address on the reverse so that we can return the card to you. 0 Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: { ' Ms. Mary`Joa a Pugh'• ' North.Carolina Zoological Park 4401 Z_oo-Parkway Asheboro,.NC 27205`'' '' Arf[n6 KI—k—__ -_ --- _ 7012 2920 0000 3656 1493 PS Form 3811, February 2004 Sincerely, Matthew E. Gantt, PE Regional Engineer Land Quality Section A. Signature 4 X (n1 Agent Addre Recggived by (Pr' ted. fVame) C. Dat of DP s\d D. Is delivery aM ress diift. '-ent from item f ? Yes if YES, enter delivery a t-idress below: ❑ No 3. ISIVice Type rtified Mail ❑ E1 Registered ❑ ❑ Insured Mail. Cf 4. Restricted Delivery? (E Domestic Return Receipt NIL E : press Mail R+i turn Receipt for Merchandise ; 'C 9D. rtr., a Fee) ©Yes WtIl1L3-702— J&595-02-MAUD i a „ U.S. Posta4 ServiceTt., CERTIFIED MAIL,.RECEIPT � ' • (Domestic MaiFpnly, No Insurance Coverage Provided) For deilvery information visit our webstte et wvrvr.usps.come L .1] rl $ SW LI1�i {•�• Swql to -IL Certified Fee C3 Postmark C3 © Retum Receipt Fee (Endorsement Required) Here O Restricted neil,rery tree Ar..%- ��'t C- p (Endomse+nent Required) ru sOtw P not Ms. Mary Joan Hugh ru r ° North Carolina Zoological Park 0 SgB�2 4401 Zoo Parkway r` °rPos Asheboro, NC 27205- ciiy, Sra Compliance Inspection Report Permit: SW4100801 Effective: 10/20/10 Expiration: County: Randolph Region: Winston-Salem Contact Person: Mary Joan Pugh Title: Chief of staff Directions to Project: Type of Project: State Stormwater - Low Density Drain Areas: 001 - (Panther Creek) (03-06-09) { C) On -Site Representative(s): Related Permits: Inspection Date: 08/2912013 EntryTime: 10:00 AM Primary Inspector: Aana Taylor -Smith Secondary Inspector(s): Sue White Reason for inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) . Owner: North Carolina Zoological Park Project: NC zoo African Plains Barns 4401 Zoo Pkwy Asheboro NC 27205 Phone: 336-879-7110 Exit Time: 11:00 AM Phone: 336-771-5000 Phone: Inspection Type: Compliance Evaluation Page: 1 Permit: SW4100801 Owner - Project: North Carolina Zoological Park Inspection Date: 08129/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Randolph County un-tipped by HB 492 - permittee may wish to consider requesting permit rescission File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ■ ❑ ❑ Q Signed copy of the Operation & Maintenance Agreement is in the file? ■ ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? ■ ❑ ❑ ❑ Comment: Randolph County un-tipped by HB 492 - permittee may wish to consider requesting permit rescission. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the SUA (as permitted) graded such that the runoff drains to the system? ■ Cl ❑ ❑ Comment: Are the SW measures constructed as per the approved plans? ■ Cl ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ ❑ Are the outlet structures located per the approved plans? ■ ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ■ ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWO ■ ❑ ❑ ❑ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ■ ❑ ❑ ❑ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ■ ❑ ❑ ❑ Comment: Page: 2 Compliance Inspection Report Permit: SW4110702 Effective: 07/18/11 Expiration: 07/17/21 Owner: NC Zoological Authority Project: NC Zoo Polar Bear Exhibit Expansion/Renovation County: Randolph 4401 Zoo Pkwy Region: Winston-Salem Contact Person: Mary Joan Pugh Title: Directions to Project: Type of Project: State Stormwater - General Permit Drain Areas: On -Site Representative(s): Related Permits: Asheboro NC 27205 Phone: 336-879-7110 Inspection Date: 08/2912013 EntryTime: 09•.00 AM Exit Time: 1a00 AM Primary Inspector: Aana Taylor -Smith Secondary Inspector(s): Sue White Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: E State Stormwater (See attachment summary) Phone: 336-771-5000 Phone: Inspection Type: Compliance Evaluation Page: 1 Permit: SW4110702 Owner - Project: NC Zoological Authority Inspection Date: 08/29/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Randolph County un-tipped by HS 492 - permittee may wish to consider requesting permit rescission. Biocells not constructed. This was recommended by Mike Randall because Randolph County was un-tipped and biocells as designed were not practical for site. Page: 2 Permit: SW4110702 Owner - Project: NC Zoological Authority Inspection Date: 08/29/2013 Inspection Type: Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? ■ ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ❑ ■ ❑ Signed copy of the Operation & Maintenance Agreement is in the file? 0 ❑ ❑ ❑ Copy of the recorded deed restrictions is in the file? 001111 Comment: Randolph County un-tipped by HB 492 - permittee may wish to consider requesting permit rescission. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ■ ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? ■ ❑ ❑ ❑ Are the inlets located per the approved plans? ■ ❑ ❑ Cl Are the outlet structures located per the approved plans? E ❑ ❑ ❑ Comment: Biocells not constructed. This was recommended by Mike Randall because Randolph County was un-tipped and biocells as designed were not practical for site. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ■ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ■ ❑ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? Comment: Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: ■ ❑ ❑ 0 Page: 3 State Stormwater Inspection Report General Project Name: Permit No: SW '-1 1 1 o�i o2 Expiration Date: —1 -Z o2I Contact Person: C—t c y� �cRyu.a�r Phone Dumber: a-, -1 _ -1S 15 Inspection Type: o,�r Inspection Date: 2� t Time In: (09 &0 Time Out: Current Weather: Recent Rain (Date)? Rain — in Location Facility Address / Location: , p 1 Zo o Pa-t'1C.uoaA - City: f\Sln2,bl�Yo �'p 2`t p - County: �� Lat: "N Long: - "Vv Permit Information Rule Subject to (circle ooze): 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule Session Law 2006-246 Goose Creek High Quality Waters Outstanding Resource Waters Density (circle on(,,): igh (HD Low (LD) Stormwater Best Management Practices (BMPs) (insert number of each). - Wet Ponds Infiltration Basins Infiltration Trenches LD Swales Stormwater Wetlands Dry Ponds 2 Bioretention CeitS Permeable Pavement Sand filters (circle one) Open Closed Cistern Level Spreader/Filter Strip Other (specify): File Review Yes No NIA NIE I. Is the permit active? 2. Signed Engineer's Certification on file? 3. Signed Operation and Maintenance agreement on file? 4. Recorded Deed Restrictions on file? Site Visit: Built Uoon Area iBUAI Yes No NIA N1E 5. BUA is constructed and consistent with the Eermit. requirements? 6. BUA aspermitted) is graded such that the runoff drains to the system? (high density only) 7. Drainage area is consistent withpermit? i.e. no un ermitted drainage to the SW BMPs 8. Drainage area is stabilized? to reduce risk of sedimentation to the SW BMPs Site Visit: Stormwater BMPs Yes No NIA NIE 9. Stormwater BMPs are located per the approvedplans? 10. Stormwater BMPs have dimensions (ea. length, width, area) matching the approvedplans? 11. Stormwater BMPs are constructed_per the approved plans? Site Visit: Oneration and Maintenance Yes No NIA NIE 12. Access points to the site are clear and well maintained? 13. Trash has been removed as needed? 14. Excessive landscape debris (grass clippings, leaves, etc) is controlled? 15, Stormwater BMPs being operated and maintained as per the permit requirements? 16. Ins ection and Maintenance records are available for inspection? (high density only, 1995 —present only) Site Visit: Other Permit Conditions Yes No NIA NIE 17. is the site compliant with other conditions of thepermit? Site Visit: Other Water Quality Issues Yes No NIA NIE 18. Is the site compliant with other water quality issues as noted during the inspection? State Stormwater Inspection Report, Version 3.0_3-09 Page 1 of 2 State Stormwater Inspection Report Pictures (some of the pictures taken during the site visit) Compliance Status E Compliant ❑ Non -Compliant Letter Sent (circle one): Yes No Letter type: CEI NOV NOVRE Other Date Sent: Reference Number: Inspector Name and Signature: Date: w 1 l l Boors \JP Sfi b Ua e 0Lv,6Q = OoJwh-, w i 1 I Vv4 vt otyou Y1 sipYnn Mljo v) v\-UMS vy-o+C ,4-p-r's !: t oSiCsn Gc�rul blOLAI\ e�- Ov ey vr01 wDu�i u n l�wx-ri r �P l v�Gl V)�2, PLAut JI Y) P 1 OZQ ho-t- hWOUCA Ve- r 1UI , V _avviz�d 1 +'sb vO vtffvvUt 'rOj h G(.t.! 1-e Dh top V-.DY'n C,U U 1AA-e_ ho <! State Stormwater Inspection Report, Version 3,0_3-09 Page 2 of 2 BIORETENTION CELL: O & M Inspection Checklist INLET and PERIMETER 1. Inlet and Perimeter are free of erosive gullies and bare soil areas: ❑ ❑ ❑ ❑ 2. Inlet device (swale, pipe, stone verge) is free of erosion, damage or clogs: ❑ ❑ ❑ ❑ 3. Weir heights appear to match approved plans: ❑ ❑ ❑ ❑ PRETREATMENT 4. Flow is entering pretreatment area (not being bypassed): ❑ ❑ ❑ ❑ 5. Pretreatment area is free of erosion: ❑ ❑ ❑ ❑ 6. Pretreatment area is free of excessive sediment or clogs: ❑ ❑ ❑ ❑ MAIN TREATMENT AREA 7. Side slopes are 3:1 or less: ❑ ❑ ❑ ❑ 8. The under drain system is free flowing and free of clogs (if applicable): ❑ ❑ ❑ ❑ 9. Cleanout(s) and cap is provided for the under drain as per the approved plans: ❑ ❑ ❑ ❑ 10. Heavy equipment has not been driven into the cell: ❑ ❑ ❑ ❑ 11. Surface is free of piles of heavy materials (piles of mulch, etc): ❑ ❑ ❑ ❑ 12. Ponding depth is 9-12 inches after rain: ❑ ❑ ❑ ❑ 13. All dimensions are >=10ft.: ❑ ❑ ❑ ❑ SOIL/MULCH and VEGETATION 14. Plants are healthy and being maintained: ❑ ❑ ❑ ❑ 15. The proper amount and type of vegetation is present in the cell: ❑ ❑ ❑ ❑ 16. Mulch is in good condition (has not broken down or floated/migrated towards the outlet): ❑ ❑ ❑ ❑ 17. Surface if free of excessive sediment and clogs: ❑ ❑ ❑ ❑ 18. Trees are free of stakes/wires > 6 months after planting: ❑ ❑ ❑ ❑ 19. The annual soil test shows the proper pH and absence of heavy metal accumulation: ❑ ❑ ❑ ❑ OUTLET 20. Outlet is free of evidence of improper drainage (no standing water, cattails, etc.): ❑ ❑ ❑ ❑ 21. Outlet device (drop inlet, weir, etc.) is free of damage or clogs: ❑ ❑ ❑ ❑ 22. Orifice size matches approved plans: ❑ ❑ ❑ ❑ f 23. Outlet is free of damage, clogs, or erosion: ❑ ❑ ❑ ❑ 24. Relative elevations match approved plans: ❑ ❑ ❑ ❑ V3.3_09