Loading...
HomeMy WebLinkAboutSW4101001_CURRENT PERMIT_20111201STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW��D�i�J�� DOC TYPE CURRENT PERMIT r APPROVED PLANS ❑ HISTORICAL FILE DOC DATE /) /I���/�l WYYMMDD - a7 NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Richard A Brown Progress Energy Carolinas PO Box 1981 - TPP 18 Raleigh, NC 27602 Division of Water Quality Coleen H. Sullins Director November 8, 2011 Subject: Stormwater Permit No. SW4101001 Modification - Correction Progress Energy Ramseur 115/24kV Substation High Density Utility Project Randolph County Dear Mr. Brown: Dee Freeman Secretary RECEIVED IJ,C, Dent. of F.NR DEC 01 20ii winston•5alem Regional Office The Stormwater Permitting Unit received an administrative correction request for the Stormwater Management Permit for Progress Energy Ramseur Substation on November 7, 2011. Staff review of the file and permit has determined that the correction request is valid. We are forwarding a corrected Permit No. SW4101001, dated October 31, 2011, for the construction, operation and maintenance of the subject project and stormwater BMPs This corrected permit reflects changing the stormwater system inspections from semi-annual to annual per, the approved 0&M Agreements. This permit continues to be effective from the date of issuance until December 16, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375 or robert.patterson@ncdenr.gov. Sincerely, cc: SW4101001 File �v�% ec: Sue Homewood - Winston-Salem Regional Office Virginia Russell - Dewberry & Davis, Inc. forColeen H. Sullins Dalton Cook- Progress Energy Carolinas Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919.807.63001 FAX: 919-807-6494 L Customer Service: 1-877-623-6748 Internet. www.ncwaterquality org Nne orthCarolina Naturally An Equal Oppcoun4\AEfrmaliveActon Employer State Stormwater Permit Permit No.SW4101001 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY UTILITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Progress Energy Carolinas Progress Energy Ramseur 225/24kV Substation 357 King Road, Ramseur, Randolph County FOR THE construction, operation and maintenance of two (2) extended dry detention basins in series followed by a level -spreader and vegetated filter strip in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 16, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control has been designed to handle the runoff from 29,185 square feet of impervious area. 3. The stormwater system drainage area will be limited to the amount of built -upon area indicated in Section 1.6 of this permit, and per approved plans, resulting in an impervious percentage of 83%. The total project impervious percentage is limited to 54%. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the stormwater system and must be maintained at design condition: Page 1 of 6 State Stormwater Permit Permit No. SW4101001 Al. Dry Extended Detention Basin #1 for drainage area B as per the attached approved Dry Extended Detention Basin Supplement dated October 21, 2011 and approved October 31, 2011. A2. Dry Extended Detention Basin #2 for drainage area B as per the attached approved Dry Extended Detention Basin Supplement dated October 21, 2011 and approved October 31, 2011. A3, Level Spreader with Vegetated Filter Strip for drainage area B as per the attached approved Level Spreader, Filter Strip and Restored Riparian Buffer Supplement dated October 21, 2011 and approved October 31, 2011. B. Receiving Streams/River Basin: Deep River 1 Cape Fear Basin C. Stream Index Numbers: 17-(10.5) D. Classification of Water Body: "C" II. SCHEDULE OF COMPLIANCE 1, The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Annual scheduled inspections (every 12 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. a. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed as shown on the approved plans. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 6 State Stormwater Permit Permit No.SW4101001 Access to the stormwater facilities shall be maintained via appropriate easements at all times. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12, The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. Page 3 of 6 State Stormwater Permit Permit No.SW4101001 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9, Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11, The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 315C day of October, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION P /'� ;60. forColeen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No.SW4101001 PROGRESS ENERGY RAMSEUR 115/24KV SUBSTATION Stormwater Permit No. SW4101001 Randolph County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No.SW4101001 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. a. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12, Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay, if required. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: DWQ Winston-Salem Regional Office Surface Water Protection 585 Waughtown Street Winston-Salem, NC 27107 Page 6 of 6 S %/ LJ 10 1 CC)) Ai Z: ' Permit No. (to be provided by DWO) ��STORMWATER ar": MANAGEMENT PERMIT APPLICATION FORM �`l.JtltJLxr NCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all the required information. I:P.ROJECT INFORMATION Project name PEG Ramseur Substation - First Dry Detention Basin in the Series _ 1 Contact person Virginia Russell, PE Phone number 919-881-9939 Date 10 21.11 Drainage area number B V'dESIGiV INFQRNlIAT10.' Site Characteristics Drainage area 35,283.00 Impervious area 29,185.00 % Impervious Design rainfall depth C.83 1,00 in _,i nly[r, r+;I4il'rl ;rCil+rllal'I" + �� rcPUINd ter I,,,, Peak Flow Calculations , 1 yr, 24-hr rainfail depth I;l il�r, , C�14Jfl,j Illal Iln, ;1l- ; ff'r- • .� 2.89 in IrSl:eri (III1;N;l ,:rdu;,b!I- rltll, , hJ r Rational C, pre -development .• 4'i:ilr„rn1i1; wllll .L: 0.23 (unitless) plrJrlh'.Irn1 Ir:e�r :, •;no'I_ Iltf, I , ;7iltlnrrl ,•,I;j, itl�: Rational C, post -development menl p p 0.77 (unitless) '!'1 III It u,5 +b'r j t V 1 c v t rear 3r Rainfall intensity: 1-yr. 24•hr storm 3.85 inthr . ra ,r Pre -development i-yr, 24-hr peak flow Post -development 1-yr, 24•hr peak flow 0.70 ft'lsec II "i'•"!III?r, ral,'lI,14 2.40 ft'lsec rlr.. t - ----- Revisirr' Oat', / PretPosl 1-yr, 24-hr peak control 1,70 ft�tsec Storage Volume: Non -SA Waters Minimum required volume 2,336.00 ft' Provided volume 2,479.00 je Gil Sediment storage volume provided 619.75 q' OI, Storage Volume: SA Waters 1.5' runoff volume ft1 Pre -development 1-yr, 24•hr runoff volume ft� Post -development 1-yr, 24•hr runoff volume ft' Minimum required volume 0 Provided volume ft� Sediment storage volume provided ft3 Basin Design Parameters Dmwdown time 3.00 days GK Si elevation 558.00 fmsf Basin bottom elevation 561.00 frnsl Storage elevation 562.50 fmsl Basin side siopes 3.0 :1 OK Top elevation 564.00 fmsl OK Freeboard provided 1.50 ft GK Basin Bottom Dimensions Basin length 47.00 1t Basin width 29.00 fi Length to width ratio 1.62 :1 Form SW401-Dry Extended Delentlon Basin-Rev.3 Parts I. & II. Design Summary, Pago I of 3 Permit No. _!��V'a 1 0 1 00 k tto be provided by OWO) Additional Information Total runoff volume captured by basin 0.68 ac-in corebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? N (Y or N} Need to a recorded drainage easement Goes basin capture all runoff at ultimate build -out? Y, (Y or N) 01< Is a sediment depth indicator included? y (Y or N) OK Does the basin include a drain? Y' ^ (Y or N) OK Form SW40I-Dry Extended Dotenfion BaSin•Rev.3 Parts I. & It. Design Summary, Page 2 of 3 SW l l l) 2 0 01 !4•crn Permit No, (to be provided by DWQ) AMAr ` 4 STORMWATER MANAGEMENT PERMIT APPLICATION FORM up—,NCDENR `- 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be lilted out, printed and submitted. The Required Items Checklist (Part )II) must be printed, filled out and submitted along with all the required information. I: j P,_ROJECT INFURMATIONs _ Project name PEC Ramseur Substation - Second Dry Detention Basin in the Series - 2 Contact person Virginia Russell, PE Phone number 919-881-9939 Date 10.21.11 Drainage area number B u. u SfcN iN oRMATIOl Site Characteristics Drainage area 35,283 00 jr,' Impervious area 29,185,00 ,t1 %Impervious 0.83 N,:]rn•r,.,vV:,A fn:. d Oct lnin111 Design rainfall depth 1.00 iF required by tfie storrnwaler f),;rniil. Nnrth k:arolinn Peak Flow Calculations rules require that the sr.rmr;:: .; .ysiem detsigAer 1-yr, 24-hr rainfall depth 2,89 In Inspect during construe+ion; coiiify conformity with th*u Rational C, pre -development Rational C, post -development 0.23 {unitless) plans and eper;3: unri certify r.Umphance with the t,]rmwater rules. (15A l 2H .1008 (1)) f 0.77 (unitless) Permit # rC�W l 0l00 Dal-) I n! Rainfall intensity: 1-yr, 24-hrstorm Pre -development 1-yr, 24 hr peak flow _ 3.85 inlhr b>)- ^9� 10 NC Ol ision of cf1t, ',ht luq 0.70 il Revlsi— Data, Posi-development 1-yr, 24-hr peak flow She t 2.40 fi'Isec Pre/Post 1-yr, 24-hr peak control 1.70 ft'fsec Storage Volume: Non -SA Waters Minimum required volume 2,336A0 fi ` Provided volume 2,479.00 Sediment storage volume provided 619,75 Storage Volume: SA Waters 1.5' runoff volume ft� Pre -development 1-yr, 24-hr runoff volume W Past-developmenl 1-yr, 24-hr runoff volume ft3 Minimum required volume It Provided volume ft3 Sediment storage volume provided It, Basin Design Parameters Drawdown lime 3.00 days i f Sl elevation 558.00 fmsl Basln bottom elevation 561.00 fmsf Ox Storage elevation 562.50 fmsl Basin side slopes 3.0 :1 OK Top elevation 564 00 fmsl OK Freeboard provided 150 It OK Basin Bottom Dimensions Basin length 47.00 fj Basin width 29,00 fl Length to width ratio 1.62 f r;.ir, Fonn SW401-Dry Extended Detention Basin-Rev.3 Farts I. & 11. Design Summary, Page 1 of 3 Permit No. S W'I 10 10 a 1 {to be provided by DWOJ Additional Information Total runoff volume captured by basin 11.68 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? N (Y or N) Need to a recorded drainage easement Does basin capture all runoff at ultimate build -out? y (Y or N) OK Is a sediment depth indicator included? y (Y or N) OK Dees the basin include a drain? �x (Y or N) OK Form SW40I-Cry Extended Delention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 3 .'`C7l11Q5� NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely lilted out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! 1.` I?ROJEC7IN M 71. Project name PEC Ramseur Substation Contact name Virginia Russell, PE Phone number 919.881.9939 Date 10,21,11 Drainage area number B IL;DESIGN INFORMATION,:-L.". For Level Spreaders Receiving Flow From a BMP Type of 8MP Dry Detention Pond Drawdown flow from the BMP 1.10 cis For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 inihr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10•yr storm Where Does the Level Spreader Discharge? To a grassed biorelention cell? To a mulched biorelention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downsiope base of level lip Elevation at top of bank of the receiving water Slope (from ievel lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer 'Y' to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? i ,not comfle'e this 5eclfon cf 6e vrork%he.!I. ry� DC ncl cpmplote Ihis seclion,:f thn v erkshcol f1' Do nol conidere Leis section of the ;,aorksh"�I. % Do not canplete ihis seclion of the worksheol 0C ncl comple'e Ihis tpclioa of the vrorkr.heel, cfs Do i iol c omp'.ele Ihis seclion :.I the worksheel. min in/hi Da not conple!e this seclion of the, wwksheal. cfs Do nol complete I's seclion of the warksheol, N (Y or N) N (Y or N) N (Y or N) Y (Y or N) Please cnnpla:,; fi!cr sln;i eharackirizauon below 50.00 It 0.00 ft 0.00 ft 50.00 it 559.00 fmd 556.00 fmsl 6.00 % ul. n (Y o[ N� OF sq ft 13 fttcfs (Y or N) Y (Y or N) (YorN) t.00 cfs N (YorN) Approved .;,ocunnenis; Gonstruction in accordalr:%.,:fi .jese documents iv rmquired by the stormwatci permit. North Carolimr) rulos ie•Zulro that the si :rrnw,::.i, ,ys[e1n designer Inapeet during constru- •+ion: C".. rtify conformity with thav plans and aril certif; ccinpliance with the i!,Vrnwater rules (15a, N(;�%C 2H .1008 (j) ) t'etmitf#..-,4✓q IV) 00 1 Dew 1 c. , r .r b+d_p D - _ MC Di..ision of Wahj1 _:1u li1y Revisi— Oate i%� 3+ r a Ho lov�bay Ti nepeej. A byp:i_is if•YlCF, iE I;:)I IIer..ad. Form SW401-Levei Splendor, Filler Strip, Restored Riparian Buffor"Rov.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): 8 1+1j Y Peak velocity in the channel during the 10•yr storm Channellfnirg material 25.00 h N (Y or N) I I f� F IL u {1 e 1' • (Y or N) Do oal ror,*c: i i3 section ct lha wcfk :heel. (Y or N) Do nol t�oraplete;his section of tha worksheel, Do not cwmple:e This ;Action cf OF,, uartw heel, ft Do not complete Ihi: section of tho-worksloeet. ft Po not complete this seclicm of the vr;r1 sheet. ft l not :�mplcte this section of the worksheef. ft Co nol r,'Ompleie this r,aclion of the wrxksheel, cfs t o nol complete ibis section of the worksheel. Co not twrnplek,' this section of the wclkshael, Form SW40t-Lovol Spreader, Filter Strip, Restored Riparian Butter-Rev.5 Parts I. and 11. Design Slrmmary, page 2 of 2 Permit No.SW4101001 '...PROGRESS ENERGY RAMSEUR 115/24KV SUBSTATION Stormwater Permit No. 5W4101001 Randolph_ County Designer's Certification. ;� �� '.,�6y-Q.(, , as a duly registered L _�' _ __ � in the State of `'` North. Caro a, having been authoriied to observe (periodically) weziefytft+lirt'rei-the construction -of the.project, -Progress Energy -Ramseur 1151.20V Substation (Project) Ca�v1 i►�s it t� • . :".;; '' •:: ; .for?Yo4fc�ts (Project Owner) hereby state that, to the best of my abilities, ` :..due care and diligince'was used in the observation of the project construction such that the '",.'.. construction was observed to be.built within substantial compliance and intent,of the approved plans .and specifications. The checklist of items'.on page.2 of this form is included in the Certification. Noted deviations ftom approved -plans and specification: ;.>; SEAL Signature . 1 'Reg � istration Number E). .'3l0 2_ t (�._ _ `�� C A R O y Date %a� �2�'�'y SEAL r �NGIh�'S5�'` GI N!1 A Page 5 of 6 State Stormwater Permit Permit No.SW4101001 ;Certification .Requirements: 1. The drainage,area:to the system contains approximately the permitted acreage. 1 The drainage area to. the system contains no more than the permitted amount of built - ...:upon area. -All built -upon area associated with the project is graded such that the runoff drains to the system.. NIA": 4. All roof drains are located.such that the runoff is directed into the system. _ ✓. ,The outiet/bypass structure, elevations.are per the approved. plan.. 6.- The outlet.strutture is located per the approved plans. 7. - : :Trash rack is provided on the outlet/bypass structure.. ✓8 All slopes are grassed with -permanent vegetation. 9. Vegetated'slopes are no steeper than IL The inlets are located per the approved plans and do not cause short-circuiting of. the .system.' 11. The permitted amounts of'surface area and/or volume have been provided. _12..: ` .Required drawdown devices are correctly sized per the approved plans. 13. depths All,required design are provided. 14. All .required parts of the system are provided, such as a.vegeta ted•shelf, and a forebay, if•required. . The required system dimensions are provided per the approved plans. Please submit: this'Designer's Certification to: DWQ Winston-Salem Regional Office Surface Water Protection 585 Waughtown Street Winston-Salem, NC 27107 Pagq 6 of 6 ��� "''~=® NCDENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Richard A Brown Progress Energy Carolinas PO Box 1981 - TPP 18 Raleigh, NC 27602 Division of Water Quality Coleen H. Sullins Director October 31, 2011 Subject: Stormwater Permit No. SW4101001 Modification Progress Energy Ramseur 115/24kV Substation High Density Utility Project Randolph County Dear Mr. Brown: Dee Freeman Secretary The Stormwater Permitting Unit received a revised and complete Stormwater Management Permit Modification Application for Progress Energy Ramseur Substation on October 28, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000 and Session Law 2006-246. We are forwarding modified Permit No. SW4101001, dated October 31, 2011, for the construction, operation and maintenance of the subject project and stormwater BMPs. This modified permit includes the extension of the driveway, and keeping the temporary construction entrance as permanent. This permit shall be effective from the date of issuance until December 16, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375 or robert.patterson@ncdenr.gov. Sincerely, �1 , cc: SW4101001 File / �� ��;c� cc: Sue Homewood -Winston-5alcm Regional Office %/ ✓�-c' Virginia Russell - Dewberry & Davis, inc. forColeen H. Sullins Dilton Cook -- Progress Energy Caroli;tas Wetlands a� rl Slur, water Branch 1v17 Mail 5ervir.t! r ent, r, Raieicgh, North Cam; :a:"699- 617 I r,calicn. 512 N. S.iiisht ry Si. Raleigh, North (,arolirr! 27':1=1 :.ow 919.847-8' 0 =AX . i 9-B07-64941 C. ,ln rer rvice: 1-877-62'' :71^ L ,,rnet: www,i!ra. ,,er,,,uaiily -.1 One 11-4orthCarol:iii, .Naturals 1 .qualopp.m,,3 ,-t;rnaGa^'-AvrEmpic,c State Stormwater Permit Permit No. SW4101001 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY UTILITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Progress Energy Carolinas Progress Energy Ramseur 115/24kV Substation 357 King Road, Ramseur, Randolph County FOR THE construction, operation and maintenance of two (2) extended dry detention basins in series followed by a level -spreader and vegetated filter strip in compliance with the provisions of 15A NCAC 2H .1000 and S.L. 2006-246 (hereafter referred to as the "stormwaterrule5'1 and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 16, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. The stormwater control has been designed to handle the runoff from 29,185 square feet of impervious area. 3. The stormwater system drainage area will be limited to the amount of built -upon area indicated in Section 1.6 of this permit, and per approved plans, resulting in an impervious percentage of 83%. The total project impervious percentage is limited to 54%. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recopied easements. Tire final plats for the project will be : ~corded showing all such required easer>nents, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The following design criteria have been provided in the stormwater system and must be maintained at design conr4ition: Page 1 1 k State Stormwater Permit Permit No.SW4101001 Al. Dry Extended Detention Basin #1 for drainage area B as per the attached approved Dry Extended Detention Basin Supplement dated October 21, 2011 and approved October 31, 2011. A2. Dry Extended Detention Basin #2 for drainage area B as per the attached approved Dry Extended Detention Basin Supplement dated October 21, 2011 and approved October 31, 2011, A3. Level Spreader with Vegetated Filter Strip for drainage area B as per the attached approved Level Spreader, Filter Strip and Restored Riparian Buffer Supplement dated October 21, 2011 and approved October 31, 2011. B. Receiving Streams/River Basin: Deep River / Cape Fear Basin C. Stream Index Numbers: 17-(10.5) D. Classification of Water Body: "C" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: / a'. Semiannual scheduled inspections (everynonths), b. Sedlti%—(removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. The stormwater treatment system shall be constructed in accordance with the approved plans and specifications, the conditions of this permit, and with other supporting data. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved pans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation �js a stormwater treatment device, and prior to occupancy of the facility. Page 2 )f 3 State Stormwater Permit Permit No. SW4101001 Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below; a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additions I or replacement ;tormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. i a(;e of 6 State Stormwater Permit Permit No.SW4101001 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 3151 day of October, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION forColeen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Pb.je 4 of 6 State Stormwater Permit Permit No.SW4101001 PROGRESS ENERGY RAMSEUR 115/24KV SUBSTATION Stormwater Permit No. SW4101001 Randolph County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL F;ige5ofC. State Stormwater Permit Permit No. SW4101001 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay, if required. 15. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: DWQ Winston-Salem Regional Office Surface Water Protection 585 Waughtown Street Winston-Salem, NC 27107 Fige6ofC ' (to pi,:vidL , by DWC} HCDENR S CORMI DATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 1/1) must be printed, filled out and submitted along with all the required information, Project name Contact person Virginia Phone number Date * 10.21r11w Drainage area number B I I L"? 6 E S I G U I N F 0 R MAT 10 N 'Site Characteristics Drainage area 35,28100' Impervious area 29J85.007411le % Impervious 0.83 Design rainfall depth r?�r' " 1'. 00Y, ','i n Gonstructior in accordar•^,, v, i* Peak Flow Calculations 1 -yr, 24-hr rainfall depth :2.89ar in Rational C, pre -development , Rational C, post -development 0 77& .,,,(unitless) Rainfall intensity: 1 -yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow :A.70`-'t`f:ft3/sec Post -development 1-yr, 24-hr peak flow 2AOW1�''i;.'Wlsec Pre/Post 1 -yr. 24-hr peak control 1.70 0sec Storage Volume: Non -SA Waters Minimum required volume Provided volume -2,479,00U. 4�'�-11 ;' 3 ft3 OK Sediment storage volume provided 61915�: OK Storage Volume: SA Waters 1.5' runoff volume ft, Pre -development 1 -yr, 24-hr runoff volume 3 Post -development 1-yr, 24-hr runoff volume ft, Minimum required volume ft, Provided votume 3 ft Sediment storage volume provided 3 Basin Design Parameters Drawdown time 3.601' days OK SHWT elevation 558,Wo',:. fmsI Basin bottom elevation 561 _00.1,;, fms) 0K Storage elevation 562.50', fmsl Basin side slopes 3.0' .'; : 1 OK Top elevation 564.007 fmsI OK Freeboard provided 1. 50;, N OK Basin Bottom Dimensions Basin length 47.00-. ft Basin width 29.00 ft Length to width ratio 1.62:: :1 OK " required by inp Siorm%vale; 1N(jr-th C1.Aocun)F_-rjtS n arolin.-j- fules require that the de6ig?ier Inspect during ronz;tru,, f'Oflf0i'Mity with tha. plans and SlDef,:3; Urlco cerlif) .c r,t,',)liance with the �;-Orrnwater miles. (15,k NCAC 2H .1()08 (j)) Permit #.5 k1H ) 0 f a 0 j Dal b,,,, W ___ NC D ;Jsion of VVale r Q I -ty REviskI.-I Dale —/ '/ I Form SW401 -Dry Extended Detention Basin-Rev.3 Paris I. & 11. Design Summary, Page 1 of 3 Storage Volume: SA Waters 1.5' runoff volume ft, Pre -development 1 -yr, 24-hr runoff volume 3 Post -development 1-yr, 24-hr runoff volume ft, Minimum required volume ft, Provided votume 3 ft Sediment storage volume provided 3 Basin Design Parameters Drawdown time 3.601' days OK SHWT elevation 558,Wo',:. fmsI Basin bottom elevation 561 _00.1,;, fms) 0K Storage elevation 562.50', fmsl Basin side slopes 3.0' .'; : 1 OK Top elevation 564.007 fmsI OK Freeboard provided 1. 50;, N OK Basin Bottom Dimensions Basin length 47.00-. ft Basin width 29.00 ft Length to width ratio 1.62:: :1 OK " required by inp Siorm%vale; 1N(jr-th C1.Aocun)F_-rjtS n arolin.-j- fules require that the de6ig?ier Inspect during ronz;tru,, f'Oflf0i'Mity with tha. plans and SlDef,:3; Urlco cerlif) .c r,t,',)liance with the �;-Orrnwater miles. (15,k NCAC 2H .1()08 (j)) Permit #.5 k1H ) 0 f a 0 j Dal b,,,, W ___ NC D ;Jsion of VVale r Q I -ty REviskI.-I Dale —/ '/ I Form SW401 -Dry Extended Detention Basin-Rev.3 Paris I. & 11. Design Summary, Page 1 of 3 " required by inp Siorm%vale; 1N(jr-th C1.Aocun)F_-rjtS n arolin.-j- fules require that the de6ig?ier Inspect during ronz;tru,, f'Oflf0i'Mity with tha. plans and SlDef,:3; Urlco cerlif) .c r,t,',)liance with the �;-Orrnwater miles. (15,k NCAC 2H .1()08 (j)) Permit #.5 k1H ) 0 f a 0 j Dal b,,,, W ___ NC D ;Jsion of VVale r Q I -ty REviskI.-I Dale —/ '/ I Form SW401 -Dry Extended Detention Basin-Rev.3 Paris I. & 11. Design Summary, Page 1 of 3 Pprrrit No. 'o be Ljrr­,dcd by DWO) Additional Information ntal runo4volurne -.aplureJ by basin 0.68 oreba,, is not required I irebay provided N-.I. '(Y or N) fs basin in a recorded drainage easement? N 0, (Y or N) Need to a recorded drainage easement Does basin capture all runoff at ultimata build -out? (Y or N) OK Is a sediment depth indicator included? OK Does the basin include a drain? or N) OK Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & 11. Design Summary, Page 2 of 3 S Wq t 0; ? C.,I Pr:r nit N:,. (to be pm d b), 'We STORMI lATEF Cl.L1L3t! MANAGEMENT GERM i APPLICATION rORM NCDENR GY 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checki,st (Part 111) must be printed, filled out and submitted along with all the regtired information. I: PROJECT, INFORMATIOH -Wnr U :e Project name PEC_Rai6si&SU'6kad&ri -:Second Dry_t)efention Basin in,tfi&_Series2 ; Contact person Viiginie Russell, P,E Phone number 919881:9939t ,:.: { h., '•, s ry s Date Drainage area number '73'1- t' "ix �" C'L:..".zz R ^^wrr;^.�,`'7r."r3.v -a"' �':t rck w.< w.r• y:, II413ESlGNi(HFQRMATION..�..�'��".������.��r�,:'1'+�:=`����:��%��-��a,rr���.�.�._.�, Site Characteristics Drainage area 35,283.00' ' fe Impervious area 29;185,00 �iZ fe %Impervious 0.83 ;1gs7roue :s�.att:�trr.�:;:r ;`;;;'eraii s:ucumentg; Design rainfall depth -;11'.00 'in Construction in accordarac4 vvjih :.1cse documents is rr quired by We stormwatel t,L•n -iil,. North Carolinn Peak Flow Calculations rules require that the sr.:rmr i y rent designer 1-yr, 24-hr rainfall depth 289 ;in Inspect during construr?ion; certiry conformity with thw Rational C, pre -development Rational C, post -development "0,23 '(unitless) plans and spe,;% and certify r,a mpliance with the `�arfnyvater rules. (15A NCAC 2H .1008(j)) `0.77 { r (unitless) Permit ##-SW 1 t110o I Date f ci3?1! Rainfall intensity: l-yr, 24-hr storm Pre -development 1-yr, 24•hr peak flow '3:85 F initlr b„�y? NC Gi:-ision of Watef Q, Nty 0.70 ft3lsec t,L q fI "— Revisi— Post -development 1-yr, 24-hr peak flow _ 2:40;,:d, ,a'ft3tsec Pre/Post t-yr, 24-hr peak control 1.70 ft'/sec Storage Volume: Non -SA Waters Minimum required volume 2;336.K`r`.1;;, ft3 Provided volume 2,479.00-ff3 OK Sediment storage volume provided 619.75". ;;: ff3 OK Storage Volume: SA Waters 1.5' runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume f13 Post -development 1-yr, 24-hr runoff volume ff3 Minimum required volume ft, Provided volume - ff3 Sediment storage volume provided It Basin Design Parameters DrawdGwn time _ 3.00:. = _days OK SHWf elevation 558.00:" fmsl Basin bottom elevation 561.00 :' fmsl OK Storage elevation 562.50 ?` fmsl 'Basin side slopes 3.0 :1 OK Top elevation 564.00 _ ' fmsl 0K Freeboard provided 1.50 ' ft CK Basin Bottom Dimensions Basin length 47.00%. ft Basin width 29.00' ft Length to width ratio 1.62 :1 0K Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 3 Permit N-, 10 1 C) C-) , be provided by i ,VO) Additional 11orrination f Total runoff iolu me captured by basin 'c -orebay is not rqu­el Foiebay provided (Y or N) Is basin in a recorded drainage easement? (Y or Na Need to a recorded drainage easement Does basin capture all runoff at ultimate build -out? or N) OK Is a sediment depth indicator included? (Y or N) OK Does the basin include a drain? (Y or N) OK Form SW401 -Dry Extended Detention Basin-Rev.3 Parts I. & M. Design Summary, Page 2 of 3 MEW i7jg.' S rORMWATER MANAGLMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! Project name Contact name Phone number Date Drainage area number For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMA For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the f inlhr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed Noretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer 'Y' to one of the following: Length based on the 1 inihr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? Virginia Russell',PE.` r <t it r r`z F i' j 919-881=9939 1021 11 Dry Defeitton Pond" I , • � ,� • ,,,; t cfs Do not complete this section of the wrrksheet. Do not complete this section of the worksheot. Do not complete this section of the,=Vsheet. % Do not complete this section of the worksheet. Do not complete this section of the worksheat. cfs Do not compete this section of the worksheel min ,._. inittf Do nai complete Ihis section of the worksheet. cfs Do not complete this section of the worksheel. N(Y or N) Nr;;., , (Y or N) Please complete filter strip characterization below, 50100:'S _ ft 0,00"',, . ft 0'O.O r"::.:., It 559.00, , fmsl 556'00<.- fmsl 6.00 % OK n (Y or N) OK Gonstruction in accordvrs�� , ,T;kh -.iese documents i- inquired by the stormwaiei prcjfwul. North Carolin rules require that the sL,. rrnin,:.; .ystat:a debigner Inspect during construe?ion; certify conformity with th; plans and spo ,s; :ano earth; cr.,;i3pliance with the !.',,P Rlwater rules. (15A NCAC 2H .1008 (j) ) Permit #-.-Si't''t Ib/ 'L i Date t a 3i r td"C C'-tiJsion of Water Qu ftty Revising, Date I u/Z 1 1 r sq ft No forebay is needed. 13 fVcfs (Y or N) Y (Y or N) (Y or N) 1.00 , cfs N (Y or N) A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Le-• M of Ttie Lvel lip Are wel !,Prc iders in series? Bypass Chanel Drsign (if applicabir) Does the bypass dis(,;iarge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M 8 W y Peak velodly in the channel during the 10-yr storm Channel lining material ---------- M B o o' '25,M ft atVAUUI�- N.): ly or (Y or D not complete this section vf Ili; worksheet i.(Y or N) Du not complete this section of the worksheet 00 not comptwe this section of the worksheal section of thavio6sheei Da not comple!e This ft Do Rot complee ihis section or the worksheet. -7;. Do not comp!(I;e This section of the ftfthee,. ft Do not comp) [e I his section of I tie works hee!. Cfs Do not comps -a this section of the woOqheel. to not complete this section of lhehvrkshect. Form SW401 -Level Spreader, Filter Strip, Restored Riparian Duffer-Rev.5 Parts I. and 11. Design Summary, page 2 of 2 'DWQUSE ONLY .,. Date Received Fee Paid Permit Number rU io oS SVLt 101dco/ Applicab e R les: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 2'Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form ruay be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, Ietters, operation and maintenance agreements, etc.): Progress Energy Carolinas - Ramseur 115 kV Substation 2. Location of Project (street address): 357 King Road City:Ramseur County:Randolph Zip:27316 3. Directions to project (from nearest major intersection): From Raleigh, take US-64W toward Pittsboro/Asheboro (approx. 50 miles). Turn right on King Road. T he substation will be approximately 0.3 miles down Kin Road on the left. 4. Latitude:34' 44' 35.9" N Longitude:79' 38' S7.7" W of the main entrance to the project. H. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New Modificati b. if this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) 12-17-2010 , and the status of construction: ❑Not Started ®Partially Completed* ❑ Completed* *provide a designer's certification. ,j lt/VPG f cot 2. Specify the type of project (check one): ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4, a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 1.5 ac of Disturbed Area ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Acquired an Erosion and Sedimentation Control Permit on 9-15-2010. ,vLl Y 1 I 1 lilif 1 DENR - WATER QUALITY Form SWU-10! Version 07Jun2010 Page I o#'6 TtAN 1'�EDS AND STORMWATER BRAKH III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Progress Energy Carolinas Signing Official & Title:Richard A. Brown - General Manager of Tranmission Construction & Engineering b.Contact information for person listed in item 1a above: Street Address:100 East Davie City:Raleigh State:NC Zip:27601 Mailing Address (if applicable):P. O. Box 1981 - TPP 18 City:Raleigh State:NC Zip:27602 Phone: (919 } 546-3122 Fax: (919 } 546-7552 _ Email: richard.brown@pgnnmail.com Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if appIicable): City: Phone: ( 1 Email: State: Zip: State: Zip: Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Buzz Bryson _ Signing Official & Title:Lead Environmental Specialist b.Contact information for person listed in item 3a above: Mailing Address:P. O. Box 1551 - TPP 16 City:Raleigh State:NC Zip:27602 Phone: (919 ) 546-6637 Fax: (919 ) 546-6386 Email:buzz.bKyson@12znmail.com 4. Local jurisdiction for building permits: Randolph Count Point of Contact:David Brest _ Phone #: 919 318-6366 Form SWU-101 Version 07Jun2010 Page 2 of 7 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff from the substation expansion will be routed to two dry detention basins in series, then to the levels reader and engineered filter strip. The dual basins will be sel2arated with a fiberglass baffle. Offsite flow will be bypassed around the BMPs. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW - 1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear _ River basin. 4. Total Property Area: 1.5 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area': 1.5 acres Total project area shall be calculated to exclude the followin the normal pool of impounded structures, the area between the banks of strearns and rivers, the area below the Normal High Water (Nh[W) line or Mean High Water (MHW) lire, and coastal wetlands landward from the NHW (or MHW) line. Tile resultant project area is used to calculate overall percent built upon area (BUA). Notr-coastal wetlands landward of the NHW (or MHW) line tnay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 54 % 9. How many drainage areas does the project have? 2 (For high density, count I for each proposed engineered stormwater BMP. For low densihf and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information' Draina e Area Draina e Area Draina e Area Drama e Area Receiving Stream Name Deep River Stream Class C Stream Index Number * 17-(10.5) Total Drainage Area (so 35,283 On -site Drainage Area (so 35,283 Off -site Drainage Area (so 0 Proposed Impervious Area** s 29,185 % Impervious Area** total 83% Impervious— Surface Area 'Drains e Area" Drainage`Area. -Drains e'Area _ Draina e Area On -site Buildings/Lots (so 0 On -site Streets (so 0 On -site Parking (so 0 On -site Sidewalks (so 0 Other on -site (so 29,185 (stone) Future (so 0 Off -site (so 0 Existing BUA*** (so 0 Total (so: 1 29,185 * Stream Class and Index Number can be determined at: http.- portal.nederrr.oryAuet)AiJg&s/cstr/classifrcations Form SWU-101 Version 07Jun2010 Page 3 of 7 Iru ervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. " Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area fisted above determined? Provide documentation. No offsite impervious drains to the BMP. Proleets in Union County: Contact DWQ Central Dice staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.ori ,/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from h_ttp://Rortal.ncdenr.org/web/wqf ws/su1statesw_/forms_docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map athttl2://i2ortal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been pLovided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. LD C 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants lU /A Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M �-D �- agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor G D L the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the G D �- receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'/z mile radius on the map. 7. Sealed, signed and dated calculations.�- 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. Form SWU-101 Version 07Jun2010 Page 4 of m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (PIease identify�- elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: 1087 Page No: 28 L 1] L 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC —/�/A� Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/"CSearch.asj2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If Iot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from littp//portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. Vill. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer-T. Virginia Russell Consulting Firm: Dewberry & Davis, Inc. Mailing Address:2301 Rexwoods Dr, Suite 200 City:Raleigh State:NC Zip:27607 Phone: (919� ) 881-9939 Fax: (919 ) 881-9923 Email:fvrussell®dewberry Form SWU-101 Version 07Jun2010 Page 5 of 7 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, coniplete this section) I, (print or type name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1 a) with (print or hjpe name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. 1 understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, . a Notary Public for the State of do hereby certify that before me this day of County of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 7 X. APPLICANT'S CERTIFICATION I, (print or hype narue of person listed in Contact Information, item 1a) Richard A. Brown certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules nder 15A NCAC 2H .1000, SL 2006-246 (Ph. 11 -Post Construction) or SL 2008-211. Signature: �' Date: �Z�r7 /Z� I fi 1, f2Y4` QI' i a Notary Public for the State of NG County of ruo► do hereby certify that (1_i�Jlto personally appeared before me this � day of _ion®beY 011 and no ge t e execution of the application for a stormwater permit. Witness my hand and official seal, ------ EAL Otf1cw Seal North Carolina • Wake Coa C:AROLYN HARDING Notary Public O/5 ------ -- -- y commission expires_ �1" a-e Form SWU-101 Version 071un2010 Page 7 of Permit No. W `t l o rmof fro be provided by DWQ) wAr�Ro� A� F — RECEIVED - o�oF A STORMWATER MANAGEMENT PERMIT APPLICATION FOORM h.c. Deot. of sNR > y NCDENR I ` 401 CERTIFICATION APPLICATION FORM JAN 2 4 2011 DRY EXTENDED DETENTION BASIN SUPPLEMENT Winston -sale This form must be filled out, printed and submitted. R c.on.ii Offre The Required Items Checklist (Part /Il) must be printed, tilled out and submitted along with all the required information. I;PRODECTJINF,ORMATION Project name PEC Ramseur Substation - First Dry Detention Basin in the Series -1 Contact person Virginia Russell, PE Phone number 919-881-9939 Date 11.24.10 Drainage area number B Site Characteristics Drainage area 29,185.20 ft2 Impervious area 23,086.00 ft2 °% Impervious 0.79 Design rainfall depth 1.00 in Approved Storiviwa:,:l : L -nit Documents Construction in accordan^ witn „lose documents is Peak Flow Calculations required by the stormwater perrnit. North Carolina 1-yr, 24-hr rainfall depth 2.89 in rules require that the stormwa.. , system designer Rational C, pre -development 0.23 (unitless} Inapeet during construction; certify conformity with the plans and specs; and certify compliance with the Rational C, post -development 0,77 (unitless) stormwater rules. (15A NCAC 2H .1008 (j) ) Rainfall intensity: l-yr, 24-hr storm 3.85 inlhr Permit #__,<Wf{ j O 0o Date i (7 Lt 0 Pre -development 1-yr, 24-hr peak Flow 0.60 ft'/sec by C(., NC Division of Water Post -development 1-yr, 24-hr peak flow 2.00 ft/sec Sheet # -Revision Date( !�=j0 Pre/Post 1-yr, 24-hr peak control 1.40 ft/sec Storage Volume: Non -SA Waters Minimum required volume 1,863.00 ft' Provided volume 2,096.00 rya OK Sediment storage volume provided 524.00 -ft' OK Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft3 Minimum required volume ft3 Provided volume ft3 Sediment storage volume provided rya Basin Design Parameters Drawdown time 2,70 days OK SHVVT elevation 558.00 fmsl Basin bottom elevation 561.00 fmsl OK Storage elevation 562.30 fmsl Basin side slopes 3.0 :1 OK Top elevation 564.00 fmsl OK Freeboard provided 1,70 ft OK Basin Bottom Dimensions Basin length 47.00 ft Basin width 29.00 ft Length to width ratio 1.62 :1 OK Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No. I (to be provided by DWO) Additional Information Total runoff volume captured by basin 0.58 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? N (Y or N) Need to a recorded drainage easement Does basin capture all runoff at ultimate build -out? y (Y or N) OK Is a sediment depth indicator included? x_ (Y or N) OK Does the basin include a drain? y (Y or N) OK Form SW401-Dry Extended Detention Basin-Rev-3 Parts I, & It. Design Summary, Page 2 of 2 r " R Permit No. Sw ( #/&a ! (to be provided by DWQ) � - — • - OF W A r�q STORMWATER MANAGEMENT PERMIT APPLICATION FORM , y NCDENR 401 CERTIFICATION APPLICATION FORM BAN 2 4 2011 DRY EXTENDED DETENTION BASIN SUPPLEMENT Regional Office This farm must be filled out, printed and submitted. The Required Items Checklist (Part /I/) must be printed, filled out and submitted along with all the required information. I11IRRMECAINFORMATION Project name PEC Ramseur Substation - Second Dry Detention Basin in the Series - 2 Contact person Virginia Russell, PE Phone number 919-881.9939 Date 11,24.10 Drainage area number B tI11DESIWINF,ORMATION Site Characteristics Drainage area 29,185.20 ft2 Impervious area 23,086.00 ft2 %Impervious 0.79 A.ppro.ed Storrnwa-e,r 19, rai:t :)ocuments Construction in atccordam^c vith :;iese documents is Design rainfall depth 1.OQ in required by the stormwater perm it, North Carolina Peak Flow Calculations 1-yr, 24-hr rainfall depth 2.89 in Rational C, pre -development 0.23 (unilless) Rational C, post -development 0.77 (unitless) Rainfall intensity: 1-yr, 24-hr storm 3.85 inthr Pre -development 1-yr, 24-hr peak flow 0.60 ft3lsec Post -development 1-yr, 24-hr peak flow 2.00 ft3lsec Pre/Post 1-yr, 24-hr peak control 1.40 ft3lsec Storage Volume: Non -SA Waters Minimum required volume 1,863.00 ft3 Provided volume 2,096.00 ft3 OK Sediment storage volume provided 524.00 ft3 OK Storage Volume: SA Waters 1.5' runoff volume {f3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development 1-yr, 24-hr runoff volume ft3 Minimum required volume ff3 Provided volume ft3 Sediment storage volume provided ft3 Basin Design Parameters Drawdown time 2.70 days OK SHWT elevation 558.00 fmsl Basin bottom elevation 561.00 fmsl OK Storage elevation 562.30 fmsl Basin side slopes 3.0 :1 OK Top elevation 564.00 fmsl OK Freeboard provided 1.70 ft OK Basin Bottom Dimensions Basin length 47.00 11 Basin width 29.00 ft Length to width ratio 1.62 :1 OK rules require that the stormwat.,e Rystem designer Inspect during construction; Lerttfy conformity with the plans and specs; and certify compliance with the stormwater rules. (15A NCAC 2H .1008 (j) ) Permit Date�'Zlf it0 by C �,. NC Dirision of Water. Quatty Sheet # _ -Revision Date_(, (A Form SW401-Dry Extended Detention Basin-Rev.3 Parts I, & II. Design Summary, Page 1 of Permit No. �W qff e t ry 1 _ (to be provided by DWO) Additional Information Total runoff volume captured by basin 0.58 ac-in Forebay is not required Forebay provided N (Y or N) Is basin in a recorded drainage easement? N (Y or N) Need to a recorded drainage easement Does basin capture all runoff at ultimate build -out? y (Y or N) OK Is a sediment depth indicator included? _ y (Y or N) OK Does the basin include a drain? y (Y or N) OK Form SWa01-Dry Extended Detention Basin-Rev.3 Parts I. & 11. Design Summary, Page 2 of 2 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted, DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEi 13P,RO�JECTf INFORMATION Project name PEC Ramseur Substation Contact name Virginia Russell, PE Phone number 919.881-9939 Date 11.24.10 Drainage area number B i II.qDESIG.NJINF,ORMATIQN For Level Spreaders Receiving Flow From a BMP Type of 8MP Dry Detention Pond Drawdown flow from the BMP 0.80 cis For Level Spreaders Receiving Flow from the Drainage Area Do not complete this section of the worksheet. Drainage area ft2 Do not complete this section of the worksheet. Impervious surface area ft2 Do not complete this section of the worksheet, Percent impervious % Do not complete this section of the worksheet, Rational C coefficient Do not complete this section of the worksheet. Peak flow from the 1 iri storm cfs Do not complete this section of the worksheet. Time of concentration min Rainfall intensity, 10-yr storm inlhr Do not complete this section of the worksheel. Peak flow from the W-yr storm cfs Do not complete this section of the worksheel. Where Does the Level Spreader Discharge? To a grassed bioretention cell? N (Y or N) To a mulched bioretention cell? N (Y or N} To a wetland? N (Y or N} To a filter strip or riparian buffer? Y (Y or N} Please complete filter strip characterization below. Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Approved Si.orrnwalt•- i �- :. ;;,1,t ': ocuments Width of grass 50.00 It Construction in accordan:�e v,;w „tese documents is Width of dense ground cover 0.00 ft required by the stormwater pPrmlt. North Carolina rules require that the storm n; ;,_r system designer Width of wooded vegetation 0.00 ft Inspect during construction, cwtify conformity with the Total width 50.00 ft plans and specs: and certify compliance with the Elevation at downslope base of level lip 559.00 fmsl stormwater rules. (15A NCAC 2H .1008 (j) Permit # SW Lf f e � pe► j Date � Z/ (y�f d Elevation at top of bank of the receiving water 556.00 fmsl by �- �NC Slope (from level lip to to top of bank) 6.00 % OK Division of Water ur,�l{ty Sheet #� Revisicr D'ate__ �� Are any draws present? n (Y or N) OK -- —�' 1- • •I• Yf 0 Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the 8MP discharge rate? Design flow Is a bypass device provided? sq ft 13 fuefs (Y or N) Y (Y or N) (Y or N) 0.80 cfs N (Y or N) No forebay is needed. A bypass device is not needed. Form SW401-Level Spreader, Filter Strip, Restored Riparian Butter-Rev,5 Parts I. and II. Design Summary, page 1 of 2 ti Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W Y Peak velocity in the channel during the 10-yr storm Channel lining material M 25.00 ft #VALUE! N (Y or N) (Y or N) Do not complete this section of the worksheet (Y Or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet ft Do not complete this section of the worksheet. It Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet. Do not complete this section of the worksheet Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and ll. Design Summary, page 2 of 2 ' Permit Number: :51v 141 d 1 a-o i (to be provided by DWQ) Drainage Area Number: 4 Dry Extended Detention Basin Operation and Maintenance Agreement This manual establishes procedures for maintenance and operation of this facility's dry detention pond in accordance with Stormwater Management ordinances and regulations. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if provided. Important maintenance considerations: The drainage area will be managed to reduce the sediment load to the dry extended detention basin. The embankment should have a ground cover as specified in the erosion control plan, which, if properly maintained, will minimize erosion and provide an easy surface for inspection. Re -Seeding — periodic re -seeding at appropriate times of the year may be required to continue to provide an appropriate ground cover. Mowing — grass mowing and removal of unwanted vegetation will be necessary for the proper maintenance of the embankment. Grass on embankment slopes should be maintained at an appropriate height. After the dry extended detention basin is established, it will be inspected annually. Records of operation and maintenance will be kept and will be available upon request. Inspection activities will be performed as follows. fAny problems that are found will be repaired in a timely manner. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP 'Trash debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or. Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then re - basin establish a ground cover. Form 5W401-Dry Detention O&M-Rev.3 Page 1 of 5 {7 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. swale applicable). The pipe is cracked or Repair or replace the pipe. otherwise damaged (if a [icable). Erosion is occurring in the Repair eroded area. swale if applicable). The forebay, Sediment has accumulated Remove the sediment and dispose and reduced the depth to 75% of it in a location where. it will not of the original design depth cause impacts to streams or the see diagram below). BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove nuisance vegetation by best means. The main treatment area Sediment has accumulated Remove the sediment and dispose and reduced the depth to 75% of it in a location where it will not of the original design depth cause impacts to streams or the See diagram below). BMP, Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an appropriate rofessional. Weeds and noxious plants are Remove nuisance vegetation by best growing in the main means, if necessary. treatment area. Form SW401-Dry Detention O&M-Rev.3 Page 2 of 5 BMP element: Potential roblem: How I will remediate theproblem: The embankment Shrubs or trees have started to grow on the embankment. Remove shrubs or trees. Grass cover is unhealthy or eroding. Restore the health of the grass cover. The outlet device Clogging has occurred. Clean out the outlet device. The outlet device is damaged Repair or replace the outlet device. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 561.4 feet in the main pond, the sediment shall be removed. When the basin depth reads NJ A feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Temporary Pool Elevation 562.3 Sediment Removal E NIA Te npora Poolr . emporary ool -------------- -- [Volume Sediment Removal Elevation 561.4 Volume Bottom Elevatio N/A 25%-------------------------------------------- Vdiment Sediment Bottom Elevation 561.00 25% Storage Storage FOREBAY MAIN POND M Form SW40i-Dry Detention O&M-Rev.3 Page 3 of 5 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any significant problems with the system or prior to any changes to the system or responsible party. Project name: Progress Energy Ramseur 115/24 kV Substation BMP drainage area number: B — for first dry detention basin in the series — "I" Print name: Richard A. Brown Title:.-Generai Manager — Transmission Construction & Engineering Address: _ 100 East Davie St., Raleigh, NC 27601 Phone Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, �/, ��,�1 CJp_/g , a Notary Public for the State of 4t.AROX�A County of _LA6 , do hereby certify that �•/piQ c( , .4. 6w,J personally appeared before me this .2 91 day of /(,fDV-f—M j- eA , b , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, Y r SEAL My commission expires/q 15�� Form SW401-Dry Detention O&M-Rev.3 Rage 4 of 5 Permit Number: 5W'f/ 0 1 " t (to be provided by DWQ) Form SW401-Dry Detention O&M-Rev,3 Page 5 of 5 5MA DEVL�,-_.. , . Permit Number: S L-" t-fl ° t O V 1 (to be provided by DWQ) Polo I Drainage Area Number; Dry Extended Detention Basin �,�; ` 4 Operation and Maintenance Agreement This manual establishes procedures for maintenance and operation of this facility's dry detention pond in accordance with Stormwater Management ordinances and regulations. The dry extended detention basin system is defined as the dry detention basin, outlet structure, pretreatment including forebays and the vegetated filter if provided. Important maintenance considerations: The drainage area will be managed to reduce the sediment Ioad to the dry extended detention basin. - The embankment should have a ground cover as specified in the erosion control plan, which, if properly maintained, will minimize erosion and provide an easy surface for inspection. — Re -Seeding — periodic re -seeding at appropriate times of the year may be required to continue to provide an appropriate ground cover. Mowing — grass mowing and removal of unwanted vegetation will be necessary for the proper maintenance of the embankment. Grass on embankment slopes should be maintained at an appropriate height. After the dry extended detention basin is established, it will be inspected annually. Records of operation and maintenance will be kept and will be available upon request. Inspection activities will be performed as follows. Any problems that are found will be repaired in a timely manner. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the dry Areas of bare soil and/or Regrade the soil if necessary to extended detention erosive gullies have formed. remove the gully, and then re - basin establish a ground cover. Dorm SW401-Dry Detention O&M-Rev.3 1.Page 1 of 5 BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged (if Unclog the pipe. swale applicable). The pipe is cracked or Repair or replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Repair eroded area. swale if applicable). The forebay, Sediment has accumulated Remove the sediment and dispose and reduced the depth to 75% of it in a location where it will not of the original design depth cause impacts to streams or the see diagram below). BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove nuisance vegetation by best means. The main treatment area Sediment has accumulated Remove the sediment and dispose and reduced the depth to 75% of it in a location where it will not of the original design depth cause impacts to streams or the see diagram below). BMP. Water is standing more than Check outlet structure for clogging. 5 days after a storm event. If it is a design issue, consult an appropriate rofessional. Weeds and noxious plants are Remove nuisance vegetation by best growing in the main means, if necessary. treatment area. Form SW401-Dry Detention O&M-Rev.3 Page 2 of 5 3 BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs or trees have started to grow on the embankment. Remove shrubs or trees. Grass cover is unhealthy or eroding. Restore the health of the grass cover. The outlet device Clogging has occurred. Clean out the outlet device. The outlet device is damaged Repair or replace the outlet device. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 561.4 feet in the main pond, the sediment shall be removed. When the basin depth reads N/A feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Temporary Pool Elevation 562.3 Sediment Removal El NIA Te pora Pool emporary ool - - - - - - - - olume Sediment Removat Elevation 561 A VoluV Bottom Elevatio NIA 25%-------------------------------------------- --__ Sediment Bottom Elevation 561.00 25%iment Storage Storage FORFBAY MAIN POND Form SW401-Dry Detention O&M-Rev.3 Page 3 of 5 r Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any significant problems with the system or, prior to any changes to the system or responsible party. Project name: Progress_ Energy Ramseur_115/24 kV Substation BMP drainage area number: B - for second_ dry detention basin in the series -- "2" Print name: Richard A. Title: General Manager — Transmission Construction & Engineering Address: 100 Cast Davie St., Raleigh, NC 27601 Phone: S i gnatu Date: l t � 2--1 / Zo to Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Ael) a Notary Public for the State of AkA County of 6J,411� do hereby certify that •,Q,Qr�, �i '',(3�¢6 personally appeared before me this.2 Q day of/4 yemi-cp, , 2016 , and acknowledge the due execution of the forgoing dry detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires. �,0 Y / Z :7 dr/� Form SW401-Dry Detention O&M-Rev.3 Page 4 of 5 Permit Number: Sw`f l e4nJ (to be provided by DWQ) Form SW401-Dry Detention O&M-Rev-3 Page 5 of 5 am Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement This manual establishes procedures for maintenance and operation of this facility's filter strip and level spreader in accordance with Stormwater Management ordinances and regulations. Important maintenance procedures: • Maintain vegetation at a reasonable height, depending on type of vegetation. • Reseed, if needed, on an annual basis. After the filter strip is established, it will be inspected annually. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired in a timely manner. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The flow splitter is clogged. Unclog the conveyance and dispose (if applicable) of any sediment properly. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of property, The level lip is cracked, Repair or replace lip, settled, undercut, eroded or otherwise damaged. There is erosion around the Repair erosion and revegetate. end of the level spreader that shows stormwater has bypassed it. 'frees or shrubs have begun Remove unwanted vegetation. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Repair erosion and revegetate. erosive gullies have formed. The filter strip Areas of bare soil and/or Repair erosion and revegetate. erosive gullies have formed. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Plants are dead, diseased or Remedy the problem and dying. re-establish vegetation, Nuisance vegetation is Remove nuisance vegetation by best choking out desirable species. means. Herbicides, approved for aquatic use and applied by or under the direct supervision of a certified applicator, may be used. ,.s st✓1� f o ! 9D f Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Ramseur 115/24 kV Substation Expansion BMP drainage area number:—] Print name: Richard A. Brown Title: General Manager -- Transmission Construction & Engineering Address: 100 E. Davie St., Raleigh, NC 27601 (TPP 18) Phone: Signati Date: 10 Z2 0 Z Z o Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of ounty of /D'— , do hereby certify that r Qom. personally appeared before me this 2-dr�:-A day of � � , Z.D/G , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, G ZZ SEAL My commission expires, ���_