Loading...
HomeMy WebLinkAboutSW4090903_HISTORICAL FILE_20110908STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW40M3 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE O10IIl7glJ4Y YYYYMMDD Homewood, Sue From: Homewood, Sue Sent: Thursday, September 08, 2011 3:43 PM To: 'Frank Fawcett' Subject: RE: Mocks ville pipes corrected Thank you. All that's left is for us to receive an Engineer's Certification on the pond, and then to watch it and make sure it hold water at the proper elevation now that it has been retrofitted with a liner. Please send the certification in as soon as possible. Sue Homewood NC DENR Winston-Salem Regional Office Division of Water Quality S85 Waughtown Street Winston-Salem, NC 27107 Voice: (336) 771-4964 FAX: (336) 771-4630 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Frank Fawcett[mailto:FFawcett@primaxproperties.com] Sent: Thursday, September 08, 2011 3:28 PM To: Homewood, Sue Subject: FW: Mocks ville pipes corrected Sue, we fixed the pipes from the roof drains as noted in your voicemail at the Mocksville NC Dollar General site. Thanks Frank Fawcett -----Original Message ----- From: Russ [mailto:r_harriger@yahoo.com] Sent: Friday, August 26, 2011 4:30 PM To: Frank Fawcett Subject: Mocks ville pipes corrected 1 ■ Complete items 1, 2, and 3. Also complete A Signature ' item 4 If Restricted Delivery Is desired. X t ❑ Agent ■ Print your name and address on the reverse ❑ A91dreFne so that we can return the card to you. eceived by (Printed Namel C. at f D i ■ Attach this card to the back of the mailpiece, t or on the front if space permits. 1 D. is delivery address different from ite 1 ❑ Y s I 1. Article Addressed to: If YES, enter delivery address below: ❑ No I Mr. Frank Fawcett I I I i PRIMAX Properties, LLC i 1 1065 E. Morehead Street, 4th Floor f 3. Service Type ' Charlotte, NC 28204 53.egrtified Mail ❑ Express Mail \ ❑ Registered 0 Return Receipt for Merchandise f ❑ Insured Mail 13 C.O.D. , 4. Restricted Delivery? (Edra Fee) ❑ Yes l 2_ 7010 2780 0001 4221'16078 I`ll ` 3�� Noel J Ps form 3811, February 2004 Domestic Return Receipt 7 _ 7 _ 102595-02•M-1540 NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary June 30, 2011 CERTIFIED MAIL 7010 2780 0001 4221 6078 RETURN RECEIPT REQUESTED Mr. Frank Fawcett PRIMAX Properties LLC 1065 E. Morehead St. 4`11 Floor Charlotte NC 28204 Subject: Stormwater Permit No. SW4090903 Notice of Violation #NOV-2011-PC-0328 Mocksville Dollar General Davie County Dear Mr. Fawcett: The Division of Water Quality. (Division) is in receipt of your Violation Response and plan of corrective action dated June 28, 2011. The Division has reviewed your letter and requires the following action to be taken within 30 days of receipt of this letter: • The outlet structure will be modified to bring it in compliance with the approved specifications. • A pipe will be installed within the conveyance Swale beside the building to collect runoff from the roof that is not currently reaching the wet detention basin. • The swale beside the parking lot will be regarded and vegetated to ensure proper conveyance of stormwater to the wet detention basin. • A clay liner will be installed in the bottom of the wet detention basin. Please submit a new engineer's certification for the wet detention basin modifications, and an As -Built survey (as noted in your letter) of the front parking lot and both conveyance swales to show proper drainage patterns. North Carolina Division of Water Quality, WrnstonSalem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 Phone: 336-771-50001 FAX: 336-771-48301 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity t Affirmative Action Employer Nne orthCarolina Aatura!!y Mr. Fawcett June 30, 2011 Page 2 of 2 I Thank you for your attention to this matter. This Office is still considering sending a Recommendation for Enforcement to the Director of the Division of Water Quality regarding these issues and any future/continued violations that may be encountered. Your above -mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be abated immediately. These violations and any future violations are subject to civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters, please contact Sue Homewood at this office at 336-771-4964 or sue.homewood@nLdenr.gov or myself at 336-771-5000. cc: WBSCaPE Unit DWQ WSRO ■ Complete items 1, 2, and 3. Also complete item,4 if Restricted Delivery is desired. ■ Pririt your name and address on the reverse so that we can return the card to you. ■ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: Mr. Frank Fawcett PRIMAX Properties, LLC 1o65 E. Morehead Street 4th Floor Charlotte, NC 28204 Sincerely, r W. Corey Basinger Water Quality Regional Supervisor Winston Salem Regional Office Signature X ❑ Agent ❑ Addressee B. Received by (Printed Name) C. " of Oeliv r•� D. is delivery address different from item 1? ❑ Yes If YES, enter delivery address below: ❑ No r 1 e.nlie-w-e-a Ill UiMS 3. S9rvIce Type Certlfled Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ G.O.D. r 4. Resist-11d Delver (Extra Fee) ❑ Yes z. Arty -- -7010 z780 0001-4221 S149' ".NO Pc, PS Form 3811, February 2004 - Domestic Return Receipt, y 10259"2-M-1540'1 RUDER RUDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 26, 2011 CERTIFIED MAIL 7010 2780 0001 4221 51 RETURN RECEIPT REQUESTED Mr. Frank Fawcett PRIMAX Properties LLC 1065 E. Morehead St. 41h Floor Charlotte NC 28204 Subject: Stormwater Permit No. SW4090903 Inspection Report and Notice of Violation #NOV-2011-PC-0328 Mocksville Dollar General Davie County Dear Mr. Fawcett: On September 25, 2009 the Division of Water Quality (Division) issued a High Density Commercial Property Stormwater Permit for the proposed Dollar General of Mocksville in Mocksville, NC in Davie County. On May 19, 2011, Sue Homewood, Robert Patterson and Brian Lowther from this Division conducted a routine inspection of the approved Wet Detention Basin. The following items were noted during their inspection and a subsequent file review: Condition 11.5 of Permit No. SW4090903 requires that "the facilities shall be constructed as shown on the approved plans." The site inspection determined the following discrepancies. o' The outlet structure does not provide the approved elevation difference between the pvc drawdown pipe and the intermediate weir, therefore the wet detention basin does not provide the required storage volume. o The stormwater collection/drainage system was not constructed as approved. Curb and gutter was not present around the entire parking lot as indicated on the approved plans and drainage swales were not present adjacent to the parking area and building on both sides of the property in order to capture and convey the water to the pond. 2. Condition I1.3 of Permit No. SW4090903 requires that "the pennittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency." The following maintenance problems were noted during the inspection: North Carolina Division of Water Quality, Winston-Salem Regional Office Location: 585 Waughtown St. Winston-Salem, North Carolina 27107 One Phone: 336-771-50001 FAX: 336-77146301 Customer Service: 1-877.623.6748 North Carolina Internet: www.ncwaterquality.org Naturally An Equal Opportunity 1 Affirmative Action Employer Mr. Fawcett May 26, 2011 Page 2 of 3 It appears that maintenance of the forebay had recently occurred, and the Division commends you for attention to the stormwater treatment system, however the wet detention basin did not have the annronriate minimum water level nresent at the time of the incnectinn_ Required_ Response Accordingly, you are directed to respond to this letter in writing within 30 calendar days of receipt of this Notice. Your response should be sent to this office at the letterhead address and include the following: 1. A copy of all inspection, repair, and maintenance records, or a statement of why records cannot be provided as required by Condition II.4 of Permit No. SW4090903. 2. A proposed maintenance and corrective action plan to bring stormwater drainage system and the wet detention basin back into compliance with the approved plans and permit conditions. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Water Quality regarding these issues and any future/continued violations that may be encountered. This office requires that the violations, as detailed above, be abated immediately and properly resolved. Environmental damage and/or failure to secure proper authorizations have been documented on the subject tract as stated above. Your efforts to undertake activities to bring the subject site back into compliance is not an admission, rather it is an action that must be taken in order to begin to solve ongoing environmental issues. Mr. Fawcett May 26, 2011 Page 3 of 3 Pursuant to G.S. 143-215.6A, these violations and any future violations are subject to a civil penalty assessment of up to a maximum of $25,000.00 per day for each violation. Your above -mentioned response to this correspondence, the degree and extent of harm to the environment and the duration and gravity of the violation(s) will be considered in any civil penalty assessment process that may occur. Should you have any questions regarding these matters, please contact Sue Homewood at this office at 336-771-4964 or sue.homewood(cUncdenr.p,o or myself at 336-771-5000. Sincerely, W. Corey Basinger Water Quality Regional Supervisor Winston Salem Regional Office cc: DWQ WSRO C®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Frank Fawcett Primax Properties, LLC 1065 E. Morehead Street Charlotte, NC 28204 Dear Sir or Madam, Coleen H. Sullins Director October 1, 2009 Subject: Post -Construction Notification Project ID: Davie-2010-004 Project: Dollar General Davie County, North Carolina _RE CEIVE1) N,C. [)Out. or ENR OCT 0 6 2009 vvinstorn-iaiem Regiona4 Office Dee Freeman Secretary A review of the Financial Responsibility/Ownership (FRO) form required under the Sedimentation Pollution Control Act received on September 28, 2009 has determined that the Dollar General project may be subject to a State Stormwater Permit for Post -construction. Unless excluded under the provisions of Session Law 2006-246, Section 8, you must submit within 30 days an application for a Post -Construction Stormwater Permit to: North Carolina Department of Environment and Natural Resources Division of Water Quality Stormwater Permitting Unit Post -Construction Application 1617 Mail Service Center Raleigh, NC 27699-1617 The Post -construction permit is in addition to a North Carolina General Permit (NCG010000) permit received for construction activity from the Division of Water Quality. For more information regarding MSI Post -Construction and Phase II Session Law 2006-246 please visit: http://li2o.eiir.state.nc.us/sLi/NI'DC-S_Pliase_II_Stormwater- Program.htm If you have any questions concerning.this matter please feel free to call me at 919-807-6379 or e- mail me at Jennifer.Jones@ncdenr.gov. Sincerely, Jennifer Jones cc: Winston-Salem Regional Office, Surface Water Protection Section 'Stormwater Permitting Unit Files Wetlands and Stormwater Branch One 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 NorthCaro 1 i nit Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 ;Vattfrally Intemet: www.ncvvaterquality.arg An Equal Oppodunity 1 Affirmative Action Employer First Submittal ❑ Re-su Development/Project Name: Receiving stream name P_ Application Completeness Review Date Received: 4 o Date Reviewed: ? r °9 By A G � - �t o�xsvl� L4 5-wi , �f_ classification: C For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-1, WS-I1, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. Projects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water weds): •r/ Latitude and Longitude: -A s' ss o Z. "At �o' 3Y' S� i✓ Jurisdiction Project Address: . .60 e-m-oe_)oV1 L-GPc Engineer name and firm: Mo4t7Jf pw _r- Ow , 7 -r1Z1AAA' S PGA 6 ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets ITHigh Density ❑ Other ❑ 4011404 impacts o surface waters, wetlands, and buffers (add language to cover letter and/or addinfo letter) Er`BUA 2; V" Check for $505.00 included Cr'- Original signature (not photocopy) on application C!D liedc_ egal signature (Corporation-VP/higher, Partnership -General Partner/higher, LLC-member/manager, Agent). vp 91 149 Check spelling, capitalization, punctuation: http://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. ❑ For subdivided projects, a signed and notarized deed restriction statement Q�-- Sealed, signed & dated calculations a- Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland Q-Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site . ❑ NCDOT Linear Road c'1' Two sets of sealed, signed & dated layout & finish grading plans with appropriate details Narrative Description of stormwater management provided Soils report provided Wetlands delineated or a note on the plans that -none exist on site and/or adjacent property CV Details for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; Gr Dimensions & slopes provided 9( Drainage areas delineated R(Pervious and impervious reported for each ❑ Areas of high density GY Inspection and maintenance agreements provided %Application complete MIXpplication Incomplete Returned: D (Date) Comments c+#0e.9 _y)e4w 'raww c}yCs . May 14, 2008 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low -density projects ., ❑ No more than two "dwelling units per acre or 24% built -upon area; ❑ Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. High density projects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the. predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended, solids: •': ' ❑ For.BMPs that require,a separation from the seasonal high-water table (SHWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); .x ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters, ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices Post -Construction Runoff Controls for T&E Species "J Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffers ❑ 200' undisturbed buffers on perennial streams 0 100' undisturbed buffers on intermittent streams Low -density projects ❑ All built upon area shall be limited to 10 percent. ❑ Use of vegetated conveyances to the maximum extent practicable; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures High -density projects. ❑ The stormwater control measures must control and treat the difference between the pre -development and post -development conditions for -the 1-year-24-hour storm. - . - ----• ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ All structural stormwater treatment systems must be designed to achieve 85% average annual removal of total suspended solids; . ❑ Stormwater management measures must comply with the General Engineering Design.Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c) ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. ❑ Provide a mechanism to require long-term operation and maintenance of Best Management Practices High Density Projects that require a 401/404 within.an NSW ❑ 85% TSS ❑ 30% TN ❑ 30% TP May 14, 2008 Revision WET DETENTION 0 & M Inspection Checklist I NIA 1. Inlets are located per the approved plans: 2. Inlet device (swale or pipe) is free of damage, clogs or erosion: El EJ D 3. Forebay berm is in place and without erosion: bIc.' El 9 El El 4. Forebay is free of excessive sediment: � El 0 El PPES'ANIXBANKS' �q 4� ....... .. . 5. Vegetated slopes are 3:1 or less: El El El 6. Banks are stable and free of erosion or bare soil: 9 El F-1 El 7. Slopes or berms are free of woody vegetation: .5 El El EJ S. Free of muskrats or beaver activity: X. El El El 9. Grass is being maintained and mowed (not scalped) as required: El El F-1 ILA t R AND,MAIN IBAY-j;� 10. Vegetated shelf is 6:1 or 10:1 as permitted and properly vegetated: [I El 0 11. Algal growth covers less 50% of the area: 1:1 31 1:1 12. Cattails, phragmites or other invasive plants cover less than 50% of the basin surface: EJ 1:1 E. El 13. Main treatment area is free from excess sediment accumulation: � 13 13 El M-1`TT^4f 14. Swale or emergency outlet bypass is in the correct place and is in good condition: t!l- El El El 15, Drawdown device is correctly sized free of damage or clogging: P5 El El 0 16. Orifice size matches the approved plans El � El 11 17. Outlet is free of erosion or other signs of damage: 0 El E] 18. Trash rack is installed [I D D 19. Vegetated filter is in place (if applicable) El El Z D 20. Relative elevations match approved plans El El 0 9 21. Fountain pump (if permitted) is less than or equal to the maximum allowable size: El El 9 El V3.309 FAR LIMITED LIABILITY COMPANY ANNUAL REPORT NAME OF LIMITED LIABILITY COMPANY: PRIMA..- PROPERTIES, LLC SECRETARY OF STATE L.L.C. ID NUMBER: 0382061 NATURE Of BUSINESS: hivesmtew Properties REGISTEREDAGENT: SE1iL1OUR, IVILLbbVG ljW �� ] -606-49h l 359 STATE OF INCORPORATION: NC REGISTERED OFFICE MAILING ADDRi3SS: 1065 Etrsi Morehead Street, 4th Floor Charlotte, A'C 28204-2812 REGISTERED OFFICE STREET ADDRESS: 1065 East Morehead Street, 4th Floor Charlotte, NC 28204-2812 Hecklenhurg Coturty SIGNA'I'URE OF 'rf E NEW REGISTERED AGENT - PRINCIPAL OFFICE TELEPHONE NUMBER: (704) 344-8200 PRINCIPAL OFFICE MAILING ADDRESS: PRINCIPAL OFFICE STREET ADDRESS MANAGERS/NE- MBERS/ORGANIZERS : SIGNATURE CONSTITUTES CONSENT'I'O nn'. APPOINTMENT 1065 East Morehead Street, 41h Floor Charloite, A'C 28204-2812 1065 East Morehead Street, 41h Floor Charlotte, NC 28204-2812 Nance: I11illiam G Sevntour Name: Emma C Selmrour Title: Manager Title: Alcvrager Address: Address: 1065 East lt4orehead Street, 41h Floor 1065 Last Morehead Street, 41h Floor Charlotte, NC 28204-2812 Charlotte, NC 28204-2812 CERTIFICATION OF ANNUAL REPORTMUST- BE COMPLETED BY ALL LIMITED LIABILITY COMPANIES FORM MUST BE SIGNET) BY A MANAGERIAIEAIBER DATE TYPE OR PRINT Nt"IE TYPE OR PRINTTITLE ANNUAL REPORT FEE: $200 MAIL TO: Secretary of State • Corporations Division • Post Office Box 29525 • Raleigh, NC 27626-0525 Page 2 accordance with the application for this mining permit, which is hereby approved by t De rtment of Environment and Natural Resources, hereinafter referred to as the De rtment, and in conformity with the approved Reclamation Plan attached to and incorporate as part of this per t provisions must be made for the protection of the, surrounding enviro ment and for reclamatio of the land and water affected by the permitted mining operation. his permit is expressly co ditioned upon compliance with all the requirements of the appr ved Reclamation Plan. Howev�r, completed performance of the. approved Reclamation PI is a separable obligation, secu 4 the expiration, re d by the bond or other security on file with the Depart ent, and may survive 'ocation or suspension of this permit. This permit is not transferable by the permittee with the following ception: If another . operator succeeds to th� interest of the.permittee in the permit# d mining operation, by virtue of a sale, lease, assignment or otherwise, the Department m release the permittee from the duties imposed upon him by the conditions of his permit an by the Mining Act with reference to the permitted operation, and transfer the permit to the ccessor operator, provided that both operators have complied with the requirements of e Mining Act and that the successor operator agrees to assume the duties of the permitte with reference to reclamation of the affected land and posts a suitable bond or other se rity. In the event that the Department deteHines thprf the permittee or permittee's successor is not complying with the Reclamation Plan or other erms and conditions of this permit, or is failing to achieve the purposes and requirements the Mining Act, the Department may give the .operator written notice of its intent to mod' , r voke or suspend the permit, or its intent to modify the Reclamation Plan as incorpo ated in he permit. The operator shall have right to a hearing at a designated time and plac on any proposed modification, revocation or suspension by the Department. Alt natively and inkaddition to the above, the Department may institute other enforcement p cedures authorized, by law. Definitions Wherever used or referred o in this permit, unless the contex ]early indicates otherwise, terms shall have the samg meaning as supplied by the Mining A t, N.C.G.S. 74-49. Expiration Date This permit shall b(�'effective from the date of its issuance until March 26�\2019. Conditions This permit s all be subject to the provisions of the Mining Act, N.C.G.S. 74-4 et. seq., and to the folio (nq conditions and limitations: A. Any wastewater processing or mine dewatering shall be in accordance wit the permitting requirements and rules promulgated by the N.C. Environmental Management Commission. 0 Storm Water & Erosion Control Design Calculations August 31, 2009 Dollar General Development US Highway 601 Davie County, NC Prepared for: Primax Properties, LLC Attn. Frank Fawcett 1065 E. Morehead Street, 4th Floor Charlotte, NC 28204 704-954-7229 Prepared by: Triangle Site Design, PLLC SEP o 9 2009 165 Trantham Trail OUAL Clayton, NC 27527 & 919-553-6570 TABLE OF CONTENTS OVERVIEW STORMWATER NARRATIVE FIGURES SOILS SURVEY & SOIL INFORMATION SUBSURFACE INVESTIGATION REPORT STREAM INDEX CLASSIFICATION USGS TOPOGRAPHIC MAP DRAINAGE AREA MAPS SEDIMENT BASIN DRAINAGE AREA MAP WATER QUANTITY/QUALITY WET DETENTION POND 'TIME OF PEAK' CN VALUES POND SUMMARY PRE -DEVELOPMENT HYDROGRAPHS POST -DEVELOPMENT HYDROGRAPHS TIME VS. VOLUME (STORAGE) TIME VS. ELEVATION (STAGE) ELEVATION -VOLUME -FLOW SUMMARY POND OUTLET/STRUCTURE SUMMARY EROSION CONTROL CALCULATIONS TEMPORARY BASIN DESIGN RIP -RAP APRON DESIGN OVERVIEW Background This report contains the storm water and erosion control calculations for the proposed Dollar General retail site. The project site is located on US Highway 601 south of the intersection of US Highway 601 and Koontz Road. The project consists of approximately 1.59 acres and will be developed as a Dollar General retail store. Approximately 1.4 acres will be disturbed as part of this project for the construction of the site improvements. The proposed storm water management facility (wet detention pond) outlined in this report has been designed to treat 1.1 acres of the site with a maximum impervious area of 60.4% for the drainage area. The site is designed to treat a 1.0" design storm and 90% TSS. Erosion Control Erosion control measures have been designed in accordance with the NCDENR erosion control standards and regulations to minimize sediment laden runoff from exiting the site. Silt fence will be installed along the low sides of the site prior to construction. The construction entrance will be installed prior to construction commencing. Inlet protection will be installed around all existing inlets and will be utilized for the proposed curb inlets and drop inlets. Soils The Davie County Soils Survey indicates that Clifford sandy clay loam soils are present on the site. Site Stabilization After final grading is completed, permanent vegetation shall be applied in accordance with the seeding requirements and landscape plan for this site. Stormwater Analysis Storm water runoff from the developed areas of the site will be treated within a wet detention pond. The pond has been designed to treat a drainage area of 1.1 acres. The site grading and storm drainage pipe systems are used to divert storm water runoff from the site to the wet pond. The storm water management pond is designed for an impervious area of 60.4% for the drainage area. Water Quantity Post -development peak flows from the site will not exceed pre -development flows for the 1- year and 10-year storms. The site is designed for the 1.0" storm and 90% TSS. The wet detention pond will utilize a concrete riser structure with a low flow orifice, intermediate weir, and an emergency spillway to reduce peak flows. Please reference the Water Quantity section of this report for details regarding drainage areas and stormwater routing. Water Quality For water quality purposes the site is designed so that storm water runoff is treated in a wet detention BMP pond. The proposed wet detention pond will provide 90% removal of Total Suspended Solids (TSS). Methods The stormwater conveyance system was analyzed using "Hydraflow Storm Sewers" and "Hydraflow Hydrographs" computer software program. Conclusion Based on the analysis provided herein, this design meets the stormwater and erosion control requirements of NCDENR. Pre -development flows will not exceed post -development flows for the 1-year and 10-year storm events. Stormwater Narrative Dollar General US Highway 601 Mocksville, NC Site Information: Total Site Area = 1.59ac Disturbed Area = 1.4ac Wetland Area = No on -site wetlands No impact to existing wetlands Developer = Primax Properties, LLC Frank Fawcett 1065 E. Morehead Street 4t' Floor Charlotte, NC 28204 704-954-7229 Engineer = Triangle Site Design, PLLC Matt Lowder, PE 165 Trantham Trail Clayton, NC 27527 919-553-6570 Development Plan: A stormwater wet pond will be constructed at the time of the Dollar General construction. The existing site conditions are an existing single family house with accessory structures along with the associated driveway. The remainder of the site consists of grass in good condition with trees along most of the perimeter of the property. Phasing: The proposed Dollar General store will be constructed at this time along with the proposed wet pond. Utility Systems: Domestic water supply will be provided via a new service line from the existing Town of Mocksville water system. Sanitary sewer will be provided via a new service to the existing Town of Mocksville sanitary sewer system. Historic/Public Money: The property does not contain any historic sites and is not being funded with public monies. NCDENR: There are not any non-compliance issues with DENR Agencies. Stormwater Information: River Basin: Yadkin Stream Classification: C Stream Index #: 12-102-15 Stormwater Design: State Stormwater Density Option: High Density Development Type: Commercial Impervious Area: Dollar General: 28,934sf Proposed Treatment Measures: BMP Wet Pond (Designed for 90% TSS) Will all built -upon areas be collected: The proposed buildings and parking lots will drain to the BMP wet pond. A small portion of the project driveway drains onto Highway 601 to the existing storm sewer system. Buffer Requirements: None On-site/off-site runoff: No off -site drainage is draining towards the site and none will be collected and/or treated by the proposed BMP system. Road Construction Requirements: A deceleration lane will be constructed on US Highway 601 as part of the development of this project. FIGURES Soil Map —Davie County, North Carolina 35, 55' 3" 35. 54' 59" Map Scaie'. 1:783 if printed cn A size (8.5" a 11") sheet. Meters N o ,0 20 40 so Feet 0 40 80 160 240 USDA Natural Resources Web Soil Survey S Conservation Service National Cooperative Soil Survey 814l2009 Page 1 of 3 35' 55' 3" 35' 54' 54' MAP LEGEND Area of Interest (AOI) Area of Interest (AD I) Soils Soil Map Units Special Point Features Blowout ® Borrow Pit Clay Spot 6 Closed Depression Gravel Pit Gravelly Spot Landfih 4 Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Ly. Perennial Water v Rock Outcrop + Saline Spot Sandy Spot Severely Eroded Spot `• Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Soil Map -Davie County, North Carolina Very Stony Spat Wet Spot a Other Special Line Features Gully Shod Steep Slope Other Politicat Features p Cities Water Features Oceans Streams and Canals Transportation ++-+ Rails y� Interstate Highways US Routes Major Roads Local Roads MAP INFORMATION Map Scale: 1:763 if printed on A size (8.5' x 11") sheet. The soil surveys that comprise your AQI were mapped at 1 24,000 Please rely on the bar scale on each map sheet for accurate map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http;l/websoilsurVeyLnres.usda.gov Coordinate System: UTM Zone 17N NAD83 This product is generated from the USDA-NRCS certified data as of the version dates) listed below. Soil Survey Area: Davie County, North Carolina Survey Area Data: Version 8, Jun 17, 2009 Date(s) aerial images were photographed: 6/20/2006 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 8/4/2009 �� Conservation Service National Cooperative Soil Survey Page 2 of 3 Hydrologic Soil Group —Davie County, North Carolina Hydrologic Soil Group j Hydrologic Soil Group-- Summary by Map Unit — Davie County, North Carolina I Map unit symbol A Map unit name I Rating I Acres in AOI I Percent of A01 CfB2 Clifford sandy clay loam, 2 to 8 B 2.8 100.0% percent slopes, moderately eroded Totals for Area of Interest 2.8 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (AID, BID, and CID). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (AID, BID, or CID), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.• None Specified Tie -break Rule: Lower USIA Natural Resources Web Soil Survey ." Conservation Service National Cooperative Soil Survey 8/4/2009 Page 3 of 3 ATC Associates of North 2725 E. Millbrook Rd Suite 121 Raleigh, NC 27604 919-871-0999 Fax 919-871-0335 www.ateassociates.com July 2, 2009 Mr. Frank Fawcett Primax Properties 1065 East Morehead Street 4th Floor Charlotte, NC 28204-2812 FFawcett(a primaxpror)erties_.com ATC Project No, 45.27739.0042 Carolina, PC Reference: Report of Subsurface Exploration Services Proposed Dollar General Mocksville, North Carolina Dear Mr. Fawcett: ATC Associates of North Carolina, PC is pleased to present this report of subsurface exploration and geotechnical analysis for the Dollar General in Mocksville, NC. This report contains the results of our subsurface exploration, boring logs, and laboratory test information. It is expected that the findings of this exploration will aid in the design and construction of foundations, pavements, earthwork, and other soil related aspects of the construction. We have enjoyed being of service to Primax Properties during the design phase of this project. If you should have any questions regarding the information and recommendations contained in the accompanying report or if we can be of further assistance, please do not hesitate to contact us. Respectfully, ATC ASSOCIATES OF NORTH CAROLINA, PC Mike Harwood, P.E. Project Manager Tooie. Hales(a),atcassociates.com Benjamin V. Wilson, P.E. Principal Engineer wilson45@atcassociates.com TABLE OF CONTENTS PROJECT OVERVIEW PAGE Executive Summary 1 Scope of Work 2 Purposes of Exploration 3 Project Characteristics 3 EXPLORATION PROCEDURES Surface Exploration Procedures 4 Subsurface Exploration Procedures 4 Laboratory Testing Program 5 EXPLORATION RESULTS Site Conditions 6 Regional Geology 6 Subsurface Conditions 6 Groundwater Observations 7 ANALYSIS AND RECOMMENDATIONS • Seismic Site Classification 8 • Foundations 8 Slab on Grade Design 9 Below Grade Walls 10 Drainage 10 Exterior Pavements 11 Fill Design and Construction 12 Subgrade Preparation and Earthwork Operations 13 Difficult Excavation and Rock Excavation 15 Construction Considerations 15 Closing 15 APPENDIX I Site Location and Aerial Photos li Boring Location Diagram and Site Layout III Soil Boring Logs IV Laboratory Test Data V Site Photos TREA,�J0,(-1 ATES tNC, Environmental, Geotechnical and Materials Professionals TABLE OF CONTENTS PROJECT OVERVIEW PAGE Executive Summary 1 Scope of Work 2 Purposes of Exploration 3 Project Characteristics 3 EXPLORATION PROCEDURES Surface Exploration Procedures 4 Subsurface Exploration Procedures 4 Laboratory Testing Program 5 EXPLORATION RESULTS Site Conditions 6 Regional Geology 6 Subsurface Conditions 6 Groundwater Observations 7 ANALYSIS AND RECOMMENDATIONS Seismic Site Classification 8 Foundations 8 Slab on Grade Design 9 Below Grade Walls 10 Drainage 10 Exterior Pavements 11 Fill Design and Construction 12 Subgrade Preparation and Earthwork Operations 13 Difficult Excavation and Rock Excavation 15 Construction Considerations 15 Closing 15 APPENDIX I Site Location and Aerial Photos li Boring Location Diagram and Site Layout III Soil Boring Logs IV Laboratory Test Data V Site Photos YMASS{.. CIATE1 hN- C. Environmental, Geotechnical and Matenafs Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page I PROJECT OVERVIEW Executive Summary This report presents the results of our subsurface exploration and geotechnical engineering analysis for the proposed Dollar General to be located at the east side of Yadkinville Road south of the intersection with County Lane, in Mocksville, North Carolina. Based on the information provided, the project will consist of the construction of a typical Dollar General Prototype Building of approximately 9,100 square feet consisting of load bearing masonry walls with steel frame structure and slab on grade, and associated parking areas and access. The site is vacant and mostly grassed and relatively flat. The subsurface conditions at the site are generally uniform and consist of SILT with varying amounts of fine sand and clay. In summary, we recommend that the proposed building be supported on a shallow spread footing foundation system. The spread footings may be designed to bear on either compacted Engineered Fill or suitable natural soils. For footings designed as discussed herein, a net allowable soil bearing pressure of 3,000 pounds per square foot (psf) may be utilized for column and wall footings. In order to attain this allowable capacity, it will be necessary to adhere to the design and construction recommendations discussed in the text of this report. Based on the design bearing pressure and the anticipated structural loads, total settlements are anticipated to be less than 314 inch with long term differential settlements of approximately one-half this amount. Care should be taken to design the site for positive drainage to prevent saturation of the SILTS at the site. In addition it is IMPORTANT that the site not be graded during the wet periods of the year because of the moisture sensitivity of the soils encountered at the site. \YRWA5S00'AT'1_75 rNc` Environmental, Geotechnical and Materials Professionals ap Dollar General, Mocksville, North Carolina ATC Job # 45,27739.0042 - July 2, 2009 Page 2 Further information regarding the subsurface exploration procedures used; groundwater conditions; foundations; floor slab and pavement design; building and pavement area earthwork operations; and construction considerations is included in the text of this report. Scope of Work The conclusions and recommendations contained in this report are based upon our field exploration, which consisted of a site visit by an engineer of this office and 5 soil test borings. Laboratory testing performed on several representative samples obtained during the field exploration aided in the evaluation of the field data. Borings were located in the field by ATC representatives by measuring distances and estimating right angles from existing site features. The locations shown on the boring location diagram provided in the Appendix should be considered approximate. The recommendations contained herein were developed from our interpretation of the subsurface data obtained from the soil test borings. The borings indicate subsurface conditions at specific locations at the time of the exploration. If, during the course of construction, variations appear evident, the Geotechnical Engineer should be informed so that the conditions can be addressed. Design recommendations were developed based on design criteria considered typical for this type of project. Should structural loading characteristics differ from those discussed herein, ATC should be contacted for review of these conditions and possible revisions to the recommendations of this report. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 — July 2, 2009 Page 2 Further information regarding the subsurface exploration procedures used; groundwater conditions; foundations; floor slab and pavement design, building and pavement area earthwork operations; and construction considerations is included in the text of this report. Scope of Work The conclusions and recommendations contained in this report are based upon our field exploration, which consisted of a site visit by an engineer of this office and 5 soil test borings. Laboratory testing performed on several representative samples obtained during the field exploration aided in the evaluation of the field data. Borings were located in the field by ATC representatives by measuring distances and estimating right angles from existing site features. The locations shown on the boring location diagram provided in the Appendix should be considered approximate. The recommendations contained herein were developed from our interpretation of the subsurface data obtained from the soil test borings. The borings indicate subsurface conditions at specific locations at the time of the exploration. If, during the course of construction, variations appear evident, the Geotechnical Engineer should be informed so that the conditions can be addressed. Design recommendations were developed based on design criteria considered typical for this type of project. Should structural loading characteristics differ from those discussed herein, ATC should be contacted for review of these conditions and possible revisions to the recommendations of this report. lyme-1.55'00ATES AC Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739,0042 - July 2, 2009 Page 3 Purpose -of Exploration The purpose of this exploration was to explore the soil and groundwater conditions at the site and to develop engineering recommendations to aid the design and construction of the project. This was accomplished by drilling soil test borings, performing a site reconnaissance, performing laboratory testing on representative samples obtained from the borings, and analyzing the field and laboratory data to develop appropriate engineering recommendations regarding earthwork specifications and the design of foundations, slabs, and pavements. Proiiect Characteristics Based on the information provided, the proposed Dollar General will be located at the center portion of the site and will consist of the construction of a typical Dollar General Prototype Building consisting of load bearing masonry walls with steel frame structure and slab on grade, and associated parking areas and access. Based on existing site characteristics we anticipate that cut and fill operations will be minimal to bring it to grade. A 5S!'�ouF�� lr^��• Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45,27739.0042 —July 2, 2009 Page 4 EXPLORATION PROCEDURES Surface Exploration Procedures A representative of ATC performed a reconnaissance of the project site and laid out boring locations. The site was cleared by calling the North Carolina One -Call Center prior to drilling operations. During the site visit, visual observations of drainage and surface water conditions, vegetation, and shallow subgrade conditions were made. The results of this field visit are discussed under Site Conditions. Photos of the site are included in the appendix to this report. Subsurface Exploration Procedures In order to characterize the general subsurface conditions at the site, a total of 5 soil test borings were performed. Four borings were performed in the proposed building area (D-1 through D-4) and one in the proposed parking 1 drive area (DP-1). The borings were advanced to a depth of 15.0 feet below the ground surface in the building area and 10.0 feet in the parking area. All borings were performed with Truck -mounted drilling equipment utilizing continuous -flight, hollow -stem augers to advance the boreholes. Drilling fluid was not used in this process. Representative soil samples were obtained by means of the split -barrel sampling procedure in accordance with ASTM Specification 0-1586. In this procedure, a 2- inch O.D., split -barrel sampler is driven into the soil a distance of 24 inches by a 140-pound hammer failing 30 inches. The number of blows required to drive the sampler through a 12-inch interval is termed the Standard Penetration Test (SPT), N-value and is indicated for each sample on the boring logs. This value can be used as a qualitative indication of the in -place relative density of cohesioniess soils. In a less reliable way, it also indicates the consistency of cohesive soils. Many factors can significantly affect the Standard Penetration resistance value and prevent a direct correlation between drill crews, drill rigs, drilling procedures, and •M�1.S�"� it�0 � ft. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 6 EXPLORATION RESULTS Site Conditions The project site is located at the east side of Yadkinville Road south of the intersection with County Lane, North Carolina. The site is currently occupied by an existing residential house that is located on the property boundary between the project site and the adjacent parcel to the north. The site is mostly grass -covered and has a thin veneer of topsoil, with a wooded area located at the east end of the property, where the topography goes downward to an existing draw. The western two-thirds of the site is relatively flat. Photos of the site conditions are included in the appendix to the report. Regional Geology The project site lies in the Piedmont Physiographic Province, in the Inner Piedmont Belt geologic area. The soils in this area consist of silts, sandy silts, and clayey silts weathered from the underlying amphibolite and biotite gneiss, with interlayer hornblende gneiss, mica schist and granitic rock. Subsurface Conditions Boring logs describing the soil conditions encountered in the soils borings are included in the appendix of this report. A general description is included in the table below: 'YMASSCI IATE JNC, Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 — July 2, 2009 Page 6 EXPLORATION RESULTS Site Conditions The project site is located at the east side of Yadkinville Road south of the intersection with County Lane, North Carolina. The site is currently occupied by an existing residential house that is located on the property boundary between the project site and the adjacent parcel to the north. The site is mostly grass -covered and has a thin veneer of topsoil, with a wooded area located at the east end of the property, where the topography goes downward to an existing draw. The western two-thirds of the site is relatively flat. Photos of the site conditions are included in the appendix to the report. Regional Geology The project site lies in the Piedmont Physiographic Province, in the inner Piedmont Belt geologic area. The soils in this area consist of silts, sandy silts, and clayey silts weathered from the underlying amphibolite and biotite gneiss, with interlayer hornblende gneiss, mica schist and granitic rock. Subsurface Conditions Boring logs describing the soil conditions encountered in the soils borings are included in the appendix of this report. A general description is included in the table below: IrMA550Ci TES AC. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 — July 2, 2009 Page 8 ANALYSIS AND RECOMMENDATIONS Seismic Site Classification Based on the results of our exploration, we calculate that the SEISMIC SITE CLASSIFICATION will be C for this site under the 2000 International Building Code. Foundations Based on the results of our exploration, we anticipate that the proposed structure can be supported by shallow spread footing foundation systems placed to bear on the existing natural soils. We recommend that the proposed building be supported on a shallow spread footing foundation system. The spread footings may be designed to bear on either compacted Engineered Fill or suitable natural soils. For footings designed as discussed herein, a net allowable soil bearing pressure of 3,000 pounds per square foot (psf) may be utilized for column and wall footings. In order to attain this allowable capacity, it will be necessary to adhere to the design and construction recommendations discussed in the text of this report. Based on the design bearing pressure and the anticipated structural loads, total settlements are anticipated to be less than 3/4 inch with long term differential settlements of approximately one-half this amount. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The bearing capacity at the final footing elevation should be verified in the field by an experienced Soils Engineer to assure that the in - situ bearing capacity at the bottom of each footing excavation is adequate for the design loads. ly=A5 0CIAIES WC. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 8 ANALYSIS AND RECOMMENDATIONS Seismic Site Classification Based on the results of our exploration, we calculate that the SEISMIC SITE CLASSIFICATION will be C for this site under the 2000 International Building Code. Foundations Based on the results of our exploration, we anticipate that the proposed structure can be supported by shallow spread footing foundation systems placed to bear on the existing natural soils. We recommend that the proposed building be supported on a shallow spread footing foundation system. The spread footings may be designed to bear on either compacted Engineered Fill or suitable natural soils. For footings designed as discussed herein, a net allowable soil bearing pressure of 3,000 pounds per square foot (psf) may be utilized for column and wall footings. In order to attain this allowable capacity, it will be necessary to adhere to the design and construction recommendations discussed in the text of this report. Based on the design bearing pressure and the anticipated structural loads, total settlements are anticipated to be less than 3/4 inch with long term differential settlements of approximately one-half this amount. The net allowable soil bearing pressure refers to that pressure which may be transmitted to the foundation bearing soils in excess of the final minimum surrounding overburden pressure. The bearing capacity at the final footing elevation should be verified in the field by an experienced Soils Engineer to assure that the in - situ bearing capacity at the bottom of each footing excavation is adequate for the design loads. INC. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 10 We recommend that the floor slab be isolated from the foundation footings so differential settlement of the structure will not induce shear stresses in the floor slab. Also, in order to minimize the crack width of any shrinkage cracks that may develop near the surface of the slab, we recommend mesh reinforcement be included in the design of the floor slab. The mesh should be in the top half of the slab to be effective. We recommend the slabs -on -grade be underlain by a minimum of 6 inches of clean, angular gravel (crushed stone) having a maximum aggregate size of 1,5 inches. No. 57 Stone is considered suitable for this purpose. This porous fill layer will facilitate the fine grading of the building pad, provide more uniform bearing conditions, and help prevent the rise of water to the bottom of the slab (capillary action). As an alternate, should select off site borrow be readily available on this project, the porous fill layer can consist of 12 inches of relatively clean Sand classified as SP, SW or better with a maximum 5% passing the No. 200 sieve. Before placement of concrete, a polyethylene vapor barrier should be placed on top of the granular material to provide additional moisture protection. Slabs supported by well - compacted on site borrow or firm, natural subgrades treated as discussed herein can be designed assuming a Modulus of Subgrade Reaction (Ks) of 100 pounds per cubic inch. Below Grade Wails At this time there is no indication that retaining walls will be used at the project. Drainage As indicated previously groundwater is not expected to be an issue. Positive drainage should be provided around the perimeter of the buildings to minimize moisture infiltration into the foundation soils. We recommend landscaped areas adjacent to the buildings or pavements be provided with a fall of at least 3 to 5% for the first 10 feet outward from the wall. IV=A5SO"--iATE.ri INC. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksvilie, North Carolina ATC Job # 45,27739.0042 — July 2, 2009 Page 11 Exterior Pavements For the construction of exterior pavements, we recommend that topsoil and any other soft or unsuitable materials be removed from the paved areas prior to fill placement. The stripped or filled surfaces should be proofrolled and carefully observed at the time of construction immediately prior to placement of the Stone Base in order to aid in identifying any localized soft or unsuitable materials. Such materials should be removed prior to Stone placement. The grading information provided indicates that most of the proposed pavement areas will be supported on slight fill or existing fills. Based on topographic data and anticipated grading requirements for the site, soil classification performed on the on site materials, we estimate soaked CBR values of 4 in a saturated condition and 12 in a dry condition at 95 percent compaction. These values have been utilized in our pavement design according to AASHTO standards. The following minimum pavement sections are recommended on this project: Heavy Duty Pavements EAL = 150,000 (Main traffic and truck access lanes if applicable) Subgrade: Stable and compacted to a dry density of at least 95% of that soil's Standard Proctor maximum dry density (ASTM D-698) to a depth of 10.0 inches. Aggregate Base: 8.0 inches Aggregate Base (NCDOT Aggregate Base Course) Asphalt Base: 2.0 inches Asphalt Concrete Base (NCDOT Superpave B-25.0B or equivalent). Asphalt Surface: 1.0 inches Asphalt Concrete Surface (NCDOT Superpave SF-9.5A or equivalent). IYAWASSO IATES INC, Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 -- July 2, 2009 Page 11 Exterior Pavements For the construction of exterior pavements, we recommend that topsoil and any other soft or unsuitable materials be removed from the paved areas prior to fill placement. The stripped or filled surfaces should be proofrolled and carefully observed at the time of construction immediately prior to placement of the Stone Base in order to aid in identifying any localized soft or unsuitable materials. Such materials should be removed prior to Stone placement. The grading information provided indicates that most of the proposed pavement areas will be supported on slight fill or existing fills. Based on topographic data and anticipated grading requirements for the site, soil classification performed on the on site materials, we estimate soaked CBR values of 4 in a saturated condition and 12 in a dry condition at 95 percent compaction. These values have been utilized in our pavement design according to AASHTO standards. The following minimum pavement sections are recommended on this project: Heavy Duty Pavements EAt_ = 150,000 (Main traffic and truck access lanes if applicable) Subgrade: Stable and compacted to a dry density of at least 95% of that soil's Standard proctor maximum dry density (ASTM D-698) to a depth of 10.0 inches. Aggregate Base: 8.0 inches Aggregate Base (NCDOT Aggregate Base Course) Asphalt Base: 2.0 inches Asphalt Concrete Base (NCDOT Superpave B-25.OB or equivalent). Asphalt Surface: 1.0 inches Asphalt Concrete Surface (NCDOT Superpave SF-9.5A or equivalent). T=AS SOGATFi INC, Environmental, Geotechnical and Materials Professionals Itp Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 13 Subgrade Preparation and Earthwork Operations The near -surface soils at the site are typically medium -dense, to dense fine grained medium to low plasticity SILT (ML) and should provide adequate support at grade. However, there may be isolated areas where clay content and plasticity may exceed typical levels. Some areas may require some undercutting and/or re -compaction. Care should be taken to design the site for positive drainage to prevent saturation of the SILTS at the site. In addition it is IMPORTANT that the site not be graded during the wet periods of the year because of the moisture sensitivity of the soils encountered at the site. In addition, any old foundations associated with the existing residential structure should be removed from the building and parking areas. Areas of old foundations should be proofrolled and backfilled according to the recommendations of this report after removal of the old foundations. The soils observed in our borings are fine grained and moderate to low plasticity and are moisture sensitive. We recommend that the grading operations at this site be performed during the drier periods of the year (April 1st to November 30th). If grading is attempted during the wet winter months, extra cost for undercutting of saturated soils wmay be incurred. However, during the drier periods of the year, the moisture content of these soils may be adjusted using discing or other drying procedures to achieve moisture contents consistent with good compaction results. After stripping to the desired grade and prior to fill placement, the stripped surface should be observed by an experienced Soils Engineer or his authorized representative. Proof -rolling using a dump truck or other construction equipment loaded to one-half capacity is recommended because of the proximity of the existing building. Any soft or unsuitable materials encountered during this proof rolling should be removed and replaced with engineered fill. Xmi-415SOCIATES iNC, Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 13 Sub4rade Preparation and Earthwork Operations The near -surface soils at the site are typically medium -dense, to dense Fine grained medium to low plasticity SILT (ML) and should provide adequate support at grade. However, there may be isolated areas where clay content and plasticity may exceed typical levels. Some areas may require some undercutting and/or re -compaction. Care should be taken to design the site for positive drainage to prevent saturation of the SILTS at the site. In addition it is IMPORTANT that the site not be graded during the wet periods of the year because of the moisture sensitivity of the soils encountered at the site. In addition, any old foundations associated with the existing residential structure should be removed from the building and parking areas. Areas of old foundations should be proofrolled and backfilled according to the recommendations of this report after removal of the old foundations. The soils observed in our borings are fine grained and moderate to low plasticity and are moisture sensitive. We recommend that the grading operations at this site be performed during the drier periods of the year (April 1st to November 30th). If grading is attempted during the wet winter months, extra cost for undercutting of saturated soils wmay be incurred. However, during the drier periods of the year, the moisture content of these soils may be adjusted using discing or other drying procedures to achieve moisture contents consistent with good compaction results. After stripping to the desired grade and prior to fill placement, the stripped surface should be observed by an experienced Soils Engineer or his authorized representative. Proof -rolling using a dump truck or other construction equipment loaded to one-half capacity is recommended because of the proximity of the existing building. Any soft or unsuitable materials encountered during this proof rolling should be removed and replaced with engineered fill. TMADXIATLS INC. Environmental, Geotechnical and Materials Professionals Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 - July 2, 2009 Page 14 Following stripping, proof rolling, and subgrade preparation procedures, Engineered Fill can be placed. Subgrades which are clean and stable and to be covered by Engineered Fill need not be compacted. Fill used to support any part of the proposed foundation system and pavements should be placed in lifts not exceeding 8 inches in loose thickness, moisture conditioned to within +1- 3% of the optimum moisture content and compacted to at least 95% of the maximum dry density obtained in accordance with ASTM Specification D-698, Standard Proctor Method. Field density testing of subgrades and each lift of fill should be performed at a rate of no less than one test per 5,000 square feet in the building area and one test per 10,000 square feet in the pavement areas. It is recommended that the construction contract include a unit rate for undercut and backfill below subgrade elevations. The construction contract should also provide for a unit price for importation of a clean fill for placement to design subgrades. The following fill types are recommended for use on this project: Engineered Fill (on site) SM, SC or better. Engineered Fill (imported) SW, SM, SC or better. Soil Material obtained on site classified as ML or MH, Soil Material obtained off site classified as ML, SP, Porous Fill: Clean crushed gravel (No. 57 Stone) with a maximum aggregate size of 1.5 inches placed in a minimum 6 inch layer or clean Sand classified as SP, SW, or better with a maximum 5% passing the No. 200 Sieve placed in a minimum 12 inch layer. Aggregate Base: Aggregate Base Course. 'YNCAS SO IATa a PDX. Environmental, Geotechnical and Materials Professionals f Dollar General, Mocksville, North Carolina ATC Job # 45.27739.0042 — July 2, 2009 Page 15 Difficult Excavation and Rock Excavation Based on the boring data it does not appear that rock will be encountered in the excavations at this site unless excavations are extended beyond the boring depths. Construction Considerations Proper compaction control of fill is an essential aspect of this project. Therefore, we recommend that all cut and fill operations be observed full-time by a qualified Soil Technician to determine if minimum earthwork and compaction requirements are being met. C os'n We recommend that the construction activities be monitored full time by a qualified geotechnical engineering firm to provide the necessary overview and to check the suitability of the subgrade soils for supporting the footings. We would be most pleased to provide these services. This report has been prepared in order to aid in the evaluation of this property and to assist the architect and/or engineer in the design of this project. The scope is limited to the specific project and locations described herein and our description of the project represents our understanding of the significant aspects relative to soil and foundation characteristics. In the event that any change in the nature or location of the proposed construction outlined in this report are planned, we should be informed so that the changes can be reviewed and the conclusions of this report modified or approved in writing by the soil and foundation engineer. It is recommended that all construction operations dealing with earthwork and foundations be reviewed by an experienced soils engineer to provide information on which to base a decision as to whether the design requirements are fulfilled in the IM.J V A JSOCATES M. Environmental, Geotechnical and Materials Professionals APPENDIX I SITE LOCATION AND AERIAL. PHOTOS 'FRgASS00ATES INC. Environmental, Geotechnical and Materials Professionals APPENDIX 16 BORING LOCATION DIAGRAM AND SITE LAYOUT PLANS TREASSMAM INC.Environmeotat, Geotechnicai and Materials Professionals CMA D-zfisliv P.0,viorn,hIP j65 Job Nlamk!, 6 0 of, 100:'r, satura!ioil Millar lefseral- ior soecllic jrz1,;"-JC!s quill 155 tiampik.t Mo. H 2.6 145 - D. dayj trace mica 140 Maxinjiiiij Dry Do)sitv (ff), 1.4,") 135 L j Optimum klc6sttiri.- 7 110 F 98'-!;, Max. Dy Dc-nsity 2 1 95,;", Max. Dry CpnsA,) I t 121) job khlmb��I- _VT 45.27739.0042 Dale Ady 3, 2009 ia H.H. - I_; 'L. Jll'., Tem �Ivleth�nf ASTN4 D698 fes; A 95 L 90 M t J..J.''... tot) _tj AMM 75 �A TO RIO 70 JA rr... 65 0 10 N 10 N-foisture Con[cm - }dice(} Dry Weiz1p ht r � i i crrj� I � I r I ' i s I r I � r I 1`i + Ir el I f IK I >r l r I I r-. f �..1AIL r6,:f 4 ! ` t r r PROPOSED SITE LAYOUT AND BORING LOCATIONS SOURCE: Primax Properties SITE LAYOUT ATC PROJECT NO. NTC Subsurface ExpYoration Services 45.27739.0042 Proposed Dollar General SCALE: NTS Mocksv&e, North Carolina I 1',15 2 1-140 J, A 1380 U 12 5 E 12 -1'!" V 9 Al 2, A -A Area Topography SITE SOURCE Davie County GIS Topographic Map Subsurface Exploration Services Proposed Dollar General Mocksville, North Carolina ATC PROJECT NO 45.27739,0042 SCALE: NTS APPENDIX M ;dill.. BORING LOGS T/GKIAMCIATFS INC. Environmental, Geotechnical and Materials Professionals CVV)725 Fa,, P01416,100k RoPCI, �'i TIF',ST BOi-I%IN(d' FI;:4�ifihi, MC 2760,; �) � �1-11117 1-0999 I,f Rix D-I roc, 3crT NA-m;-:7 Dollar ggnq .r.11 - Mork-svillp Joe 45.27739.0042 I.C(ATIOw Hwy -N-2!Lh -qa —rOI I fLa8VW- DWLIX- ' , arrISAMPU', INFOR:F IrJ,1! TE 3 T Q,' T A SIPM Hammer,Vt. JAIL-s- Mjla 6129/09 Hammer Drop Drill 179f9man Mario I Rrjc 4!-,Ofe DO-J. N/A in. I Borlsk] W-1hod HSA SfWhJy Tub? 01) __NIA in. 'r, 13 6 :L v cc t7 :i Z 5,011L CLASSIFICATK)Hal Z. s v 0 SVRFI,CE L G /A'F 10 il', � 2 T; Is viz` 0 'XI I �. 00,dwm De gyreSfL F, MrAm, f thl topsoil 1 Jv Fi 12 Pe"Isih bro*n Ctwa)rsy SIP T, Timjim Wor4fmr, &5 - Omen -1401 Spoon ST - PrezSM- SNiby Tube CA - coukinmus F" Auger RC - Rocs Core CU - Cu*nqs CT - Con6n uous T tite 's s 17 4 L 1- 3 5 1 04 1 12 I)ekLfi tv(37rog, Iw? e, Pl,ted on Orbring 70-ms ME f:. Aa Czm*,Iiejn (in ay.,qers", NE ft. Aj CompleCon (Open, ho'eL_NE ft. Alma h0u;s ft. After hours ' q Cave Dept —TOTS- --. ft cav9-in al 8Gfi2q,L%--etqqd HSA - Holtow s!?.JqI Augei-,q FA - Com mujus e Right A�,rt.1 - rs DC (]riving Casing MCI Mud DHOng Page Y 272AIIiiqil (;rift, F2 0 ,3t1itF, 1 1RP, MC TT ° t;J pp11t ! r �1 �•iS1 �-Uiii1�.1 t;l_7Cs;'f NTlrtkl'x NfQ E f£3 13rF1NG 4 i } Fie ME - Dollar c3artra1-- Mcx kgyille, �..�....._...._ . .__ rr�1 a ._� 45.27739.0042 - — -- --- ;ar,•.:�f r'��CTts,tr NCxy_601 -_.. - __..._._.�._ --- ctirrr;ar_MH NIQck vii1q,i!io1 4'iarolirl�._—�.------ —•--- APPw—j'iEO8y Qil --- t1wuJN+G rlr1 sr?14iW1-!i f1; OlP iRMA-f s()N 7 PST - .4 1A _ f�,�¢e5rarx:sS--61281U8- Liato'nerYY, �q0 Dare Crrntrl5ly<f 61291h9 _—,---_ Hammer Vrac .-------.•_- 3Q n�. � i � I � f �! Voit T!wesnan Mario ar;rrort Sam kv ]Ci z I,Z. f Rocx Core Ufa. _ _.._ N/A In. Boivnq f61e1hod ,A Sh4,-" Tt,,bt OD _N/A in. i_n 0 CLEVATtOk SO!I. CLASSJPiCATIGFI 1 UPFACL, r u' 77f '1 rb Ix ! t� oz i, U n: 4 v c rz I —n.. _' I a tfEf Ftedrf str BrcEm, all? A1ri;}, L,1«dir m [`Anus. Some Clay [AAIi { 1 inC,h t]c;ril Y loci i1D pmcio k'(own Clayey ;'M F. �ta:k fsd;9irt41, iv'4i� . ;tiN(Wro Cianse !r•.14) Saraale Tim rJ,iveyr SPR Spoor. 61 - Pre-Ised Sbrelby Tube CA Colfm,;ouzPOjtaAuWr �C • Rohr. ery,,,. �i1 - uuCir':gs CT - Cpwrriircrnus Tuoe a 1 ZS cepih to GfQt mwaref q ,11owl on Dry cools NE ff , ;F At COM*,Wr. ('rr, a-sgersL NE f1. 9, At Cf;mpTetfan (open Wet NE ft.. T. Nter _ hot,rs _ P. A,r krours tt. a Cave Depth 10,31n. CaVe-41 ct i0'2" Borina Method FfSA - Hollow Stem Augers CFA Conlinuaus 6=1t'gh1 Au,7eas OC - Dri"nq Casing NO - Mud Drifting Page 1 of 2725 Ea.-, iP iAn 12.1 f ES i' F3C)RiNG' j Ok:'.� 0_Fnx 9�-i571 C39 gt?I r 1„ Inc r rit, mE _ Dollar _er1 r�I wMocksvillN __,._.. Jr"G v !�-?77.',9.0OA �- -- pP�idE;;r u,cn rt��t.__ NC Hwy. BQ1 _ _—..____..M._......._......__..._..__ � - DF%M,NN y°r.._ MH --- _ _-W� _K41—OU. lgrt_h��ro l l _...__��_�_ __� _� ;%PPROS /ED BY B WII rrILL_ S firr1 T DateN?�tli.10 _,...�. �i ._ rl:�fniTt`:r �'.lS, 1li� _ IG4. I Gzlo comptopff 61291QN _.._._._., I wmm'�r Drop _ ... 30 ir,. fyrdf Forvmars Marto SF;vdr+ SamptCr SNa _--2 iri. 3ru,t;er:lrr ._...--- ._..__._. {rrc"�C,:ta��'It• ..,....._..,f":Ila it7. 1�! � � � r� _ � +{}`ij I 1 I II -v F'r)r'7f4sF Mt:[tlr7ri {_i,5/a Sh�it; � i!�'.3a {Ji7 __..,._ �![IAin. ,r n. ;° :� I a a; 1 £;VRFAC FIC/�TiL1t _ oIf '- s) of rn r aJ L L. _-'. - I -.l I Q t_=fAy+(MU ; ' } I -i i;Xil k)n;,;il 0 Pe7d+sh Src-lin S;tayc:y SILT; BtaO. rActiling, MbeA, Medfurn Cewe (ML) S'$ - Drkpm .` piii Soojn Sr - P(9ssed Shetby TkrbP A.. - �. W..'Irwmit, Fkhl auger ?r; - f?iEk Care CT - C,.7FWTN,;m* 3ube I � , _._� t -', 4� 71 tom../ tiF y t r Qom.' rr'rgl.-ak�i 9 Noted orr Dnl;ino Taois NE A. # Al Ce)mpiotk r (.r aX4z:,-3L,_ EVE It, 93- Al Crnriptntfrn (Oper nohk;_ NE ft. . Amr _ hViurs T ijfer _ _ t4Atlf`a 0 CaveDepth ft. Gave -In at iOl Bcrfrra Method HSA • Haflow Stern Augers CPA - Conllnuous FRgrl Au,jers D(' - Drodrng Caslnrr 100 - Mud Lrillin.l Page 1 ;v 1 2 `25 t 275;t !'Aiti:? C�;'c 2 7 �j 0 f 3) () R I N Priarax D-4 PR("'JE; f, ,J1,4VAE _—__Dollar General.- Wx*sVille .1-02 �j 415.27739-0042 `R!1JE4� T LCjC;Jl0N -01 F, 3y MH ville. North Cafolma P Krlvir e" f3VVV ;we, '5AMPLIN"_' TE :-!T DATA u re S;Srtod 6/29109 Hammel VA. 140 i rA, 8129109 HammerE;frc; 30 jrr, D, W Po,,eMai) Mario jo,)n Sampiu OD 2 H impecPw Prck ccrc Gia, N/A :n. E3,),erg MM,ix,-,J HSA 131*lby Tut` 00 NIA -im j 11 SOIL r1,L_A_1z.__1;::fr_jkTjOfj 4) IL 7a SURFACE ELEVATION F- E N n �5 z m — `4 loz� 40 0&1 0 keddish Bfmr, SILT. Mwf. M,!dlum Ckamse, �me Ciay VZO _aMpie T Jai SS Dmfert SPR', Spoon ST • Pressed S?ien;l Tube CA Comrmtrcws Ftl�hl AMeF RIC - Rack Core C42 - - 01. tino;4 CT - 6nit*mDwi Ta;b-_ rzo r f_-j u. E Lid f at 162" J r Qywh to Grricnevj;3te -9 Noted, on Drilling Toois NE AL :1 At Crm ptelicn (in augef sj, NE tt. q, At Completion f,Vem hnie' NE f: _y After hcjrs ft, AAeT hours ft. CI ' X, Depth P, aaoiwietnod HSA' - H'oJ?cw Stem AKaf .9 CFA Contnuous Flight At.gers DC Driving Casing N11-- %hic DrVing Rage '1 0', 1 272-S E-,ust PAjIf,,r;ior< Ro;� d, tji :y 111 9 Fp<, f194371 J3315 Prirrlax Qgq[e — �;? _-- �Mo�ksyifie,�iorthC;aroiirta DRILLING and SA.i1Pt_10G' INFC)RMAT1CF; t7ase ti.a t� r 6129/09 f3r,t: ;-r,;rr ar, _ MarI0 .viofi'helh i"{SA Iaamme0l.1t. ___ 740 it.5. hammtw Drop .._,_ 30 ir- :�paxn Sampler of? 2 in. Ror. Gofe C7 a, iti/ai in, .Sbalt;7Ttjb,-.OD NIA -in. T�! 1 HORING Ll fit; COFING UP-1 DRAWN a'( MH APPROVED B-(—E3VW sarmf6e Tv! e r-Intts to Geoonduater 99L9_ leti��+i - F,rixa Split Spoon g Meted an oriffinq TaeIS ME ft. WSA - Hotlow S',en, augers S. T - Pressed She>by Tubb # At Cmpfetior! !n au er,, NE 1i. CFA - Continuous Fligbt Augzxs CP: - Continuous Fligh$ Auger CC - Driving Casing R'C - Rack Core £� Al Ccmpfel'icn (epEn Wei i jE fL MD _ Mud Drilog CU - Cuttings g After hours ft- CT - Cclb*R-nws Tut7e I After _ _ hours _ _ I Page 'i of i �a Caue Depth s'1i}" ft. APPENDIX !V LABORATORY TESL' DATA ASSO IATES INC. Environmental, Geotechnicai and Materials Professionals ATC , ssor:#atns of North C:nroliwj PC.; CI 2725 E. Mil(brook f1d /ATCsuito 1z'I I AD& ri1 Raleigh, NC 27604 pn8H7r) nyn Nkpisture C.'oritt�nt'fublc f'rei-VxI Name: Dill<ir General- Moicktville f'ro.)-oo idui bob: 45.27734.0042 l.i:ite: 7/3/2004) Boring Sample Depth miiist. rout. !boos; SF Number Number 0-10 (`%, D-4 S2 3.5-510 37.0 4.0 D-4 S3 6.0-7.5 38.7 3.0 D-4 �S4 9.5-10 40.6 1.J D-4 SS 13.5-15 3<i.7 f,R I APPENDIX V SITE PHOTOS 'FAftASSOCATES INC. Environmental, Geotechnical and Materials Professionals Name of Stream Description Curr. Class Date Basin Stream Index # YADKIN RIVER From a point 0.3 mile WS-V 08/01/98 Yadkin 12-(98.5) downstream of U.S. Hwy. 64 to a point 1.0 mile upstream of mouth of Dutchmans Creek Dutchman Creek, From source to Davie B 05/01/70 Yadkin 12-102-(1) including County SR 1002 proposed reservoir Dutchman Creek From a point 0.9 mile WS-IV 0.8/01/98 Yadkin 12-102-{I7.5) upstream of mouth to Yadkin River Dutchman Creek From Davie Countyy SR C 08/01/98 Yadkin 12-102-(2) 1002 to a point 0.9 mile upstream of mouth Bryant Branch From source to C 04/06/55 Yadkin 12-102-10 Dutchman Creek Frost Mill Creek From source to C 04/06/55 Yadkin 12-102-11 Dutchman Creek Noland Creek From source to C 04/06/55 Yadkin 12-102-12 Dutchman Creek Cedar Creek, From source to Davie B 05/01/70 Yadkin 12-102-13-(1) including County SR 1410 proposed reservoir Cedar Creek From Davie County SR C 04/06/S5 Yadkin 12-102-13-(2) 1410 to Dutchman Creek Sugar Creek, From source to B 09/01/14 Yadkin 12-102-13-3-(l) including Interstate Hwy. 40 proposed reservoir Sugar Creek From Interstate Hwy. C 04/06/55 Yadkin 12-102-13-3-(2) 40 to Cedar Creek Cub Creek From source to Cedar C 04/06/55 Yadkin 12-102-13-4 Creek Buffalo Creek From source to C 04/06/55 Yadkin 12-102-14 Dutchman Creek Elisha Creek From source to C 09/01/74 Yadkin 12-102-15 Dutchman Creek Nelson Creek From source to Elisha C 09/01/74 Yadkin 12-102-15-1 Creek Leonard Creek From source to C 08/01/98 Yadkin 12-102-16 Dutchman Creek Ellsworth Creek From source to Davie B 08/01/98 Yadkin 12-102-16.5-(1) County SR 1606 Ellsworth Creek From Davie County SR C 08/01/96 Yadkin 12-102-16.5-(2) 1606 to Dutchman Creek No Creek From source to C 08/01/98 Yadkin 12-102-17 Dutchmans Creek Humpy Creek From source to a point C 08/01/98 Yadkin 12-102-18-(1) 0.3 mile upstream of mouth Page 2 of 4 2009-08-29 07:i0:24 ,i ~ice. ��.,� �� `��� ` �•., i..- # �`ti�!/�} 1`l' } i f' II t . - -"� ' � j r% �1 � fr i�'A.,s r, ;. `ilti-' \\\���\ � �. �, 'W ,�� . �_.,` .•f•#'�;� �.���._._� . �.�� a .•� \ � .,Ii�t _. � l 1 1�'-. `��_� l 'Yy � _ �14 ii}l� - -_• l:f���,r�" �' � , r•.4, �. \ :r �! `• i {! \� �-=��` I � �..�. !t+j q'it .'\,` `t `�,\ '" •�'� � _ "_- `\�\• . - 1' `i 5 l..-��f! .r-..�� jlir �'� �� tiic��f�'is r� ?.' o I�� �3� r 11,. �1��! 4%i i1{ - i , l.. � r �/ \. l i't• ��...._..�, [ -r-�'y__ r�f' '�1 -ti l.' �il+Air _� ""%r,•i% �1• �' } i ! �ti� \` ! 1 ( !�! '\ �, h"�_ - 7 S1 1 f'r-�'.- tt .,,_�`\`: ����, � ^i J� ��I 1u �jJ. ;� �; �' _.�•1J �'�� �� ��ru \ \'- \ ' ! 1 ` �- � - _�.\� ' ( ':)'t \ 3 1 i •�„�. � i l.." :'r i $? � �� `���1-r V� I + �.. � w � ` w '` �'\ I � I ` f ' ��. � tit• 4 1 t� rr- `-\,. �' ' }�';--.�ti�Z I�;'\ \J � � � • �. �`�\- �'`�'I. , � � ,' J t'�._ ', ~- w � 1.: —�;��` ;,� •�� ��>`.' ° Ifj�\ l�f'; i�` _ " r "4� ,—; 1--�'r`� I+ , •�\ +�`._ �., ! � .. ..� [� �1 ��`! - t l� iJ�4 1 l` ;,�.� _JY r ' ` ,4\�t� •�l .� \1 • ��.1 V" � ( ' ! k � =' �� ` -. `� 1 \ i(. •1,5�`\ ..'-i}� Slr'�- 1 �J \��- I� ;. f _ 7,� ��•' - ~•-_ ~�f �� l�~ i( `� _ 1�, l�: 1{�� � _ , -�✓ - .._, ���\ -mil. �J 4/� r �— ) 'st f l_ i \� ti �\ ✓. - 1 _ F? j i( d r.�"r,� 1 i ,ti ' J �G!�,..-s;..�=��� r^�� (. ii?�1 \ � .1 ` �_ r ,' 11 l�: 4 :�,s�' "ji J+��"":�.`•� -. �"��_ 1—N � �'�� -,�"•' 3'..`l,..k�t ' l,l„ r w- - ' 'q�1f��` r '�r w j, =�:t.' _� :` - .�SI�i`I�J� r^ �._ _-.. \�• f`-�".�= �_`��'_-�\\ �'%��l e+c `--'',1�•n ti 1\�:.' div _ • _ � � : I � 1 f/ `�J , �� 1,^v�S'�' �_'y�•���.� ��y� IP` F •Y � I (1�S 7 �-- ' ` i i ''Y'. _, �J✓f !rr%� i I �, � '•i`�� Y i-� . l�'` � . \ti\ \ �•[ �\ ,,� _ - ; � , 4 •.'� ✓motif �r •�� . `_ .��` j � �� 1 �. \._� � �`\ � ji .-' � 1��� � =i �ai[}r1i�E :1 - - - _ -=� �. .- .�� \ _ . � I t \\ � _' �_ .� C �-^ . :-� �..�--".r . - a f "_y } .�,�� (� ) � ``mil �i-'ice%' !y' rr' �-', ' � F - wT - �'-•' � ` � Ft �- �.`\ ` _ � '1 \ I - _ \`�'•� } �. - i• � a� '1 '�--� � c �. �r \_� -r a' - Chi- � JISg� I�J F« i --� 31+-7r1 �" �� 1 t1 n r ` • .I - ' ( G-� �'Y ,•\�--�ti; r•� -./ / ;, � :,�: \ ,.11 1 `� �lr">r'- . � � ���'.�(17`�; �/ �: �,'• t.,l\\ - rt_ 1. /-t( .�.� _ •' //c'� -.__ " Ov \. � fly �\��' Jam, ,, ;fir,- � t)�i�'��!(.,�� ,�,���! (1 r;� rl t;/� ';j,�' "� ,fit--,/'�1.� E J Et�;;i�•.�.���' Jf , ,�r r'.:.., '�---, iJ iif �'l� I• •'�I IIJ 1 'b• /`' �� .,v ( \� I� !Il 1` _' 1 , a• -\., i• � tt. r fir,. .�i�- \`f t ' .1 `4! f• �r,'f yyl` i` _ ')I, e ••��` .. 1� { �f+ j„tE� Ct I� � �C �?_ • ,� J �i_ '- ���, ',1 : t 1 �S 6.', � l f .Ir, ,5 y ' •'1 i'•' �! :'t.fl � %. 7 ,I .l '.:A t _ � '/� __ iyl� 14\`;If 1. •� ifrr r'` J I ��1i _ 4'� :. +nj -��5� `� •___% �y1•= �_ i`f �ti; � I � t�� i �. .. jli '� � �.r�� .�::': ���j'L � - ��5� � =/; f,,. .. ,- � ,_�._ �a_� Y;�1n�% f( �. _���— ,!� \ � � ,f %,/�� ! � \ ` "�� t �,'�'r� .� r f/`I�i�-`� \\ �� i{��ra�i. - �o- (1f;'�}�✓ I: f. �S° j I+�,sA /, fl \ l'' •'i •z..,,�v/, 1l��'1 _`'� _ 1 f( . / 1, �V"titi�:\:. r i �' `'`� '�1 f ., r� - �� `~�. �t� \.. �(�''�S• r l `'Nc r �'� r��"! �! �i��' �:-'t\�'�/r s __ �:;� _ '`, I1 rr1'/: `fr� e C r` ` i.`•' /1 ,. � �y��-^'.�lSlJ�r��,_ '�� -.- )`'1 (f��� .f7,F�-t�'��\1•-rl��"'":. ----. •• � J �11\\;ti., � �V{F�II:..t �,IiF'+'�Lwt"-�1���`�:,'1't��y�[-�y \�'.`�,, � ,41'.�'./�' i .. ----'ram-.. -- � �' }I ".-� i;" ���'•,�'' - _j ' �-��%/ •11 1'fSr�i•�'� ��1: �� f.i'--�� `4.� �4_�'- "7� s �,' __. -••'F •f _ 'A i _ �� � iitir- �) /%���r-., - . � '�'.,` i� �—• -1''t' ` I,t° i S S' i ; {';) ; (' `�J � \ \ � ;l:s T-�-=__:-� �' _ _�`�.-.� _ �! -\_fry w !r �I�f, 1!, .%� .�ti\_` �`/�i�` \ `,_`•:mot f 1`t )� � -- J yri" if .�..� S \� 11 �- - '; ?`` ����� _• . / .s/f �_.e�-��"- � �/!Y/il� (, �-y_`= � •��''''~�r` % I �.f-�`�� \ �''/lt \'•��~ _' .£ F + �` r,� ��� } fl -' +, lam'-s. \`+:'` • +$ 6` f ,L_� % t �,,,y' �+' __.J'���I� ���'..1;. ; .�• t,. / � � � 1�.��'1 � ��\`\ • � _ - Yr, l _ � � �! � ' l � 1 �l � t' � . i.� f f ti ,' I��t\ .� 1n�s iw `J , � f � � / � ' y,_. lY :� " �J, �: .1j = r !' /' _ ' '•--/!/'�_ '�:�-� _'_'_��—^— Iill , , � i\� r�S I S 111 1.Lfr 1 11•.11i / --r, �� __ .,` r �- � �')1 [ - 1 �,'J � �I �`• �i�?��-�� if `::'�f � v ` -, lv- „ _ i' - 41• ) � �-- ��' \ j' ; } � . 4�� \ •�� -° • � !'� i I 'rr� '�'�_—'.—%��,�1i�i'-1!� /f ��si) S ..\`� 111 :.-��.\ti i.� (�'ti � } _ r' ,�i �f •j,•Ji,?_�7 ``\'i�_ - `. �' _. _ �. rzi . `'l'. ( . ,.���' .; � fill} -;�, �_�— '. ",- (•�! a ( �, ;V2 f,��/�_S<}S/' ` =1 I +I'�t\.! �+�ai- `V I�� `\Lf J �' r_�L=• L`f I ; ""�`/�� ! i '�-\ _ - _ _t [, .....1j� s {`L� �rS'\l' _ � i - }. \\.•.i £ i^�}r' �,.� r � 1 t 4 : � , .'�� �'. _ t � J + i � _ �i ���� ✓ i--�`l\��' � l - JJfrjr.,-. ---� ( ��\�••-+-� � ,•`�/���'\ J 1 � 1 � r t ����i('.j �(�'U �, � •ii t� 1 - '11�, "`\i�� - �• -'•1 4S� �LFI 1, f � \ _.� ` "',•��'J'�•i'�5� ``-' _./.. y j i j �-' I r `"�\i r;�� � I{..'\� s1` ���1�� -�'.✓ }} o _ ' `•, 11 , _...-�==; ---. ti - +1 1 � L� , Df !.%� %~''f : � / ,ev, / d I ri ,� L f 11i r�, r .. _- __�_ `� ` � � + �_ �- . �+:� `, '4,i �, r,aG+C�r� , \� _�`�`� : , 1.y7 � �t}' L/jr � ,----�;•� I ((�rJ� � � �\1 fG r / ��n.%�-.��'P ` 4 __ -j/ii _� ! �. J f�. ��� ���`4'\S �fll /_ \��•'\ '- � /-Q, "� Ir °' (jI I _-+-\�i�'` e Il � i - , "' _ � �is \ \�"'�' \ r�1: �_�� `r� lLr- { '�« � /, � / J1,� _.•� / i \ f 5-•'� � ti� -`���,r�-��•-� - t �r \.` T.1 • � rl';�j��.1t `\�_ •� �(f � ' _ 11; �., .�' _ •;,l 1 �., ,,;�;�r: I i ��� ' � .-� _ � �t s���.' _: /' -r. ` �! � r +( .-���✓II � r �� \ `� \ 1 �, ' i 1 - •:1 � ��rlr ���/�• � ,J -� I �� t �t� • r � � �S �� rl i/ill j ;•j _ i,�, l'� tit• _._.�. I`y`�kk��\�\`�.\�; � \�// + L `�f'= .- � � �.f.;� i! .'1-r '�~ 1�,,%:�': ��`.�-^' f;.r"I!:�s'r, �._ _ t' '%!ice / �� `�f/�rr•__._ \,`. �.,.%'1 \ r`r ��i '�'ti '1, —�."r'• vt'' t �.Il�r �•f \..J-. 'i�' (f - ,%� ,� ;-\ lJ 1. "w -� c [�•=..._y:\\\,. \�. .\ , - r • .�� ,`Qvl t �t�, /r-_ \�f��\`,yl4t ,��'`-'��'`.. `�t� =�- �'1 t �f if •'"�-�. Sit.• � _ � �' . � � ! : J,1(�ti €: _ LEGEND: v ,waian eKh !-�r ]TN ]i r PRIA /AW PROPERTIES, LLC D]3�NA��DTES: � � m GRADING NOTES: . ........ . _ .d w�. r• . r wm _. r sar r � K w ��" d�"swn x�c .w r�.ie u�wa r..�i e�Y .Mr u a, r� .00... e.• � w., ..R w, . ® � .4`."� «" �_ a.... ,.Q -. rw.� err ...,.� ,. . v°prrr"�`�. � � w�i.' sw. r � vnme� rw.aws . ... �.. w'c'n`m" .aa•• TRL1N LB SITE Dtcslr.N. Yu,Cr Tm—al. My V;.r PLLr te5 W-th— h.L cl.r... Jac 273n (030)559-L570 SUL 0 t 00 a� PA.— Pr.P.,U-. uC 10e5 C Y. b. d ettw.t {th FL.' Charlotte, NC 28804 (704)P64-7220 '704)3a-ewe PzTtgNe IAl01R CUUM m FUXNM im m OIL= tt: m httC E/II/b in Rum 0000G6 aac GRADING AND DRAINAGE PLAN smr rmxft C-4 PRIM& PROPERTIES, LLC V \ S tI? _ r er 1[y , •sir rn -. �1, - i\\ \ `\ a:t,a. ---. � � ~ �~ 6� i' \ 4:t i �l 1 - 111 - 1 � � --i t•` � At Am— LZC Pri� `, e . _ t �\,, � ''�� -- _ \ ,� + � � •, ..�=r'"�' .V � 11�t �ti�7111`, �1t 1� `\\~ _ // 7 71 i_ ' � •� mo. �.. o Y ,1 j - +Y .. •�,l 1 .•�, i f""7 • t _ , �,�` lw �l os.. e..._e.we.. ...._.. 5 71 n� u }.`, .`'\a .`F•,e• "t roes a Lnnh..a s\r..t «n n..r ((704)954 ZF— •�1:;. t [Hoar MOM m 9] DL WAFM 11: m Gl Mal. m•• �r Toe ALSO! OWMD$ EROSION CONTROL PLAN ERASION �ONTRDL NT ❑ C-5 I tarur: 7RtArGNN, �[$ 1-5SITS OSS ?K..,]• Sits D-Lga FUZ res T—te.m •rr.0 c3ZnZ He 178 7 (atpZ-657o F.$QSIDN CDNTRDL NOTES: It1P-X1P •PSIOM pfYEMSf6HSru.. s x o •rr • m�w.r. � da_�x � lour.. woes anror .sn 0•nrl .w m m. 'r`2 sTx CTIO� 1�Ny�, .� •sue a'.� � �..«a . � .ti ,.......r ... �. �r. r�..r ..�.�%�.'�'� � �" ., r�d� ��a �..,K..p' ��.,..e-.m.o .e r... r.m-�.�rr. ®,ar�""�..�.G.a :... r...•.ao .., • — aw ' s�`e•�rsr—iwi w� ur�w a�.a�i � �r+� pia• � w w raw w— �_ sw �. wnorimr m+wmur oruo �.r �..mr.rr n.�.wv. a.m d . •..., m.r- a ..�..o.r � .� ..0 . rm ......-.. � ®.ram. .• met e'�.:r s •; � '^ REQUI�EtF.�d.r �.. :.:.�. ~--'.. ��� .•�W ���.-��arro.•,.• WATER QUALITY/QUANTITY Precipitation Frequency Data Server http://hdsc.nws.noaa.gov/cgi-bi n/hdsc/bui Idout.perl?type=pf&units=u POINT PRECIPITATION A�y�'``` 8 $ FREQUENCY ESTIMATES FROM NOAA ATLAS 14 :yM na North Carolina 35.831 N 80.459 W 698 feet FTorn "Pre cipitalion- Frequency Atlas oFthe United States" NOAA Atlas 14, Volume 2. Version 3 G.M. Bonin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D, Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Tie Aug 4 2009 i I I t , Precipitation Frequency Estimates (inches) ARP 5 10 ° 15 30 60 120 , ' � 10 'E 20 30 45 60 , 3 hr ' 6 hr j 12 hr:24 hr'48 hr4 day '7 day (years}: min .min ,min min i min .min ` 3 1 day dam day d� day 1 0.38 ;0.61 :0.76 1.04 1.30 1.50 1.60 :1.94 :2.29 �2.75 3.19 3.59 4,14 ;4.72 ;6.34 7.$5 9.88 1 f .7$ 2 :0.45 ,0.72 ,0.91 125 .1.57 ;1,82 1.94 i2.34 2.76 •3.31 3.83 '4.30 4.93 15.61 7.49 �9.23 11.56 13.72 5 i0.53 �0.84 :1.07 0.52 1.94 '2.27 2.42 !2.93 3.46 '4.16 �4.77 5.30 5.99 :6.73 :8.84 110.71 �13.19 15.47 .. 10 '0.58 10.93 11.17 '1.70 2.21 12.60 2.79 3.38 --........5.49 4.01 ...82 6.08 6.83 7.6111.85 9,91- i 9.91 , i 14.44 ;16.81 25 '0.64 ;1.02 11.29 A.91 .`2.54 13.04 3.27 �398 4.76 '5.71 16,46 1,7,14 17.96 8.78 1 1.35 ,13.34 .16.07 18.52 50 �0 68 AM 11.37 :2.06 2.79 3.36 3.64 4.45 `5.35 '6.42 17.23 7 98 8.86 -19,70 ;.12.47 ;14.48 17.30 , 19.81 100 10,71 11.13 11.43 ,2.19 3.02 13,68 4.00 A.92 :5.96 7.14 '8.00 •8.83 9,76 10.63 .13.61 15.61 18.50 21.05 200 0.74 11.18 j1.49 i2.31 3.24 ;3 99 '4.37 ,5.40 6.58 ,7.89 18.79 i9.70 10,69 •[ 1.56 14.76 116,73 '19.67 '22.24 500 '0.78 i1.23 1.54 '2.46 3.52 4.40 4.85 ;6.05 ':7.43 ,8.90 ;9.86 10.88 ,11,95 12.$2 1b.31 ,1$.21 21,21 23.77 1000 .0.80 ,1.25 ' 1.58 ,2.55 ,'3.73 4.70 '5.21 16.54 8,08 -9.69 10.69 ;1 1,81 12.93 13.80 17.5 l 19.34 22.36 24.91 OF 1 Sheet Flow Time of Concentration Calculation (Tc) Drainage Area: 1.1 Surface description = Short Grass Roughness, n = 0.15 Length, L = 160 ft Average slope, s = 0.047 ft/ft Two-year 24-hour rainfall, P2 = 3.5 in Shallow Concentrated Flow Surface = Length, L = Average slope, s = Velocity = Channel Flow 1 Cross Sectional Flow Area, A = Wetted Perimeter, Pw = Hydraulic Radius, r = A / Pw = Channel slope, s = Roughness, n = Flow Length, L = Channel Flow 2 Cross Sectional Flow Area, A = Wetted Perimeter, Pw = Hydraulic Radius, r = A / Pw = Channel slope, s = Roughness, n = Flow Length, L = Unpaved 80 ft 0.300 ft/ft 3.7 fps Total Time T, = Tt, + Tt2 + Tt3 + .....+ Ttm 41 ft2 17 ft 2.41 ft 0.030 ft/ft 0.024 Oft 60 ff 21 ft 2.86 ft 0.012 ft/ft 0.024 Oft See TR-55 Table 3-1 0.007 nL °'6 Tt = (P2)0.5 So.a T, = 0.1616 hr + See TR-55 Figure 3-1 T, = L / 3600V T, = 0.0061 hr Velocity = 1.49 ra.667 sa.s n Velocity = 19.34 fps T, = L / 3600V Tt= 0hr Velocity = 1.49 ro.667 s°.s n Velocity = 13.52 fps T, = L / 3600V Tt = 0 hr T, = 0.1677 hr - 10.06 miry Dollar General - Triangle Site Design, PLLC BMP Pond Drain ge Area (acres). Curve Number Calculation (CN) Post -Developed Conditions 1.1 Existin soil Grou s' 5od Group Map Symbo! B CfB2 Proposed_ Land_ Uses. Land Use Description Open Space - Good Condition Impervious - Pavement/Bldg Soil Description Acres Percent of DA_ Clifford Sandy Clay Loam 1.1 100% Existing 8oil_Group Acres Curve # Weighted GN CfB2 CfB2 0.43 61 23.8 Cf62 Cf82 0.67 98 59.7 Cumulative Curve # = 83.5 Dollar General - Triangle Site Design, PLLC BMP Pond Drainage Area (acres) Existing Soil Groups Existing Land Uses: Curve Number Calculation (CN) Pre -Developed Conditions 1.1 Soil Group Map Symbol B CfB2 Land Use Description Open Space - Good Condition Impervious - Pavement/Bldg Soil Descri tion Acres Percent of DA Clifford Sandy Clay Loam 1.1 100% Existing Soil Group Acres Curve # Weighted CN CfB2 1.03 61 57.1 CfB2 0.07 98 6.2 Cumulative Curve # = 63.4 Pond Summary - BMP Pond Drainage Area (acres): Curve Number: Time of Concentration (minutes): Q 1-year (cfs): Q 10-year (cfs): Q 50-year (cfs): Outlet Controls: Permanent Pool Elevation: Min. Required Surface Area (so: Surface Area provided (so: Design Storm : design storm storage volume required (co: design storm storage volume provided (co: Drawdown time for design storm (days): Design Storm control. Incremental Weir elevation: Incremental Weir width (in): Incremental Weir height (in). # Weir Openings: Q 1-year routed through pond (cfs): 1-year storm elevation: Q 10-year routed through pond (cfs): 10-year storm elevation: Riser structure outfall: Emergency Spillway Elevation: Emergency Spillway Width: Q 50-year routed through pond (cfs): 50-year storm elevation: Top of dam elevation: Pre -Developed 1.1 63.4 10 4.032 6.274 7.389 836.5 1,682 3,775 1" 2,369 2,812 2.27 1" opening @ 836.5 837.1 24 4 2 2.096 837.43 2.888 837.8 15" HDPE 837.9 16 3.637 837.98 839 Post -Developed 1.1 83.5 5 4.728 7.277 8.547 Post -Developed routed through pond (Based on 90% T55 Removal) < Q 1-year pre -developed < Q 10-year pre -developed Riser is emergency spillway < Q 50-year pre -developed 2.096 2.888 3.637 Proposed Wet Pond #1 Project Information Project Name: Dollar General Project #: Designed by: MEL Date: Revised by: Date: Checked by: Date: Site Information Sub Area Location: Drainage To Proposed Pond#1 Drainage Area (DA) = 1.1 Acres fmpervious Area (IA) = 0.66 Acres Percent Impervious (I) = 60.4 % Required Surface Area Permament Pool Depth: 3 ft SA/DA = 3.51 (90% TSS Removal via Wet Pond) Min Req'd Surface Area = 1,682 sf (at Permanent Pool) Required Storage Volume Design Storm = Determine Rv Value = Storage Volume Required 1 inch 0.05 + .009 (1) = 0.59 in/in 2,369 cf (above Permanent Pool) Elevations Top of Pond Elevation = 839.00 ft Temporary Pool Elevation = 837.10 ft Permanent Pool Elevation = 836.50 ft Shelf Begining Elevation = 837.00 ft Forebay Weir = 836.00 ft Shelf Ending Elevation = 836.00 ft Bottom Elevation = 831.00 ft Permanent Pool Area Area @ Top of Permanent Pool = 3,775 sf Volume of Temporary Storage = 2,812 cf Is Permenant Pool Surface Area Sufficient (yes/no)? Yes Is Temporary Storage Volume Sufficient (yes/no)? Yes 3775 > 2812 > 1682 ) sf 2369 ) cf Incremental Drawdown Time Project Information Project Name: Project #: Designed by: Checked by: STORMWATER POND INCREMENTAL DRAWDOWN METHOD Date: Date: Water Quality_ Orifice_ ' Incremental Determination of Water Quality Volume Drawdown Time Zone 2 Orifice Diameter (D) = Cd = Ei = Zone 1 Range = Zone 2 Range = Zone 3 Range = Qs = 0.0437 Cp ' Dz (Z-Dl24-Ei)^"" Qz = 0.372 Co ' D'(Z-Ei)^Ivzi Q, = 0 1 in 0.6 836.5 Orifice Inv. to 836.5 836,5 to 836.7 836.7 to 24.9 Incremental Drawdown Method Countour Contour Afea Incremental Volume Stage, Z Zone Q Drawdown Time sq ft cu ft ft cfs min 836.50 3,775 0 0.00 2.00 0.000 -- 836.70 4582 836 0.20 3.00 0.010 1,335 836.90 4965 955 0.40 3.00 0,016 1,014 837,00 5116 504 0.50 3.00 0.018 473 837.10 5238 518 0.60 3.00 0.020 440 Total 2,812 -- 3,262 Drawdown Time = Incremental Volume 1 Q 160seclmin Summary Total Volume = 2,812 cf Total Time = 3,262 min Total Time = 2.27 days 8/31 /2009 Prop Wet Pond.xls Iof1 Project: Pond # 1 Date: 8/4/2009 Pond Contours -Volumes Elevation Pond Forebay Total -Areas Incremental Vol. Accumulated Vol. Description 839 7,702 0 7,702 7,177 22,665 838 6,652 0 6,652 5,350 15,488 837.1 5,238 0 5,238 518 10,137 837 5,116 0 5,116 504 9,620 836.9 4,965 0 4,965 955 9,116 836.7 4,582 0 4,582 836 8,161 836.5 2,465 1,310 3,775 1,604 7,325 A2 (Perm_Poo)) 836 1,660 980 2,640 2,278 5,722 Al (Bottom_Shelf) 835 1,250 665 1,915 1,600 3,444 834 900 385 1,285 1,018 1,844 833 600 150 750 556 827 832 362 0 362 271 271 831 179 0 179 0 0 A3 (Bottom -Pond} 830 Forebay Contours -Volumes Elevation FBI FB2 FB3 Total -Areas Incremental Vol. Accumulated Vol. 836.5 1,310 1,310 424 1,514 836 980 980 565 1,090 835 665 665 333 525 834 385 385 193 193 833 150 150 75 75 832 0 0 0 0 Average Depth (Option 1) 1.9405 *At least 3' average depth Forebay Volume 0.2066 *Above 20% Average Depth Calculation (Option 2) Al (Bottom_Shelf): 2,640 A2 (Permanent -Pool): 3,775 A3 (Bottom -Pond).- 179 Depth: 5 Average Depth = 3.09 Project Information Proposed Wet Pond #1 Project Name: Dollar General Project #: Designed by: MEL Date: Revised by. Date: Checked by: Date: Site Information Sub Area Location: Drainage Area (DA) _ Impervious Area (IA) _ Percent Impervious (1) _ Orifice Sizing Drainage to Proposed Pond 1.1 Acres 0.7 Acres 60.4 % (Drainage Area) Orifice Size = 1.0 in (Diameter) Drawdown Time = 2.3 days (Incremental Draw Down Method) less than 5 days (yes/no) ? yes greater than 2 day (yes/no) ? yes Anti -Flotation Device 4' x 4' Inlet Structure Area: 16.0 sf Volume: 128.0 cf Weight: 7987 Ibs Factor of Safety 1.20 WT Req'd of Anti -Flotation Device: 9,585 Ibs Volume of Concrete Req'd: 63.9 cf Volume Provided: 77.6 cf Sediment Storage L20=2.3CA(.0091+.05) C = 50.00 mgll A = 1.10 ac I = 60.36 % L20 = 75.05 cf depth 1.00 ft Area required 75 sf Area Provided 6,274 sf Depth of Sediment Storage Required 0.01 ft Depth of Sediment Storage Provided 1.00 ft (Water Displaced - Top of Pond to Bottom of Pond) (Unit WT of Concrete = 150 pcf) (4'x4' riser x 2.6' = 41.6cf, 6'x6' footing x 1' = 36cf) Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3M 2009 by Autodesk, tnc. v6.066 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.100 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.21 in Storm duration = 24.00 hrs 2 Tuesday, Aug 4, 2009 Peak discharge = 4.032 cfs Time to peak = 726 min Hyd. volume = 8,810 cuft Curve number = 63.4 Hydraulic length = 0 ft Time of cone. (Tc) = 10.00 min Distribution = Synthetic Shape factor = 484 BMP Pre -Developed Q (cfs) Hyd. No. 1 -- 1 Year Q MS) 5.00 5,00 4.00 4.00 3.00 3,00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 - Hyd No. 1 Time (min) fHydrograph Report 7 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2009 by Aulodesk, Inc. v6.066 Tuesday, Aug 4, 2009 Hyd. No. 1 BMP Pre -Developed Hydrograph type = SCS Runoff Peak discharge = 6.274 cfs Storm frequency = 10 yrs Time to peak = 726 min Time interval = 1 min Hyd. volume = 18,587 cuft Drainage area = 1.100 ac Curve number = 63.4 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 10.00 min Total precip. = 4.65 in Distribution = Synthetic Storm duration = 24.00 hrs Shape factor = 484 BMP Pre -Developed Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 7.00 7.00 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 1 Time (min) 4 Hydrograph Report 11 Hydrailow Hydrographs Extension for AutoCAD® Civil 3D@ 2009 by Autodesk, Inc. v6.066 Hyd. No. I BMP Pre -Developed Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 1.100 ac Basin Slope = 0.0 Tc method = USER Total precip. = 8.08 in Storm duration = 24.00 hrs 0 (cfs) 8.00 MIIrl 4.00 2.00 0,00 f- I I I 0 120 240 360 -- Hyd No. 1 BMP Pre -Developed Hyd. No. 1 -- 50 Year 480 600 Tuesday, Aug 4, 2009 Peak discharge = 7.389 cfs Time to peak = 726 min Hyd. volume = 32,258 cuft Curve number = 63.4 Hydraulic length = 0 ft Time of cone. (Tc) = 10.00 min Distribution = Synthetic Shape factor = 484 Q (cfs) 8.00 . 11 4.00 2.00 I I I I I 1 0.00 720 840 960 1080 1200 1320 1440 Time (min) Hydrograph Report R] Hydraflow Hydrographs Extension for AUtoCAD® Civil 3DQ 2009 by Autodesk, Inc. v6.066 Hyd. No, 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 1.100 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 2.21 in Storm duration = 24.00 hrs 'Tuesday, Aug 4, 2009 Peak discharge = 4.728 cfs Time to peak = 724 min Hyd. volume = 9,085 cuft Curve number = 83.5 Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Synthetic Shape factor = 484 BMP Post -Developed Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 5,00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 Time (min) Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 1,100 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 4.65 in Storm duration = 24.00 hrs Q (cfs) 8.00 .MI 4.00 2.00 0.00 -' 0 120 Hyd No. 2 BMP Post -Developed Hyd, No. 2 -- 10 Year Tuesday, Aug 4, 2009 Peak discharge = 7.277 cfs Time to peak = 724 min Hyd. volume = 19,168 cuft Curve number = 83.5 Hydraulic length = 0 ft Time of cone. (Tc) = 5.00 min Distribution = Synthetic Shape factor = 484 240 360 480 600 720 840 960 1080 Q (cfs) 8.00 OEM 4.00 2.00 0.00 1200 Time (min) a Hydrograph Report Hydraflow Hydrographs Extension for Au[oCAD® Civil 30® 2009 by Autodesk, Inc. v6 066 Hyd. No. 2 BMP Post -Developed Hydrograph type = SCS Runoff Storm frequency = 50 yrs Time interval = 1 min Drainage area = 1,100 ac Basin Slope = 0.0 % Tc method = USER Total precip. = 8.08 in Storm duration = 24.00 hrs Q (cfs) 10.00 M . M 4.00 2.00 0.00 J 0 120 240 Hyd No. 2 BMP Post -Developed Hyd. No. 2 -- 50 Year 360 480 600 720 840 12 Tuesday. Aug 4, 2009 Peak discharge = 8.547 cfs Time to peak = 724 min Hyd. volume = 33,266 tuft Curve number = 83.5 Hydraulic length = 0 ft Time of cons. (Tc) = 5.00 min Distribution = Synthetic Shape factor = 484 Q (cfs) 10.00 M 4.00 2.00 1 ;_ �. 0.00 960 1080 1200 1320 1440 Time (min) j ^ Pond Report Hydraflow Hydrographs Extension for AutOCAD® Civil 3D® 2009 by Autodesk, Inc. v6.066 Pond No. 1 - BMP Pond Pond Data Contours - User -defined contour areas. Conic method used for volume calculation. Begining Elevation = 836.50 ft Stage ! Storage Table Stage (ft) Elevation (ft) 0,00 836.50 0.20 836.70 0.40 836.90 0.50 837.00 0,60 837.10 1.50 838.00 2.50 839.00 Contour area (sgft) 3.775 4,582 4,965 5,116 5,238 6,652 7.702 Culvert 1 Orifice Structures [A] [B] [C] [PrfRsr] Rise (in) = 15.00 1.00 4.00 0.00 Span (in) = 15.00 1.00 24.00 0,00 No. Barrels = 1 1 2 0 Invert El. (ft) = 836.50 836.50 837.10 0.00 Length (ft) = 30.00 0.50 0.50 0.00 Slope (%) = 0.67 1.00 1.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0,60 0.60 Multi -Stage = nla Yes Yes No Incr. Storage (cult) 0 834 954 504 518 5,337 7,170 Total storage (cult) Weir Structures 0 834 1,789 2,293 2,810 8.148 15,317 G1 Tuesday, Aug 4, 2009 [A] [B] [C] [D] Crest Len (ft) = 16.00 0.00 0.00 0.00 Crest El. (ft) = 837.90 0.00 0.00 0.00 Weir Coeff. = 3.33 3.33 3.33 3.33 Weir Type = Riser --- --- --- Multi-Stage = Yes No No No Exfil.(inlhr) = 0.000 (by Contour) TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (icl and outlet (oc) control. weir risers checked for orifice conditions (ic) and submergence (s). Stage 1 Storage 1 Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr WrA Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 836.50 0.00 0.00 0.00 0.00 -- --- --- --- --- 0.000 0.20 834 836.70 0.01 is 0.01 is 0,00 --- 0.00 --- 0,010 0.40 1,789 836.90 0.02 is 0.02 is 0.00 --- 0.00 --- --- --- -- --- 0,015 0.50 2,293 837,00 0.02 is 0.02 is 0.00 --- 0.00 -- - 0.017 0.60 2,810 837.10 0.02 is 0.02 is 0.00 --- 0.00 --- --- --- --- --- 0.019 1.50 8,148 838.00 3.86 oc 0.01 is 2,17 is --- 1.68 --- --- --- -- 3.861 2.50 15,317 839.00 8.00 oc 0,00 is 0,37 is --- 7.63 s --- --- - - 8.003 1. 4 Hydrograph Report Hydrafiow Hydrographs Extension for AuloCADQ Civil 3D D 2009 by Autodesk, Inc. v6.066 Tuesday, Aug 4, 2009 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Peak discharge = 2.096 cfs Storm frequency = 1 yrs Time to peak = 731 min Time interval = 1 min Hyd. volume = 7,777 cuft Inflow hyd. No. = 2 - BMP Post -Developed Max. Elevation = 837.43 ft Reservoir name = BMP Pond Max. Storage = 4,754 cuft Storage Indication method used, Post Through Pond Q (cfs) Hyd. No. 3 -- 1 Year Q (cfs) 5.00 5.00 4.00 4.00 3.00 3.00 2.oa 2.00 1.00 1.00 o.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 3 - Hyd No. 2 Total Time (min)- storage used = 4,754 cuff { Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. A.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. Elev (ft) 839.00 838.00 837.00 836.00 ' I' 0 2 4 1, BMP Pond Post Through Pone! Hyd. No. 3 -- 1 Year Tuesday, Aug 4, 2009 Peak discharge = 2.096 cfs Time to peak = 731 min Hyd. volume = 7,777 cuft Max. Elevation = 837.43 ft Max. Storage = 4,754 cuft 6 8 10 12 14 16 18 20 22 Elev (ft) 839.00 838.00 837.00 -L 836.00 24 Time (hrs) .Hydrograph Report 9 Hydraflow Hydrographs Extension for AutoCADO CivR 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. Q (cfs) 8.00 . 11 4.00 0.00 - 0 120 240 Hyd No. 3 Post Through Pored Hyd. No. 3 -- 10 Year 360 480 600 Hyd No. 2 Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage Tuesday, Aug 4, 2009 = 2.888 cfs 733 min = 17,798 tuft = 837.80 ft = 6,982 cuft Q (cfs) 8.00 . 11 111 2.00 0.00 720 840 960 1080 1200 1320 1440 Time (min) a.� 11, Total storage used = 6,982 tuft Hydrograph Report Hydraflow Hydrographs Extension forAutoCADO C'M1 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. Elev (ft) 839.00 : 11 837.00 836.00 ' ' ' 0 2 4 1. BMP Pond Post Through Pond Hyd. No. 3 -- 10 Year Tuesday, Aug 4, 2009 Peak discharge = 2.888 cfs Time to peak = 733 min Hyd. volume = 17,798 cult Max. Elevation = 837.80 ft Max. Storage = 6,982 tuft 6 8 10 12 14 16 18 20 22 Elev (ft) 839.00 837.00 —L 836.00 24 Time (hrs) Hydrograph Report HydraFlaw Hydrographs Extension for AutoCAD AO Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 1 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. Post Through Pond Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage 13 Tuesday, Aug 4, 2009 = 3.637 cfs = 733 min = 31,844 cuft = 837.98 ft = 8,006 tuft Q (cfs) Hyd. No. 3 -- 50 Year Q (cfs) 10.00 10.00 8.00 8.00 6.00 6.00 4.00 4.00 2.00 2.00 0.00 - - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 - Hyd No. 2 ,,,r 9 Time (min) Total storage used = 8,006 cu#t Hydrograph Report Hydraflow Hydrographs Extension for AutoCADO Civi! 3D® 2009 by Autodesk, Inc. v6.066 Hyd. No. 3 Post Through Pond Hydrograph type = Reservoir Storm frequency = 50 yrs Time interval = 1 min Inflow hyd. No. = 2 - BMP Post -Developed Reservoir name = BMP Pond Storage Indication method used. Elev (f#) 839.00 838.00 837.00 836.00 ' ' — ' 0 2 4 — 1. BMP Pond Post Through Pond Hyd. No. 3 -- 50 Year Tuesday, Aug 4, 2009 Peak discharge = 3.637 cfs Time to peak = 733 min Hyd. volume = 31,844 tuft Max. Elevation = 837.98 ft Max. Storage = 8,006 tuft 6 8 10 12 14 16 18 20 22 Elev (ft) 839.00 837.00 ' 836.00 24 Time (hrs) Hydrograph Summary Re PP' Hydr-afTow Hydrographs Extension for AutoCAD® Civii 3D® 2449 by Aufodesk, Inc. v6.466 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph description 1 SCS Runoff 4.032 1 726 8,810 ------ ------ BMP Pre -Developed 2 SCS Runoff 4.728 1 724 9,085 ------ ------ ------ BMP Post -Developed 3 Reservoir 2.096 1 731 7,777 2 837.43 4,754 Post Through Pond Mocksville_Pond.gpw Return Period: 1 Year Tuesday, Aug 4, 2009 Hydrograph Summary Repp lydrra#iow Hydrographs Extension for AutoCAD® Civil 3DO 2009 by Autodesk, Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph description 1 SCS Runoff 6.274 1 726 18,587 ------ — ------ BMP Pre -Developed 2 SCS Runoff 7.277 1 724 19,168 — ------ ------ BMP Post -Developed 3 Reservoir 2.888 1 733 17,798 2 837.80 6,982 Post Through Pond Mocksvi(le_Pond.gpw Return Period: 10 Year Tuesday, Aug 4, 2009 10 Hydrograph Summary Repr ydra ow Hydrographs Extension for AutoCRD R0 Civil 3D® 2009 by Autodesk. Inc. v6.066 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation N Total strge used (tuft) Hydrograph description 1 SCS Runoff 7.389 1 726 32.258 ------ ------ ------ BMP Pre -Developed 2 SCS Runoff 8.547 1 724 33,266 ------ ---- ------ BMP Post -Developed 3 Reservoir 3,637 1 733 31,844 2 837.98 8,006 Post Through Pond Mocksville_Pond.gpw Return Period: 50 Year Tuesday, Aug 4, 2009 EROSION CONTROL CALCULATIONS - w SEDIMENT TRAP CALCULATIONS EROSION CONTROL CALCS -CUSTOM BASIN Project Information Project Name: DG-Mocksville Project #; 002005 Designed by: Date. Revised by: Date: Checked by. Date: Sediment Basin 10-year Runoff (Q10) A = 1.20 Ac C = 0.50 T� = 5.00 min i10 = 7.03 in/hr Q10 = 4.2 efs Surface Area Required SA = 435 x 010 SA = 1335 sf Volume Required VR = 3600 cl/Ac x AD VR = 4320 cf Sediment Trap Dimensions L = 62 ft W = 30 ft D = 3.3 ft Sideslopes = 2 : 1 L lop L ioQ = 68 It W �.p = 36 fi W ico W" Lb., = 49 ft L boi W bey = 17 ft Description Elevation Area Elevations & Areas Top of Berm 838.8 2448 Cleanout Elev. 835,7 Spillway 837,3 1860 Surface Area Provided Bottom 834.0 820 Volume Provided VP = 4420 cf Spillway - 10Year Storm h = 0.5 ft C. = 3.1 Lw= 4.0 It (sized to pass 01o) (10.0' Minimum) Sediment Basin.xls 8/13/2009 Page 1of1 , EROSION CONTROL CALCS (RIP -RAP CALCULATIONS) Project Information Project Name: Dollar General - Mocksville Project #1 _ 0020_C5 _ Designed by: Date: Revised by: Data: Checked by: Date: Pipe Outfalllti Pond Outfall Pipe Diameter d= 12 Pipe Slope s= 05 % Manning's number n= 0.013 Flow 0= 1 5 cis Velocity V = 2 00 IVs Dissipater DimensionsZone = 2 Slone Fitting Class = t3 Entry Width {3X Do)= 30 ft Length { 6 X Do) = 6.0 ft Width (La . Ds) = 7.0 it Min. Thickness = 22 inches Min. Slone Diameter-- 6 inches 6.0 r 1 3.0 7.0 NI unss are n feel ❑is"tor pad d espned for full saw of pipe Pipe Diameter d= 15 in Pipe Slope 5= 0.8 % Nl8m1ing'S numbs( n= 0,013 Flow o= 2.9 cis Velocity V = 2.00 IV$ Dissipater Dimensions' Zone = 2 Slone Filling Class = B Entry Width X Do = 3.8 ft Length { 6 X Do) = 7.5 ft Width (La * Do) = 8.8 ft Min. Thickness = 22 inches Min. Stone Dwmetsr- 6 inches h 7.5 r 3.8 8.8 ' NI untie are in feet Ll"petor pad desgned for full 11— of pipe RIP-RAP.xIs 8113/2009 Page t of 1