Loading...
HomeMy WebLinkAboutSW1080801_CURRENT PERMIT_20090514STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ��pO DOC TYPE %CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE YYYYMMDD ALIT,+ A MA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 14, 2009 Cashiers Canoe Club Development, LLC Steven G. Harris- Operation Manager 1600 Camden Rd. Charlotte, NC 28203 Subject: Stormwater Permit No. SW 1080801 Canoe Club Low Impact Development Jackson County Dear Mr. Harris: The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Canoe Club on April 9, 2009. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000. We are forwarding Permit No. SW1080801, dated May 14, 2009, for the construction, operation and maintenance of'the subject project and the stormwater BMPs. ']'his permit shall be effective from May 14, 2009 until May 14, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the storinwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 2761 1-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Asheville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Linda Wiggs or Stormwater Staff at 828- 296-45 00. Sincerely, } 4 le° for Coleen H. Sullins cc: Asheville Regional Office Central Files SI'U Files -..._ ---- ----- . GAWPDATA\DEMWQUackson\Sinte Stormwater ManagcmentlCanoeCIub\CanocClubLID Cover fctter,doe Asheville Regional Office One 2090 US HWY 70, Swannanoa, NC 28778 NorthCarolina Phone : www,n.wa0e FAX:.org 9-7043 4 Customer Service: i 877 623 &748 Naturally Internet: www,newalerquality.org ` 1 i/ An Equal opportunity 4 Affirmative Action Employer State Stormwater Permit Permit No. SW1080801 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW IMPACT DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Steven G. Harris/Cashiers Canoe Club Development, LLC Canoe Club Cashiers Lake Road, Cashiers NC, Jackson County FOR THE construction, operation and maintenance of a Low Impact Development in compliance with the provisions of 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans, application, LID-EZ Spreadsheet supplement form and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from May 14, 2009 until May 14, 2019 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application, LID-EZ Spreadsheet supplement form and other supporting data as attached and on file with and approved by the Division of Water Quality. 2. This stormwater system has been approved for the management of stormwater runoff as described the LID-EZ Spreadsheet supplement form in Appendix A of this permit. The subdivision is permitted for 54 lots (49 lots and 5 villages), each limited to a maximum amount of built -upon area as indicated in Appendix B of this permit. 3. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 4 State Stormwater Permit Permit No. SW1080801 II. SCHEDULE OF COMPLIANCE No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. if an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built - upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall -provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the stormwater management system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 9. If the stormwater management system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 2 of 4 State Stormwater Permit Permit No. SW1080801 11. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 12. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 13. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 14. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW1080801, as issued by the Division of Water Quality under the stormwater rules. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The subdivision is permitted for 54 lots (49 lots and 5 villages), each limited to a maximum amount of built -upon area as indicated in Appendix B of this permit. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Built -upon area in excess of the permitted amount will require a permit modification. h. Covenants and Restrictions will restrict future property owners from further clearing or additional land disturbance -on their lots_ 15. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 16. Prior to transfer of the permit, DWQ personnel will inspect the stormwater facilities. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 3 of 4 State Stormwater Permit Permit No. SW1080801 III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed Name/Ownership Change Form must be submitted to the Division of Water Quality, signed by the parties involved. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Failure to abide by the terms and conditions contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 6. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. The approved plans and specifications, LID-EZ spreadsheet supplement form and other supporting data for this project are incorporated by reference and are enforceable parts of the permit. 8. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 10. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 14th day of May 2009. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION P'5'W"-J C4-. zEzve& for C I n H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 4 Canoe Club Jackson County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 1 of-2 Canoe Club Jackson County Certification Requirements: The planned development consist of the [number] residential units and [number] common open space areas. 2. Homesites are accessed by gravel roads and shared drives. 3. All jurisdictional waters and wetlands are identified and protected. Impacts to wetlands and streams are prohibited and a 30 foot undisturbed buffer measured from the normal water elevation if all surface waters is maintained. 4. Stormwater runoff is handled through low impact development practices. Storage devices include (number) vegetated swales (number) bio- retention cells, and (number) filter strips. 5. Stormwater runoff is effectively dispersed and discharged in a sheet flow along the project natural drainage paths. 6. Disconnected impervious surfaces account for approximately % of the total impervious surfaces. Disconnected impervious surfaces are treated by a natural wooded filter strip at least fifty feet in width. 7. Structures such as residences and garages are constructed so that stormwater runoff from these areas will sheet flow and infiltrate into the ground. 8. Stormwater runoff from connected impervious areas (i.e., roads and driveways and residential units where runoff flow path is less than 50 feet in length/width) are initially treated by infiltration swales and rain gardens before being ultimately treated by wooded filter strips. 9. Infiltration swales and rain gardens are designed and constructed in accordance with Rule 15A NCAC 02H .1008. Infiltration swales are provided throughout the development along roadways and shared driveways. Checkdams along swales are properly installed and maintained. 10. A total of acres is dedicated as common open space, or approximately % of the entire development. 11. Sensitive stream banks within open space areas are protected by riparian buffers. 12. Plunge pool level spreaders are placed at the outlet of each pipe. cc: NCDENR-DWQ Regional Office Page 2 of 2 Appendix A Canoe Club I III-F7 SnrPadsheet �T� . y' ;, fir, ,..: -� �. ! �`�, µ _"'4•, '� �M KS� r Project: 6007047 ► DWQ USE ONLY Bate Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Reso Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATI 7'Iris form may be photocopied for use as an original sr 1 �1 N FORM VVAT�fjQIJAUTY SECTtO[' pcur�rll_4G 1ZEG101 `= r 1. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): ,�f -11 Cashiers Canoe Club Development, LLC 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compllan' ce)a��l-� Steven G. Harris Operations Manager �4 3. Mailing Address for person listed in item 2 above: �c.►� 1'� 1600 Camden Road V City: Charlotte State: NC Zip:-2fiN8 2�2D3 Phone: 704 377.6224 Fax: 704. 342.3453 Email: sieve@harrisdevelopmentgroup.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Canoe Club 5. Location of Project (street address): Cashiers Lake Road City: Cashiers County: Jackson Zip: 28717 6. Directions to project (from nearest major intersection): Approximately 2300 feet down Cashiers Lake Road to the intersection of Cashiers School Road. 7. Latitude:35° 06'20 " N Longitude:83°06'11" W of project 8. Contact person who can answer questions about the project: Name: Marty Kocot, PE Telephone Number: 828.281 .1447 Email:mkocot©landdesign.com IL PERMIT INFORMATION: 1. Specify whether project is (check one): ®New []Renewal ❑Modification Form SWU-101 Version 03.27.08 Page of'4 G:1_200n60070471Docs\Permit Forms\NCDENR StormwaterlLow Density\Permit=07047 Slormwaler Management Application.Doc Land Design r Project: 6007047 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): ®Low Density []High Density []Redevelop ❑General Permit []Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit ®NPDES Stormwater III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Stormwater will be treated utilizing vegetative conveyances and non-structural BMP's. 2. Stormwater runoff from this project drains to the Savannah River basin. Classification B; Tr, ORW 3. Total Property Area: 53.79 acres 4. Total Wetlands Area:.22 acres 5. 100' Wide Strip of Wetland Area: 0 acres (not applicable if lro wetlands exist on site) 6. Total Project Area": 6.40 acres 7. Project Built Upon Area: 11.89 8. How many drainage areas does the project have? 2 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high densitv oroiects. complete the table with one drainage area for each eneineered Stormwater device. -Basin Information ,,a,Drainage.Areatl :, a Drainage Area' Receiving Stream Name Tributary (west) Tributary (east) Stream Class & Index No. B, Tr, ORW, 3 B, Tr, ORW, 3 Total Drainage Area (sf) 1,313,334 1,845,637 On -site Drainage Area (sf) 72,751 690,881 Off -site Drainage Area (sf) 1,240,583 1,154,756 Existing Impervious' Area (sf) 82,328 83,788 Proposed Impervious"Area (sf) 10,563 130,527 9% Impervious'r Area (total) 7.07% 11.61% Impervious' Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (sf) 1,808 67,741 On -site Streets (sf) 8,755 62,786 On -site Parking (sf) Included in streets Included in streets On -site Sidewalks (sf) 0 0 Other on -site (s€) 0 0 Off -site (sf) 82,328 42,015 Total (sf): 92,891 172,542 " Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. "Total project area shall be calculated based on the current policy regarding inclusion of zoetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BLIA). Form SWU-l01 Version 0327.08 Page of 4 G:1_2007160070471Docs\Permit Forms\NCDENR StormwaleLow DensitoPermit16007047 Stormwater Management Application.Doc LandDesign Project: 6007047 10. How was the off -site impervious area listed above derived? High definition orthogonal images provided b Jackson County, field shot survey data, and site visit verification. Areas determined by polygons in IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.etir.state.iic.us/su/bnip forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-b Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from htt h2o.enr.state.nc.us su bm forms.lhtm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off -Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page of 4 G:L2007160070471Docs\Permi1 FormsNNCDENR Stormwater\Low DensityAPermkt 6007047 Stormwater Management Application.Doc Land Design Project: 6007047 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at htlp:Hh2o.etir.state.nc.us/sti/nisi maps.htm} 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form /7f' • Original and one copy of the Deed Restrictions & Protective Covenants Form (if rhl).h required as per Part IV above) ,,",,� • Original of the applicable Supplement Form(s) aI rnd O&M agreement(s) for each BMP ► dt • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) payable to NCDENR i t fx+ ► • Calculations & detailed narrative description of stormwater treatment/management 07-A-- • Copy of any applicable soils report • Two copies of plans and specifications (sealed, signed & dated), including: iiYYF� - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) Designated agent (individual or firm): Marty Kocot, PE LandDesign, Inc. Mailing Address:1 Page Avenue, Suite 220 City: Asheville State: NC Zip: 28801 Phone: 828. 281.1447 Fax: 828. 281.1449 Email: mkocot@landdesign.com VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, itern 2) Steven G. Harris , certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recordecy,, and that the proposed project complies with the requirements of 15A NCAC 21-1.1000. Signature: Date: /2' LZ• 08 Form SWU-101 Version 03.27.08 Page of 4 (3:L200716007047 0=APermit Forms\NCDENR StormwaterlLow Densit)APermit16007047 Stormwater Management Application.Doc LandDesign NC DENR - DIVISON OF WATER QUALITY Alphabetic list of NC Waterhodies SAVANNAH RIVER BASIN Name of Stream Subbasin Stream Index Number Map Numher Class (North) Fowler Creek SAVO1 3-1-(2) G06SE2 C;Tr:+ (North) Fowler Creek (Hampton Lake) SAV01 3-1-(1) G06SE2 B;Tr:+ (South) Fowler Creek SAVOI 3-8 G06SE7 C;Tr:+ Abes Creek SAVO1 3-10-2-2-2 G05SE9 C;Tr,CRW Aiken Creek SAV02 4-9-3 G07SE1 C;Tr Ammons Branch SAVOI 3-5 G06SW9 C;Tr:+ Ann Creek SAV02 4-9-2 G07SE1 C;Tr Auger Fork Creek SAV02 4-8 G07SW3 C;Tr Bad Creek SAVO1 3-9 G06SE7 C Bear Creek SAV02 4-12 G07SW5 C;Tr Bearcamp Creek SAV02 4-13-13 G07SW5 C;Tr Bearpen Creek SAV02 4-10-1 G07SR4 C;Tr Bearwallow Creek SAV02 4-7-(1) 007SW2 C;Tr:® Bearwallow Creek SAV02 4-7-(2) G07SW2 C;Tr,HQW Beech Creek SAVOI 3-11-7 G04SE8 C;Tr Big Creek SAVO1 3-10-3 G06SW9 C;Tr,ORW Blackrock Branch SAV01 3-10-3-2 G06SW6 C;ORW Blue Ridge Lake SAV02 4-5-2 G07NWS B;Tr Brooks Creek SAVO1 3-10-2-3-3 G06SW7 B;Tr Bryson Branch SAVO1 3-7-1 G06SE7 C;Tr,ORW Burlingame Creek SAV02 4-13-10 G06SE3 C Burnt Cabin Branch SAV01 3-11-6 1-104NE2 C;Tr Cane Creek SAVO1 3-4 G06SW9 C;Tr:+ Charlies Creek SAVOI 3-11-9 H04NE1 C;Tr CHATTOOGA RIVER (Cashiers Lake) SAV01 3 GO6SE1 B;Tr,ORW Chester Branch SAVOI 3-8-1-1 G06SE7 C:+ Chimney Rock Branch SAV01 3-11-3 G04SEB C;Tr Clear Creek SAVO1 3-10-2-3 G06SWB B;Tr Cobb Creek SAV02 4-11 G07SW6 C;Tr Coleman River SAVO1 3-11-10 H04NE3 C;Tr Coley Creek SAV02 4-14-6-2 G07SW7 C;Tr Corbin Creek SAV02 4-14-5 G06SE9 C;Tr,HOW Cornet Branch (Cornel Branch) SAVO1 3-10-2-3-2 G06SW7 B Covefield Branch SAV01 3-10-2-3-1 G06SWB B. Deep Ford Creek SAV02 4-3 G07SW2 B;Tr Deep Gap Branch SAV01 3-11-1 004SE8 C;Tr Democrat Creek SAV02 4-14-3 G06SE5 C;Tr,HQW Devils Hole Creek SAV02 4-9-1 G07SE4 C;Tr Dogwood Creek SAV02 4-15-2-1 G07SE5 B;Tr East Fork Chattooga River SAV01 3-10 G06SES C;Tr East Fork Overflow Creek SAVOI 3-10-2-1 GO6SW7 C;Tr,ORW Eastatoe Creek SAV02 4-15 G07NW5 B;Tr Edwards Creek SAVO1 3-10-3-1 G06SW5 C;Tr,ORW Fall Branch SAVO1 3-11-8 H04NE2 C;Tr Flatwood Branch SAV02 4-13-3-1 G06NEB C;Tr Frozen Creek (Frozen Lake) SAV02 4-9-5 G07SEI C;Tr Glade Creek SAV01 3-6 G06SW9 C;Tr:+ Green Creek SAVO1 3-2 G06SW6 C:+ Henson Branch SAVO1 3-10-2-3-4 G06SW7 B Hogback Creek SAV02 4-13-9 G06NE9 C;Tr Page I of 2 2009-01-03 06:25:11 Prolect: 6007047 High Density Residential' Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for High Density Residential Subdivisions where lots will be subdivided and sold and runoff will be treated in an engineered stormwater control facility. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the design criteria used to size the stormwater control facility. I, _Steven G._Harris , acknowledge, affirm and agree by my signature below, that I will cause the following deed restrictions and covenants to be recorded prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number , as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State .of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is see other 6 square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. OR, if the proposed built -upon areas per lot will vary, please REPLACE #6 above with the following: 6. The maximum built -upon area per lot, in square feet, is as listed below: Lot # BUA Lot # BUA Lot # BUA Lot # BUA See attached spreadsheets. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. 7. All runoff from the built -upon areas on the lot must drain into the permitted system. This may be accomplished through a variety of means including roof drain gutters which drain to the street, grading the lot to drain toward the street, or grading perimeter swales to collect the lot runoff and directing them into a component of the stormwater collection system. Lots that will naturally drain into the system are not required to �dese additional measures. f c Signature: Date: 9' 29S' 6 o kA 6Y r, , a Notary Public in the State of County of do hereby certify that ��kevevx S personally appeared before me this the day of Jv�'�"`r' `� �h-2008owledge ,� P• HA the due execution of the foregoing'instrument. Witness -my - hand l-IIIan 4ctal:seppal, p R Y U Sbjature AUG 4 L1 M Commission expires Y p I�bVR�n�� 15. 7�0 l2 •--------__ 1_F7Y SECT GA 2007160070470ocsTermit Forms\NCDENR Stormwater0eed Restrictions P-c!Applicatio'n16007047 HigLQlensity_DRPC.doc LandDesign Form DRPC-3 Rev.1 Page 1 of 3 "'�'" Project: 6007047 F1 HIGH DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT2) BUILDING "BUILT- UPON" AREA (FT) ROADWAYSIPARKING "BUILT -UPON AREAS (FT2) TOTAL "BUILT - UPON" AREA (FT2) VILLAGES , ..... � � t 11Ilil J, 1 77972.4 19845.00 5080.60 24925.60 2 64033.2 19845.00 9883.00 29728.00 3 49222.8 15876.00 5188.90 21064.90 4 39204 11907.00 4124.40 16031.40 5 33541.2 7938.00 5477.40 13415.40 c VJ LOTS, 1 i��fi ..".�� :R 101 15246 2705.00 225.50 2930.50 102 12632.4 2705.00 131.60 2836.60 103 20037.6 1549.84 2004.50 3554.34 104 16117.2 1537.14 1377.60 2914.74 105 13068 2069.00 929.20 2998.20 106 11325.6 1922.00 766.00 2688.00 1,07= �95832= 11 922:00" 7.7.3:00 2695003 108 10018.8 1922.00 802.00 2724.00 109 11325.6 1922.00 1043.00 2965.00 110 12632.4 2069.00 987.00 3056.00 111 13068 2705.00 1011.20 3716.20 112 13068 1922.00 1793.90 3715.90 113 16552.8 1658.23 2408.20 4066.43 114 14810.4 1922.00 1124.00 3046.00 115 11325.6 1867.08 418.60 2285.68 116 6534 1922.00 773.30 2695.30 117 7405.2 1922.00 752.90 2674.90 118 9583.2 1922.00 1590.00 3512.00 119 10454.4 2069.00 956.10 3025.10 120 6969.E 1922.00 623.40 2545.40 121 11325.6 2069.00 1903.80 3972.80 122 7405.2 1922.00 690.00 2612.00 123 15681.6 2705.00 2407.30 5112.30 124 10018.8 1922.00 1667.30 3589.30 125 12196.8 1922.00 2407.60 4329.60 126 7405.2 1922.00 553.00 2475.00 127 7840.8 1922.00 670.20 2592.20 128 6969.6 1922.00 565.54 2487.54 129 11761.2 1922.00 561.14 2483.14 130 18730.8 2069.00 595.64 2664.64 131 19602 2705.00 591.94 3296.94 132 16117.2 2069.00 572.30 2641.30 133 12196.8 2705.00 560.50 3265.50 134 11325.6 1922.00 542.60 2464.60 135 9147.6 1922.00 548.80 2470.80 136 13068 2705.00 401.30 3106.30 137 10454.4 1922.00 1810.20 3732.20 5 C v S' G:1_2007160070470ocsTermit Forms\NCDENR StoTrriwat, eed Restrictions PC Application16007047 Built p nd Area-FT^2 Landdesign Project: 6007047 HIGH DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT2) BUILDING "BUILT- UPON" AREA (FT2) ROADWAYS/PARKING "BUILT -UPON AREAS (FT2) TOTAL "BUILT - UPON" AREA (FT2) 138 10018.8 2069.00 608.30 2677.30 301 ' 2613.6 666.00 634.40 1300.40 302 3484.8 666.00 387.10 1053.10 303 5227.2 666.00 316.20 982.20 304 3484.8 666.00 252.00 918.00 305 3484.8 666.00 753.10 1419.10 306 3049.2 666.00 685.60 1351.60 307 2613.6 666.00 682.40 1348.40 308 3049.2 666.00 795.30 1461.30 309 2613.6 666.00 765.20 1431.20 310 3049.2 666.00 735.60 1401.60 311 4356 666.00 906.30 1572.30 312 3920.4 666.00 692.00 1358.00 313 3920.4 666.00 766.90 1432.90 314 3484.8 666.00 414.60 1080.60 C.O.S. !!.�.►. ,4 A 1 28057.3 NIA 2140.90 2140.90 2 156887 NIA 3641.20 3641.20 3 36377.5 NIA 5071,90 5071.90 4 184258.8 NIA 5331.40 5331.40 5 149410.8 NIA 5697.40 5697.40 Total 1 30.31 1 163205.29 1 98572.27 1 261777.56 J G:1_200716007047Tocs\Permit FormslNCDENR StormwaterlDeed Restrictions PC Application16007047 Built Upon Area•FT^2 Landdesign Compliance Inspection Report Permit: SW1080801 Effective: 05/14/09 Expiration: 05/14/19 Owner: Cashiers Canoe Club Development LLC Project: Canoe Club County: Jackson Region: Asheville Contact Person: Steven G Harris Title: Directions to Project: Type of Project: State Stormwater - General Permit Drain Areas: On -Site Representative(s): Related Permits: Inspection Date: 08/31/2010 Entry Time: 02:50 PM Primary Inspector: Susan A Wilson Secondary Inspector(sj: Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ■ Compliant ❑ Not Compliant Question Areas: M State Stormwater (See attachment summary) Subdivision Exit Time: 03:10 PM Phone: 828-286-5189 Phone: 828-2944500 Inspection Type: Compliance Evaluation Page: 1 Permit: SW1080801 Owner - Project: Cashiers Canoe Club Development LLC Inspection pate: 08/31/2010 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Susan Wilson and Linda Wiggs drove through the Canoe Club area on August 31, 2010 to see if any building had occurred (it is a LID). It appeared that no new houses have been constructed (lots were still for sale). No evaluation could be performed on the stormwater measures at this time. File Review Is the permit active? Signed copy of the Engineer's certification is in the file? Signed copy of the Operation & Maintenance Agreement is in the file? Copy of the recorded deed restrictions is in the file? Comment: Built Upon Area Is the site BUA constructed as per the permit and approval plans? Is the drainage area as per the permit and approved plans? Is the BUA (as permitted) graded such that the runoff drains to the system? Comment: SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Yes No NA NE Yes No NA NE ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑❑❑■ Are the outlet structures located per the approved plans? ❑ ❑ ■ ❑ Comment: The site is not yet built yet. Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? ❑ ❑ ■ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑ ❑ ■ ❑ upon request? Comment: Other Permit Conditions Yes No NA NE Is the site compliant with other conditions of the permit? ❑ ❑ ❑ ■ Comment: Other WQ Issues Yes No NA NE Is the site compliant with other water quality issues as noted during the inspection? ❑ ❑ ■ ❑ Comment: Page:2 6007047 Permit No. (to be provided by DIVQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM LOW DENSITY SUPPLEMENT This form may be photocopier) for tlse as an original A low density project is one that meets the appropriate criteria for built upon area and transports stormwater runoff primarily through vegetated conveyances. Low density projects should not have a discrete stormwater collection system as defined by 15A NCAC 2H .1002(18). Low density requirements and density factors can be found in 15A NCAC 2H .1005 through .1007, DWQ BMP Manual (2007). and Session Law 2006-246. I. PROJECT INFORMATION Project Name: Canoe Club Contact Person: Steven G. Harris Phone Number: ( 704 )377-6224 Number of Lots:61 Allowable Built Upon Area Per Lot*:Varies-See Attached Table *If lot sizes are not uniform, attach a table indicating the number of lots, lot sizes and allowable built upon area for each lot. The attachment must include the project name, phase, page numbers and provide area subtotals and totals. BUA sliall be shown in units of square feet. II. BUILT UPON AREA See the Stormwater Management Permit Application for specific language that must be recorded in the deed restrictions for all subdivisions. For uniform lot sizes, complete the following calculation in the space provided below where: • SA Site Area - the total project area above Mean High Water. Wetlands may be excluded when the development results in high density pockets. • DF Density Factor - the appropriate percent built upon area divided by 100. • RA Road Area - the total impervious surface occupied by roadways. • OA Other Area - the total area of impervious surfaces such as clubhouses, tennis courts, sidewalks, etc. • No. Lots - the total number of lots in the subdivision. • BUA/Lot - the computed allowable built upon area for each lot including driveways and impervious surfaces located between the front lot line and the edge of pavement. Form SW401-1_ow Density-Rev.2 Page 1 of 3 GA_2007160070471Docs\Permit Forms\NCDENR Stormwater\Low Density\LD Supplement16007047-Supplement_LowDensity_Rev2.Doc 6007047 (SA x DF) - RA - OA = BUA No. Lots Lot Calculation: (SA: ,t2 x DF: ) —_LR_A: ft'`) — (OA: i't') = BUA per Lot = lt2 (No of Lots: } III. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate that the following requirements have been met and supporting documentation is provided as necessary. Indicate the page or plan sheet number where supporting documentation can be found. If the applicant has designated an agent on the Stormwater Management Permit Application Form, the agent may initial helow. Page/Plan Initials Sheet No. ftC7.1&C7.2 a. A 30 foot vegetative buffer is provided adjacent to surface waters. Projects in the Neuse, Tar -Pamlico, Catawba River basins, and Randleman Lake may require additional buffers. m_±L_ LD Deed Restriction b. Deed restriction language as required on form SWU-101 shall be recorded as a restrictive covenant. A copy of the recorded document shall be provided to DWQ within 30 days of platting and prior to sale of any lots. M_ Attached Table c. Built upon area calculations are provided for the overall project and all lots. MM C7.5 d. Project conforms to low density requirements within the ORW AEC (if applicable). yy 1 15A NCAC 2H .1007(2)(b)l 1 �1� D1.2 e. Side slopes of swales are no steeper than 3:1. m Narrative f. Longitudinal slope of swales is no greater than 5%; calculations for shear stress and y�, velocity are shown if slope is greater than 5%. yii l Narrative g. Swales are designed to carry, at a non -erosive velocity, at least the 10-year storm. D 1.2 h. Swale detail and permanent vegetation is specified on the plans. Form SW401-Low Density-Rev.2 Page 2 of 3 W_2007160070471Docs\Permit Forms\NCDENR 5tormwaterlLow DensitylLD Supplement16007047-Supplement_LowDensity_Rev2. Doe 6007047 IV. SWALE SYSTEM MAINTENANCE REQUIREMENTS Mowing will be accomplished as needed according to the season. Grass height will not exceed six inches at any time. 2. Swales will be inspected monthly or after every runoff producing rainfall event for sediment build-up, erosion, and trash accumulation. Accumulated sediment and trash will be removed as necessary, Swales will be reseeded or sodded following sediment removal. 4. Eroded areas of the Swales will be repaired and reseeded. Swales will be revegetated as needed and in a timely manner based on the monthly inspections. 5. Catch basins, curb cuts, velocity reduction devices, and piping will be inspected monthly or after every significant runoff producing rainfall event. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 6. Swales will not be altered, piped, or filled in without approval from NCDENR Division of Water Quality. I acknowledge and agree by my signature below that I am responsible for the performance of the six maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Steven G. Harrris Address: 1600 Camden Road Charlotte, NC 8 27203 Phone: 2 Date: / -2— - :2- Z • [7,9 Signature: Note: The le all}v responsible part, should not be a homeowners association unless more than SOU% of the lots helve been sold and a resident of the subdiNsron has been nanzed the president. Ir, `�a �ennBca , a Notary Public for the __State of ��.�n ' Ql r� , County of I.. n, o�"r'1 n do hereby certify that _ i�W tf 1 5 personally appeared before me this=f1a day oI. me op T, cROOS , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements, Witness my hand pnd official seal \`���tt�tt t rrrgrg�i F R 6 e4f $ 0 �o _ tyotasV Pub►tc _ untor Counw Q SEAL My commission expires Form SW401-Low Density-Rev.2 Page 3 of 3 GL2007\60070471DocsTarmit Forms\NCDENR Stormwater\Low Density\LD Supplement\6007047-Supplement_LowDensity_ReQ.Doc Project: 6007047 LOW DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT2) BUILDING "BUILT- UPON" AREA (FT2) ROADWAYS/PARKING "BUILT -UPON AREAS (FT2) TOTAL "BUILT - UPON" AREA (FT2) VILLAGES). '•.l 4 ! 1 1..1 s , .h 77it y i '..�i af+ 1 78049 19992 5080 25072 2 64033 19992 7240 27232 3 55212 15993 5188 21181 4 39133 11995 4124 16119 5 33518 7996 5477 13473 L4TSp i I .��iu�lil�' � +p q 11. .g• }ry . � ��' rle l :.r���i5 I' 1., . klali1$$ {{ l 11??;' Ay¢F.1' v, L.I7 lY . llflfliSlc .�1lilf f�� �1 �� I 'pI'lih ` si li•i:r � I Ir t. �r�ll✓,l I 1 . if i . I�i�4l��i14 tl��lf� I;.1y �I uifiL' r:.. •{,e y Ili dtlN ' I tlf I i1W ,fl7a � � �{.. t 1 M �l"�• i l., ��;�i�'�i;l����, � 'rnvyl i �`"' e � iE1i[I# innl I� pf ,.III Vi h �f.� I �, . �; ht. il� 101 15299 3147 948 4095 102 12571 3147 1168 4315 103 19943 1550 2004 3554 104 16179 1537 1413 2950 105 10922 2175 846 3021 106 10485 2008 766 2774 107 9773 2008 773 2781 108 10.081 2008 802 2810 109 11253 2008 1043 3051 110 12448 2175 987 3162 111 10487 3147 1011 4158 112 12631 2175 1566 3741 113 15622 1658 2233 3891 114 14990 3147 1124 4271 115 11405 1867 106 1973 116 8841 2008 860 2868 117 8864 2008 862 2870 118 9499 2008 1590 3598 119 10276 2175 1470 3645 120 6773 2008 737 2745 121 11485 2175 1648 3823 122 7351 2008 782 2790 123 15577 3147 1860 5007 124 9818 2008 1540 3548 125 12228 2175 2108 4283 126 7434 2008 553 2561 127 7761 2008 670 2678 128 7155 2008 565 2573 129 11745 2175 640 2815 130 18524 3147 676 3823 131 19565 3147 676 3823 132 16159 3147 658 3805 133 12352 2736 640 3376 134 11329 2008 640 2648 135 9356 2008 640 2648 136 13045 3147 469 3616 137 9285 2175 811 2986 G:1_2007160070470ocsTermit Forms\NCDENR Stormwater\Low Density\Deed Restriction LD16007047 Built Upon Area-LD.xis L.anddesign Project: 6007047 LOW DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT2) BUILDING "BUILT- UPON" AREA (FT2) ROADWAYS/PARKING "BUILT -UPON AREAS (FT2) TOTAL "BUILT - UPON" AREA (FT2) 301 2829 707 634 1341 302 3523 707 387 1094 303 5355 707 316 1023 304 4757 707 354 1061 305 4752 707 937 1644 306 4378 707 868 1575 307 5708 707 1685 2392 308 4294 707 742 1449 309 4589 707 872 1579 310 5284 707 852 1559 311 5286 707 858 1565 312 4281 707 431 1138 0 l I L 1 28219 50 2140 2190 2 188962 50 3641 3691 3 16820 0 864 864 4 281153 0 5182 5182 5 41222 0 5697 5697 6 17245 744 2860 3604 7 1005661 0 4456 4456 Total 1 1 2342774 1 170487 L 98771 1 269258 G:1_2007160070471Docs\Permit Forms\NCDENR Storm waterlLow Density\Deed Restriction LD16007047 Built Upon Area-LD.xls Landdesign 6007047 Low Density Residential Subdivisions Deed Restrictions & Protective Covenances In accordance with Title 15 NCAC 2H.1000, the Stormwater Management Regulations, deed restrictions and protective covenants are required for Low Density Residential Subdivisions where lots will be subdivided and sold. Deed restrictions and protective covenants are necessary to ensure that the development maintains a "built -upon" area consistent with the applicable regulation governing the density level. I, Steven G. Harris acknowledge and affirm by my signature below, that i will cause the following deed restrictions and protective covenants to be recorded for Canoe Club prior to the sale of any lot: 1. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number as issued by the Division of Water Quality under NCAC 2H.1000. 2. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the stormwater management permit. 3. These covenants are to run with the land and be binding on all persons and parties claiming under them. 4. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Wafer Quality. 5. Alteration of the drainage as shown on the approved plan may not take place without the concurrence of the Division of Water Quality. 6. The maximum allowable built -upon area per lot is Provided in an Attached Spreadsheet square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, and coquina, but does not include raised, open wood decking, or the water surface of swimming pools. 7. 1n the case of a lot within CAMA's regulated AEC, where the Division of Coastal Management calculates a different maximum allowable built -upon area for that lot than is shown herein, the governing maximum built -upon area for that lot shall be the most restrictive of the two. 8. Filling in or piping of any vegetative conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings is strictly prohibited by any persons. 9. Each lot will maintain a 30 foot wide vegetated buffer between all impervious areas and surface waters. 10. All roof drains s 11 termina a least 30 foot from the mean high water mark of surface waters. �-• 2-- 2 • D +' Signature: Date: / _ I , a Notary Public in the State of ��(I ot is County ofA�_i, do hereby certify that 4c�,(C% 5 _ personally appeared before me this the CXO5 0E day ofr �UP� , 20 �$ , and acknowledge the due execution of /h$ foregoing instrument. Witness my hand and official sA[1{fi,lrrrq, p,I�RFFM,'I/ O p �otatY public My Commission expires //I bo&- +onoounry - Form DRPC-5 Rev.1 6007047 LD Deed Restrictions Protective Covenances.doc Un /��''iiOPrHIC A�\����`��LandDesign Project: 6007047 LOW DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT2) BUILDING "BUILT- UPON" AREA (FT) ROADWAYS/PARKING "BUILT -UPON AREAS (FT2) TOTAL "BUILT - UPON" AREA (FT2) VILLAGES ,, 4111114 1!l,Ia ' ' ,• 1111K�iH441111�} ii! " u.6!. m. , ,f.,Tq;i.. ll'l!Ilrijrfiilli.til f4 -I !q)'u +� fr'}: 1 78049 19992 5080 25072 2 64033 19992 7240 27232 3 55212 15993 5188 21181 4 39133 11995 4124 16119 5 33518 7996 5477 13473 ,,I,.. —,,. LOTS111 " . - . ! ,,. I 101 15299 3147 948 4095 102 12571 3147 1168 4315 103 19943 1550 2004 3554 104 16179 1537 1413 2950 105 10922 2175 846 3021 106 10485 2008 766 2774 107 9773 2008 773 2781 108 10081 2008 802 2810 109 11253 2008 1043 3051 110 12448 2175 987 3162 111 10487 3147 1011 4158 112 12631 2175 1566 3741 113 15622 1658 2233 3891 114 14990 3147 1124 4271 115 11405 1867 106 1973 116 8841 2008 860 2868 117 8864 2008 862 2870 118 9499 2008 1590 3598 119 10276 2175 1470 3645 120 6773 2008 737 2745 121 11485 2175 1648 3823 122 7351 2008 782 2790 123 15577 3147 1860 5007 124 9818 2008 1540 3548 125 12228 2175 2108 4283 126 7434 2008 553 2561 127 7761 2008 670 2678 128 7155 2008 565 2573 129 11745 2175 640 2815 130 18524 3147 676 3823 131 19565 3147 676 3823 132 16159 3147 658 3805 133 12352 2736 640 3376 134 11329 2008 640 2648 135 9356 2008 640 2648 136 13045 3147 469 3616 137 1 9285 1 2175 811 2986 GA_2007160070471Docs\Permit Forms\NCDENR Stormwater\Low Density\Deed Restriction LD16007047 Built Upon Area-LD.xls Landdesign v Project: 6007047 LOW DENSITY RESIDENTIAL SUBDIVISIONS DEED RESTRICTIONS & PROTECTIVE CONVENANCES "BUILT -UPON" AREA CALCULATIONS NUMBER TOTAL AREA (FT) BUILDING "BUILT- UPON" AREA (FT) ROADWAYS/PARKING "BUILT -UPON AREAS (FT) TOTAL "BUILT - UPON" AREA (FT) 301 2829 707 634 1341 302 3523 707 387 1094 303 5355 707 316 1023 304 4757 707 354 1061 305 4752 707 937 1644 306 4378 707 868 1575 307 1 5708 707 1685 2392 308 4294 707 742 1449 309 4589 707 872 1579 310 5284 707 852 1559 311 5286 707 858 1565 312 4281 707 431 1138 1 28219 50 2140 2190 2 188962 50 3641 3691 3 16820 0 864 864 4 281153 0 5182 5182 5 41222 0 5697 5697 6 17245 744 2860 3604 7 1005661 0 4456 4456 Total I I 2342774 170487 98771 1 269258 G:1_2007160070470ocsTermit Forms\NCDENR StormwateALow DensityTeed Restriction LD16007047 Built Upon Area-LD.xls Landdesign 6007047 Permit Na (to be provided by DWQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed Swale. The grassed Swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 G:1_2007160070471Docs\Pemiit Forms\NMENR Stormwaterl )w DensitylGrass Swale O&M Agreement_M007047 O M GrassedSwale Rev3 A-2.doc 6007047 Permit Number: (to be provided by DIVA) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Canoe Club BMP drainage area number:A-2 Print name:Steven G. Harris Title: Operations Mana er Address:1600 Camden Road Charlotte, NC z` 9i�48 2 U'_2.J" Phone:704.337. 24 S ignature: Date:_ _ 1- 2. 2' g Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. it Notary Public for the State of J��CPICQVAA,, ll , County of k.ksr % , do hereby certify that IEy1 _ t-t�r�� iS personally appeared before me this �� day of ��PLE+r�1�� o900 , and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, SEAL My commission expires�r Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 G:1 2007160070471Docs\Permit Porms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements\6007047 O M GrassedSwale Rev3 A-2.doc A� NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. Permit Number: (to be provided by DWQ) o�GF W A7�RQG li i d � Project name Canoe Club Contact name Steven G. Harris Phone number 704.337,6224 Date December 15, 2008 Drainage area number A-2 Il.:.IDESIGN'INFORMATION,�iljs� i`',ii, f'�` I' .X' 5;,ii'"i;�,'� +r�" �,..1+ I:r w„t 6i .� I t. ' Site Characteristics Drainage area 8,276.40 ft2 Impervious area 2,178.00 ft2 Percent impervious 26.3% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7,06 in/hr Post -development 10-yr storm peak flow 0.69 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ft/sec Soil characteristics (enter "x" below) Sand/Silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter "x" below) Bermuda Tallfescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 1.26 ft/sec Side slopes 3.00 :1 Swale length 114.00 ft Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to bo provided by DWQ) Swale Characteristics Swale Shape: Enter an "x" in the appropriate cell below: 'trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale 9.00 It Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope of the swale? 3.00 % OK What is the depth of freeboard? 1.07 ft OK Form SW401-Grassed Swale-Rev.3 Paris I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III: REQUIRED;ITEMS CHECKCIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 4 l6 H C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7,2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 - Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 - Boundaries of drainage easement. 1 1, C2.1 2. Plan details (1 " = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 - Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (it applicable),and C7.6 Boundaries of drainage easement. D1.2 1� C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 Side slopes, C4,3 - Longitudinal slope, C7.6 - Freeboard 01.1 Swale dimensions, and D1.2 - SHWT level(s) Ms — ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 144.5 Y ATTACHED 5, A copy of the signed and notarized operation and maintenance (O&M) agreement. I 5 H ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 M 6007047 Permit Name: (to be provided by DWQJ Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. Tliese deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed Swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed, remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 G:1 2007160070471DocslPerniit FormANCDf NR Sto mwateftLow Density\Grass Swale O&M Agrcc;1u;11ts16007047 O M GrassedSwale Rev3 A-t.doc 6007047 Permit Number: (to be provided br DWQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project notne:Canoe Club BMP drainage area number:A-1 Print name:Steven G. Harris Title: 0Derations Address:1600 Camden Road Charlotte, NCB Phone: Signatt Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, � , a Notary Public for the State of T'-�bA+)CAQ rc'4. i,rtWq , County of do hereby certify that __ _ rr►5 personally appeared before me this or'or' =' day oftnnlotz.r , and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, RE E4f O� y O t401011— VlonC°u�tV OP TN 1C 1'� �\��`S, SEAL My commission expires Gr t 111,1613 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 GA— 2007160070471DocslPeimit FomiANCDENR Stumiwater\Low Density\Grass Swale 0&M Agreements16007047 0 M GrassedSwale Re%,3 A-l.doc r Permit Number: (to be provided by DWQ) ARA OF W A 7�R NCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. LGi !'' 11�91i1i 'iIIHi li�ll - !. ,,PRO,IECTtINFORMATION (1r, Project name Canoe Club Contact name Steven G. Harris Phone number 704.337,6224 Date December 15, 2008 Drainage area number A-1 ._. `I '"'IlI ,I -Ilj1 4. • ! els '_.I �... 1 mt ! :':i. ' .II �C3^Ir liu I .�'t ., r ,) ,I . °rII,,�ESIGNIINFORMATI�N 1 Site Characteristics Drainage area 49,335.60 ft2 Impervious area 17,424.00 ft2 Percent impervious 35.3% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlhr Post -development 10-yr storm peak flow 4.17 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10•yr storm 3.26 ftlsec Side slopes 3,00 :1 Swale length 445.00 ft Form SW401-Grassed Swale-Rev.3 Parts I and tl. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width o1 the bottom of the swale 0.00 ft Width o1 the top of the swale 9.00 ft Additional Information Is the Swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right o1 Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,461.00 fmsl What is the elevation of the bottom of the Swale? 3,459.50 fmsl What is the SHWT elevation? 3,452.501msi What is the longitudinal slope of the swale? 4.00 % OK What is the depth of freeboard? 0.84 ft OK Form SW401•Grassed Swale•Rov.3 Parts I and 11, Project Design Summary, Page 2 of 2 Permit No: (to be assigned by D WQ) Ill.. "REQUIREI] ITEMS CHECKLISTif�s,. =•.t'�� .� � � � `": s " , � v' �� " ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project, Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Ms H A4_2 J4 Pagel Plan Sheet No. C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 - Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. C2.1 2. Plan details (V = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7,6 Boundaries of drainage easement. D1.2 C4.1 3. Section view of the grassed swale (11 = 20' or larger) showing: C4.2 - Side slopes, C4.3 Longitudinal slope, C7.6 freeboard D1.1 - Swale dimensions, and D1,2 SHWT level(s) A4_ ' H ATTACHED 114.5 H ATTACHED v' 5 H. ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (lo be provided by 1AVQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the Swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of Ion . approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786, Form SW401-Grassed Swale O&M-Rev.3 Page I of 2 G:1_200A600704ADocsTermit Forms\NCDENR StormwaterlLow Density\Grass Swale Q&M Agreements16007047 O M GrassedSwale Rev3 8.1a.doc 6007047 Permit Number: (try he provided 8y D1VQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nwne:Canoe Club BMP drainage area n unber:B- Print name:Steven G. Harris Title:0 erations Manager Address:1600 Camden Road Charlotte, NC3 S 2.. 203 Phon{ Signo Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,�n1A �'Q�-YY�ay� , a Notary Public for the State of County of 1A %a V-\- , do hereby certify that (t personally appeared before me tliis U day o(�CCewAlnxp_tr , ),WSL and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, SEAL My commission expires_�la013 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of'2 G:1_2007160070471Docs\Permit Forms\NCDENR StormwaterlLow DensitylGrass Swale O&M Agreements16007047 0 M Grassed5wa1e Rev3 B-1a.doc � r Permit Number: (to be provided by OWO) � o�oF W A7�9Qc NCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information. I: PROJECT IN FORMATION �'' i, t ,u ' , tll� 'gyp; , . 7I „I ,Ir1� ,: I 1 �f 41Ifz1, ��. ! f ! p l �"I Iylj�tl hi,Ill 1, lv,l . it, 1 'r,, ' h "1114i l a ! I �•11 � i r,! r L, r.i� II{)il iH �Il�l i, � , 9 • Jd114., .tl . �9 .tl�14r' ' Is , i ! (� rli m . `i.i •� jl s I .Lr !`�! lll, lJiiM M'. t„ � Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15, 2008 Drainage area number B-1a IIr. DESIGNINFORMATION ..��li'.r - -.. !-.! i ,1 .'f !! s i.1� ..v ,. ;. rn� :.. �n ar it 111 e.•. :'� :-'•'1 aI i.i: Ittt .La 'u..� r 1,I r�rl: �i .� - i(iri.:1, tt �.%, Site Characteristics Drainage area 22,651.20 h2 Impervious area 5,662.80 ft� Percent impervious 25.0% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlhr Post -development 10-yr storm peak flow 1.83 ft3lsec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter'x' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter 'x' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 1.46 ftlsec Side slopes 3.00 :1 Swale length 148.00 ff Form SW401 -Grassed Swale-Rev.3 Parts I and If. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope of the swale? 1.50 % OK What is the depth of freeboard? 0.86 ft OK Form SW401-Grassed Swale-Rev.3 Parts ! and II. Project Design Summary, Page 2 of 2 Permit No: r (to be assigned by DWQ) III:REQUIRED' ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials 446 H 114_i J4 MsH Pagel Plan Sheet No. C2.1 1. Plans 0" = 50' or larger) of the entire site showing: C2.2 - Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 - Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 - Grass species, and D1.2 Boundaries of drainage easement. C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 - Maintenance access, C7.2 Proposed drainage easement and public right o1 way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 Side slopes, C4.3 - Longitudinal slope, C7.6 Freeboard D1.1 Swale dimensions, and D1.2 SHWT level(s) A4_5E Y ATTACHED %V r S Y ATTACHED IV 5 H ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (to be provided bly DWQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1756. Corm SW401-Grassed Swale O&M-Rev.3 Page I of 2 GA— 2007M0704ADocs\Permit Forms\NCDENR Stormwater\Low DensitylGrass Swale 0&M Agreements16007047 O M GrassedSwale Rev3 B-1a1Am 6007047 Permit Number: (to be pro vitleel by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project nctnte:Canoe Club BMP drainage area number:13-1 a1 Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte, NC ��?j Phone Signat Date: Note: The legally responsible party should not be a homeowners association unless more than SO°Io of the lots have been sold and a resident of the subdivision has been named the president. [,�17or�,no, �C�2_tlh�nn a Notary Public for the State of {`_, County of l , do hereby certify that ttaft't 5 personally appeared before me this a� day of and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seat, SEAL My commission expires_ Ct II t I (Q617, Form SW40 I -Grassed Swale O&M-Rev.3 Page 2 of 2 G:1_2007160070470ocs1Permit Forms\NCDENR Stormwater\Low DensitylGrass Swale O&M Agreements16007047 O M GrassedSwale Rev3 B-lal.doc Permit Number: (to be provided by DWQ) ARM%of wAr�9 NCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part HIJ must also be filled out, printed and submitted along with all of the required information. I.'.'PROJECTiINEORMATION„',- ! Ir e �,;�� r1 �,11 ,, ; ;lllt3lll �I �y111 If I:� �' E I1 , i 'IL e Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15, 2008 Drainage area number 13-1al Site Characteristics Drainage area 8,712.00 ftz Impervious area 1,306.80 ft2 Percent impervious 15.0% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm inlensily 7.06 in/hr Post -development 10-yr storm peak flow 0.62 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length It Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 1.59 ft/sec Side slopes 3.00 :1 Swale length 150.00 ft Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWR) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the swale Width of the top o1 the swale Additional Information Is the swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the swale? What is the SHWT elevation? What is the longitudinal slope of the swale? What is the depth of freeboard? X 0.00 It 5.20 It yes (Y or N) OK yes (Y or N) OK 7.00 ft OK 3,479.50 fmsl 3,478.001msl 3,471.001msl 6 - Mountain o� Slope too steep. Explain why it is impractical to achieve 5%. OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 y Permit No: (to be assigned by DWQ) Ill., REQUIRED ITEMS CHECKLIST: `:`. 4 f Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification, Initials Page/ Plan Sheet No. �f 4b H C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C. coefficient per basin), C7.3 - Swale dimensions (width, length, depth), C7.4 - Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. C2,1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 - Maintenance access, C7.2 - Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (if applicable),and C7.6 - Boundaries of drainage easement. D1.2 S P C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 - Side slopes, C4.3 - Longitudinal slope, C7.6 - Freeboard D1.1 Swale dimensions, and D1,2 SHWT level(s) IL S %4 ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) /Y' $ H ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. IV 5 �/ ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (to be pro i ded bY DIVQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location, Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the Swale, fertilizer will not be applied to the grassed swale. The grassed swalc will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer ae2lication. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page l of 2 G:1_2007160070471DocslPermit FormsMDENR StormwalerlLow Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 B-1b.doc 6007047 Permit Number: (to be Pr'ovidecl bY DIVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narrte:Canoe Club BMP drainage area number:B-lb Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte NC 2&-b@C Phon Signo Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of �` "A1�z)VN %IA County of _f),16YA do hereby certify that Uen 24, �- lr� tS personally appeared before trte this day ornL�P� bag , and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, ��11111UttlrffJ//�/ � O u00r% G4vntY =� 4"0R r H C P� �'�rrrrrrrEitti~»`�� SEAL My commission expires '01-1I—aoI3 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 G:1_2007M070471flocslPermit FormsINCDENR Stormwater%ow DensitylGrass Swale O&M Agreements16007047 O_M_GrassedSwale_Rev3_13-1 b.doc Permit Number: (to be provided by DWQ) O� QG MCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part llI) must also be filled out, printed and submitted along with all of the required information. I: "PR 'O`^','alr OJ , ECT„l NFRMATI N sf,.1 , , r!dl t �.. 1, t r..,. �� rr t-,l.:..a.. k.. , , , il1li 6 r:;��_ o+ry Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15, 2008 Drainage area number 6.1b Ill.", DESIGN INFO RMATION'G Site Characteristics Drainage area 34,412.40 ft2 Impervious area 6,534.00 ft2 Percent impervious 19.0% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 initlr Post -development 10-yr storm peak flow 2.58 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ft/sec Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter Y' below) Bermuda Tall fescue 8ahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 1.72 fl/sec Side slopes 3.00 :1 Swale length 160.00 ft Form SW401•Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 1 Permit Number: (to be provided by DWO) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWt- elevation? 3,454.50 fmsl What is the longitudinal slope of the swale? 1.50 % OK What is the depth of freeboard? 0.79 It OK Form SW401-Grassed Swale-Rev.3 Parts I and 11. Project Design Summary, Page 2 of 2 FM Permit No: (to be assigned by DWQ) III.;,AEQUIRED'ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found, An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials 445 H 114 s 9 MsN Page/ Plan Sheet No. C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 - Grass species, and D1.2 Boundaries of drainage easement. C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 - Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1.1 - Swale dimensions, and D1.2 SHWT level(s) 1145 I � ATTACHED %f!r 5 K ATTACHED 114.59 ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page t of 1 6007047 Permit Name: (Io be provided by DIV& Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed Swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the Swale, fertilizer will not be applied.to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 cif 2 GA— 2007160070470ocsTermit FormsINCDENR StormwaterlLow Density\Grass Swale O&M Agreements16007047 O M GrassedSwa1e Rev3 B-2.doc 6007047 Permit Number: (to be provided 11), DWQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Canoe Club BMP drainage area number:13-2 Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte, NC 2 Z< ZW 3 Phone:704.337. 224 Signature: Date: 2— Note: The legally responsible party should not be a homeowners association unless more than 50%n of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of , County of LA, r tty-, , do hereby certify that personally appeared before me this oia� day of71�f, and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, NNNs���` %,Ci E E t�� I/j����i •� t�►p• N � Q r N°t°x �Ga�t`� wo 2 � Rt `,H�ti�+\\0` 1 SEAL My commission expires. 4111 ► 10/5 Form SW401-Grassed Swale O&M-12ev.3 Page 2 of 2 G:1_2007160070471Docs%Permit Forms\NCDENR Stormwalerll_ow Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 B-2.doc Permit Number: (to be provided by DWO) o2pF WATF9OG w NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. li I,X t �rll'li r'sll"Irl rl,l 'i 1'4il 1 7 ,11 -fl I �f tu,yi li ;I•�..n it •lll:. jlPi l,. Ir'{fj' I •, {II IP L�(RROJECTiINF,ORMATIONf, �lillh.:It,Ili.6t,.dRl�I)i�)II��IIi��I✓HIIIN��,i,111Vl���ih,IlltNl1,11l1111Yl6Sinit:IfildN�:���)�e��li)anl��o!IIN.uHultld(,��Ilmdii...,��1.vd�i�itl)IIp�,I�hINVr�1wl%INI,INIjp�lf4,lrili:.Illy{q,.,1�ur,Ip,IIIINI�,ril.5�i�i,l Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15, 2008 Drainage area number B-2 Site Characteristics Drainage area 16,117.20 ft2 Impervious area 6,534.00 ft2 Percent impervious 40.5% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 in/hr Post -development 10-yr storm peak flow 1.53 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 fdsec Soil characteristics (enter Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter "x' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length If Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 3.37 ft/sec Side slopes 3.00 :1 Swale length 114.00 ft Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope of the swale? 12 - Mountain % Slope too steep. Explain why it is impractical to achieve 5%. Terrain What is the depth of freeboard? 1.11 ft OK Form SW401-Grassed Swale-Ftov.3 Parts I and II- Project Design Summary, Page 2 of 2 S ' A Permit No: (to be assigned by DWQ) III: REQUIRED'.ITEMS CHECKI"IST _ u' �,a• �, s' ` y£ Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials 446 H / l_:- 9 MsH Page/ Plan Sheet No. C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7,2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. C2,1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 - Grass species, CT5 - Off -site drainage (if appiicable),and C7.6 Boundaries of drainage easement. D1.2 C4,1 3, Section view of the grassed swale (1 " = 20' or larger) showing: C4.2 Side slopes, C4.3 - Longitudinal slope, C7.6 - Freeboard D1,1 Swale dimensions, and D1.2 - SHWT level(s) /V r S y ATTACHED N ATTACHED +' ` 5 9 ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (to be proi4ded br 1)kVQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect tine integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed Swale. — After the first-time fertilization to establish the grass in tine swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximatel six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page I of 2 GA-2007160070471DocslPermit FormsINCDENR StormwaterlLow DensitylGrass Swale O&M Agreements16007047 O M GrassedSwale Rev3 C-1.doc 6007047 Permit Number: {to he Provided bY DWQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project rzame:Canoc Club BMP drerin(ige areo monber:C-1 Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte, NC 29M8 22'620.3 Phone:704.337,6224 Signature; Date: /- —` Z Z. • Qc�r' Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Y'f o'�ldYl , a Notary Public for the State of EO} CA f GA4 , County of Lk h i bob_ , do hereby certify that personally appeared before me this day of Dee_ _Yy%) Ljr— �, and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, t' ma's O NotigN P o'1mty G � 2Q �irrurrn nts�ti�`� SEAL My commission expires 12013 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 GA-2007160070471Docs\Permit FormsINCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 C-1.doc Permit Number: (to be provided by DWO) ��� O20F W ATE9OG NC ENR � STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. Project name Contact name Phone number Date Drainage area number Canoe Club Steven G. Harris 704,337.6224 December 15, 2008 C-1 Site Characteristics Drainage area 27,007.20 hZ Impervious area 6,098.40 fe Percent impervious 22.6% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 in/hr Post -development l0-yrstorm peak flow 2.11 ft'/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 f /sec Soil characteristics (enter Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length It Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 3.27 fl/sec Side slopes 3.00 :1 Swale length 233.00 it Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page t of 2 Permit Number: (to be provided by DWO) Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale Ho ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope of the swale? 8 - Mountain % Slope too steep. Explain why it is impractical to achieve 5%. Terrain What is the depth of freeboard? 1.04 ft OK Form SW401-Grassed Swale-Rev.3 Pans I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III:;'REQUIRED.ITEMS°CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. It a requirement has not been met, attach justification. Initials 1146 H Ms& MsH Pagel Plan Sheet No. C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (it applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 - Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 - Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 - Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1.1 Swale dimensions, and D1.2 - SHWT level(s) ATTACHED %Vl S H ATTACHED 5 y ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 i 6007047 Permil Name: (to he proi4ded b), Dtt'Q) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed Swale. -- After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 GA-1D 200716007047ocsTermit Forms\NCDENR 5tormwaterlLow DensitylGrass Swale O&M AgreementsM07047 O M GrassedSwaie Rev3 D-1.doc 6007047 Permit Number: (to be provided bY DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Canoe Club BMP drainage area mtrlber.D-1 Print name:Steven G. Harris Title:Operations Manager Address:1600 Camden Road Charlotte, NC 2t2#8 ZSZ03 Phone:704.337.6224 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident ol'the subdivision has been named the president. I, I)6no*A a Notary Public for the State of 'lVbf �d�ii11� County of q�� , do hereby certify that t en i�Lri(t^5 personally appeared before me thisav day of�, and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, ON SSE MAV 2P J'Q ,0 r a` o o�G0� NP 0 NORl\N O rrrnnu► SEAL My commission expires Form SW401-Grassed Swale O&M-Rev3 Page 2 of 2 GA-2007160070471DocsTerm'it Forms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O�,M_GrassedSwale_Rev3_D-1.doc Permit Number: (to be provided by DWQ) Qp W AT�R F "A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. Project name Contact name Phone number Date Drainage area number Site Characteristics Drainage area Impervious area Percent imperious Design rainfall depth Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter 'Y below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Canoe Club Steven G. Harris 704.337.6224 December 15, 2008 D-1 15,681.60 ft' 6,969.60 ft' 44A% % RD inch 4.90 in 7.06 inlhr 1.55 ft'/sec 3.50 ft/sec X Y N (Y or N) Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 2.55 ftlsec Side slopes 3.00 :1 Swale length 172.00 It Form SW401-Grassed Swale-Rev.3 Paris I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the Swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or IV) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,449.40 fmsl What is the elevation of the bottom of the swale? 3,447.90 fmsl What is the SHWT elevation? 3,440.90 fmsl What is the longitudinal slope of the swale? 6 - Mountain % Terrain Slope too steep. Explain why it is impractical to achieve 5%. What is the depth of freeboard? 1.04 ft OK Form SW401-Grassed Swale-Rev,3 Paris I and 11. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III."FIEQUTAED-ITEMS;C-HECKLIST j! Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. P a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 • Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7,4 - Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. /� •S C2,1 2, Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 - Swale dimensions (width, length, depth), C7.1 - Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (if applicable),and C7.6 - Boundaries of drainage easement. D1.2 !/ C4.1 3, Section view of the grassed swale (V = 20' or larger) showing: C4.2 Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1.1 Swale dimensions, and D1.2 SHWT level(s) /V ► s )�L ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) A S Y ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. y' 5 H ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit (to be proi4ded by DVVQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed Swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed Swale. The grassed Swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem, How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page I Of 2 GA— 2007160070471Docs\Permit Forms\NGDENR StormwatertiLow Density\Grass Swale O&M Agreements16007047 O tN GrassedSwale Rev3 E•1a.doc r 6007047 Permit dumber: (to he provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Canoe Club BMP drainage area number:E-1 a Print name:Steven G. Harris Title. Operations Manager _ Address:1600 Camden Road Charlotte, NC 239N Phonc:704.337.6 24 S ignature: Date: / 2. 2 Z • CJ Note: The legally responsible party should not be a homeowners association unless more than 50111b of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of "ThC4:1CWtAcl , County of tJni ciy,, , do hereby certify that c 1 �V2 H,rKi personally appeared before me this 04 day of 7L�Cem %r , and acknowledge the due execution of the forgoing grassed Swale maintenance requirements. Witness my hand and official seal, O 110AP 4 SEAL My commission expires ! Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 G:1_2007160070471Docs\Permit Forms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O_M_G rassedSwa le_Rev3_E-1 a. doc r Permit Number: (to be provided by DWQ) o� wArF9 NCDENR a Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information L:iPROJEUINFORWON ; I' , �: ii "IJ<<I 1 11II i J V ir,'•',I. , E ill ..�� , Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15. 2008 Drainage area number E-1a Ill." DESIGN INFORMATION!II ---------- Site Characteristics Drainage area 28,314.00 ft2 Impervious area 6,534.00 It' Percent impervious 23.1% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlhr Post -development 10-yr storm peak flow 2.24 ft3lsec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter 'Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length It Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 1.61 ft/sec Side slopes 3,00 :1 Swale length 150.00 It Form SW401 -G rassed Swale•Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 t - Permit Number: {to be provided by DWQ} Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width o1 the bottom of the swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the Swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,465.001msi What is the elevation of the bottom of the swale? 3,463.50 fmsl What is the SHWT elevation? 3,456.50 fmsl What is the longitudinal slope of the swale? 1.50 % OK What is the depth of freeboard? 0.82 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and 11. Project Design Summary, Page 2 of 2 J , Permit No: (to be assigned by DWQ) 11I °REQUIREO.ITEMS'CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated'an agent, the agent may initial below. It a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 445 H C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 - Boundaries of drainage easement. /4 C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 - Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1.1 - Swale dimensions, and D1.2 SHWT level(s) s Y ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) 11 S ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. r V 5 y ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (to be provided by D111Q) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Tlne drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application, Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW40 I -Grassed Swale O&M-Rev.3 Page 1 of 2 G:1_2007160070471Docs\Permit FormsINCDENR StormwateALow DensitylGrass Swale 0&M Agreements16007047 O M GrassedSwale Rev3 E-1b.doc 6007047 Permit Dumber: (to be proi4ded by DVVQ) I acknowledge and agree by trey signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project n(une:Canoe Club BMP drainage area number-1-lb Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte, NC 26 7-03 Phon, Signa Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I�,c ir1 12eV_pnsAO f __ _ , a Notary Public for the State of l County of Anj Ova , do hereby certify that personally appeared before me thi r n� day of LwetnM bz,-- abb? and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, _ Notaty Public _ Union County SEAL r. My commission expires qz// lad 13 Dorm SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 GA_20071600704ADocs\Permit Forms\NCDENR Stormwater\Low Density\Grass Swale 0&M Agreement816007047 0 M GrassedSwale Rev3 E-1b.doc A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information. Project name Contact name Phone number Date Drainage area number Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 10-yr storm runoff depth 10-yr storm intensity Post -development 10-yr storm peak flow Velocity Maximum non -erosive velocity (peak 10-year storm) Soil characteristics (enter Y below) Sand/silt (easily erodible) Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: Maximum velocity Side slopes Swale length Option 2: Conveyance Swale, Seeking Pollutant Credit: Maximum velocity for 10-yr storm Side slopes Swale length Canoe Ctub Steven G. Harris 704.337.6224 December 15, 2008 E-1 b 32.670.00 ft' 10,018.80 ft2 30.7% % RD inch 4.90 in 7.06 in/hr 2.83 ft3/sec 3,50 tvsec X N (Y or N) :1 ft N (Y or N) 1.79 ft/sec 3.00 :1 250.00 ft Permit Number: (to be provided by DWO) O�OF W A7F9pG d Y Form SW401-Grassed Swale-Rev.3 Parts I and It. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWOJ Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom o1 the Swale 0.00 ft Width of the top of the swale 9.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,465.00 imsl What is the elevation of the bottom of the swale? 3,463.501msl What is the SHWT elevation? 3,456.501msi What is the longitudinal slope of the swale? 1.50 % OK What is the depth of freeboard? 0.77 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and If. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III.. REQUIRED. ITEMS: CH ECRls Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 4 5 H C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 - Off -site drainage (if applicable), C7.2 - Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 - Grass species, and D1.2 Boundaries of drainage easement. n C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 - Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 1 s P C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1,1 - Swale dimensions, and D1.2 SHWT level(s) /V l S ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) /0 5 ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. IV 5 H ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (to be pro i ded bY DW& Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris, Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer aeplication. Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary, Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page l of 2 G:1_2007160070471DocslPermit FormsINCDENR StormwaterlLow DensitylGrass Swale O&M Agreements16007047 O_M_GrassedSwale_Rev3_F-1 a.doc 6007047 Permit Number: (to be provided by DtVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project ttcrtne:Canoe Club BMP dreiinage area number:17-1 a Print name:Steven G. Harris Title:Operations Manager Address:1600 Camden Road Charlotte. NC ZR218 2`320 Phon Sign, - Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, =:)Dnn AR II , a Notary Public for the State of �Or�('� rcyi.', nZ , County of _uffhJDV�. , do hereby certify that 1d t?.t/l j2, +�Ltr z _ personally appeared before me this day of Y�.�p� , a)0p , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, 0 _ O �olt]�V 4u�11c ��1on CO 47 'G 0�� SEAL My commission expires q//I /c-1b1 3 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 GA_20M60070471Docs\Permit Forms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 F-1a.doc Permit Number: (to be provided by DWQ) A� O G r NCDENR p STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part !1!) must also be filled out, printed and submitted along with all of the required information. I. PROJECtINFORMATION''`1;-I ,, r' I lei .' 1 i l,l°'!t 11 ; sl 01 FF 114 Project name Canoe Club Contact name Steven G. Harris Phone number 704.337,6224 Date December 15, 2008 Drainage area number F-1a II.'DESIGNINFORMATION °`�,`EV'Al h I.,1'� e1 14 ,i i,i1 .111 i i JI ! a .. , .. Site Characteristics Drainage area 39,204.00 ft 2 Impervious area 10,018.80 ft2 Percent impervious 25.6% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlhr Post -development 10-yr storm peak flow 3.17 ft3lsec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter "x" below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter "x" below) Bermuda Tallfescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 3.46 ft/sec Side slopes 3.00 :1 Swale length 285.00 It Form SW401-Grassed Swale-Rev.3 Parts I and tl. Project Design Summary, Page 1 of 2 ' Permit Number: (to be provided by DWR) ' Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width o1 the bottom of the Swale 0.00 ft Width of the top of the swale 9.00 it Additional Information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,463.00 tmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope ai the swale? 6 - Mountain ° Terrain �° Slope too steep. Explain why It Is impractical to achieve 5%. p p' p y p What is the depth of freeboard? 0.95 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) 'REQUIFiEn ITEMS`CNECKL1ST"' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. JI/rS N C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 - Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 - Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 - Grass species, and D1.2 - Boundaries of drainage easement. C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 - Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 M S YY C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing; C4.2 Side slopes, C4.3 Longitudinal slope, C7.6 - Freeboard D1 A Swale dimensions, and 01.2 SHWT level(s) ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) ALLY- H ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. ►" 5 H ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 6007047 Permit Name: (ro be proi,ided bY DIV& Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed Swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary, Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786, Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 G1_2007160070471Docs\Permit Forms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 F-t b.doc 6007047 Permit Dumber: (to be provided by DIVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narne:Canoe Club BMP droinoge area number: F-1 b Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road Charlotte. NC Phon Sign, - Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident oi'the subdivision has been named the president. I, � �xa r , a Notary Public for the State of i�OC-�L�AXIAi0A , County of Uhl DO, , do hereby certify that e-n Q . personally appeared before me this gs2L�r-- day of. iene Y\v--)2r , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, �``���»i t i►t t trrrgrr/i �o i �atatY P�pI1G _ \3c\1or+C°u�'tY c O`' I-- 0R rt' HCtP,(z� I SEAL My commission expires 7i) r 4.00 13 Dorm SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 G:1_2007160070471Docs\Permit Forms\NCDENR StormwatertiLow Density\Grass Swale 0&M Agreements16007047 0 M GrassedSwale Rev3 F-1b.doc Permit Number: (to be provided by DWQ) O� W ATF9 AT -A> i NCDENR a STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must also be filled out, printed and submitted along with all of the required information. Project name Canoe Club Contact name Steven G. Harris Phone number 704.337.6224 Date December 15, 2008 Drainage area number F-1b II d.,.'., ' ,, '. {,L,il,r; I r. 1. ��� I ii :k_u, �;: Isr •: ,�;1b �:'sii { In,�,y�...,i y „' .-';'; i n ,�" 11'�1„Iri nl.., � ,t,�,� i�l,I3, } II ', ! ii :;I I'-.. •,. ,I I :.11 11 - ut!II•�,.•I �--.I .I-c' [!!DESIGN.INFQRMATIDN,I ::j lt! I , >a,, 1, 1 i,;+jj,II ``! ,11: I fp :.,I, it ! , ? , ,.,,a t ,•I I,i;a 1Il�tI hl i i, , i , I.,,uI s st! I !I .II li •+ ...... .. ... .. !•. .._.......... :E.t ,Liil„,,,,L� .III. .� , i •, ,I _[k.�l,, �i¢.lt,i �� ,f )I .li LI ,. ,. ,t,d.i. I+,. , 'f!I;,d,..,.�fll<1i4:�114�d ,, - 4I.11:1r :Ilihij..! II�I�.JjI�. � _,��.,! 1, ,n: II� LIf.jL i,.,t,ll,t••n•Illilli:liiiftli',I„ii.:.l:il.i„ ,Il.:o• Site Characteristics Drainage area 33,541.20 ft2 Impervious area 12,632.40 ft2 Percent impervious 37.7% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlflr Post -development 10-yr storm peak flow 3.13 ft3/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 fusee Soil characteristics (enter Y below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter "x" below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 3.16 ft/sec Side slopes 3.00 :1 Swale length 303.00 ft Form SW401-Grassed Swale•Rov.3 Parts I and 0. Project Design Summary, Page 1 of 2 4 Permit Number: (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the swale 9.00 ft Additional information Is the swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 It OK What is the ground level elevation? 3,463.00 fmsl What is the elevation of the bottom of the swale? 3,461.50 fmsl What is the SHWT elevation? 3,454.50 fmsl What is the longitudinal slope of the Swale? 5.00 % OK What is the depth of freeboard? 0.93 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and 11. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by FWQ) REQUIIRED'ITEMS! CHECKLIST,,� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 446 H C2.1 1. Plans (1" = 50' or larger) of the entire site showing: C2.2 - Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), C7.4 Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 - Grass species, and D1,2 Boundaries of drainage easement. C2.1 2. Plan details (V = 50' or larger) for the grassed Swale showing: C2.2 Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 - Proposed drainage easement and public right of way (ROW), C7.3 - Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 10511 C4.1 3. Section view of the grassed swale (V = 20' or larger) showing: C4.2 - Side slopes, C4.3 Longitudinal slope, C7.6 Freeboard D1.1 Swale dimensions, and D1.2 SHWT level(s) / I/ ► s N ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) .14 .5 fi ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. 05 5 N ATTACHED 6, A copy of the deed restrictions (if required). SW401 -G rassed Swale- Rev. 3 Part III, Page i of 1 r 6007047 Permit Name: (to be provided by D1VQ) Drainage Area Number: Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. T7ne grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. Swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sad (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the Swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 GA— 2007160070471Docs\Permit Forms\NCDENR 5tormwater\Low DensitylGrass Swale O&M Agreements16007047 O M Grassed5wale Rev3 G-1.doc 6007047 Permit Number: (to be provided br DWO) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project natne:Canoe Club BMP drainage area nu►rtbe Print name:Steven G. Harris Title:Operations Manager Address:1600 Camden Road Charlotte NC 203 Phone: S ignatt Date: r _ Note: The legally responsible parry should not be a homeowners association unless more than 50010 of the lots have been sold and a resident of the subdivision has been named the president. CID1�nne, 3R—,ee rn , a Notary Public for the State of i 304'-"l 0-Ard; n 11 , County of LAY) 1� 0 � , do hereby certify that t' n ,(t S personally appeared before me thiA� day of bg-rr , o?t'O? , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, O �p t401004 QubUc OR /n r n%00 SEAL (2�� My commission expires_ g1114Qw3 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 GA-2007160070470ocsTermit Forms\NCDENR Stormwater\Low Density\Grass Swale O&M Agreements16007047 O M GrassedSwale Rev3 G-i.doc Permit Number: (to be provided by DWO) &RA OF W ATF9 NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part /II) must also be filled out, printed and submitted along with all of the required information. . PROJECT,INFORMATION,,'�'-',i',!.'! a14., Project name Canoe Club Contact name Steven G. Harris Phone number 704-337.6224 Date December 15, 2008 Drainage area number G-1 it ,li.h Site Characteristics Drainage area 23,086,80 ftz Impervious area 10,454,40 ftz Percent impervious 45.3% % Design rainfall depth RD inch Peak Flow Calculations 10-yr storm runoff depth 4.90 in 10-yr storm intensity 7.06 inlhr Post -development 10-yr storm peak flow 2.35 ft3isec Velocity Maximum non -erosive velocity (peak 10-year storm) 3.50 ftlsec Soil characteristics (enter Y below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter Y' below) Bermuda Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture X Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, 2: Conveyance Swale, SeekingPollutant Credit: N (Y or N) Maximum velocity for 10-yr storm 2.80 fYsec Side slopes 3.00 :1 Swale length 218.00 ft Form SW401-Grassed Swale- Rev .3 Parts I and II- Project Design Summary, Page 1 of 2 Permit Number: (fa be provided by DWQ) Swale Characteristics Swale Shape: Enter an N" in the appropriate cell below: Trapezoidal Parabolic V-shaped X Width of the bottom of the swale 0.00 ft Width of the top of the Swale 9.00 ft Additional Information Is the Swale sized for all runoff from ultimate build -out? yes (Y or N) OK Is the BMP located in a proposed drainage easement with a yes (Y or N) OK recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? 7.00 ft OK What is the ground level elevation? 3,483,00 fmsl What is the elevation of the bottom of the swale? 3,481.50 fmsl What is the SHWT elevation? 3,474.50 fmsl What is the longitudinal slope of the swale? 5.00 % OK What is the depth of freeboard? 0.97 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III. REQUTAENTEM&CHECKLIST x 3 a� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. ff a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. 1145 H C2.1 1. flans (1" = 50' or larger) of the entire site showing: C2.2 Design at ultimate build -out, C7.1 Off -site drainage (if applicable), C7.2 Delineated drainage basins (include Rational C coefficient per basin), C7.3 Swale dimensions (width, length, depth), CT4 - Maintenance access, C7.5 Proposed drainage easement and public right of way (ROW), C7.6 Grass species, and D1.2 Boundaries of drainage easement. 1' C2.1 2. Plan details (1" = 50' or larger) for the grassed swale showing: C2.2 - Swale dimensions (width, length, depth), C7.1 Maintenance access, C7.2 Proposed drainage easement and public right of way (ROW), C7.3 Design at ultimate build -out, C7.4 Grass species, C7.5 Off -site drainage (if applicable),and C7.6 Boundaries of drainage easement. D1.2 1� C4.1 3. Section view of the grassed swale (1" = 20' or larger) showing: C4.2 Side slopes, C4.3 Longitudinal slope, C7,6 Freeboard 01.1 Swale dimensions, and D1.2 SHWT level(s) /V ► 5 /-/ ATTACHED 4. Supporting calculations (including maximum velocity calculations for applicable storms) %V! 5 Y ATTACHED 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. +" 5 9 ATTACHED 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 T,-.,..n:.c::�',.�,ylbaliix-.sG:�4✓.�rca...:iw.hnxk .tw::.i..i.::. �!.—�.- .,ti� 6007(97 Perniit Number - Residential Basins f� ••h'ro fecf=v Drainage •e 1 M Infiltration Basin Operation and Maintenanc �eem nt 4 2008 I will keep a maintenance record on this BMP. This maintenance r ord LWj = e)kpeptjn,,a:,T�0N log in a known set location. Any deficient BMP elements noted, in ifl be °FFICF corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency ofi.the.BMP. -. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Residential Basins.doc SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 Residential Basins BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75` , of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is damagec Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Residential Basins.doc SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Residential Basins (to be provident by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name. Canoe Club BMP drainage area number: Residential Infiltration Basins for Lots: 101-103, 105-1 12, 114. 1 16-138, 201-204, 215, 216 Print name:Steven G_ Harris Title:0 crations Mana er Address:1600 Camden Road, Charlotte, NC 28203 Phon Sign; Date Note: The legally responsible party should not be a homeowners association unless more than 50% or the lots have been sold and a resident of the subdivision has been named the president. 1, ,7a N4 A . �karrno^ , a Notary Public for the State of l�orkh CaY.o\vnz County ofdo hereby certify that Sk\ien G. �\arrls personally appeared before me this day of IAV 200R , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, 01>1tlftllrl A, Nq �0 NQTAR f'V BLICcc 2 NCH►�111111111U1,t1 t�xptes 1. SEAL �J My commission expires 6007047 Basin OM agreement —Residential Basins.doc SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 Permit No. Inlituabon Basin aes_2011 sq a (to be provided by DwC) �jMI-WIVA o�of WATEAo� STORMWATER MANAGEMENT PERMIT APPLICATION FORM P ^c NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. l; PROJECT INFORMATION" - ; It ,: .. <,r, i�I,l!" �l�l�.,, i, i,-I, , . s ?... lfyl" i+ui� 1 1 . i i �.,z� ,,����!�,"„+',.i l,i .. ,i' ,t4;1;ji h: C',. i I. Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin for 2011 sq ft Residential Home 1I. DESIGN: INFORMATION 'ai ' Il a. '` ! rili.rl,' IC.t ?i rIII Site Characteristics Drainage area 1,922.00 h2 Impervious area 1,922.00 rye Percent impervious 1,00 % Design rainfall depth 1,00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2,16 in 1-yr, 24-hr intensity 0,09 inihr Pre -development 1-yr, 24-hr runoff volume f131sec Post -development 1-yr, 24-hr runoff volume H Isec PrelPosl 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SR Waters Minimum design volume required 152.10 It Design volume provided 224.70 rya OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfal! depth in Pre -development 1-yr, 24-hr runoff rya Post -development 1-yr, 24-hr runoff rya Minimum volume required rya Volume provided rya Soils Report Summary SO type sandy silts Infillratlon rate 1,50 inlhr SHWT elevation not detected fmsl Basin Design Parameters Dfawdown time 1.17 days OK Basin side slopes NIA :1 OK Basin bottom elevation Varies fmsl #VALUE! Storage elevation Varies fmsl Storage SA 116.80 ft, Top elevation Varies fms! Basin Bottom Dimensions Basin length 22.25 ft Basin width 5.25 ft Bottom SA 116.80 ft2 Form SW401.Infiltrafion Basin-Rev.2 6007047 Supplement-InfillraGonBasm_Ras 2011 Parts I, 8 II. Design Summary. Page 1 of 2 6DO7047 Infittralion Basin Res-2011 sq it Additional Information Total runoff volume captured by basin Length of vegetative filler for overflow Distance to structure Distance from surface waters Distance from water supply wells) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided Permit No. (to be provided by OWO) 0.04 ac-in OK Greater than 30' It OK Greater than 15' ft OK Greater than 30' ft OK Greater than 100' ft OK 5.50 it OK not detected ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Catch Basin Forrn SW401 •Irllrllratlor Basin- Rev. 2 6007047 Supplement- I nliItralioneasp n_Ras 2011 Parts I, & ll. Design Summary, Pago 2 cl 2 6007047 Permit No. Infiltration Basin Res-2233 sq tl {ta be provided by DWo) O`,OF W ATg9QG Au*'Ar STORMWATER MANAGEMENT PERMIT APPLICATION FORM r NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I !..PROJECT;INFORMATION Project Name Canoe Oub Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin for 2233 sq ft Residential Home II.;DESIGN INFORMATION Site Characteristics Drainage area 2,069.00 ft2 Impervious area 2,069.00 ft' Percent impervious 1.00 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2.16 in 1-yr, 24-hr intensity 0.09 inlhr Pre -development 1-yr, 24-hr runoff volume ft"/sec Post -development 1-yr, 24-hr runoff volume ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type tnfiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 163.B0 ft3 224.70 it in W ft3 ft3 ft3 sandy silts 1.50 inlhr not detected imsl OK for non -SR waters 1.17 days OK NIA :1 OK Varies fmsl Varies fms4 116.80 f? Varies fmsl 22.25 ft 5,25 ft 116.80 rye #VALUE! Form SW401-Infiluation Basin-Rev,2 6MI047 Supplement- InMuationeasin_Rgs 2233 Parts I. R II. Design Summary, Page I of 2 6007047 Permit No. ntillranon Basin Res-2233 sv Q (to be provided by OWQ) Additional Information Total runoff volume captured by basin 0.04 ac-in Length of vegetative filter for overflow Greater than 30' it Distance to structure Greater than 15' it Distance from surface waters Greater than 30' it Distance from water supply well(s) Greater than 100' it Separation from impervious soO layer 5.50 it Naturally occuring soil above shwl not detected ft Bottom covered with 4-in of clean sand? Y (Y or N) Proposed drainage easement provided? Y (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided Catch Basin OK OK OK OK OK OK OK OK OK OK OK Form SVV401-InRllration Basm-Rov.2 6007047 Supplement_InfiltrationBasin_ Res 2233 Pam I, & II. Design summary, Page 2 of 2 6007697 Permit No. Infiltration Basin II sq a {ro be provided by D WQJ O` �F W A r�c9OG STORMWATER MANAGEMENT PERMIT APPLICATION FORM r n NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. L PROJECT. INFORMATION err i tl r J1 �ht 11' �' dt� . i,�:�ili; i..i,l., � +� 9; ;'i.. � �,_ .tlll. 'Ia„ ,Iin„ 4„ .n 1 „a . I ,�� t� Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin for 2836 sq ft Residential Home Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1 -yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHVVT elevation Basin Design Parameters Drawdown tuna Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2,705,00 ft' 2,705,00 h2 1.00 % 1,00 in 2,16 in 0,09 infhr ft3lsec ft3lseC ft3isec 214.10 ft3 224.70 ft3 in ff3 It tt3 ff3 sandy silts 1.50 ini not detected fmsl OK for non -SR waters 1.17 days OK NIA :1 OK Varies III Varies fmsl 116.80 ft2 Varies fmsl 22.25 f1 5,25 ft 116.80 ft2 #VALUE! Form SW401-Infiltration Basin-Rev.2 6007047 Supplement_InrillralionBasin_Res 2836 Parts I, 6 II, Design Summary, Page 1 of 2 6007O47 Permit No. lnfiglabon Basin Res_2836 sq ft (to be provided by DWQ) Additional Information Total runoff volume captured by basin Length of vegetative filter for overflow Distance to structure D}stance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered v,rith 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 0.04 ac-in Greater than 30' ft Greater than 15' ft Greater than 30' it Greater than 100' It 5.50 It not detected It Y {Y or N) Y (Y or N) Y (Y or N) Y (Y or N) Catch Basin OK OK OK OK OK OK OK OK OK OK OK Form SW401-Infiltration Basin. Rw,2 6007047 Supplement-InfiltrationBasin_Fas 2836 Parts I. 6 IL Design Summary, Pago 2 of 2 6007047 Permit No. Inlittrauon Basin Res -Duplex (ro be provided by DWO) oaOE WArg�,oG Av"A STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. I.' PROJECT INFORMATION I Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin for 3593 sq ft Duplex Units mi, r,, „ n III.- DESIGN INFORMATION.'.. ra r .,1et�' • " n I I , Illi �st a -fit' I .•N. `�., i �, r . e� i f . [ '!'1 Site Characteristics Drainage area 2,705.00 ft2 Impervious area 2,705.00 it Percent impervious 1.00 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2.16 in 1-yr, 24-hr intensity 0,09 inlhr Pre -development 1-yr, 24-hr runoff volume it3lsec Post -development 1-yr, 24-hr runoff volume It Isec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Mon -SR Waters Minimum design volume required 314.20 it3 Design volume provided 374.50 ft3 Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff rya Post -development 1-yr, 24-hr runoff f13 Minimum volume required rya Volume provided W Soils Report Summary Soil type sandy silts Infiltration rate 1.50 inlhr SHV `T elevation not detected fmsl Basin Design Parameters Drawdown time 1.17 days Basin side scopes NIA :1 Basin bottom elevation Varies fmsl Storage elevation Varies fmsl Storage SA 155.65 ft2 Top elevation Varies fmsl Basin Bottom Dimensions Basin length 22.25 it Basin width 9.50 It Bottom SA 155,65 it, OK for non -SR waters OK OK #VALUE! Form SW401-Infiltration Basin. Rev 6007047 Supplement_InldtrationBasin-Duplex Parts I. A 11. Design Summary, Page I or 2 6007047 Permit No. Inliltration Basin Res -Duplex (to be provided by OWQ) Additional Information Total runoff volume captured by basin Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 0.04 ac-in Greater than 30' ft Greater than 15' ft Greater than 30' ft Greater than 100' It 5.50 ft not detected ft Y (YorN) Y (YorN) Y (YorN) Y (YorN) Catch Basin OK OK OK OK OK OK OK OK OK OK OK Form SLV401-Infi11ration Basir-Rov.2 6007047 Supplemenl_Inliltrationeasin_Ouplex Parts 1. a u. Design Summary, Page 2 of 2 Permit No Ea .s . -; s (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. N1s�J C2.) C2.Z � 3.1 L3.y G 7.! G7.Z 7•Z Flans (1 " - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. 7• 3. Section view of the infiltration basin (1" = 20' or larger) showing: Pretreatment and treatment areas, and p ! " Inlet and outlet structures. yu S �{ C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verity the volume provided. A4-5N INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. /MS # NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized, /4 5 /) NARRATIVE 7. The supporting calculations. /0 // INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. A S /-/ INCLUDED 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev,2 Page 1 of i Part III. Required Items Checklist, Page 1 of 1 f Permit No. (to be provided by DWQ) 13os I'm Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will . result in a request for additional information. This will delay final review and appn3val ofrtiiijirojectlrlittai in the space provided -fog „s indicate the following design requirements have been met. If the applicant has designated an agent, the agent'may initial beEow. If, a ?. requirement has not been met, attach justification. i Pagel Plan . Initials Sheet No, l ' 1 O M s ri C 2.) r. Plans (1" - 50' or larger) of the entire site showing: t;�t: 2— Design at ultimate build -out, Ir C+ 1 Off -site drainage (if applicable), 3 C 3. 2 G 3 - Delineated-drainage'basins (include Rational C coefficient pbr.basin);,ti,.; ' Basin dimensions, G -7, Pretreatment system, G 7. x High flow bypass system, e— I . y Maintenance access, Proposed drainage easement and public right of way (ROW). Overflow device, and Boundaries of drainage easement. 7•) I � So 2. Partial plan (1" = 30 or.larger nd details for the infiltration basin showing: 4 -7. Z Bypass structure, '"l_ftm� . Y Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device, ASH C 7, i �X 3. Section view of the infiltration basin (1" = 20' or larger) showing: /) Pretreatment and treatment a{eas, and, ,Sst� Inle d outlef sk�uctures. ,L6 C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. �f N INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. M 5 N NARRATIVE 7. The supporting calculations. /fps /y INCLUDED B. A copy of the signed and notarized operation and maintenance (0&M) agreement. ,41S / -1 INCLUDED 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 6007047 Permit Number: Infiltration Basin I: Pipe I (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire SMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 1 Pipe I.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 0007047 Inrtltration B;isin I: Pipc BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth, possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive re air. Weeds and noxious plants are Remove the plants by hand or by grooving in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs, appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. 6007047 Basin OM agreement —Basin 1 Pipe I.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infiltration Basin l: Pipe I (to be provided by OWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 1: Drainage Area Pipe I-3 Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road, Charlotte, NC 28203 Phone Sign Date: Note: The legally responsible party should not he a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. �t ,-Y-Y­Non , a Notary Public for the State of County of' do hereby certify that S personally appeared before me this a%' day of r \�A and acknowledge the due execution of the; forgoing infiltration basin maintenance requirements. Witness my hand and official seal, rZ.TA,gyZ PUBLIC 2 S .,, saes SEAL co"aA� My commission expires QJ&Vw- 1rzi-ol 6007047 Basin OM agreement —Basin 1 Pipe Woc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 Permit No. Inliltranon Basin ,_Pipe I Ou be provided by D WO) o�OF W A TE,9OG AMAMA STORMWATER MANAGEMENT PERMIT APPLICATION FORM a Y NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. 1 I /i1 I1,11 �� I l' 1i�111i 41t,i �iS Itlri: lilNl�1i:yl!I.1 IS� 1.1�1}YII{I111 �f'�ii; Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281.1447 Date 10-Jun-08 Drainage Area Number Basin 1 II.; DESIGN INFORMATION„ �,,I,. °t�;y ln'14� + j .r ; . !� . Site Characteristics Drainage area 72,745.20 ff2 Impervious area 19,780.00 ft2 Percent impervious 0.27 % 0 Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Solis Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin s!de slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft'/sec ft3is ec ft31SeC 1,566.00 ft3 1,573.00 it in ft3 ft3 it ft 3 sandy silts 1.50 inlhr not detected fmsl OK for non -SR waters 1.17 days OK NIA J OK 3,455.50 fmsl 3,455.50 fmsl 699.23 ft2 3,459.00 fmsl 50.58 ft 13,75 ft 699.23 ft2 #VALUE! Form SW40,-Infiltration Basin-Rev.2 BW7047 Supplement-InfilirationBasin-Basin t Parts L & "Design Summary. Page 1 01 2 Permit No 6007047 Inhllralion Basin I_Pipe I ((o be provided by DWQ) Additional Information Total runoff volume captured by basin 0.43 ac-in OK Length of vegetative idler for overflow 51.53 ft OK Distance to structure 43.54 ft OK Distance from surface waters 55:37-----> ft OK Distance from water supply well(s) 150.00 ft OK Separation from impervious soil layer 5.50 ft OK Naturally occuring soil above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin Form SW401-Infiltration Basim Plev.2 6007047 Supplement_InM1ltrabon5asin_Basin I Paris I, d II. Design Summary. Page 2 of 2 r } Permit No 13pp 0 S ,1 h (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. AA S C Z.) 1'. flans (1" 50' or larger) of the entire site showings C Z. Z - Design at ultimate build -out, C 3.1 Off -site drainage (it applicable), Delineated drainage basins (include Rational C coefficient per basin), G3,51 Basin dimensions, C_ 7, l Pretreatment system, G 7, Z High flow bypass system, y Maintenance access, Proposed drainage easement and public right of way (ROW),, Overflow device, and Boundaries of drainage easement. ; /14 f C 7.1 � f 2. Partial 30' or larger) details for the infiltration basin Iwo ngt jr, plan (1" = and sh G 7• Z Bypass structure, D . W Maintenance access, ' AUG - 4 2008 - Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout,! Flow distribution detail for inflow, r , lh 4TER () 1, t I SECTION C ' Vegetated filter, and FpsH` VILLE RFG1UNAL O'+=ICE Pretreatment device. y' ASH 47, 3. Section view of the infiltration basin (1' = 20' or larger) showing: � D t Pretreatment and treatment areas, and Inlet and outlet structures. C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. /fit 1a INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form, County soil maps are not an acceptable source of soils information. S>y NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. NARRATIVE 7, The supporting calculations. INCLUDED 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. ,915/4 INCLUDED 9, A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 6007047 Permit Number: Infiltration Basin 2: Pipe G (to be pro14ded bY DW& Drainage Area Dumber: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). -- No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 2 Pipe G.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 tntiltration Basin 2: Pipe G BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75%. of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred The outlet device is damagec Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spy). _ Remove shrubs or trees immediately. _ Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 2 Pipe G.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infiltration Basin I pipe G (to be provided by DWQ} I acknowledge and agree by my signature below that I am responsible for the perforniance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project narne.: Canoe Club RMP drainage area number: Infiltration Basin I Drainage -Area Pipe_G-I Print name:Steven G. Harris Titie: Operations Manager Address:1600 Camden Road, Charlotte, NC 28203 Phone: 704.377.6/ 4 Signature: Date: Note: The legally responsible party should nol be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. V�zrN`Z)✓N , a Notary Public for the State of 1',4&kti C&Y4N na. County of PeLW\eVAbVUYq do hereby certify that ��eve\n Cam. �dY� 5 _ personally appeared before me this day of UO , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, O HOTAR �,Z t:U pU B LlC ,? SEAL L� My commission expires Y 15 O1`L 6007047 Basin OM agreement —Basin 2 Pipe G.doc Form SW401-infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 Permit No. Inliltrabon Basin 2-Pipe G (to be provided by DtNQ) �o�oF wnrfgQi FMA STORMWATER MANAGEMENT PERMIT APPLICATION FORM D t NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required !tams Checklist (Part Ill) must be printed, filled out and submitted along with all of the required information. L,PROJECT,INFORMATION1�;iltt lrtl�,n4.1:`ill,;.�lt� ,'I �ti'.I �alUt„%in'Itdii.lttlii!!,;.tl�rt �ltl p!iilill!1yypp1.1d�u411���1 ��{;,i lti r I1 1 i S _�� _ �!. s. - 41. Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 2 _,:r '.: .7 ,.i hS.�-ui4,�;i,h1 :1'unatdlLati1113S�11111111, tl .11; t;� ;I•Ilt 4 h n - I,et 1 IL. DESIGN�INFORMATION .411Vu lh;A1t!,TN�jM19 Site Characteristics Drainage area 63,597.60 it' Impervious area 9,950.00 It Percent impervious 0.16 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevafion Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft3]sac ft3lsec ft3lsec 788.00 rya 824.00 it in rya it it it sandy silts 1.50 inmr not detected fmsl 1.17 days NIA :1 3,449.70 imsl 3,449.70 imsl 409.64 ftz 3,453.20 imsl 22.25 1t 18.00 it 409.64 it2 OK for non -SR waters OK OK #VALUE! Form S W 401-Infiltration Basin-Rev.2 6007047 Supplement-InfillrationBasin-Basin 2.xla Parts I. & II. Design Summary. Page 1 of 2 Permit No 6007047 Infiltration Basin 2_Pipo G Additional Information Total runoff volume captured by basin 0.23 ac-in OK Length of vegetative filter for overflow 62.04 It OK Distance to structure 21.76 it OK Distance from surface waters `48:56 ffa OK for non -SA waters Distance from water supply b(s) 200.00---fS r OK Separation from impervious soil layer 4,50 it OK Naturally occuring soll above shwa not detected It OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff a1 ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basln (to be provided by DWO) Form SW401 Infiltration Basimney 2 6007047 SupplemBnl_Inldvatlp Basin_BaSin 2-x19 Pans 1. & II. Design Summary, Page 2 of 2 Permit No 3 (to bo provfded by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result In a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. /U1 5 } 1 C Z.) 1' Plans (1" - 50' or larger) of the entire site showing' ' Z • Z Design at ultimate build -out, - Y,• Off -site drainage (if applicable), :.,.,:. YAti',V • ; „� :... -,�; - -.�y .Y aa:;', rt,, -Delineated drainage basins (include Rational C coeffi, gnttper basth),"_. . Basin dimensions, r G 7, I Pretreatment system, '= ' l .�� YL 1 �_ : _ �� •.._ `f ___ 11� L 4 G 7. Z High flow bypass system, Maintenance access, } 4 tl II fl Lli ; I! Proposed drainage easement and public right of way (f�0 4,. ;UG Overflow device, and t ' Boundaries of drainage easement. 'i f l7 [ 7• / 2. Partial plan (1" = 30' or larger) and details for the infiltration basin snotvin : C_ 7 - Z Bypass structure, D r .'-/ Maintenance access, Basin bottom dimensions. Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. a Section view of the infiltration basin (1" = 20' or larger) showing: ' t , �' Pretreatment and treatment areas, and Inlet and outlet structures. 5 C7.2 4, A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. �13 INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. /Gi S # NARRATIVE .44 5 /) NARRATIVE INCLUDED INCLUDED 6. A construction sequence that shows how the inlitlration basin will be protected from sediment until the entire drainage area is stabilized. 7• The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Form 5W401-Infiltration Basln-Rev,2 Page t of 1 Part III, Required Items Checklist, Page 1 of 1 6007047 Permit Number: [nfiluatim Basin 3: Pipe a (ro be provided by DIVA) Drainage Area [Dumber: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies cart affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to tine infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (connmonly six weeks). — No portion of the infiltration basal will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basil is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire I3MP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occ�rrring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 Gitiliration Basin 3: Pipc R BMP element: Potentialproblem: How I will remediate the rroblenu The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more Ihan Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An amrlual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged. Repair air or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786, 6007047 Basin OM agreement —Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit NUrnber: _ Infiltration Basin 3: Pipe 13 (to he, provided bY DWQ) I acknowledge and agree by nny signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 3: Drainage Area rea Pipe B-1 Print name:Steven G. Harris TitleDperations Manager Address:1600 Camden Road Charlotte NC 28203 Note: The legally responsible party should not be a homcowriers association unless more than 50%n of the lots have been sold and a resident of the subdivision has been named the president. I, J ask 1N. ( -, , it Notary Public for [lie State of Czvbl%Oa , County of �1L�ev rovdo hereby certify that personally appeared before me this day of ` , . -)-DDB , and acknowledge the clue execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, We A. tyq 'H0T Agyz IC SEAL My commission expires 6007047 Basin OM agreement_ Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 InlilualiiHl Basin 3_Pipe B Permit No. (fo be provided by 0W0) FOt`�'r W A T fiAOG ® � STORMWATER MANAGEMENT PERMIT APPLICATION FORM r o � NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. y 1,2 ; 1 5ia r f l I 9 I.f'e „ t PtiJl t S" 1 1!4 .�:rr.: - y: Il, :f Ir.1• t,r rg-0ir FIiy. } ..R lf,.: I �pRO;1fcCT1INFORMATIOiV ��,�r�,&`.�„al,,. ��s� s!1° - `s��'��I,::��tiR!.:.•�-,_:�;=�-eta::�.,I�t:n�.:c�.�Yt'r.�:;.,a�;�)t�;�����?i�r��it�x�-rv,l!'I��.�n�I1�I Project Name Canoe Club Contact Person Scdtt Homewood, E1 Phone Number (828) 281.1447 Date 10-Jun-08 Drainage Area Number Basin 3 Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Posl-development 1-yr, 24-hr runoff volumo PrelPost 1-yr, 24•hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runofl Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SH'NT elevation Basin Design Parameters Dfawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 55,756.80 it 15,050.00 it 0.27 % 1,00 in 246 in 0,09 irdhr ft3lsec ft3lsec f131sec 1,19i.00 it 1.198.00 fl3 OK for non -SR waters in f t3 ft3 it" 10 Sandy silts 1.50 inlhr not detected imsl 1.17 days OK NIA :1 OK 3,454.00 fmsl 3,454.00 Imsl 589.42 It? 3,457.50 Imst 43.50 It 13,75 h 589.42 it2 #VALUE! Form SMDI-InfduaUon Basin -Re .2 6007047 Supplemenl_InTi,tralionBasin-Basin 3.,1s Parts I. a 11. Dasign Summary. Pago I of 2 6007W Permit No. Infiltration Bash) 3-PrPe B (to be proiided by 0W01 Additional I nformatlon Total runoff volume captured by basin 0.35 ac-in Length of vegetative filter for overflow 47.40 ft Distance to structure 41.90 It Distance from surlace waters 151.20 fl Distance from water supply well(s) 120.00 f1 Separation from impervious soil layer 5.00 It Naturally occu ring soil above shv t not detected ft Bottom covered wilh 4-in of clean sand? Y {Y or N) Proposed drainage easement provided? Y (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided entrance manhole OK OK OK CK OK OK OK OK OK OK OK Fprm SW407-1011rat W Basln-Aev.2 6007657 Supplement_IJIFali0r,9asin-13osin 3_vis Pans I, & II. Omp Summery, Page 2 of 2 Permit (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. M 5, Y4 L Z.) v Nans (1" - 50' or larger) of the entire site showing C Z. Z - Design at ultimate build -out, C. 3.) - Off -site drainage (if applicable), 7. 2 c" 3.3 Delineated drainage basins (include Rational C coe L3.y Basin dimensions, G 7,1 Pretreatment system, G 7. Z High flow bypass system, L , y Maintenance access, Proposed drainage easement and public right of wa Overflow device, and Boundaries of drainage easement. ffidxent.,P basih};:` .:"' . '��,. :;�.`,� „5..._..M,.:•. ; � yi Ow;Fl� AUG I � I 114 Jr C 7. 2. Partial plan (1' = 30' or larger) and details for the infiltration b c. -7. z Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. H C 7• 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and 01- y - Inlet and outlet structures. 5 $/ C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. AZT iN INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. A S # NARRATIVE 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. A a NARRATIVE 7. The supporting calculations. 110 511 INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. S INCLUDED 9. A copy of the deed restrictions (it required). Form 5W401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 6007047 Permit Number: Infiltration Basin 3: Pipe B (to be Provided by DWQ) Drainage Area Dumber: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and /or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 Infiltration Basin 3: Pipe B BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shoves that the embankment needs repair. Clogging has occurred. The outlet device is damaged Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. _ Replace the top few inches of filter media and see if this corrects the standing ester problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide {do not spray Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infliraiion Rasin 3: Pipe B (to he provided by DWQ) acknowledge and agree by my signature below that I am responsible for the performance of. the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Can6e Club BMP drainage area number: Infiltration Basin 3: Drainage Area Pipc 13-1 _ Print name:Steven G. Harris Title:O _eration5 Manager Address:1600 Camden Road,_ Charlotte, NC 28203 Phon SignE Date: Note: The legally responsible party should not be a homeowners association unless more than 50°Io of the lots have heen sold and a resident of the subdivision has been named the president. 1, Ja�'r-raY nndn , a Notary Public for the State of County of V-�<60ev'kbY !�N , do hereby certify that J t S personally appeared before me this day of `�, and acknowledge the clue execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, s �NOTA�z RI✓ �pUgLIC 2 SEAL My commission expires 6007047 Basin OM agreement_ Basin 3 Pipe B.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 W07047 Permit No. Infiltration Basin 3_Pipe 9 (re; be provided by DINO) LIMA O�O� W A re9�G STORMWATER MANAGEMENT PERMIT APPLICATION FORM r NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. .' L, PROJECTINFORMATION:I,'' .. It _ ... ,_. . . Project Name Canoe Club Contact Perscn Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 3 II::DESIGNINFORMATION.w r t, 1I� f J1 t '>pr �I'.� 9 SI t I:, I.,1 iiltl +rt�a lt,` t. ! i1r99:, t. al i:,.l,J,'I. ilr, i ill t IId �, t,i 1f,1i,lItFY I,; Ili t+ IJr!;;�il,l!YrLu�l Hittlln�HN ill Ii; jllr ,1 f�n .,') Site Characteristics Drainage area 55,756.80 it' Impervious area 15,050.00 it Percent impervious 0.27 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development i -yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Solis Report Summary Soil type Infiltration rate SHVVT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft3lsec ft3lsec ft3lsec 1,191.00 it 1,198.00 it in h3 ..3 if ft3 sandy silts 1.50 inihr not detected fmsl 1.17 days NIA :1 3,454.00 fmsl 3,454.00 fmsl 589.42 ft2 3,457.50 fmsl 43.50 it 13.75 ft 589.42 it OK for non -SR waters OK OK #VALUE! Form Sw401-1011liation Basin -Rev 2 6007047 Supplement - IntiltrationElasin-Basin 3.x1s Parts I. d II. Design Summary, Page I of 2 Permit N 6007047 Inlillratien Basin 3-Pipe B Additional Information Total runoff volume captured by basin 0.35 ac-in Length of vegetative filter for overflow 47.40 ft Distance to structure 41.90 It Distance from surface waters 151.20 ft Distance from water supply well(s) 120.00 ft Separation from Impervious soil layer 5.00 ft Naturally occuring soil above shwt not detected ft Bottom covered with 4-in of clean sand? Y (Y or N) Proposed drainage easement provided? Y (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided entrance manhole OK OK OK OK OK OK OK OK OK OK OK (to be provided by DWQ} Form S W 401-Infiltration Basin-Rov.2 6007047 Supplement-InrruralionBasin_Basin 3..Is Parts I. & 11. Design Surnmary, Page 2 of 2 Permit No (to be provided by DWQ) r3tis•�h �l .S� y 4 k ,�`; (. i �;� .^�` 1 3r - 4� �/ q •'fir`. - - v 1 �u'�ti,'"'; �. 111 REQUfREIT£MS CF[ECKIIST'� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. if a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. S' C 2. i 1.' Plans 0 " 50' or larger) of the entire site showing: C x• Z Design at ultimate build -out, Off -site drainage (if applicable),;`�`"� 2 Delineated drainage basins (include Rational C coefficient per basin),°: Basin dimensions, G 7, / Pretreatment system, G 7_ Z High flow bypass system, -� y Maintenance access, t; Proposed drainage easement and public right of way (ROWJ, LF I AUG 2008 j Overflow device, and I s Boundaries of drainage easement. VL WATER QUALITY SECTION F,HEV!LLE AFC.V,JAL OFF! E [ 7, J 2. Partial plan (1' = 30' or larger) and details for the infiltration basin- e- 7 • Z Bypass structure, t Maintenance access, ._..-_............,.�._..�`.__._:......:._.__..,. Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. 3. Section view of the infiltration basin (1" = 20' or larger) showing: e- 7. 11� Pretreatment and treatment areas, and D t Inlet and outlet structures. „5 Al C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. �1� N INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information, NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. 145 NARRATIVE 7. The supporting calculations. 1 /y INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. A 15 /'/ INCLUDED 9. A copy of the deed restrictions (if required), Form SW401-Infiltration Basin-Rev,2 Page 1 of 1 Part III, Required Items Checklist, Page i of 1 (,txM97 Permit Number: Infiliration Basin 4: Pipe A (to be proi,ided by DIVQ) Drainage Area Ntmiber: Infiltration Basin Operation and Maintenance Agreement will keep a maintenance record on this 13MP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the: vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: plow 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if -applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicabte). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 4 Pipe A.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 IM111ralinn Eiasin 4: five A BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75`%, of the original design depth. l;rosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is damaged F.,rosion or other signs of damage have occurred at the Outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the 13MP. Provide additional erosion Protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problern if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13MI1. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray. Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 40l Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 4 Pipe A.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: [nriltration Basin 4: Pipe A (to he provided by DtVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 4: Drainage Arca Pipe A -I Print name:Steven G. Harris Title:Onerations Manager Address:1600 Camden Road, Charlotte, NC 28203 Phone Signo Date: Note: The legally responsible party should not be a homeowners association unless more than 50%n of the lots have been sold and a resident of the subdivision has been named the president. I, \ 1a'f1eV�- P, . ��Vry ­ O"C , a Notary Public for the State of iAOr-,�Y\ Qz_�,Ya\:%YNZ- County of C�'- bv`'rq , do hereby certify that INC, 6. S personally appeared before me this day of �� �, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, P. HA �o 0TARYy PUBLIC II i1N►�'C EXPI� SEAL My commission expires 012 6007047 Basin OM agreement -Basin 4 Pipe A.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 Fi°07047 Permit No. Infiltration f3asin 4_Pipe A (to be provided by DWQ) 0 w a r�goF &P_ STORMWATER MANAGEMENT PERMIT APPLICATION FORM P t NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. a 1 i�F.!? ivkl,-F III +ItU I'r i(liil r H it d! n i rn I II Irt'I' 1 4 i'4 it .i -q1, 11 I IY II" , p, u..'i, t t 1 1 f� I'I PI3DJECT,INFDRMATION' I it I l 4tt1r, ..`� I 1 ij1C�f ,; ; '" s*�t ' t1'rf44 4411'urYl f .l 1, I,p, ,ill t 1,1.11i,4i1 � I , 11;i ,;; t,11 It11,'111t1, , .h Ipc ,r.;,. O7V ,4 d �•., � 5, a i 1 , I 1 • it , rn i r rt ',;! .d 9: � ..4..-.n. ,:.i,.-1!�dL.,. Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 4 Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHW7 elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 40,511.00 It, 13,943,00 f12 0,34 % 1.00 in 2,16 in 0.09 inthr f?/sec f olsec ft'Isec 1,068.00 ft2 1,123.00 ft2 in W W f t, ft3 sandy sins 1.50 inlhr not detected fmsl 1.17 days N/A :1 3,454.00 fmsl 3,454.00 fmsl 500.63 ft2 3.457.50 fmsl 22.25 ft 22.50 h 500.63 ft2 OK for non -SR waters OK OK #VALUE! Form SW401 -Infiltration Basin-Rev.2 6007047 suppmmenl_mrittratloneasin_9asin 4.05 Parts I. & II. Design Summary, Page 1 of 2 6007047 Permit No. 1011ralion BASin 4_Pipe A (to be provided by DWQ) Additional Information Total runoff volume captured by basin Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build -out? Bypass provided for larger storms? Pretreatment device provided 0.31 ac-in OK 113,40 it OK 33.50 1t OK 167,40 it OK 130.00 1t OK 5.00 it OK not detected it OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Form SW401-Inhluatmi Basin-Rev-2 6W7047 Supplement_lnfinranonaasin-team 4AS Parts I. & II, Design Summary, Page 2 of 2 Permit No (to be provided by OWQ) + C 13LtS f M J .- _, III ,7-UIRED.:9!4VCHECKLIST . _.s-♦ .__,-. Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. M 5 c ca.z � 3,1 � 3.2 �3\y G -7. G7.Z Gi•`1 G '7.z D+.y 1.'Plans (1' - 50' or larger) of the entire site showing: ' Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient,per;b-an)j�,M�. Basin dimensions, •.\Y. .i.. ...a1�"..,y:v ,td''••l.tl'.,,�...,,.+,. mY �' .1 Pretreatment system, High flow bypass system, g YP Y rt, �:. - Maintenance access, Proposed drainage easement and public right of way (ROW), ss, Overflow device, and AUG ` 4 200$ Boundaries of drainage easement. 2. Partial plan (1' = 30' or larger) and details for the infiltration ba4 in showings Eli QUALITY SECTION t Bypass structure, " ASHEVILI_E PEGIONAI OFFICE. Maintenance access, i Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. .dH L 7• ; 3. Section view of the infiltration basin (1" = 20' or larger) showing: e- 7. ',F- - Pretreatment and treatment areas, and 0 f • 14 - Inlet and outlet structures. 6 C7,2 Af -S H INCLUDED /M S # NARRATIVE M y N NARRATIVE /ys ly INCLUDED �? s INCLUDED 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. B. A copy of the signed and notarized operation and maintenance (0&M) agreement, 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. required Items Checklist, Page 1 of 1 6007047 Permit Number: Intiltration limin 5: Pipe D (to he provided br DVVQ) Drainage Arca NUnlhel': Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches for 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential.problem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Area,; of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed, remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe, otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 5 Pipe D.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6(X)7047 lniiltruion Basin 5: I'ipc D BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem, _ Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the plain treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred The outlet device is damaged Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13M I'. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. _ Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location Where it will not cause impacts to streams or the 13M1'. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the stand ng water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 5 Pipe D.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: lntiltration Basin 5: Pipe D (to be Provided bV DtVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 5: Drainage Area Pipe D-2 Print name:Steven G. Harris Title: Operations Manager Address:1600 Camden Road, Charlotte NC_28203 Phone: Signatt Date: Note: The legally responsible party shouid not be a homeowners association unless more than 50% of the tots have been sold and a resident of the subdivision has been named the president. CNVOVkYNr-_' , County of !aeetin G. kkavy-,S a Notary Public for the State of do hereby certify that personally appeared before me this day of 1uNkA and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, Pf 'y Q' O N0TAR14 PUBLIC Ze %EXPT; SEAL My commission expires v vn t7112- 6007047 Basin OM agreement —Basin 5 Pipe D.doc Form SW401-infiltration Basin O&M-f3ev.3 Page 3 of 3 6007047 Permit No. inMlration Basin 5_Pipe D (!o be provided by DWO) yy.. ®N - ,� ``-- STORMWATER MANAGEMENT PERMIT APPLICATION FORM � Y NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form most be filled out, printed and submitted. The Required items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I: ;,PROJECT,.INFORMATION Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281.1447 Date 10-Jun-08 Drainage Area Number Basin 5 Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHVVT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 40,946.40 it 12,544.00 it2 0.31 % 1.00 in 2.16 in 0.09 inlhr ft3isec ft3isec ft3isec 993.00 ft3 1,049.00 ft3 in it ff3 it ff3 sandy silts 1.50 inlhr not detected fmsl 1.17 days NIA :1 3,448,50 fmsl 3,448.50 imsl 513.13 it 3,452.00 imsl 29.33 1t 18.00 ft 513.13 ft2 OK for non -SR waters OK OK #VALUE! Form SYJ40ldnllltraton Basin-Ray.2 6007047 Supplement_lnflllralionBasln_Bas-n 5,As Parts I, & II. Design Surrmary, Page f of 2 Permit 6W7047 infilvation Basin 5_Pipe D Additional Information Total runoff volume captured by basin 0.29 ac-in OK Length of vegetative filter for overflow 75.54 it OK Distance to structure —18.1.7 it OK Distance from surface waters 51.61, ft OK Distance from water supply y well(s) 740.00 it OK Separation from impervious soil layer 2.00 ft OK Naturally occuring soil above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (10 be provided by DWO) Form S W 401-Intillration Basin-Rev-2 6007047 Supplement_lrfiltration6asin_Basin 5.a1s Parts I. 6 II. Design Summary. Page 2 of 2 Permit No (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information, This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. cz.z G3,2 L3,y G 7,! G7.Z LI•y 4 7.Z p +.W 1, 9ans (1' - 50' or larger) of the entire site showing: f_3 Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin); Basin dimensions, I AUG — 4 2008 Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW) - Overflow device, and $ Boundaries of drainage easement. ., 2. Partial plan (1' = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. M 5H 4 Z 1 3. Section view of the infiltration basin (1" = 20' or larger) snowing: 4 - Pretreatment and treatment areas, and A t - Inlet and outlet structures. 6 C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. /RA H INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. A451NARRATIVE 7, The supporting calculations. /05 // INCLUDED B. A copy of the signed and notarized operation and maintenance (0&M) agreement. �?'S / INCLUDED 9. A copy of the deed restrictions (if required). Form SW401-Iniiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 (1007047 Permit NUinber: Inliltratinn Basin 6: Pipe I. (to be prur'rrlerl br 1)WQ} Drainage Area NLII11hC1': Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the infiltration basin Areas of bare soil and/or erosive gullies have formed. Degrade the soil if necessary to remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problcins with erosion. 6007047 Basin OM agreement —Basin 6 Pipe E.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 - 1w, 6M7047 indiltralion Basin 6: Pipe is BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75` , of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 clays after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is damaged Erosion or other signs of damage have occurred at the Outlet.-.. How 1 will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the f3MP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than ,praying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the 13MI1. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing Water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (dig not spray). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 6 Pipe E.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infiltration Basin 0: Pipe E (to be provided by DVVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 6: Drainage Area Pipe E-2„ Print name:Steven G. Harris Title:Operations Manner _ Address:1600 Camden Road, Charlotte, NC 28203 Phon, Sigma Date: Note: The legally responsible Party should not he a homeowners association unless more than 50% of' the lots have been sold and a resident of the subdivision has been named the president. SeveM G . Ocavv , S a Notary Public for the State of Conly of t)C t.tdo hereby certify that personally appeared before me this day of ` ZooQ) , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seat, HA OJARY V PUBL�G t� lRG \, �y%Mf It�0�\\ SEAL My commission expires 6007047 Basin OM agreement —Basin 6 Pipe E.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007D47 Permit No. Infiltration Basin 6_Pipe E (to be provided by DWQ} OA`,�F STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part !Il) must be printed, filled out and submitted along with all of the required information. ,..�,....�'r1) II- I.,1,��.,,f.Ittdllllt,,,.11tla:liiint!, tI ali:�,,1,i Itd u;}k.I�tldrtl°i1r1"I�lull"�1,t�t•I.IYtr,,r r.14silirii�MrlRylllll14lHi�willlll��i��li,r4t,l�rl [I:,, PROJECT. INFORM ATION!,,,14,,r Siizsltl`,%RIl n,r,�a. , 1 I Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 6 IiDES 1GN'INFORMATION :II;"11'f !11,l1rtlll!fool'1lllrallE;t11�,>lil,4�l�i.�1�a111,. ,..,trl, fu f1.l.lUllrr,�lrl�a:�t, ,'.���a�'A. AIly'1.tii�yliialr4r'��lkLl Site Characteristics Drainage area 106,286.00 it2 Impervious area 24,033.00 1t2 Percent impervious 0.23 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Nan -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Solis Report Summary Soil type Infiltration rate SHINT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr tt'Isec it3lsec ft'isec 1,903.00 it' 1,947.00 it' in tt3 it It tt3 sandy silts 1.50 inihr not detected fmsl 1.17 days N/A :1 3,437.50 fmsl 3,437.50 fmsl 793.89 fie 3,441.00 fmsl 50.58 It 18.00 It 793.89 it OK for non -SR waters OK OK #VALUE! Film sw401•InfilVation Basin-Rwl 6007047 Supplement_lnfiltrationBasin-Basin 6..Is Pans I. & 11. 9osign Swrmrnary, Page I of 2 Permit GW7047 ' InlArMon Basin 6_Pipe Additional Information Total runoff volume captured by basin 0.54 ac-in Length of vegetative filter for overflow 78.30 ft Distance to structure 32.10 it Distance from surface waters 87.00 1t Distance from water supply well(s) 150.00 it Separation from impervious soil layer 2.00 it Naturally occuring soil above shwt not detected it Bottom covered with 4-in of clean sand? Y (Y or N) Proposed drainage easement provided? Y (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided Catch Basin OK OK OK OK OK OK OK OK OK OK OK (Io be provided by OWO) Form SW401-Infiltration Basin-Rev.2 6007047 Supplement_InfiltrationBasin, Basin 6.xls Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) S45• h -2 II 6 REdU_REQfT HECiCLIST, - <'�e 19MM :,s,. ..t a. .,,,.. W:�, l "`:i i. :x. r� ,,`,`*aS iM1t "..�,,'�.�'.r. ?wr.S�r. 3 �l .a:Eq•,t. �%�:+...- Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. C 3,i C Z �3.J LJ.N C 7.1 C7.Z C_)-Y 1. Plans (1" - 50' or larger) of the entire site showing: ' Design at ultimate build -out. Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, -Proposed drainage easement and public right of way (ROW),,-,- ..f Overflow device, and Boundaries of drainage easement. j�ef 7. 2, Partial plan (1" = 30' or larger) and details for the infiltration basin showing� ...M....�. 7 • z Bypass structure, C) I.Maintenance I access, AUG 4 i0o8 I Basin bottom dimensions, I t, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, V CATER r+_3til-ITY SECTION Vegetated filter, and �' c „_V_', I REGIONAL 0-710E Pretreatment device.:,,,- .. , C 7 3. Section view of the infiltration basin (1"= 20' or larger) showing: > e 7*_'� - Pretreatment and treatment areas, and 01,41 - Inlet and outlet structures. ,f5 C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. /tf ti INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. NARRATIVE 6, A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. M 6 N NARRATIVE 7. The supporting calculations. 'lo S H INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. ,0 s 1-1 INCLUDED 9. A copy of the deed restrictions (if required). C- Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 0007047 11crinit Nllllll)CI-: Inlilv,ition B,Isin 7: Pipu M (fo be provided by DWQ) Drainage Area NLI11111Cr: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMI' elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). hrosion is occurring in the Regrade the swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problerns with erosion. 6007047 Basin OM agreement —Basin 7 Pipe M.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6M7047 ]nliltt"Miun Rosin 7: Pipe N1 BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75%, of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred The outlet device is damagec Erosion or other signs of damage have occurred at the Outlet, How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13M P. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the _ sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13M1'. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not surav). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 7 Pipe M.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infiltralion Basin 7: Pipe M {to be provide(t by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area number: Infiltration Basin 7: Drainage Area Pipe M-2 Print name:Steven G. Harris Title:Operations Manager Address:1600 Camdcn Road, Charlotte Phon, Signa Date: Note: The legally responsible party shcwld not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of ``�r � C3✓a`��� County of do hereby certify that personally appeared before me this day of and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, A hq9� N07q,gya npOBLIC 2t SEAL My commission expires 6007047 Basin OM agreement —Basin 7 Pipe M.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 Permit No. Infiltration Basin 7-Pipe M (!o be provided by DWO) � O�OF W A 7F9OG �. STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. '1' pqp, 4- i ,n- ii;l al I' s'iitl ! ii r. I l I lI u I i I I 1 s p i1 i i 1 wn1. :,,� r r �; 41 Ital y, �Y•a f , I: i'PRQJECTaINFORMATIONf, I ,,L plttl ►Iri} tl1 {Stitt ,l fi lr �, ,� 111u;,r; ;, u. �,i d a r41 r�.r a1 .i .ift Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 7 III !DESIGN INFORMATION- S :'L' tt.. _,t _. ,1 ,� 1,,..,,11P , t -f t 9P, i Y I I 1 7 till n �, Ir 94! 47 1 n , •9;.; "l` n li t� � n. �,, °11�, r.tf, o-a��a'! , a i I ,-,,� 9�r111iat,:1�„ ` Site Characteristics Drainage area 39,204.00 ft2 Impervious area 18,686.00 ft2 Percent impervious 0.48 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre-developmenl 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Posi-development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SliWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft'/sec ft3/Sec ft3lsec 1,479.00 ft3 1,498.00 ft3 in ft3 ft3 ft3 ft3 silty sands 2.40 inlhr not detected fmsl OK for non -SR waters 0.73 days OK NIA :1 OK 3,477.90 fmsl 3,477.90 fmsl 612.64 ft2 3,481.40 fmsl 50.58 ft 13.75 ft 612.64 ft2 #VALUE! Form Sw401-Infiltmlion Basin-Rev.2 6007047 Supplemant_knfiltraticnBasin-Basin 7..Is Parts 1. & II. Design Summary, Page f or 2 Permit som047 Infiltration Basin 7_71pe M Additional Information Total runoff volume captured by basin 0,41 ac-in OK Length o1 vegetative filter for overflow 92.43 ft OK Distance to structure 31,03 ft OK Distance from surface waters 116.80 ft OK Distance from water supply well(s) 150.00 ft OK Separation from impervious sail layer 2.90 ft OK Naturally occuring sail above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (to be provided by 0WQ) Form Sw401-lnfillration Basin-Ftev.2 0007047 Supplemenl_InhitradonBasin-Basin 7.MI8 Pans I, A II. 09sign Summary. Page 2 of 2 Permit No D (to be provided by DWQ) f�GS i r'7 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. f 2.) cz.z � 3a1 4 3.3 c-J.y G7.Z �. I • y � 7.1 c 7�z C7.) G-7 DI•`'/ I. Mans (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system. Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: 6f V: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, } Flow distribution detail for inflow, r '� ` AUG ` 4 2008 I J - Vegetated filter, and i t l + Pretreatment device. � t , . _ ;�— 4---._�_j ITY 3. Section view of the infiltration basin (1" = 20' or larger) showing:` _ _ n,, , r �F t Pretreatment and treatment areas, and r Inlet and outlet structures, ,A5 Y C7.2 4, A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. NARRATIVE 6. A construction sequence that shows how the inlitlration basin will be protected from sediment until the entire drainage area is stabilized. •0 6 N NARRATIVE 7. The supporting calculations. '/ // I INCLUDED 8, A copy of the signed and notarized operation and maintenance (0&M) agreement. .h S 17 INCLUDED 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part ill. Required Items Checklist, Page 1 of 1 6007047 Permit Number: Inlilu•aiion Basin S: Pipe Q (!(r be proi4ded bay DWQ) Drainage Area NLIIIIhcr: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems kvith erosion. 6007047 Basin OM agreement —Basin 8 Pipe O.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6[A }7047 liltilu-alion Basin 8: Pipe 0 BMP element The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75%, of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible laver of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to }row on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is damaged E1'o510n or other signs of damage have occurred at the outlet. How 1 will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13MI'. Provide additional erosion protection such as reinforced turf matting or riprap if needed to Prevent future erosion problems._ Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the 13MI1. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by \,wiping them With pesticide (do not spray). Remove shrubs or trees ^ immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin B Pipe O.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Infiltration Basin S: Pipe O (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party, Project name: Canoe Club BMP drainage area number: Infiltration Basin 8: Drainage Area Pipe 0-10 Print name:Steven G. Harris Title:Operations Manager Address:_1600 Camden Road, Charlotte, NC 28203 _ Phone Signat Date: a IT, I W V Note: The legally responsible party should not be a homeowners association unless more than 50%n of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of CZYO`%r<a , County of T�CeUevtbvye� do hereby certify that personally appeared before me thisj.✓f'—� day of & 1 and acknowledge the clue execution of the .1 forgoing infiltration basin maintenance requirements. Witness my hand and official seal, HAF?4i ti Ft Y t5 z FIG �4 SEAT, My commission expires 6007047 Basin OM agreement —Basin 8 Pipe O.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6pp7647 Permit No. Intillration Basin 8_Pipe O (to be provided by DWQ) of w n r�•y STORMWATER MANAGEMENT PERMIT APPLICATION FORM Q NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be tilled out, printed and submitted. The Required Items Checklist (Part 111) most be printed, filled out and submitted along with all of the required information. :.'PROJECTINFORMATION •r-#;.I,.IfN„If., i„Irk:i1`il��',.#N,inYtil..'._4�i�nt�!��I'1��i1'.rt51�f�Irlll,nwKli41141ii�41Is11��I1H!.11'fltril!'rl 1,,1r',i�1 �1,tlts!j1�11���i��lnln!I'ilt' ;�iit!rf?:!,�ili���In���,tit°tll�lsr;i"+I�i, Pro;ect Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basln 8 u u; M1a tlnr,S I; 0 1ti 4 f +Ill ' I 'IurAt I tC S 0 nIU F tr; � I ,,.�I r ; I n ayrs i ,5 �, nt P , Ill ",DESIGN'IN FORMATION [', 1i : f1 #,i',,1#�t# �. (�I:.i+hmioli. a, flit I},;5�11fl.,11, t .. 4�..i1 "s 31 ;;i:..l�ltr",,,,# Site Characteristics Drainage area 20,473.20 it Impervious area 18,050.00 it Percent impervious 0.88 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pro -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHVVT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft3lsec h3lsec f13iSeC 1,429.00 h3 1,498.00 ft3 in f13 ff3 it it silty sands 2.40 inlhr not detected fmsl 0.73 days NIA :1 3,488.00 fmsl 3,488.00 fmsl 781.57 ft' 3,451.50 fmsl 50.58 it 13.75 it 612,64 it' OK for non -SR waters OK OK #VALUE! Form SW401 •Inliltiation Basin-Rev.2 6007047 Supplement_Inliltration6asin_Basin 8,As Parts I. 8 II. Design Summary. Page I of 2 I Permit 6007047 mfilfralion Basin 6-Pipe O Additional Information Total runoff volume captured by basin 0.41 ac-in OK Length of vegetative filter for overflow 250.00 it OK Distance to structure 75.23 h OK Distance from surface waters 200.00 ft OK Distance from water supply well(s) 312,00 it OK Separation from impervious soil layer 3.00 it OK Naturally occuring soil above shwl not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures aft runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (lobe provided by D WO) Form 5 W 4D1 - Inf iteration Basin-RBV.2 6007047 SupplarnArtt_ InillirabbnBasin_Basin Bxls Parts I, & II. Design Summary. Page 2 of 2 Permit No RQs, 7 9 (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. 5 C 2J [ 3.1 C_;. G �•t G7.Z L)•y c -7 - D r.W ASH cZ) —': 7.7: pt-11 I . Plans (1" - 50' or larger) of the entire site showing. Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration F�b'a_sih showing Bypass structure, Maintenance access, i , Basin bottom dimensions, �. AUG - 4 2008 , Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and^!_11'tl_;1�T 5E��rv� Pretreatment device. '.'AL C. F r 3. Section view of the infiltration basin (1 " = 20' or larger}`showing: Pretreatment and treatment areas, and Inlet and outlet structures. 6 C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. /mil S � NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. ' NARRATIVE 7. The supporting calculations. /NS // l INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. INCLUDED 9. A copy of the deed restrictions (if required). �r Form SW401-Infiltration Basin-Rev-2 Page 1 of 1 Part III. Required items Checklist, Page 1 of 1 6007(W7 Permit 1Vumher: Infillratio» Basin,): Pipe 1 (to be provided by DWQ) Drainagc Area Number - Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. 'These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the I3MP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide linle and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problerns with erosion. 6007047 Basin OM agreement —Basin 9 Pipe J.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6(N)7047 [ntil(ralion Basin 1): Pipe J BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75` , of the original design depth. ]rosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds Ind noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs reoa i r. Clogging has occurred The outlet device is damaged Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to streams or the 13M11. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 9 Pipe J.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 intoltrmion Basin 9: Pipe J Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Prr�ject name: Canoe Club BMP drainage area number: infiltration Basin-9: Drainage Area Pipe J-2 _ Print namc:Steven G. Harris Title: Operations Manger Address:1600 Camden Road. Charlotte NC 28203 Phone:704.377.6224 , Signature: Date: -- T1 - a--•3d• oq* Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, dare— A �cayn-�o{� a Notary Public for the State of pYkV� CzYQ\%'A'LA— , County of do hereby certify that yw, L. �aY".S personally appeared before me this day of , 100S_, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, OAR �� Yz SEAL My commission expires �t7UPJrn�De_..l„�jo�2- 6007047 Basin OM agreement —Basin 9 Pipe J.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 Permit 6007047 InfiRraeon Basin 9-Pipe J (to be provided by D WO) o`'�� WAT�c9OG STORMWATER MANAGEMENT PERMfT APPLICATION FORM P Y NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ifl) must be printed, filled out and submitted along with all of the required information, If; P CT�INFORMATION'u.iui,,p f'+ iyy„ ifl'!f�l iI,I{hj t ruin 4yiii r , II,� i;f"r„f,n,i, fill Ri d i11 iY1h',I `i Y it `''1 ,i L ,,,, „fl,r Ia;,..!-� kr11 l,rr !� , RQR.. r4r.. S.lJi&if',1n,fl ffi LL_.r,,:11 �j.r.,l„,I.a. >I1L,,,li�.t•lfll :w , .-,�j� . i11111j�dijitttlP ,I�. , d,. , I1 11 �.1:,vujj .,ftll� , ,i . I,i , „i11iIdJ Ihu tt.1.1>E1! ai Ir.Er:.lj d Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281.1447 Date 10-Jun-08 Drainage Area Number Basin 9 4 SS tit !' r„ r, ...4,.i1111 .:1 BI...1 _.1.:7niVi.,hf iij..l„ �11� ii .. " t i 't 4 1.1 ' II:'DESIGN'INFdRMATION,i.sli, l,f;, ''....,i€rnitr ,:h1 '' m4 ,It n k „1 `.r,.,G:,i "iinlrit!lllii"',..Iifllrly4,,,in.rJ'.': Site Characteristics Drainage area 3,484.40 it Impervious area 1,260.00 it Percent impervious 0.36 % Design rainfall depth 1.00 in Peak Flow Calculations 1 -yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Posl-development 1-yr. 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 2.16 in 0.09 inlhr ft'Isec f13/sec ft3lsec 100.00 rya 150.00 it in h3 it ft3 it sandy silts 1.50 inlhr not detected fmsl 1.17 days NIA :1 3,454.50 fmsl 3,454,50 fmsl 79.63 ie 3,458.00 imsl 15.17 it 5.25 it 79.63 ff2 OK for non -SR waters OK OK #VALUE! Form SW401-Infiltralion Basm- Rev. 2 16007047 Supplement-lntiltrationBasm-Bnsin 9xIs Parts I, & II. Design Summary, Page 1 of 2 I Permit No 6W7047 In}iltragon Basin 9_Pipe J Additional Information Total runoff volume captured by basin 0,04 ac-in OK Length of vegetative filter for overflow 35.86 h OK Distance to structure 37.22 ft OK Distance from surface waters 33.98 f ft OK for non -SA waters from supply Distance ell(s) 150.00 ft OK Separation from impervious soil layer 4,50 ft OK Naturally occuring soil above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (to be provided by DWO) Form SW401-Intiltralron Basin-Rea_2 ]6D07047 Supplement- InYdtrationBasin-Basin 9,xIs Parts I. 8 II. cosign Summary, Page 2 o1 2 Permit N (to be provided by DWQ) Elp s.7 IO ;v5RE0U18E9.ITEMS:CHECKlIS7 `•� ``r +4 : `° Y`" X;F Y �r u a. b.�i y.`�� it jc 3�x:......_.� `�.,{'it ''-.° �„iw'�3�.4'w f.e:lC.1a�:+£'�:s� 1 .•���1 rr�. '� - i�,#x� Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. M 5 Yi G 2.? 1. Plans 0" - 50' or larger) of the entire site showing: s C Z . Z Design at ultimate build -out, ''"' ::" .. , •_:...... . C 3 t Off -site drainage (it applicable), ,.;'.:::•.•' -•:" --::. 3 Delineated drainage basins (include Rational C coefficient'per basin), . G 3 y G 7./ Basin dimensions, Pretreatment system, : `` l...f, == i% I' W�'' ILI G 7, Z High flow bypass system, _ Maintenance access, ; AUG _ 4 2003 Proposed drainage easement and public right of way (ROW), Overflow device, and i _ Boundaries of drainage easement. , -1 C'Ulsi_ T}-_I fib f 17 C T) 2, Partial plan (1" = 30' or larger) and details for the infiltration basin showing. '— G 7. Z Bypass structure, C) Maintenance access, - ....... ......�. ;r,. Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. C 7 3. Section view of the infiltration basin (1' = 20' or larger) showing: Gam. A t y Pretreatment and treatment areas, and Inlet and outlet structures. 5 C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. A NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. 146 N NARRATIVE 7. The supporting calculations. /0 1V INCLUDED 8, A copy of the signed and notarized operation and maintenance (O&M) agreement. 11 S I -1 INCLUDED 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin.Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 619)7047 11crink Numhcr: Infiltration Basin ID: Pipe K fro be Provided br D1VQ) DrainaDQ Arua Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient 13MP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be. kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed, remove the gully, alld then plant a ground cover and water until it is established. Provide time and a one-time fertilizer apphcation. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). rosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid futureproblem,; with erosion. 6007047 Basin OM agreement —Basin 10 Pipe K.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 c,aMM7 Iniiltralion Basin 10; Pipc K BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75`% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An 11111LIal Inspection by an appropriate professional Shows that the embankment needs rerJair. Clogging has occurred The outlet device is damaged Erosion or other signs of damage have occurred at the outlet. _How 1 will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to sh'eams or the 13MP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it Will not cause impacts to Streams or the 13MP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not spray). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 10 Pipe K.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Intilumion Basin M Pipe K (to he provided by DWQ) acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area nuniber: Infiltration Basin 10: Drainage Area Pipe K- I Print name:Steven G. Harris Title:Ooera€ions Man Address:1600 Camden Road. Charlotte. NC 28203 Phon SignE Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I,V\aYrro,r—, a Notary Public for the State of Nor�r� CaYA,Aa Countyof t- - b.�v do hereby certify that VeVI\ C' . V Yay S personally appeared before me this day of •t.� i 008, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, OS' pTAR Y2, U PUBLIC ,? SEAL My commission expires 6007047 Basin OM agreement —Basin 10 Pipe K.doc Form SW40i-Infiltration Basin O&M-Rev.3 Page 3 of 3 5pp7p47 Permit No. Inflltra4on Basin 10 Pipe K (to be provided by D WO) LT. MA �OF WATF,gQ O G STORMWATER MANAGEMENT PERMIT APPLICATION FORM p s NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 1Il) must be printed, filled out and submitted along with all of the required information. I:"PR011ECT,INFORMATION'rr1'Y' .Au, ,IAll•, I. �, I 1 Project Name Canoe Club Contacl Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 10 I1,�iDESIGNiINFORMATIONI:a,',yli�'ly r�f;'' "'s'"fh 1'"J I.l. I a1 Site Characteristics Drainage area 6,098.40 ff2 Impervious area 2,786.00 f12 Percent impervious 0.46 % Design rainfall depth 1,00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2.16 in 1-yr, 24-hr intensity 0.09 inlhr Pre -development 1-yr, 24-hr runoff volume ft3isec Post -development 1-yr, 24-hr runoff volume ft3/sec Pre/Post 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SR Waters Minimum design volume required 220.00 It Design volume provided 225.00 ft3 OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hi runoff ft3 Post -development 1-yr, 24-hr runoff It Minimum volume required ft3 Volume provided ft3 Soils Report Summary Soil type sandy silts Infiltration rate 1.50 inihr SHWTelevation not detected fmsl Basin Design Parameters Drawdown time 1.17 days OK Basin side slopes NIA :1 OK Basin bottom elevation 3,458.00 fmsl #VALUE! Storage elevation 3,458.00 fmsl Storage SA 116.81 ft 2 Top elevation 3,461.50 fmsl Basin Bottom Dimensions Basin length 22.25 ft Basin width 5,25 ft Bottom SA 116.81 f12 Form SW401-Infiltralion BHSin-Rev,2 6007047 Supplement_IniitlrAliunBaAin_Bas�n 1013 Parts I. d II. Design Summary, Pago 1 of 2 Permit 6007047 Infiltration Bassin 10 Pipe K Additional Information Total runoff volume captured by basin 0.06 ac-in OK Length of vegetative filter for overflow 128.23 ft OK Distance to structure 53.33 1`1 OK Distance from surface waters 104,71 ft OK Distance from water supply wells) 310.00 ft OK Separation from impervious soil layer 4.00 ft OK Naturally occuring soil above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or i OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (to be prokled by AWQ) Form SW401-lnldtralion Basin.Rev,2 6007047 Supplement-InfillrationBasin-Basin 10.a1s Pans I. 6 Il, Design Summary. Page 2 of 2 � Permit No / (to be provided bynWQ) Please indicate the page mplan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result |norequest for additional information. This will delay final review and approval uYthe project. Initial inthe space provided to indicate the following design requirements have been met. |fthe applicant has designated mnagent, the agent may init albelow. If requirement has not been met, attach justification. PuQe/Plam Initials Sheet No. A4 5 1Pfann(1^'50'urlarger) ofthe entire site ohowing� � 'Design a1ultimate bui|d*ut` y drainage� �� ' C_ 3J Delineated drainage basinsRational r~~~~~~~'^~~t «�.7,16/ Basin dimensions, � ~7�� Pretreatment system, ` ' High bypmooym�m, �p�� Maintenance access, 'Proposed drainage easement and public right (ROW 'Overflow device, and '8nuoduh000fd�inugoouxommnt � ^xnuxUTY ~ 7./ 2.Partial plan (1^=30'mlarger) and details for the infiltrat gn ��showin� �~ c- -7^ Bypass structure, 0 /.:f Maintenance access, 'Basin bottom dimensions, 'Basin cross-section with benchmark for sediment o|oumout. 'Flow distribution detail for inflow, 'Vegetated filter, and Pretreatment device. ASH 67,) 3. Section view ofthe infiltration basin (1^=2O'orYarger)showing: 4 ^^ `~ I.L/ ' Pretreatment and treatment amus. and �� ' Inlet and outlet structures. C7.2 4. Atable of elevations, areas, incremental volumes & accumulated volumes k/verify the volume provided. ���_ INCLUDED 5, Ayoi|o report that iabased upon anactual field investigation, soil bohngx, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by competing & submitting the soils invmshyaUunrequest form, County soil maps are not onacceptable source ofsoils information. NARRATIVE 6. A construction sequence that shows how the infitIration basin will be protected from sediment until the entire drainage area ixstabilized. 145 NARRATIVE 7.The supporting calculations. /405�7 INCLUDED 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. �� 10SI�, INCLUDED 8.Acopy uf the deed restrictions (if requied. Form SW401 -Infiltrationeasin-Rev.0 page 1*1 Part Ill. Required Items Checklist. Page `of I 6(X17047 Permit Number: lnlihration Basin 11: Pipe Id (to be Provided bti' D;VQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. 'Phis maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the 13M1'. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid fuhn'e problems with erosion. 6007047 Basin OM agreement —Basin 11 Pipe H.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 1 of 3 6007047 Infilir"I ilfn Fusin I I: Pipe tl BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75%Y of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are gro",ing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred The outlet device is damaged hrosion or other signs of damage have occurred at the Outlet. How 1 will reinediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the 13MP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sedirent and dispose of it in a location where it Will not cause impacts to streams or the I3MP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. if so, revegetate immediately. if not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not sorav). Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 11 Pipe H.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 6007047 Permit Number: Inriliratinn Basin 1 I: Pipe 11 (to be provided by DbVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project ncune: Canoe Club BMP drainage area number: Infiltration Basin 1 1: Drainace Area Pipe H-1 Print name:Steven G. Harris Title:0 erations Mana17er Address:1600 Camden Road, Charlotte, NC 28.203 Phone: Signatt Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the suhdivision has been named the president. I, �a� rrv-+�� , a Notary Public for the State of NDr-� Cay-Av )a. County of ec)C.�eyt�puYu , do hereby certify that personally appeared before me this day of _Y�ODO?, , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, My commission expires kNoVeV%"ber 61r)-on - 6007047 Basin OM agreement -Basin 11 Pipe H.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 6007047 Permit No. Infillration Basin I I_Pipe H (to be provided by i7WQ) }o F W.aifi,94-F APA STORMWATER MANAGEMENT PERMIT APPLICATION FORM a Y NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I p11p, p� I I r °. - I a I - I I Ik I Ins ,•I,o 1 T q I:�}I PROJECTtdNFORMATION'_ � ,.,.,t.i t !. 1!"„1gtlrn 11 ��;,�g�61 L��, ,,.;.i l r Mt 'V , I .h'.. Project Name Canoe Club Contact Person Scott Homewood, Ei Phone Number (828) 281-1447 Date 10-Jun-OB Drainage Area Number Basin 11 II DESIGN, INFORMATION :.,.,es! I°et, i:,il:eH�i1n°u4i.11l�.r;t, I�,,;l�:.m�f'',Ya.,��..V Atli?.,..i,ltitlil��i�.,e�,,1d1!.I.��' L.II���1' Site Characteristics Drainage area 26,126.00 ff2 Impervious area 16,529.00 if Percent impervious 0.63 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2,16 in 1-yr, 24-hr intensity 0.09 it Pre -development 1-yr, 24-hr runoff volume f131sec Post -development 1-yr, 24-hr runoff volume felsec PrelPost 1-yr, 24-hr peak flow control ft3lsec Storage Volume: Non -SR Waters Minimum design volume required 1,309,00 ft3 Design volume provided 1,348,00 ft3 OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff 0 Post -development 1-yr, 24-hr runoff it Minimum volume required ft3 Volume provided it Soils Report Summary Soil type sandy silts Infiltration rate 1.50 inlhr SHVVT elevation not detected fmsl Basin Design Parameters Drawdowm time 1.17 days OK Basin side slopes NIA :1 OK Basin bottom elevation 3,441.50 fmsl #VALUE! Storage elevation 3,441.50 fmsl Storage SA 589.63 it Top elevation 3,444.50 fmsl Basin Bottom Dimensions Basin length 26.50 it Basin Wdth 22.50 1t Bottom SA 589,63 ft2 Form SW40t-Inliltratlon Basin-Rov.2 6007047 Supplement_ hthllrationB,vsin-Basin 11.05 Parts I. & II. Design Summary. Page I a1 2 Permit 6007047 inliltratwn Basin I I -Pipe H Additional Information Total runoff volume captured by basin 0.29 ac•in OK Length of vegetative filtef for overflow 44.14 ft OK Distance to structure 27.32 it OK Distance from surface walers 48.94 It OK for non -SA waters Distance from water supply well(s) 350.00 ft OK Separation from impervious soil layer 3.50 ft OK Naturally occuring soil above shwt not detected ft OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (ID be provided by DWO) Form SW401-In}iltralion Basin-Ra 2 00W047 Supplement-InliltratronBasin-Basin 11As Paris I, R II. Design Summary, Page 2 01 2 Permit No. (to be provided by DWQ) lass . `y I_z iIL;=I���UIRE�;IT�MS`CiiECKILIST ' ' � - "• � " .�` _� x5;�..�,�'^sr }diir,-.{�"�� •,�:�i:.k �- ,� �` ka r '�4 �''Y �. �', ia�.,F'>t r ,a.�1 .s.- .�, ..r_ �•5, r.«'�.�. y�s„'�`,� ,.a.�-Lc�;� ,i:5�ti1-.w,:- . u.. �d.s.'... Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. i , Plihns (1" - 50' or larger) of the entire site showing: Design at ultimate build -out, L Off -site drainage (if applicable), , ,�,� �,. <......•..,, ... C_ 3.11 -Delineated drainage basins (include Rational C coefficient per basin), Ly Basin dimensions, - ---- _ T� 7, / Pretreatment system, ('' S G 7, Z High flow bypass system, y Maintenance access, i Proposed drainage easement and public right of way (ROW), AUG — 4 2008 Overflow device, and Boundaries of drainage easement. vdnT P T_^ C?UALI SECrioN /l±SW 67.) 2, Partial plan (1" = W or larger) and details for the infiltration,basin'showing'.--_._-._ AL (j 1CP e 7 • z Bypass structure, i, Maintenance access, - - .. , , _ -� •-.i, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout. Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. M Sr, a 7, i 3. Section view of the infiltration basin (1' = 20' or larger) showing: 4 7 Pretreatment and treatment areas, and D f F Inlet and outlet structures. ,44 5 Jq C7.2 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. Al3 iH INCLUDED 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information, NARRATIVE 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. NARRATIVE 7. The supporting calculations. /0S H INCLUDED 8. A copy of the signed and notarized operation and maintenance (0&M) agreement, R s / a INCLUDED 9. A copy of the deed restrictions (it required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required items Checklist, Page 1 of 1 6007(W7 Permit Number: Inliltration Basia 12: Pipe L (to be Proi4ded br DVVQ) Drainage Area Numher: Infiltration Basin Operation and Maintenance Agreement 1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable), Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. 6007047 Basin OM agreement —Basin 12 Pipe L.doc Form SW401-infiltration Basin O&M-Rev.3 Page 1 of 3 rcx»ck7 hi iltration Basin 12: Pipe L BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problern: Sedirnent has accumulated and reduced the depth to 75%, of the original design depth. 1rosion has occurred or riprap is displaced. Weeds are present A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are grooving in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shoes s that the embankment needs reL)air. Clogging has occurred The outlet device is damages hrosion or other signs of damage have occurred at the Outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not Cause impacts to streams or the 13MP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. _ Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. 6007047 Basin OM agreement —Basin 12 Pipe L.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 :d 6007047 Infiltration Basin ]2: Pipe L Permit Number: (to be provided bY DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Canoe Club BMP drainage area member: Infiltration Basin 12: Drainage Area Pipe L-2 Print name:Steven G. Harris Title:Operations Manager _ Address:1600 Camden Road, Charlotte, NC 24203 Phone:704.377.424 , Signature: Date: D 0 % Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been narned the president. I, �aY�P • �y rY�c�l1 , a Notary Public for the State of County of i Kt6UVew-A)\),!, , do hereby certify that Ca .rY� personally appeared before me this I&AO-- day of , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, HAq NOTARY SEAL My commission expiresy_�Pw "W1, \15 ZOn- 6007047 Basin OM agreement —Basin 12 Pipe L.doc Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 EOC7047 Infiltration Basin 12_Pipe L Permit No. (to be provided by DWQ) �� of W n re9Q� A*Mv STORMWATER MANAGEMENT PERMIT APPLICATION FORM o -c NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. P.ROJIECT INFORMATION..;t, i }� �'t ttu t1,,,�i�11111:>'�I t iillt°illll,` ,4, ht,1.1?'.�f�1it; fnhti}111s1i1�1.tl�illttsl�lil,41��,aliGfu!L�ISir;��!h�'Il+illj�IG�w�`,1at49�+,ti�,l',,i ik:. r':P"''�6�11,, !�itNhl'tt tlsypll>,�, Project Name Canoe Club Contact Person Scott Homewood, El Phone Number (828) 281-1447 Date 10-Jun-08 Drainage Area Number Basin 12 I0YDESIGN INFORMATION` Site Characteristics Drainage area 7,405.20 if Impervious area 5.522.00 ft2 Percent impervious 0.75 % Design rainfall depth 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth 2.16 in 1-yr, 24-hr intensity 0.09 infhr Pre -development 1-yr, 24-hr runoff volume f131sec Post -development 1-yr, 24-hr runoff volume t131sec Pre/Post 1-yr, 24-hr peak flow control it3lsec Storage Volume: Non -SR Waters Minimum design volume required 437.00 0 Design volume provided 449,00 it3 Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoli ft3 Minimum volume required ft3 Volume provided it Soils Report Summary Soil type silty sands Infiltration rate 2.40 inlhr SHVJT elevation not detected fmsl Basin Design Parameters Drawdown time 0.73 days Basin side slopes NIA :1 Basin bottom elevation 3,467.60 fmsl Storage elevation 3,467.60 fmsl Storage SA 211.38 ft2 Top elevation 3,471.10 fmsl Basin Bottom Dimensions Basin length 22.25 ft Basin width 9.50 ft Bottom SA 211.38 tt2 OK for non -SR waters OK OK #VALUE! Form SWdo Llnfiluafion Basin-F:ev,2 6007047 Supplement_ Intiltrationl3asin_Basin 12..Is Parts I, A 11. Design Summary, Pago 1 012 Permit 6007047 Infiltration Basin 1 2-Pipe L Additional Information Total runoff volume captured by basin 0.06 ac-in OK Length of vegetative i ter for overflow 48.33 it OK Distance to structure 26.41 It OK Disiancallrom surface waters 30.85_ ft OK for non -SA waters Distance from water supply well(s) 310.00 It OK Separation from impervious soil layer 4.50 ft OK Naturally occu6ng soil above shwt not detected it OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Catch Basin (to be provided by DINO) Ferri SW401 dnfiltration Basin -Rav2 6007047 Supple men I_ InfovaI!onBasin_ Basin 12.ris Parts I. A 11, Design Summary, Page 2 of 2