Loading...
HomeMy WebLinkAboutSW4200301_Add Info Request_20200327ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director Thomas S. Speight, PE Bateman Civil Survey Company 2524 Reliance Ave. Apex, NC 27539 NORTH CAROLINA Environmental Quality March 27, 2020 Subject: Request for Additional Information Stormwater Permit No. SW4200301 Haw Village Alamance County Dear Mr. Speight: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on March 11, 2020. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: The applicant name in Section III. La. of the SWU-101 application is Haw Village, LLC, while the company name listed on the NC Secretary of State verification is Haw Village NC, LLC. Please revise the application to match the proper company name. 2. The project name on the application is "Haw Village", while the Supplement EZ form lists it as "Haw Village Phase II". Please adjust one of these documents so that the names are the same. 3. Please provide a post -construction grading plan showing at least the grading of the road and the roadside ditches. 4. Please provide a detail of the proposed ditches that shows at least their cross sections, side slopes, and vegetative cover. 5. Please provide calculations for the roadside ditches and any other vegetative conveyances to show that they will not erode during the peak flow rate from the 10-year storm event. 6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: https://edocs.deq.nc.gov/Forms/SW ProjectSubmittal D E Qbi�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 vOry rN Cx:40:.itiA � o .—Io E�.w��,�.���a�:r� /� 919.707.9200 Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to April 26, 2020, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW4200301 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen@ncdenr.gov or (919) 707-3649. Please note that due to the ongoing Covid-19 pandemic, I will be teleworking and will be most easily reached by email. Sincerely, Corey Anen Environmental Engineer Stormwater Program cc: Winston-Salem Regional Office