Loading...
HomeMy WebLinkAboutNCC202708_NOI Application_20200626Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/24/2020 9:46:38 AM (NCG01 NOI Submission) Approve by Farkas, Jim J 6/25/2020 3:56:50 PM (Review- Construction NOI 27414) • The task was assigned to Farkas, Jim J by round robin distribution 6/24/2020 9:47 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: June 26, 2020 5:00 PM. The priority is: High 6/24/2020 9:47 AM Submit by McCoy, Suzanne 6/26/2020 11:09:09 AM (Payment Verification for NCC202708) * David J Dellario • McCoy, Suzanne assigned the task to McCoy, Suzanne 6/26/2020 11:08 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 6, 2020 5:00 PM. The priority is: High 6/25/2020 3:57 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting f• No an NOI that was r Yes rejected before? 1a. Project Name * Marshall CAMA CAP Pilot Well Installation 1 b. Specific Lot This field nay be used to list specifc lot nunbers. Numbers 2. County* Catawba 3. Highway or Street 8202 E. Highway 150 Address* Street narre only is acceptable if no address number assigned yet 4. City or Township* Sherrils Ford 5. State * NC 6. Zip Code * 28682 7. Latitude* Enter the latitude in decirral degrees 35.5966 8. Longitude* Enter the longitude in decir al degrees (NALIST be negative) -80.9718 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/09/2020 Estimated Construction Project Start Date 10. Date to End * 03/30/2022 Estimated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial Cassification for Leveloprrent 12. Acres to be 14.10 disturbed* (including off -site borrow and waste areas) 13. Total site area 1,709.00 (acres) * 14. Post- 2.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-CATAW-2020-Marshall CAMA CAP Pilot Well Installation Tracking ID Assigned autorraticaly Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Catawba River (Lake Norman below Waterbody* elevation 760) %rre of waterbody into which storrrwater runoff will discharge 15b. Waterbody 11-(75) Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Carolinas, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * David IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Dellario It Corporation, enter F;bgistered Agent Last %ne 3b. Title Project Director 4. Permitee E-mail david.dellario@duke-energy.com Address* 5. Permittee 980-242-1764 Telephone No.* 6. Permittee Mailing Street Address Address* 526 South Church Street Address Line 2 City State / Rovince / Pbegion Charlotte NC Fbstal / Zip Code Country 28202 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 526 South Church Street Address Line 2 City State / Frovince / Region Charlotte NC Fbstal / Zip Code Country 28202 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Project Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Chris Contact - First Name * 2. Primary Site Randazoo Contact - Last Name * 3. Title Field Support Professional 4. Site Contact E- chris.randaao@duke-energy.com mail Address* 5. Site Contact 704-999-7661 Telephone No. 6. Organization Duke Energy Carolinas, LLC Name 7. Site Contact Street Address Mailing Address* 8202 E. Highway 150 Address Line 2 city Sherris Ford Postal / Zip Code 28682 8. Consultant Name (Optional) First and Last narre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Province / Region NC Country United States D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/17/2020 Approved * 2. E&SC Plan Project CATAW-2020-017 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan Marshall CAMA CAP Pilot Well Installation (CATAW- Approval letter or 278.1KB 2020-017) approval.pdf Grading Permit Mast be FDFfon-rat 6. Site Location Map Helpful for linear project review (Optional) Mast be PDFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. Reference NOI application 27280 Project ID - NC-CATAW-2020-Marshall CAMA CAP Well Installation 8. NOI Certification Marshall CAMA Pilot Well Program.pdf 40.07KB Form Mast be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * David Dellario Title Director of Projects CCP West Organization Legally Plesponsible Entity Duke Energy Carolinas, LLC Date * 06/24/2020 F. Tracking and COC Info NOI Tracking No. 27414 NC Reference No. NCG01-2020-2708 Uses 'count number' variable (incremrented by SP) Certificate of NCC202708 Coverage (COC) Uses 'count number' variable (incremented by SP) No.* Count Number 2708 Sequential number for submittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.)