LETTER OF APPROVAL
Eastwood Construction Partners, LLC
ATTN: Jeff Creighton, Vice President of Construction
3980 Premier Dr., Suite 120
High Point, NC 27265
RE: Project Dame: Magnolia Glen Phase 2A (Lots 13-20, 39-46, 107-111)
Acres Approved: 3.79
Project ID: ALAMA-2020-033
County: Alamance
City: Mebane
Address: Old Hillsborough Rd.
River Basin: Cape Fear
Stream Classification: WS-V; NSW - Jordan Lake Watershed
Submitted By: Eastwood Construction Partners, LLC
Date Received by LQS: May 19, 2020
Plan Type: Revised
Dear Mr. Creighton:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues
this Letter of Approval. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129. Should the plan not perform adequately, a revised plan will be required
(GS. 113A-54.1) (b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form maybe accessed at de.nc. ov NCG 1. Please direct questions about the NOI form
to Annette Lucas at.A, pnette,lucas@ncdenr,gov or Paul Clark at Paul.clark@ncdenr. . After you
submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a
$100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office staff in Raleigh.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Winston-Salem Regional Office I 4S0 West Hanes. Mill Road, Suite 300 I: Winston-Salem, North Carolina Z7105
336,776,960.0
Letter of Approval
Eastwood Construction Partners, LLC
June 3, 2020
Page 2 of 2
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and .adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application
fee. You are requested to file an amended form if there is any change in the information included
on the Form. In addition, it would be helpful if you notify this office of the proposed starting date
for this project. Please notify us if you plan to have a preconstruction conference. Your
cooperation is appreciated.
Sincerely,
2' cha Lentz, El
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: WSRO file
ROY COOPER.
G"eernw
M1CHAEL S. REGAN
seamy
WAN. WRENN
Aar'. 601redw
NORTH CAROtLINA
�nri`mnmer;ItQiQErallty
June 3, 2020
LETTER OF APPROVAL
Eastwood Construction Partners, LLC
ATTN: Jeff Creighton, Vice President of Construction
3980 Premier Dr., Suite 120
High Point, NC 27265
RE: Project Name: Magnolia Glen Phase 2A (Lots 13-20, 39-46,107-111)
Acres Approved: 3.79
Project ID: ALAMA-2020-033
County: Alamance
City: Mebane
Address: Old Hillsborough Rd,
River Basin: Cape bear
Stream Classification: WS-V; NSW - Jordan Lake Watershed
Submitted By: Eastwood Construction Partners, LLC
Date Received by LQS: May 19, 2020
Plan Type: Revised
Dear Mr, Creighton:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues
this Letter of Approval. This plan approval shall expire three (3) years following the date of
approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC
4B .0129. Should the plan not perform adequately, a revised plan will be required
(G,S, 113A-54.1) (b).
As of April 1., 2019, all new construction activities are required to complete and submit an
electronic Notice of intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOl form may be accessed at deq,nc,gov/NCG01. Please direct questions about the NOI form
to Annette Lucas atAnnette.lucas@ncdQnr,gov or Paul Clark at Paul elarkC�ncdenr,gov. After you
submit a complete and correct NOl Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a
$100 fee will soon be charged annually. This fee is to be sent to the DRMLR Storrnwater Central
Office staff in Raleigh.
y
.mM raia,sary
North Carolina Department of Environmental Quality I DIvislon o€'Energy, Mineral and Land Resources
Winston-Salem Regional Office 1 450 West HanesMill.Road, Suite 3001 Winston-Salem, Borth Carolina 7.7105.
336.776.9$00
Letter of Approval
Eastwood Construction Partners, LLC
June 3, 2020
Page 2 of 2
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved USC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and _adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113,E-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval dries not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application
fee. You are requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed starting date
for this project. Please notify us if you plan to have a preconstruction conference. Your
cooperation is appreciated.
Sincerely,
i
Zacha Lentz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: WSRO file