HomeMy WebLinkAboutNCC202418_ESC Approval Submitted (3)_20200615Letter of Approval with Performance Reservation
4710 Holdings, LLC
ATTN: Mr. Victor Workman
April 30, 2020
Page 3 of 3
Enclosures: NPDES NCG01 Fact Sheet
Performance Reservation
ec: Mr. Travis Maxwell, P.E. (tmaxwell@brooksea.com)
cc: Regional Office file
PERFORMANCE RESERVATION
Additional measures may be required - The developer is responsible for the control of sediment
on -site. If the approved erosion and sedimentation control measures prove insufficient, the
developer must take those additional steps necessary to stop sediment from leaving this site.
Each sediment storage device must be inspected after each storm event. Maintenance and/or
clean out, is necessary anytime the device is at 50% capacity. {G.S. 113A-57(3))
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities