Loading...
HomeMy WebLinkAboutNCS000581_MONITORING INFO_20190723STORMWATER DIVISION CODING SHEET NCS PERMITS PERMIT NO. � f LJ U 'v DOC TYPE ❑FINAL PERMIT i� MONITORING REPORTS ❑ APPLICATION ❑ COMPLIANCE ❑ OTHER DOC DATE ❑ Doj9 o-] YYYYMMDD DUKE ENERGY® PROGRESS File: 12520 R NC Division of Environmental Management Division of Water Quality ATTENTION: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Duke Energy Progress. LLC Roxboro 5learn Elecdric Plant 1700 Dwnut rav Road sernora. NC 27;4 i July 11, 2019 1?ECE/ 1/1z COL 2 -� Cie/yTk 20J DWR C MLES �C i1pN Subject: Roxboro Steam Electric Generating Plant National Pollutant Discharge Elimination System (NPDES) Number NCS000581 Stormwater Discharge Monitoring Report Dear Sir or Madam: In accordance with the NPDES Permit Number NCS000581 concerning the subject facility, enclosed is the Quarterly Stormwater Discharge report for Duke Energy Progress, LLC. For the 2"`' monitoring period. I certify, lender penalty of la►t,, that this docrnnent and all attachments were prepared tinder lily direction or supervision in accordance with a system designed to assure that qualified personnel properly Mather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knmvledge and belief; trite, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Please contact Ms. Lori Tollie at (336) 854-4916, if there are any questions concerning the data in this submittal. Sincerely, Tom Copolo- Manager Roxboro Steam Electric Gencrating Plant Enclosures STORN'[WATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number: NCS000581 SAMPLES COLLECTED DURING, CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from - the date the facility receives the sampling results from the laboratory.) FACILITY NAME Roxboro Electric Steam Plant PERSON COLLECTING SAMPLE(S) Scott Brooks CERTIFIED LABORATORY(S) Duke Analytical Lab Lab #_248 Roxboro Steam Electric Plant Lab Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected 00400 00530 Total Rainfall' PH TSS mold&/ r inches 1 Standard m Benchmark 6-9 100 SW -A 6/7/2019 1.6 6.86 110 COUNTY Person PHONE NO. (336) 597-6100 F NATURE OF PERM ITTEE OR DESIGNEE QUIRED ON PAGE 3. Outfall Additional Priority Pollutant Metals 00999 01079 00978 00998 01113 01118 01074 01114 01268 00982 No. Boron Ag' As Be Cd' Cr' Ni' Pb' Sb TV mg/1 mg/1 mg/1 mg/I mg/I mg/1 mg/l mg/1 mg/l mg/1 Benchmark N/A(monitor only) 0.0003 0.34 0.065 0.003 0.9 0.335 0.075 0.09 N/A(monitor only) SW -A 0.061 <0.00112 <0.001 <0.00I <0.001 0.00559 0.00441 0.0013 <0.001 <0.0002 Footnotes: Permit # NCS000580 (Part 11 Page 7 of 15) 4. For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge Form SWU-247, last revised 21212012 Page 1 of 3 is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading may be substituted for an on -site reading. S. These parameters shall he monitored only if coal or coal ash is transported through the drainage areas of these outfalls during the semi-annual monitoring period in Table 2. Footnotes : Permit # NCS000580 Part 11 Page 9 of 15 1. Hardness- dependent. Benchmark based on translation of dissolved value into total recoverable with an assumed hardness of 25 mg/I and a total suspended solids (TSS) concentration of 10 mg/l. 2. Values above the North Carolina water quality standard for mercury (12 ng/1) should be noted on the DMR but do not trigger Tier responses. Concentrations infield blanks or method blanks associated with the sample may be subtracted from the results for that sample, as long as all documentation of the adjustment is provided with the DMR. 3. if pH values outside.this range are recorded in sampled stormwater discharges, but ambient precipitation pH levels are lower, then the lower threshold of this benchmark range is the pH of the precipitation (within instrument accuracy) instead of 6 S.U. Readings from an on -site or local rain gauge (or local precipitation data) must be documented to demonstrate background concentrations were below the benchmark pH range of 6- 9. Does this facility perform Vehicle Maintenance Aetivities using more than 55 gallons of new motor oil per month? _yes _X_no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 1 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage moldd/ r MG inches m mgA unit gallmo Form SWU-247, last revised 21212012 Page 2 of 3 STORM EVENT CHARACTERISTICS: Date 6n12019_ Total Event Precipitation (inches): 1.6 Event Duration (hours): (only if applicable — sec permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." -- `//(`r1A_ (Signature of 0 (116 LN (Date) Form SWU-24T last revised 21212012 Page 3 of 3