Loading...
HomeMy WebLinkAboutNCS000325_COMPLETE FILE - HISTORICAL_20190517STORMWATER DIVISION CODING SHEET -:.-. RESCISSIONS . PERMIT NO. N l.S ODD, DOC TYPE COMPLETE FILE- HISTORICAL DATE OF RESCISSION YYYYMMDD RA"', FEHRGRA ENGINEERING & ENVIRONMENTAL UPS Tracking No. 1Z 651 395 03 5536 2297 May 13, 2019 Division of Water Quality Attention: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVED MAY 17 2019 CENTRAL FILES 01NR SECTION Re: Storm Water Discharge Outfall (SDO) Monitoring Report - April 2019 Patch Rubber Company 100 Patch Rubber Road Weldon, North Carolina 27870 NCS000325 Dear Sir/Madam: Enclosed please find the Storm Water Discharge Outfall (SDO) Monitoring Report for storm water discharge from the above -referenced facility for April 2019. { Please note the following: • Storm water samples were collected during a representative storm event on u April 2, 2019. • The results for zinc are above the facility's permit benchmark for both Outfall No. 001 N and Outfall 002 S. • The facility has already implemented its Tier II response and will continue monthly storm water inspections, analysis, and reporting. If you have any questions regarding these documents, please do not hesitate to contact this office. Sincerely, a'N AJ -WIULAJ Amy L. Trimble, CHMM Environmental Scientist ALT: d ld Enclosures cc: Mr. Marto Carter, Patch Rubber Company (with Enclosures) 0:IPatch Rubber Compary\19-105113A Final119-105 - NC Division of Water Quality - 2019-05-13 - April 2019 Storm Water 5D0 Report.docx 221 E. Main Street I Suite 200 1 Freeport, IL 61032 1 p:815.235.7643 1 f:815.235.4632 J www.fehr-graharn.com Insight. Experience. Results. STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000325 SAMPLES COLLECTED DURING CALENDAR YEAR: 2012 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITYNAME Patch Rubber Company PERSON COLLECTING SAMPLE(S) CERTIFIED LABORATORY(S) M r i t Prh T.a h Lab # Lab # Part A: Specific Monitoring Requirements COUNTY Halifax PHONE NO. 2( 52)53b-2574 SIGNATURE OF PER.MITTEE OR DESIGNEE REQUIRED ON PAGE 2. i, eSample 1: CoHected' I E I , 1 1 1 i �GTin-M . Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_ yes Xno (ifycs, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Reuuirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appL) Non -polar O&GM-H ' (Method 1664 • SGT-HEM); M aos)L 'Total Suslxnded Solids - . pH New Motor On Usage mo/dd/-Yr MG Inches MZA unit al/mo• Form SWU-247, last revised 21212012 Page l of 2 STORM EVENT CHARACTERISTICS: Date 04/02/2019 Total Event Precipitation (inches): 0.13 Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry or the person or persons who manage th tem, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge ief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possi icy fines and imprisonment for knowing violations." of Permittee) (Date) Form SWU-247. last relrscd 21212012 Page 2 of 2 Meritech, Inc. Environmental Laboratory Laboratory Certification No. 165 Revised Date: 412412019 Contact: Amy Trimble Report Date: 4/17/2019 Client: Fehr Graham NPDES #: NCS000325 221 E Main St Project: Patch Rubber Co. Freeport, IL 61032 Date Sample Rcvd: 4/3/2019 Meritech Work Order # 04031982A Sample: OF 001 N Grab 4/2/19 Parameters Results Analysis Date Reporting Limit Method COD 45 mg/L 4/9/19 15 mg/L EPA 410.4 Zinc, total 0.952 mg/L 4124119 0.010 mg/L EPA 200.7 Meritech Work Order # 04031983 Sample: OF 002 S Grab 4/2/19 Parameters Results Analysis Date Reporting Limit Method COD 60 mg/L 4/9/ 19 15 mg/L EPA 410.4 "Zinc, total 0.133 mg/L 4124119 0.010 mg/L EPA 200.7 I hereby certify that I have reviewed and approve these data. Laborat ry Representative 642 Tamco Road, Reidsville, North Carolina 27320 tel.(336)342-4748 fax.(336)342-1522 s.s.mrr Chain of Custody Record (COC) IVPDES#: 5QCQ3a5 Client:r- _=YY � Phone: L-gn)a35 7�� _ — -- Address: a3E. rpain .5f: Fax: (015) a35-4tv_;a' Email: moa•►'ffebried Pa h"rrO_bbracfrm. corn � {` ICF-_�, Project: PqhGh Aubbe-r C'.app2ny PA:#: Attention: m T Turn AroundTlme' How would you like your report sent? 'RUSH work needs prior approval. Circle all that apply: Email referred) , Fax, Mail Std 10 days) 3 - 5 Days 24 - 48 Hrs ME CITE H NC. 1 ENVIRONMENTAL LABORATORIES ,+ 642 Tamco Rd. Phone: 336-342-4748 Reidsville NC 27320 Fax: 336-342-1522 Email: info@meritechlabs.com www.meritechlabs.com Sample Location and/or ID # Sampling Dates &Times Person Taking Sample (Sign/print): _ Lab Usei Only Start End Comp? Grab? Hof Cont. Test(s) Required -on ice? Yes / No pH OK? Cl OK? Date - Time Date Time aF aoa ,:,_. p 4 (-0 is k'"APmGr I a � Temperature Upon Receipt: i Method of Shipment: "" Dechlorina#ion (<0.5 Rpm of Ammonia, Cyanide, Phenol and TKN samples must be done in the field riar to preservation.' Comments: - Compositor # ❑ UPS Jug # ❑ Fed Ex Are these results for regulatory purposes? Yes D� No ❑ Report results in: ' mg/L ba mg/kg ❑ ug/L ❑ ❑ Hand Delivery Relinqui he b Date: Time: 3 Received y: a Time: ® Other L Relinquiste: Time: sus R ve by: Date: Time: elinquished by: Date'. Time: Receiv b -Cdja: j' tDStTim J ry NCDENR Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidanceonfilling out thisform,please visit. httjr%jnortal.ncilenr.on;jkYcllfy %v jsii/nbilessw#eah- Permit No.: /S,/ /Q/ Q/4/ 3 /2 / 5/ or Certificate of Coverage No,: D,/f./ 1-J- /_/—/_--/—% I~acilityName: .-Patch Rubber Com n County: Halifax Phone No. 252-536-2574 Inspector:._ NAac Date of Inspection:"��� Time of Inspection: _ 0 ._ tYti ... - Total Event Precipitation (inches):• 0 . \ 3 PH Se.5 Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) Yes ❑ No Please•verify whether Qualitative Monitoring -must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, I some permits do not have this requirement. Please refer to these definitions, if applicable. A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least. 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I certify that this report is accurate and complete to the best of my knowledge: A%C (Signature of Pert iittee or Designee) Page 1 of 2 SWU-242, Last mcd4Cied 10/25/2012 .Outfall Description: Outfall No. 001 . Structure (pipe, ditch, etc.) _Concrete pipe _ Receiving Stream:. Unnamed tributary to Roanoke River _ Describe the industrial activities that occur within the outfall drainage area: North parking lot:, roof _drains Z. Color: Describe the color of the -AID 3. 4. Clarity: Choose the mimher which hest descrihes the clarity of the discharge, where 1 is clear and 5 is very cloudy: s 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: j. 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended 1, solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: t J 2 3 4 5 s 7. Is there any foam in the stormwater discharge? Yes a 8. Is there an oil sheen in the stormwater discharge? Yes 9. Is there evidence of erosion or deposition at the outfall? Yes . f 10. Other Obvious indicators of Stormwater Pollution: List and describe Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/depc may he indicative of poIIutaitt exposure. 'These condii:ions warrant furtllrr invesQati Page 2 of 2 swU•242,Lastmodified 10/25/2012 NCDENk Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Forguidanceonfrllingout thisform,please visit: 1iT5l3:%��lortal.ricdeilr;ciie/avcb(wn/wsjsujiiiicl�ssw#tnb�t Permit No.: or Certificate of Coverage No.: Facility Name: Patch Rubber _Company County: Halifax Phone No. 252-536-2574 Inspector: Date of Inspection: Time of Inspection:. Total Event Precipitation (inches):- O .V3"_ e4 � is Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit? (See information below.) ®, Yes ❑ No Please verify whether Qualitative Monitoring must be performed during a "representative storm event" or "measureable storm event" (requirements vary, depending on the permit). Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be performed during a "representative storm event" or during a "measureable storm event." However, Ii some permits do not have this requirement. Please refer to these definitions, if applicable. 1 A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. i A "measurable storm event" is a storm event that results in an actual discharge from the permitted site outfall. The previous measurable storm event must have been at least 72 hours prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter interval is representative for local storm events during the sampling period, and the permittee obtains approval from the local DWQ Regional Office. By this signature, I s erti�-fIiat t1lis report is accurate and complete to the best of my knowledge: tune of Perm6ee or Designee) Pagel oE2 swU-242, last modified 10/25/2012 1. Outfall Description: Qutfall No. 002 Structure (pipe, ditch, etc.) Concrete pipe Receiving Stream: Unnamed. stributar ito ,Roanoke River Describe the industrial activities that occur within the outfall drainage area: - Roof drains 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: - N 1A 3. Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): - 4. Clarity: Choose the number which best describes the clarity of the discharge, where I is clear and 5 is very cloudy: ® 2 3 4 5 S. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: Q) 2 3 4 5 b. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: b 2 3 4 5 7. Is there any foam in the stormwater discharge? Yes 8. Is there an oil sheen in the stormwater discharge? Yes !a . 9. Is there evidence of erosion or deposition at the outfall? Yes iVo 10. Other Obvious Indicators of Stormwater Pollution: List and describe iV \A-% Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition may be inw.licative oof iioliutant exposure. 'I'hcse condiflons warrant ffi—ri er investigation. Page 2 of 2 SWU-242, Last modified 10/25/2012