Loading...
HomeMy WebLinkAboutNCS000325_COMPLETE FILE - HISTORICAL_20190411STORMWATER D1VI510N 60DING -SHEET-..- . RESCISSIONS. PERMIT N0. DOC7YPE 1� COMPLETE FILE =HISTORICAL DATE OF RESCISSION ❑ � � I � � l I I YYYYMMDD STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000325 FACILITY NAME Patch Rubber Company PERSON COLLECTING SAMPLE(S) Not applicable CERTIFIED LABORATORY(S) Lab # Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Halifax PHONE NO. 2( 52 )536-2574 iREO ATURE OF PERMITTEE OR DESIGNEE UIRED ON PAGE 2. Outfall Date Sample ollected II 1 TotalNo. Rainfall 11 ` 11 " w FENTRAL Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _yes X no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH- New Motor -Oil Usage moldd/vr MG i inches m m /l unit gallmo Form S WU-247, last revised 21212012 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): N/A Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that 4'6nilficd`per-soniiel propefly g—ntlier.and'eva'16ate'the informntion submitted: Based on my Inquiryof the person or persons who mattiage the ern, nr;those persaris dlreclly:res}�anslble. for gatFicring:thc;lnformatlon, theinformatlan submitted is, to the best ormy,know_ led` Is cf; true, aecuia#e, sled complete: I i'in aware that there "ere slgril[Icanfpenaitles for submitting false Information, Including the ility ncs:and ltnprisonment for knowing vialationA"1-5 The Facility was unable to collect the required samples from a "Representative Storm Event" For the month of March 2019 "No Flow" Form SWU-247, lost revised 21212012 Page 2 of 2 FEHRGRAt"',�M ENGINEERING & ENVIRONMENTAL UPS Tracking Number: 1 Z 651 395 03 5711 8502 April 3, 2019 North Carolina Division of Air Quality Attention: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RE: Storm Water Discharge Outfall (SDO) Monitoring Report - March 2019 Patch Rubber Company 100 Patch Rubber Road Weldon, North Carolina 27870 NCS000325 Dear Sir/Madam: Enclosed please find the Stormwater Discharge Outfalt (SDO) Monitoring Report for storm water discharge from the above -referenced facility for March 2019. Please note the following: • The facility was not able to collect the required samples from a "Representative Storm Event" for the month of March 2019. • The facility will continue monthly collection of storm water samples for analysis. If you have any questions regarding these documents, please do not hesitate to contact this office. Sincerely, a -rot TA�)YnU-0 Amy L. Trimble, CHMM Environmental Scientist ALT:mns Enclosure cc: Mr. Marto Carter, Patch Rubber Company (with enclosure) 0:1Patch Rubber Company119.1051PA Finai119-105 - NC Div of Water Quality - 2019,04.03 - Storm Water SDO March 2019.docx 221 E. Main Street I Suite 200 1 Freeport, IL 61032 1 p:815.235-7643 I f:815.235.4632 I www.fehr-graham.com Insight. Experience. Results.