Loading...
HomeMy WebLinkAboutNCS000325_COMPLETE FILE - HISTORICAL_20190213FEHRGRAm 'I ENGINEERING & ENVIRONMENTAL Certified Mail No. 7019 0140 0000 6059 3522 Return Receipt Requested February 6, 2020 Division of Water Quality Attention: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 RECEIVED FEB 19 2019 CEWFRJ L FILE—D DWR SECTiOT.I RE: Stormwater Discharge Outfall (SDO) Monitoring Report - January 2020 Patch Rubber Company 100 Patch Rubber Road Weldon, NC 27870 NCS000325 Dear Sir/Madam: Please find enclosed the Stormwater Discharge Outfall (SDO) Monitoring Report for storm water discharge from the above -referenced facility for January 2020. n Please note the following: • The facility was not able to collect the required samples from a "Representative Storm Event" for the month of January 2020. • The facility will continue monthly collection of storm water samples for analysis. If you have any questions regarding these documents, please do not hesitate to contact this office. Sincerely, amd -FA�-fmu-t� Amy L. Trimble, CHMM Environmental Scientist ALT:dep Enclosure cc: Mr. Marto Carter, Patch Rubber Company 0:1Patch Rubber Company120-105 - Environ. Outsourcing Annuai\PA Final120-105 Patch Rubber Co. - 2020.02.06 - Storm Water SDO January 2020 tetter.docx 221 E. Main Street I Suite 200 1 Freeport, IL 61032 1 p:815.235.7643 I f:815.235.4632 I www.fehr-graham.com insight. Experience. Results. STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000325 FACILITYNAME Patch Rubber Company PERSON COLLECTING SAMPLE(S) Not applicable CERTIFIED LABORATORY(S) Lab # Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: 2020 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Halifax PHONE NO. 2( 52 )536-2574 aREO ATURE OF PERMITTEE OR DESIGNEE UIRED ON PAGE 2. Outfall No. Date Sample Collected II I Total Flow (if no . • •� • • it is Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month?_ yes Xno (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected 50050 00556 00530 00400' Total Flow (if applicable) Total Rainfall Oil & :Grease (if appL) Non -polar :: O&G/TPH ; (Method 1664� SGT-HEM);' if'. a 1. Total' Suspended ,: Solids' pl-I New Motor +Oil.Usage mo/dd/ r MG inches m C ni l unit al/mo Form SWU-247, last revised 21212012 Page l of 2 STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): N/A Event Duration (liours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 1UU 02/07/2020 (Signature of Permittee) (Dnte) The Facility was unable to collect the required samples from a "Representative Storm Event" for the month of January 2020 "No Flow" Form SWU-247, last rrvised 21212012 Page 2 of 2