Loading...
HomeMy WebLinkAboutNCS000022_COMPLETE FILE - HISTORICAL_20190509-" STORMWATER DIVISION CODING SHEET RESCISSIONS. PERMIT NO.. DOC TYPE C� COMPLETE FILE =HISTORICAL DATE OF RESCISSION ❑ ��I / ��v� WYYMMDD i STORMWATER DIVISION CODING SHEET .NCG PERMITS PERMIT NO. NCGNE DOC TYPE ❑ HISTORICAL FILE DOC DATE ❑ YYYYM M DD Global Nuclear Fuel Karen Williams EHS Specialist 3901 Castle Hayne Road P,O. Box 780 Wilmington, NC 28402 USA C:910-547-2758 _ Karen.williams@ge.com GNV Global Nuclear Fuel May 1, 2019 RpG�lV Central Files�tY� Division of Energy Mineral and Land Resources 9 20, Attn : Central Files cFN).. 1617 Mail Service Center WR SECTS S Raleigh, NC 27699-1617 Subject: Stormwater Discharge Outfall (SDO) Monitoring Form GE —Wilmington, NC Permit Number: NCS000022 Attached is the semi-annual Stormwater Monitoring Report for the GE 1 GNF-A Facility in Wilmington, NC for the first half of 2019. The sampling was performed during a measurable rain event on 4/2/2019 and the data was received from the lab on 4/15/2019. There were three minor spills this reporting period. None of the leaks involved hazardous materials and one required a 24-hour notification do the DEMLR Regional Office Located in Wilmington, NC. These leaks are summarized on the attached Appendix 1. If you have any questions or need additional information, please call me at 910-547-2758 or karen.williams(o)ge.com. Sincerely, GI bal Nuclear Fuel - Americas IA'�,&ZM66=1-1 7aren Williams Environmental Specialist Attachments: Original plus one copy Glooal Nuclear Fuel Date Page 2 Appendix 1: 15t Half 2019 Leak Summary During this stormwater reporting period, we've experienced three releases that are reportable per the site permit NCS000022. These leaks were primarily small quantity oil spills. Spill No. 1 On Friday, February 8, 2019 at -8:15, GE Security observed a tractor trailer across the street from the main GE plant, near the GE owned ball field, had leaked --1 gal of oil. The leak which was coming from the engine of a tractor trailer which had parked in the lot for - 4.5 hours. The oil stained dirt was removed. The spill was not reported per the permit as it was <25 Gal and cleaned up within 24 hours. Spill No. 2 On Thursday, March 7 at --8:00 a.m., a small area on the asphalt -3'x2' in diameter, outside of FGE facility had an oil -like sheen to it. The sheen was believed to be caused by a piece of . discarded equipment containing residual oil that had been disposed into a scrap metal dumpster. The spill was <25 Gal and was cleaned up immediately. Spill No. 3 In summary, Duke Energy Progress, during inspection of site power lines and transformers, on or around the week of April 81h, notified a GNF Electrician that a pole transformer was leaking. After the transformer was replaced by Duke Energy Progress on April 291h, evidence of an oil spill between 10 and 15 gallons, below the transformer area was communicated to GNF Facilities Management and the Environment, Health and Safety group. A 24-hour notification was made to Mr. Dan Sams at 2:39 p.m. on April 30th followed -up with a 5-day written notification. On May 111, the impacted soil was removed and will be transported and disposed of in accordance with regulatory requirements. GE-Klaetw Nuclear Energy STORMWATER DISCHARGE OUTFALL (SDO) Permit Number NCS NCS000022 FACILITY NAME Global Nuclear Fuels — Americas LLC PERSON COLLECTING SAMPLE(S) CERTIFIED LABORATORY(S) SGS Accutest _Lab # 573 Lab # Part A: Specific ,Monitoring Requirements MONITORING. REPORT SAMPLES COLLECTED DURING CALENDAR YEAR: 2019 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY New Hanover PHONE NO. ( 910 )547-2758 SIGNATURE OF PERM I'rrEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall No. Date Sample Collected 50050 01051 00530 1 00552 00400 Total Flow (if app.) Total Rainfall Lead, Total Recoverable Total Susp. Solids on -Polar Oil & Grease pH mnlrlrl/vr MC I inehPc mall malt Mot] 4/02/2019 1.26 0.002 <4.0 <5.0 7.3 9 Duplicate 1.26 0.002 <4.0 <5.0 7.3 13i 1.26 <0.001 4.0 <5.0 7.2 15i 1.26 <0.001 <4.0 <5.0 6.9 Does this facility perform Vehicle Maintenance Activities using more than 55 Gallons of new motor oil per month? _yes X No (if yes, complete Part B) Part B: Vehicle Maintenance Activity Mon' f?utfall I Date I 50050 00556 00530 l omoo No. Sample Total Flow Total Oil & Grease Non -polar Total pH New Motor Collected (if applicable) Rainfall (if appl.) O&G/TPH Suspended Oil Usage (Method 1664 Solids SGT-HEM), if appl. Form SWU-247, lust revised 6/12/2015 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 04/02/2019 Total Event Precipitation (inches): 1.26 Event Duration (hours): 12 (only if applicable —see permit.) 1617 (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only il'applicable — see permit.) Mail Original and one copy to: Division of Energy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699- "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Pernuttee) Ay-3 2o(I (Date) Form SWU-247, lust revised 611212015 Paoc 2 of 2