Loading...
HomeMy WebLinkAboutNCC202356_ESC Approval Submitted_20200611ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 2, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATION Buncombe County Board of Education ATTN: Mr. Timothy Fierle 175 Bingham Road Asheville, NC 28806 RE: Project Name: Haw Creek Elementary School Renovations and Addition Acres Approved: 1.67 Project ID: BUNCO-2020-020 County: Buncombe City: Asheville Address: Bethesda Road River Basin: French Broad Stream Classification: Haw Creek - C Submitted By: Mr. Robert Daniel Hyatt, RLA Date Received by LQS: May 18, 2020 Plan Type: Institutional Dear Mr. Fierle, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Performance Reservation. The performance reservation is attached. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucasCtncdenr.gov or Paul Clark at D_E Q North Carolina Department of Environmental Quality J Division of Energy, Mineral and Land Resources Asheville Regional Office 12090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 NOPiH CAflOUmN o:p.nm.moienmnmonm amu� 828.296.4500 Letter of Approval with Performance Reservation Buncombe County Board of Education ATTN: Mr. Timothy Fierle June 2, 2020 Page 2 of 3 Paul.clark(@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved USC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S.113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. S' rris a Assi tant Regional Engineer Division of Energy Mineral and Land Quality Letter of Approval with Performance Reservation Buncombe County Board of Education ATTN: Mr. Timothy Fierle June 2, 2020 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Performance Reservation ec: Mr. Robert Daniel Hyatt, RLA rhyattC@wadetrim.com cc: Regional Office file PERFORMANCE RESERVATION Please note that the developer is responsible for the control of sediment on -site. If the approved erosion and sediment control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out is necessary anytime the device is at 50% capacity. {G.S.113A-57(3)). Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities