Loading...
HomeMy WebLinkAboutNCC202256_ESC Approval Submitted_20200603ROY COOPER Governor MICHAEL S. REGAN Secretary Brian Wrenn Acting Director NORTH CAROLINA Environmental Quality May 13, 2020 LETTER OF APPROVAL Steeplegate Village, LLC Attention: Christopher Lyons, Partner 5826 Samet Drive Suite 105 High Point, NC 27265 RE: Project Name: Steeplegate Village Phase 2 Project ID: RANDO-2020-017 Total Acres: 19.75 County: Randolph River Basin: Yadkin -Pee Dee Project Location: Finch Farm Rd - Trinity Submitted By: Hugh Creed Associates Date Received by LQS: May 13, 2020 Plan Type: Residential — Express - New This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land -disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land -disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. Please note additional information may be requested during the review of your ESC plan, and ESC plans are reviewed in the order received. North Carolina Department of Environmental Quality d Division Energy, Mineral and Land Resources Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1Winston-Salem, North Carolina 27105 "� 336-776-9800 Cc: Be advised the NC Construction General Permit (also known as "NCGO1 ") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process, after the soil erosion and sediment control plan approval is issued. For assistance and guidance with the revised 2019 NCGO1 (Construction Stormwater General Permit NCGO10000) as adopted on April 1, 2019, please use the following link: https://deq.nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- permits/stormwater-permits/construction-sw If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your cooperation in this matter is appreciated and we look forward to working with you on this project. Hugh Creed Associates PO Box 9623 Greensboro, NC 27429 Sincerely, ScottSink Assistant Regional Engineer Land Quality Section