Loading...
HomeMy WebLinkAboutNCC192937_Modification Review_20200522Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 5/22/2020 11:19:32 AM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany 5/22/2020 11:58:11 AM (Construction COC ADD TO FILE Review- NCC192937) • The task was assigned to Georgoulias, Bethany. The due date is: May 27, 2020 5:00 PM 5/22/2020 11:19 AM Y . Ta4M1 NORTH CAPOLINA EnYlrenmemf& Qualay Certificate of NCC192937 Coverage (COC) Enter the Certificate of Coverage Ninber (Use capital letters) No.* Information associated with this permit Project Name Duke Cedar Cliff IDF and Spillway Upgrade Address Canada Road, Tuckasegee, NC County Jackson Latitude 35.2570 Longitude -83.1050 Permittee Listed Duke Energy Carolinas, LLC Legally Responsible Jon Wise Individual NC Reference No. NCG01-2019-2937 E&SC Plan ID JACKS 2020-003 Original NOI 18816 Tracking No.* Date COC Issued* 12/03/2019 Prior Rescission This field will populate only if COChas already been rescinded. Date Modification Information: Reason for r Closed -Out Lots/Outparcels in E&SC Plan Modification * r Additional Lots/Outparcels Approved - E&SC Revised F Other Revision(s) to E&SC Plan r Legally Responsible Individual Has Changed r Multiple Reasons (List) Addional We infornation if necessary Explanation Expanded disturbed area (1.99 acres) You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (%vised E&SCApproval, (lose -Out Doc, etc.) Documentation LOAwMPR revision 5-22-2020.docx.pdf 1.15MB Mast be FDFformat North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). 17 I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* r The Legally Responsible Individual f Authorized Responsible Person* *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature j Type Name* Ken Karably Title * Project Manager Organization* Duke Energy Date * 05/22/2020 Email Address* ken.karably@duke-energy.com Errail for confirmation Telephone Number* 980-373-6623 Contact nurrber if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email michael.little@hdr-inc.com (Optional) Additional errail for confirmation Original Permittee jon.uvise@duke-energy.com Email Original Site Contact ken.karably@duke-energy.com Email Review Date 05/22/2020 Request Date 20200522 Formatted Review Date 20200522 Formatted